E 77/2999
Register summary
- Holder
- Aurumin Mt Dimer Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 30 Aug 2022
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143275 | 2024 | Aurumin Limited | Mt Dimer | <1% | E77/2729 Surrender Report on the Mt Dimer Project for the period ending 16/04/2024. |
| A143489 | 2024 | Aurumin Mt Dimer Pty Ltd | Mount DImer | <1% | Surrender Report for E77/1992 for the period 17/04/2012 to 16/04/2024 |
| A144046 | 2024 | Aurumin Limited | Mount Dimer | <1% | Partial Surrender Report for E77/2518 Mount Dimer Project for the period ending 17/06/2024 |
| A126060 | 2021 | Polaris Metals Pty Ltd | Hunt Range | <1% | Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 10/11/2020 |
| A126208 | 2021 | Polaris Metals Pty Ltd | Hunt Range | <1% | Partial Surrender Report Hunt Rzange E77/2226 for the Period 19/1/2015 to 12/2/2021 |
111 more reports
| A124527 | 2020 | Polaris Metals Pty Ltd | Yilgarn Iron Ore Project East | <1% | Annual Report C104/2015 Yilgarn Iron Ore Project East for the period 24/6/2019 to 23/6/2020. M 77/01244,M 77/0 |
| A123794 | 2020 | Acertim Resources Ltd | Mount Dimer | 8.7% | Annual Report on the Mt Dimer Project C42/2002 for the period ending 30/3/2020 |
| A123974 | 2020 | Abrossimov A | Mount Dimer | <1% | Annual Report on the Mt Dimer Project, E77/2560 for the period 14th May 2019 to 13th May 2020 |
| A123990 | 2020 | Polaris Metals Pty Ltd | Hunt Range | <1% | Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 18/1/2020 |
| A119706 | 2019 | Golden Iron Resources Ltd | Mount Dimer | 8.7% | Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2018 to 30th March 2019 |
| A120389 | 2019 | Polaris Metals Pty Ltd | Yilgarn East | <1% | Combined Annual Report C104/2015 Yilgarn East Iron Ore Project for the period 24/6/2018 to 23/6/2019, M77/0124 |
| A116911 | 2018 | Polaris Metals Pty Ltd | Yilgarn West | 75% | Final Surrender E77/1543 Yilgarn Iron Ore West For the Period 7 August 2012 to 7 March 2018 |
| A116943 | 2018 | Polaris Metals Pty Ltd | Yilgarn East | <1% | Final Surrender P77/3948 Yilgarn Iron Ore East For the Period 7 February 2012 to 7 March 2018 |
| A117064 | 2018 | Golden Iron Resources Ltd | Mount Dimer | 14% | Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2017 to 30th March 2018, E77/01992, E |
| A117505 | 2018 | Polaris Metals Pty Ltd | Yilgarn Iron Ore (East) | <1% | Combined Annual Exploration Report Yilgarn iron Ore (East) Project, C104/2015, 24 June 2017 - 23 June 2018 |
| A118028 | 2018 | Golden Iron Resources Ltd | Mount Dimer | <1% | Final Surrender Report E77/2050 for the period 22nd October 2012 to 18th July 2018 |
| A113926 | 2017 | Golden Iron Resources Ltd | Mount Dimer | 14% | Mount Dimer Project C42/2002 Annual Report for the period 31 March 2016 to 30 March 2017, E77/01992, E77/02050 |
| A114565 | 2017 | Polaris Metals Pty Ltd | Yilgarn East | <1% | Combined Mineral Exploration Report Yilgarn Iron Ore (East) C104/2015 For the Period 24 June 2016 to 23 June 2 |
| A115053 | 2017 | Polaris Metals Pty Ltd | Yilgarn | 3.7% | Combined Annual Exploration Report for the period from 2 September 2016 to 1 September 2017 Yilgarn Iron Ore P |
| A108961 | 2016 | Toil Resources Pty Ltd | Mount Dimer | 14% | Mt Dimer Annual Report C42/2002, M77/427, M77/428, M77/965, M77/957, M77/958, E77/1992, E77/2050, P77/4081 & P |
| A109699 | 2016 | Polaris Metals Pty Ltd | Yilgarn East | <1% | Yilgarn Iron Ore East Combined Annual Mineral Exploration Report C104/2015, E77/01418, M77/01244, M77/01261, M |
| A110439 | 2016 | Polaris Metals Pty Ltd | Yilgarn West | 2.8% | C96/2015 Combined Annual Mineral Exploration Report for 2 Sept 2016 to 1 Sept 2016, E77/01543, E77/01739, E77/ |
| A105870 | 2015 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn Iron Ore Project E77/1275-I Surrender Report for the Period 1 May 2008 – 30 April 2015 |
| A107402 | 2015 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 20% | Annual Technical Report Bungalbin Hill Project C148/2012 for the period 1 July 2013 to 30 June 2014, E77/1359 |
| A106666 | 2015 | Polaris Metals Pty Ltd | Yilgarn | 1.3% | Combined Annual Report – C83/2003 Yilgarn Iron Ore Project for the period 24 June 2014 to 23 June 2015 |
| A102886 | 2014 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn Project, Final Surrender Report for the period 17/05/2012 to 15/05/2014, E77/1989. |
| A103300 | 2014 | Polaris Metals Pty Ltd | Yilgarn | 2.7% | Yilgarn Iron Ore Project E77/1738-I Final Surrender Report for the period 18 April 2011 - 15 May 2014 |
| A103460 | 2014 | Polaris Metals Pty Ltd | Yilgarn | 1.4% | Yilgarn Project, Final Surrender Report for the period 13/09/2006 to 15/05/2014, E77/1115 (Carina South). [C83 |
| A103815 | 2014 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 18% | ANNUAL TECHNICAL REPORT BUNGALBIN HILL PROJECT FOR THE PERIOD 1 July 2013 to 30 June 2014 (E77/1359) |
| A101579 | 2014 | Vector Resources Ltd | Mount Dimer | 14% | Mount Dimer Project, Annual Report for the period 31/03/2013 to 30/03/2014, M77/427-428, 957-958, & 965; E77/1 |
| A103106 | 2014 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn Iron Ore Project E77/1275-I Partial Surrender Report for the period 1 May 2008 – 15 May 2014 |
| A103605 | 2014 | Polaris Metals Pty Ltd | Yilagarn | 1.1% | Yilgarn Iron Ore Project C83/2003 Combined Annual Report for the period 24 June 2013 to 23 June 2014 |
| A103814 | 2014 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 22% | ANNUAL TECHNICAL REPORT BUNGALBIN HILL PROJECT FOR THE PERIOD 1 July 2013 to 30 June 2014, E77/1377. |
| A96312 | 2013 | Polaris Metals Pty Ltd | Yilgarn | 2.5% | Yilgarn (Iron Ore) Project, Final Surrender Report for the period 2nd May 2001 to 25th October 2012, E77/946. |
| A99730 | 2013 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 22% | Annual Technical Report Bungalbin Hill Project E77/1377 for the period 1 July 2012 to 30 June 2013 |
| A99731 | 2013 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 18% | Annual Technical Report Bungalbin Hill Project E77/1359 for the period 1 July 2012 to 30 June 2013 |
| A96309 | 2013 | Polaris Metals Pty Ltd | Yilgarn | 66% | Yilgarn (Iron Ore) Project Final Surrender Report for the period 7th February 2012 to 25th October 2012, P77/3 |
| A97618 | 2013 | Vector Resources Ltd | Mount Dimer | 16% | Mount Dimer Project, Annual Report for the period 31st March 2012 to 30th March 2013, M77/427-428, 957-958, 96 |
| A98008 | 2013 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn Project, Final Surrender Report for the period 14th March 2008 to 25th February 2013, E77/1129. |
| A99009 | 2013 | Independence Group Nl; Polaris Metals Pty Ltd | Yilgarn | 1.6% | Yilgarn Iron Ore Project Combined Annual Report for C83/2003 Reporting Period 24 June 2012 – 23 June 2013, E15 |
| A93733 | 2012 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 9th March 2012 , E77/11 |
| A93767 | 2012 | Vector Resources Ltd | Mount Dimer | 20% | Mt Dimer Annual Report C42/2002 M77/427, M77/428, M77/965, M77/957, M77/958, Report Period: 31 March 2011 – 30 |
| A94781 | 2012 | Independence Group Nl; Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn (Iron Ore) Project Annual Report for the period 24th June 2011 to 23 June 2012, E15/1196; E16/410; E7 |
| A93999 | 2012 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 1st May 2008 to 30th April 2011, E77/1275. |
| A94668 | 2012 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 18% | Annual Mineral Exploration Report, Bungalbin Hill Project E77/1359, for the period 01/04/2011 to 31/03/2012 |
| A94669 | 2012 | Imperial Resources Management Pty Ltd | Bungalbin Hill | 22% | Annual Mineral Exploration Report, Bungalbin Hill Project E77/1377, for the period 01/04/2011 to 31/03/2012 |
| A89588 | 2011 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn Project, Final Surrender Report for the period 24th June 2002 to 23rd June 2010, E77/1077. [C83/2003] |
| A90275 | 2011 | Golden Iron Resources Ltd | Mount Dimer | 21% | Mt Dimer Project, Annual Report for the period 31st March 2010 to 30th March 2011, M77/427-428 & M77/ 965. (C4 |
| A90651 | 2011 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn (Iron Ore) Project , Partial Surrender Report for the period 1st May 2008 to 30th April 2011, E77/1275 |
| A91315 | 2011 | Polaris Metals Pty Ltd | Yilgarn | 1.7% | Yilgarn (Iron Ore) Project, Annual Report for the period 24th June 2010 to 23rd June 2011, E16/370; E77/842, 9 |
| A89679 | 2011 | Polaris Metals Pty Ltd | Yilgarn | <1% | Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 13th March 2011, E77/11 |
| A89955 | 2011 | Golden Zen Pty Ltd | Mount Dimer | 33% | Mt Dimer Project, ANNUAL EXPLORATION REPORT FOR TENEMENT E77/1669 FOR THE PERIOD ENDING 17TH FEBRUARY 2011 |
| A88880 | 2010 | Polaris Metals Pty Ltd | Yilgarn | 1.4% | Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 13th September 2006 to 12th September 2010 |
| A88294 | 2010 | Polaris Metals Pty Ltd | Yilgarn | 1.4% | Yilgarn (Iron Ore)Project, Partial Surrender Report for the period 13th September 2006 to 13th September 2009, |
| A82333 | 2010 | Golden Iron Resources Ltd | Mount Dimer | 21% | Annual Report Mt Dimer Project M77/427, 428, 965 |
| A88125 | 2010 | Polaris Metals Nl | Yilgarn | 1.8% | Yilgarn (Iron Ore) Project , Annual Report for the period 24th June 2009 to 23rd June 2010, E16/370; E77/842, |
| A88351 | 2010 | Polaris Metals Pty Ltd | Yilgarn | 6.8% | Yilgarn (Iron Ore) Project, Final Surrender Report for the period 24th June 2002 to 23rd June 2010,E77/1076. |
| A82812 | 2009 | Southern Cross Goldfields Ltd | MT DIMER | <1% | MT DIMER ANNUAL REPORT FOR THE PERIOD 4 OCTOBER 2007 – 3 OCTOBER 2008 E77/1275 |
| A84365 | 2009 | Cauldron Energy Ltd; Polaris Metals Nl | Yilgarn | 1.9% | Yilgarn Project, Annual Report for the period 24th June 2008 to 23rd June 2009, E77/842, 919, 946, 1076-1077, |
| A80837 | 2009 | Scimitar Resources Ltd | Bungalbin | 23% | Bungalbin Project E 77/1106, Final Relinquishment Report for the Period 17th October 2003 to 16th October 2008 |
| A86845 | 2009 | Sullivan M P | Mount Dimer | 21% | Annual Report Mt Dimer Project M77/427, 428, 965 |
| A79425 | 2008 | Polaris Metals Nl | Yilgarn | 2.3% | Yilgarn Project, Annual Report for the period 24th June 2007 to 23rd June 2008, E77/946, 1076-1077, 1097, 1099 |
| A78007 | 2008 | Maher Mining Contractors Pty Ltd | Mount Dimer | 31% | Annual Activity Report Mining Leases M77/427 & M77/428 Period 31/03/2007 to 30/03/2008 C42/2002, Report Date 2 |
| A78033 | 2008 | Scimitar Resources Ltd | Bungalbin | 23% | Bungalbin Project E77/1106 Partial Surrender Report to the Department of Industry and Resources for the Period |
| A75975 | 2007 | Polaris Metals Nl | Yilgarn | 2.4% | Yilgarn Project, Annual Report for the period 24th June 2006 to 23rd June 2007, E77/946, E77/1076-1077, E77/1 |
| A74670 | 2007 | Scimitar Resources Ltd | Bungalbin | 23% | Bungalbin Project E77/1106 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 (Jackson) |
| A75316 | 2007 | Scimitar Resources Ltd | Bungalbin | 23% | Bungalbin Project E77/1106 Partial Surrender Report for the period 17th October 2003 to 16th October 2006 |
| A75787 | 2007 | Meridian Mining Ltd | Mount Dimer | 31% | Mount Dimer Project Annual Report Mining Leases 77/427 and 428 Period:01/01/06 - 30/03/07 |
| A71996 | 2006 | Scimitar Resources Ltd | Bungalbin | 3.8% | Bungalbin Project, E77/946,1076,1077, Combined Reporting No. C83/2003, Partial Surrender Report for the period |
| A73548 | 2006 | Scimitar Resources Ltd | Bungalbin | 3.8% | Bungalbin Project E77/946,1076-1077,1130, Combined Reporting No. C83/2003, Annual Report for the Period 24 Jun |
| A73052 | 2006 | Scimitar Resources Ltd | Bungalbin | 23% | Bungalbin Project E77/1106, Annual Report for the Period 17 October 2004 to 16 October 2005, (Jackson). |
| A70506 | 2005 | Mount Dimer Gold Mines Ltd | Mount Dimer | 31% | Mount Dimer Project, Annual report, Mining leases M77/427, M77/428, Period 01/01/04 - 30/03/05 C42/2002, Sout |
| A71351 | 2005 | Scimitar Resources Ltd | Bungalbin | 3.8% | Bungalbin Project, E77/946,E77/1076 & E77/1077, Group Reporting C83/2003, Annual Report for the period 24 June |
| A73186 | 2005 | Meridian Mining Ltd | Mount Dimer | 31% | Mt Dimer Project M77/427-428, Annual Report, Period 01/04/05 to 30/03/06, (Jackson). |
| A68664 | 2004 | Mount Dimer Gold Mines Ltd | Mount Dimer | 31% | Mount Dimer Project, Annual Report, Mining leases M77/427, M77/428, for the period 01/01/03-30/03/04 |
| A67145 | 2003 | Heron Resources Ltd | Bungalbin | 3.8% | Annual Report for the period 24 June 2002 to 23 June 2003 Bungalbin Project E77/946,1076,1077 Mt Diner Prospec |
| A66576 | 2003 | Maher Mining Contractors Pty Ltd | Mount Dimer | 31% | Annual Report period 31/03/02-30/03/03 Mt Dimer Project C42/2002: M77/427 and 428 |
| A65692 | 2002 | Heron Resources Ltd | Bungalbin | 2.5% | Bungalbin Nickel Project Exploration Licence 77/946 Mt Dimer Prospect. Annual Report 2 May 2001 - 1 May 2002. |
| A64762 | 2002 | Maher Mining Contractors Pty Ltd | Mount Dimer | 31% | Mt Dimer Project Annual Report Mining Leases 77/427 and 428 Period: 01/01/01 - 30/03/02. |
| A65130 | 2002 | Maher Mining Contractors Pty Ltd | Mount Dimer | 2.8% | Mt Dimer 2000 Annual Report On The Mining Leases M77/427 M77/428, E77/472, 510, 570, 571, 684, 685, 713 & P77/ |
| A61949 | 2001 | Tectonic Resources Ltd | Mount Dimer | 2.8% | Mt Dimer 2000 Annual Report on the mining leases M77/427, M77/428, E77/472, 510, 570, 571, 684, 685, 713 & P77 |
| A61950 | 2001 | Tectonic Resources Ltd | Mount Dimer | 3.6% | Mt Dimer 2000 Annual Report on the mining leases E77/490, 687, 691, 712 & P77/3156-3163, 3180-3183 (Northern P |
| A60474 | 2000 | Stockdale Prospecting Ltd | Y2 Follow-Up | <1% | Y2 Follow-Up (JV)Project,Final Surrender Report for the period 17/02/1986 to 28/05/1992, E77/105 & E77/162. [ |
| A59768 | 2000 | Tectonic Resources Ltd | Mount Dimer | 3.6% | Mt Dimer 1999 Annual Report on the Mining Leases E77/490,687 691,712,P77/3156-3163,3180-3183 Northern Project |
| A59769 | 2000 | Tectonic Resources Ltd | Mount Dimer/ Southern Project | 2.8% | Mt Dimer 1999 Annual Report on the Mining Leases M77/472, M77/428, E77/472,510,570,571,684,685,713 & P77/3123, |
| A57460 | 1999 | Tectonic Resources Ltd | Mount Dimer | 2.8% | Mt Dimer 1998 Annual Report, Mining Lease: M77/427-428, E77/472, 510, 571, 684-685, 713 P77/3123, 3179, 3184 ( |
| A57461 | 1999 | Tectonic Resources Ltd | Mount Dimer | <1% | Mt Dimer 1998 Annual Report on E77/350,375,687,691,712. P77/3156-3163,3180-3183. (Northern Project). |
| A54153 | 1998 | Tectonic Resources Ltd | Mount Dimer | <1% | 1997 Annual Report on the Mt. Dimer Mining Leases E77/350, 375, 410, 687, 691, 712 & PL's 77/3156 - 3163, 3180 |
| A53920 | 1998 | Tectonic Resources Ltd | Mount Dimer | 2.8% | Mt Dimer 1997 Annual Report Mining Lease: E77/472, 510, 570-571, 684-685, 713, etc. 01/1997 - 12/1997 |
| A54979 | 1998 | Sons Of Gwalia Ltd | Mount Dimer | 36% | Mount Dimer Surrender Report for the period 25/5/92-22/1/98 (E77/440) |
| A55453 | 1998 | Sons Of Gwalia Ltd | Mount Dimer | 10% | Mount Dimer, Partial Surrender Report 03/02/93 - 09/04/98 E77/490 |
| A55698 | 1998 | Sons Of Gwalia Ltd | Mount Dimer | 6.8% | Mount Dimer, Annual Report for 25/05/97 - 24/05/98 E77/432, 439, 490, P77/3215 |
| A52631 | 1997 | Sons Of Gwalia Ltd | Mount Dimer | 6.7% | Mount Dimer Project, Annual Report for the period 25/5/96-24/5/97, E77/431, E77/432, E77/439, E77/440, E77/441 |
| A52043 | 1997 | Sons Of Gwalia Ltd | Mount Dimer | 5.5% | Mount Dimer Project, Surrender Report for the period 25/05/1992 to 24/05/1997,E77/441. |
| A50491 | 1997 | Tectonic Resources Ltd | Mount Dimer | <1% | Annual Report Mt. Dimer Project Tectonic Resources Ltd Report Number WA 97/011 (March 1996 to March 1997) (E77 |
| A50626 | 1997 | Tectonic Resources Ltd | Mount Dimer | 31% | Mt. Dimer Annual report on the Mining Leases M77/427 and M77/428 Report No. WA 97/008 01/01/96 to 31/12/96 |
| A50627 | 1997 | Tectonic Resources Ltd | Mount Dimer South | 2.4% | Mt Dimer South Project, (E77/472 E77/510 E77/570 E77/571 E77/684 E77/685 E77/713 and P77/3184) Annual report f |
| A47591 | 1996 | Tectonic Resources Ltd | Mt Dimer South | 3.3% | Mt Dimer South Project Annual report for the 1995 period Licence E77/472 E77/510 E77/570 E77/571 M77/427 M77/4 |
| A48612 | 1996 | Sons Of Gwalia Ltd | Mount Dimer | 6.7% | Mt Dimer Project, Annual Report for the period 26/5/95 to 25/5/96, E77/431, 432, 439, 440, 441, & 490. |
| A44725 | 1995 | Tectonic Resources Ltd | Mount Dimer | 31% | Mt Dimer Gold Project Combined Annual Technical Report of Mineral Exploration on Mining leases M77/427 and M77 |
| A45002 | 1995 | Burmine Ltd | Mount Dimer West | 6.7% | Mt Dimmer West Project Exploration Licences 77/431, 77/432, 77/439, 77/440, 77/441 & 77/490, Annual Report for |
| A45924 | 1995 | Tectonic Resources Ltd | Mount Dimer | 8.3% | Mount Dimer Project, Annual Report for the period 01/08/1993 to 01/08/1995, E77/510. |
| A46435 | 1995 | Burmine Ltd | Mount Dimer West | 5.2% | Partial Surrender Report for the period 04/03/92-24/05/95 Mt Dimer West Project E77/431-432,439-441 |
| A41211 | 1994 | Glengold Holdings Pty Ltd | Mount Dimer | 31% | Annual report for the period 30/03/93 to 29/03/94 Mount Dimer Project M77/427 M77/428 |
| A41525 | 1994 | Burmine Ltd | Mount Dimer West | 6.7% | Annual report for the period 26/05/93-25/05/94, Mt Dimer West Project, E77/431 E77/432 E77/439 E77/440 E77/441 |
| A41574 | 1994 | Fodina Minerals Pty Ltd | Bungalbin | 7.9% | E77/472,Bungalbin Project, Annual Report for the Period 16 January 1993 to 15 January 1994. |
| A42045 | 1994 | Fodina Minerals Pty Ltd | Bungalbin | 8.3% | Exploration Licence E77/510 Bungalbin Project, Annual Report for the Period 4 August 1993 to 3 August 1994. |
| A38822 | 1993 | Burmine Ltd | Mount Dimer West | 6.7% | Annual Report for the period 04/03/92-25/05/93 Mt Dimer West Project E77/431-432,439-441,490 |
| A33613 | 1991 | Placer Exploration Ltd | Mount Dimer-Bungalbin | <1% | Annual Report to 16th February 1991,E77/105 and E77/162 Mt. Dimer - Bungalbin Project. |
| A34149 | 1991 | Western Mining Corporation Ltd | Karli | 31% | Annual Technical Report on Karli Mining Leases M77/427 & 428 30/03/90 - 29/03/91 |
| A30839 | 1990 | Placer Exploration Ltd | Mount Dimer - Bungalbin | <1% | Annual Report for the period 17/2/89 to 16/2/90, Mt. Dimer - Bungalbin Project, E77/105 & E77/162. |
| A31120 | 1990 | Placer Exploration Ltd | Mount Dimer - Bungalbin | <1% | Mt Dimer - Bungalbin Project, Partial Surrender Report for the period 17th February 1986 to 16th February 1990 |
| A27513 | 1989 | Placer Exploration Ltd | Mount Dimer - Bulgalbin | <1% | Mount Dimer - Bulgalbin Project, Annual Report on exploration 17th February 1988 to 16th February 1989, E77/10 |
| A26889 | 1988 | Csr Ltd | Mount Dimer - Bungalbin | <1% | Mount Dimer - Bungalbin Project, Annual Report on exploration 17th February 1987 to 16th February 1988, E77/1 |
| A21416 | 1987 | Csr Ltd | Mount Dimer- Bungalbin | <1% | Annual Report for the period 17th February 1986 to 16th February 1987, Mount Dimer- Bungalbin Project, E77/10 |
| A42852 | 1753 | Navan Mines Pty Ltd | Bungalbin | 7.9% | E77/472, Bungalbin Project , Annual Report for the period January 1994 to January 1995. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/2999 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/2999 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/2999? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.