NextMapsWA TenementsE 77/2999

E 77/2999

PendingExploration LicenceShire of YilgarnYilgarn M.F. District
Area
3,410ha
Applied
Aug 2022
4 years ago
WAMEX reports
116
WA median is 53
Report drilling
50
of 116 reports
Yilgarn Explore on the live map

Register summary

Holder
Aurumin Mt Dimer Pty Ltd
Local government
Shire of Yilgarn
Application received
30 Aug 2022

Exploration history on this ground

116 historical WAMEX exploration reports intersect E 77/2999: 52 report geochemistry or sampling, 69 include a digital data package.
When this ground was worked · 115 of 116 reports dated
31980s
271990s
282000s
482010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A143275 2024 Aurumin Limited Mt Dimer <1% E77/2729 Surrender Report on the Mt Dimer Project for the period ending 16/04/2024.
A143489 2024 Aurumin Mt Dimer Pty Ltd Mount DImer <1% Surrender Report for E77/1992 for the period 17/04/2012 to 16/04/2024
A144046 2024 Aurumin Limited Mount Dimer <1% Partial Surrender Report for E77/2518 Mount Dimer Project for the period ending 17/06/2024
A126060 2021 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 10/11/2020
A126208 2021 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Rzange E77/2226 for the Period 19/1/2015 to 12/2/2021
111 more reports
A124527 2020 Polaris Metals Pty Ltd Yilgarn Iron Ore Project East <1% Annual Report C104/2015 Yilgarn Iron Ore Project East for the period 24/6/2019 to 23/6/2020. M 77/01244,M 77/0
A123794 2020 Acertim Resources Ltd Mount Dimer 8.7% Annual Report on the Mt Dimer Project C42/2002 for the period ending 30/3/2020
A123974 2020 Abrossimov A Mount Dimer <1% Annual Report on the Mt Dimer Project, E77/2560 for the period 14th May 2019 to 13th May 2020
A123990 2020 Polaris Metals Pty Ltd Hunt Range <1% Partial Surrender Report Hunt Range E77/2226 for the period 19/1/2015 to 18/1/2020
A119706 2019 Golden Iron Resources Ltd Mount Dimer 8.7% Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2018 to 30th March 2019
A120389 2019 Polaris Metals Pty Ltd Yilgarn East <1% Combined Annual Report C104/2015 Yilgarn East Iron Ore Project for the period 24/6/2018 to 23/6/2019, M77/0124
A116911 2018 Polaris Metals Pty Ltd Yilgarn West 75% Final Surrender E77/1543 Yilgarn Iron Ore West For the Period 7 August 2012 to 7 March 2018
A116943 2018 Polaris Metals Pty Ltd Yilgarn East <1% Final Surrender P77/3948 Yilgarn Iron Ore East For the Period 7 February 2012 to 7 March 2018
A117064 2018 Golden Iron Resources Ltd Mount Dimer 14% Annual Report on the Mt Dimer Project C42/2002 for the period 31st March 2017 to 30th March 2018, E77/01992, E
A117505 2018 Polaris Metals Pty Ltd Yilgarn Iron Ore (East) <1% Combined Annual Exploration Report Yilgarn iron Ore (East) Project, C104/2015, 24 June 2017 - 23 June 2018
A118028 2018 Golden Iron Resources Ltd Mount Dimer <1% Final Surrender Report E77/2050 for the period 22nd October 2012 to 18th July 2018
A113926 2017 Golden Iron Resources Ltd Mount Dimer 14% Mount Dimer Project C42/2002 Annual Report for the period 31 March 2016 to 30 March 2017, E77/01992, E77/02050
A114565 2017 Polaris Metals Pty Ltd Yilgarn East <1% Combined Mineral Exploration Report Yilgarn Iron Ore (East) C104/2015 For the Period 24 June 2016 to 23 June 2
A115053 2017 Polaris Metals Pty Ltd Yilgarn 3.7% Combined Annual Exploration Report for the period from 2 September 2016 to 1 September 2017 Yilgarn Iron Ore P
A108961 2016 Toil Resources Pty Ltd Mount Dimer 14% Mt Dimer Annual Report C42/2002, M77/427, M77/428, M77/965, M77/957, M77/958, E77/1992, E77/2050, P77/4081 & P
A109699 2016 Polaris Metals Pty Ltd Yilgarn East <1% Yilgarn Iron Ore East Combined Annual Mineral Exploration Report C104/2015, E77/01418, M77/01244, M77/01261, M
A110439 2016 Polaris Metals Pty Ltd Yilgarn West 2.8% C96/2015 Combined Annual Mineral Exploration Report for 2 Sept 2016 to 1 Sept 2016, E77/01543, E77/01739, E77/
A105870 2015 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Iron Ore Project E77/1275-I Surrender Report for the Period 1 May 2008 – 30 April 2015
A107402 2015 Imperial Resources Management Pty Ltd Bungalbin Hill 20% Annual Technical Report Bungalbin Hill Project C148/2012 for the period 1 July 2013 to 30 June 2014, E77/1359
A106666 2015 Polaris Metals Pty Ltd Yilgarn 1.3% Combined Annual Report – C83/2003 Yilgarn Iron Ore Project for the period 24 June 2014 to 23 June 2015
A102886 2014 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Project, Final Surrender Report for the period 17/05/2012 to 15/05/2014, E77/1989.
A103300 2014 Polaris Metals Pty Ltd Yilgarn 2.7% Yilgarn Iron Ore Project E77/1738-I Final Surrender Report for the period 18 April 2011 - 15 May 2014
A103460 2014 Polaris Metals Pty Ltd Yilgarn 1.4% Yilgarn Project, Final Surrender Report for the period 13/09/2006 to 15/05/2014, E77/1115 (Carina South). [C83
A103815 2014 Imperial Resources Management Pty Ltd Bungalbin Hill 18% ANNUAL TECHNICAL REPORT BUNGALBIN HILL PROJECT FOR THE PERIOD 1 July 2013 to 30 June 2014 (E77/1359)
A101579 2014 Vector Resources Ltd Mount Dimer 14% Mount Dimer Project, Annual Report for the period 31/03/2013 to 30/03/2014, M77/427-428, 957-958, & 965; E77/1
A103106 2014 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Iron Ore Project E77/1275-I Partial Surrender Report for the period 1 May 2008 – 15 May 2014
A103605 2014 Polaris Metals Pty Ltd Yilagarn 1.1% Yilgarn Iron Ore Project C83/2003 Combined Annual Report for the period 24 June 2013 to 23 June 2014
A103814 2014 Imperial Resources Management Pty Ltd Bungalbin Hill 22% ANNUAL TECHNICAL REPORT BUNGALBIN HILL PROJECT FOR THE PERIOD 1 July 2013 to 30 June 2014, E77/1377.
A96312 2013 Polaris Metals Pty Ltd Yilgarn 2.5% Yilgarn (Iron Ore) Project, Final Surrender Report for the period 2nd May 2001 to 25th October 2012, E77/946.
A99730 2013 Imperial Resources Management Pty Ltd Bungalbin Hill 22% Annual Technical Report Bungalbin Hill Project E77/1377 for the period 1 July 2012 to 30 June 2013
A99731 2013 Imperial Resources Management Pty Ltd Bungalbin Hill 18% Annual Technical Report Bungalbin Hill Project E77/1359 for the period 1 July 2012 to 30 June 2013
A96309 2013 Polaris Metals Pty Ltd Yilgarn 66% Yilgarn (Iron Ore) Project Final Surrender Report for the period 7th February 2012 to 25th October 2012, P77/3
A97618 2013 Vector Resources Ltd Mount Dimer 16% Mount Dimer Project, Annual Report for the period 31st March 2012 to 30th March 2013, M77/427-428, 957-958, 96
A98008 2013 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Project, Final Surrender Report for the period 14th March 2008 to 25th February 2013, E77/1129.
A99009 2013 Independence Group Nl; Polaris Metals Pty Ltd Yilgarn 1.6% Yilgarn Iron Ore Project Combined Annual Report for C83/2003 Reporting Period 24 June 2012 – 23 June 2013, E15
A93733 2012 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 9th March 2012 , E77/11
A93767 2012 Vector Resources Ltd Mount Dimer 20% Mt Dimer Annual Report C42/2002 M77/427, M77/428, M77/965, M77/957, M77/958, Report Period: 31 March 2011 – 30
A94781 2012 Independence Group Nl; Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project Annual Report for the period 24th June 2011 to 23 June 2012, E15/1196; E16/410; E7
A93999 2012 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 1st May 2008 to 30th April 2011, E77/1275.
A94668 2012 Imperial Resources Management Pty Ltd Bungalbin Hill 18% Annual Mineral Exploration Report, Bungalbin Hill Project E77/1359, for the period 01/04/2011 to 31/03/2012
A94669 2012 Imperial Resources Management Pty Ltd Bungalbin Hill 22% Annual Mineral Exploration Report, Bungalbin Hill Project E77/1377, for the period 01/04/2011 to 31/03/2012
A89588 2011 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn Project, Final Surrender Report for the period 24th June 2002 to 23rd June 2010, E77/1077. [C83/2003]
A90275 2011 Golden Iron Resources Ltd Mount Dimer 21% Mt Dimer Project, Annual Report for the period 31st March 2010 to 30th March 2011, M77/427-428 & M77/ 965. (C4
A90651 2011 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project , Partial Surrender Report for the period 1st May 2008 to 30th April 2011, E77/1275
A91315 2011 Polaris Metals Pty Ltd Yilgarn 1.7% Yilgarn (Iron Ore) Project, Annual Report for the period 24th June 2010 to 23rd June 2011, E16/370; E77/842, 9
A89679 2011 Polaris Metals Pty Ltd Yilgarn <1% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 14th March 2008 to 13th March 2011, E77/11
A89955 2011 Golden Zen Pty Ltd Mount Dimer 33% Mt Dimer Project, ANNUAL EXPLORATION REPORT FOR TENEMENT E77/1669 FOR THE PERIOD ENDING 17TH FEBRUARY 2011
A88880 2010 Polaris Metals Pty Ltd Yilgarn 1.4% Yilgarn (Iron Ore) Project, Partial Surrender Report for the period 13th September 2006 to 12th September 2010
A88294 2010 Polaris Metals Pty Ltd Yilgarn 1.4% Yilgarn (Iron Ore)Project, Partial Surrender Report for the period 13th September 2006 to 13th September 2009,
A82333 2010 Golden Iron Resources Ltd Mount Dimer 21% Annual Report Mt Dimer Project M77/427, 428, 965
A88125 2010 Polaris Metals Nl Yilgarn 1.8% Yilgarn (Iron Ore) Project , Annual Report for the period 24th June 2009 to 23rd June 2010, E16/370; E77/842,
A88351 2010 Polaris Metals Pty Ltd Yilgarn 6.8% Yilgarn (Iron Ore) Project, Final Surrender Report for the period 24th June 2002 to 23rd June 2010,E77/1076.
A82812 2009 Southern Cross Goldfields Ltd MT DIMER <1% MT DIMER ANNUAL REPORT FOR THE PERIOD 4 OCTOBER 2007 – 3 OCTOBER 2008 E77/1275
A84365 2009 Cauldron Energy Ltd; Polaris Metals Nl Yilgarn 1.9% Yilgarn Project, Annual Report for the period 24th June 2008 to 23rd June 2009, E77/842, 919, 946, 1076-1077,
A80837 2009 Scimitar Resources Ltd Bungalbin 23% Bungalbin Project E 77/1106, Final Relinquishment Report for the Period 17th October 2003 to 16th October 2008
A86845 2009 Sullivan M P Mount Dimer 21% Annual Report Mt Dimer Project M77/427, 428, 965
A79425 2008 Polaris Metals Nl Yilgarn 2.3% Yilgarn Project, Annual Report for the period 24th June 2007 to 23rd June 2008, E77/946, 1076-1077, 1097, 1099
A78007 2008 Maher Mining Contractors Pty Ltd Mount Dimer 31% Annual Activity Report Mining Leases M77/427 & M77/428 Period 31/03/2007 to 30/03/2008 C42/2002, Report Date 2
A78033 2008 Scimitar Resources Ltd Bungalbin 23% Bungalbin Project E77/1106 Partial Surrender Report to the Department of Industry and Resources for the Period
A75975 2007 Polaris Metals Nl Yilgarn 2.4% Yilgarn Project, Annual Report for the period 24th June 2006 to 23rd June 2007, E77/946, E77/1076-1077, E77/1
A74670 2007 Scimitar Resources Ltd Bungalbin 23% Bungalbin Project E77/1106 Annual Report for the Period 17th Oct 2005 to 16th Oct 2006 (Jackson)
A75316 2007 Scimitar Resources Ltd Bungalbin 23% Bungalbin Project E77/1106 Partial Surrender Report for the period 17th October 2003 to 16th October 2006
A75787 2007 Meridian Mining Ltd Mount Dimer 31% Mount Dimer Project Annual Report Mining Leases 77/427 and 428 Period:01/01/06 - 30/03/07
A71996 2006 Scimitar Resources Ltd Bungalbin 3.8% Bungalbin Project, E77/946,1076,1077, Combined Reporting No. C83/2003, Partial Surrender Report for the period
A73548 2006 Scimitar Resources Ltd Bungalbin 3.8% Bungalbin Project E77/946,1076-1077,1130, Combined Reporting No. C83/2003, Annual Report for the Period 24 Jun
A73052 2006 Scimitar Resources Ltd Bungalbin 23% Bungalbin Project E77/1106, Annual Report for the Period 17 October 2004 to 16 October 2005, (Jackson).
A70506 2005 Mount Dimer Gold Mines Ltd Mount Dimer 31% Mount Dimer Project, Annual report, Mining leases M77/427, M77/428, Period 01/01/04 - 30/03/05 C42/2002, Sout
A71351 2005 Scimitar Resources Ltd Bungalbin 3.8% Bungalbin Project, E77/946,E77/1076 & E77/1077, Group Reporting C83/2003, Annual Report for the period 24 June
A73186 2005 Meridian Mining Ltd Mount Dimer 31% Mt Dimer Project M77/427-428, Annual Report, Period 01/04/05 to 30/03/06, (Jackson).
A68664 2004 Mount Dimer Gold Mines Ltd Mount Dimer 31% Mount Dimer Project, Annual Report, Mining leases M77/427, M77/428, for the period 01/01/03-30/03/04
A67145 2003 Heron Resources Ltd Bungalbin 3.8% Annual Report for the period 24 June 2002 to 23 June 2003 Bungalbin Project E77/946,1076,1077 Mt Diner Prospec
A66576 2003 Maher Mining Contractors Pty Ltd Mount Dimer 31% Annual Report period 31/03/02-30/03/03 Mt Dimer Project C42/2002: M77/427 and 428
A65692 2002 Heron Resources Ltd Bungalbin 2.5% Bungalbin Nickel Project Exploration Licence 77/946 Mt Dimer Prospect. Annual Report 2 May 2001 - 1 May 2002.
A64762 2002 Maher Mining Contractors Pty Ltd Mount Dimer 31% Mt Dimer Project Annual Report Mining Leases 77/427 and 428 Period: 01/01/01 - 30/03/02.
A65130 2002 Maher Mining Contractors Pty Ltd Mount Dimer 2.8% Mt Dimer 2000 Annual Report On The Mining Leases M77/427 M77/428, E77/472, 510, 570, 571, 684, 685, 713 & P77/
A61949 2001 Tectonic Resources Ltd Mount Dimer 2.8% Mt Dimer 2000 Annual Report on the mining leases M77/427, M77/428, E77/472, 510, 570, 571, 684, 685, 713 & P77
A61950 2001 Tectonic Resources Ltd Mount Dimer 3.6% Mt Dimer 2000 Annual Report on the mining leases E77/490, 687, 691, 712 & P77/3156-3163, 3180-3183 (Northern P
A60474 2000 Stockdale Prospecting Ltd Y2 Follow-Up <1% Y2 Follow-Up (JV)Project,Final Surrender Report for the period 17/02/1986 to 28/05/1992, E77/105 & E77/162. [
A59768 2000 Tectonic Resources Ltd Mount Dimer 3.6% Mt Dimer 1999 Annual Report on the Mining Leases E77/490,687 691,712,P77/3156-3163,3180-3183 Northern Project
A59769 2000 Tectonic Resources Ltd Mount Dimer/ Southern Project 2.8% Mt Dimer 1999 Annual Report on the Mining Leases M77/472, M77/428, E77/472,510,570,571,684,685,713 & P77/3123,
A57460 1999 Tectonic Resources Ltd Mount Dimer 2.8% Mt Dimer 1998 Annual Report, Mining Lease: M77/427-428, E77/472, 510, 571, 684-685, 713 P77/3123, 3179, 3184 (
A57461 1999 Tectonic Resources Ltd Mount Dimer <1% Mt Dimer 1998 Annual Report on E77/350,375,687,691,712. P77/3156-3163,3180-3183. (Northern Project).
A54153 1998 Tectonic Resources Ltd Mount Dimer <1% 1997 Annual Report on the Mt. Dimer Mining Leases E77/350, 375, 410, 687, 691, 712 & PL's 77/3156 - 3163, 3180
A53920 1998 Tectonic Resources Ltd Mount Dimer 2.8% Mt Dimer 1997 Annual Report Mining Lease: E77/472, 510, 570-571, 684-685, 713, etc. 01/1997 - 12/1997
A54979 1998 Sons Of Gwalia Ltd Mount Dimer 36% Mount Dimer Surrender Report for the period 25/5/92-22/1/98 (E77/440)
A55453 1998 Sons Of Gwalia Ltd Mount Dimer 10% Mount Dimer, Partial Surrender Report 03/02/93 - 09/04/98 E77/490
A55698 1998 Sons Of Gwalia Ltd Mount Dimer 6.8% Mount Dimer, Annual Report for 25/05/97 - 24/05/98 E77/432, 439, 490, P77/3215
A52631 1997 Sons Of Gwalia Ltd Mount Dimer 6.7% Mount Dimer Project, Annual Report for the period 25/5/96-24/5/97, E77/431, E77/432, E77/439, E77/440, E77/441
A52043 1997 Sons Of Gwalia Ltd Mount Dimer 5.5% Mount Dimer Project, Surrender Report for the period 25/05/1992 to 24/05/1997,E77/441.
A50491 1997 Tectonic Resources Ltd Mount Dimer <1% Annual Report Mt. Dimer Project Tectonic Resources Ltd Report Number WA 97/011 (March 1996 to March 1997) (E77
A50626 1997 Tectonic Resources Ltd Mount Dimer 31% Mt. Dimer Annual report on the Mining Leases M77/427 and M77/428 Report No. WA 97/008 01/01/96 to 31/12/96
A50627 1997 Tectonic Resources Ltd Mount Dimer South 2.4% Mt Dimer South Project, (E77/472 E77/510 E77/570 E77/571 E77/684 E77/685 E77/713 and P77/3184) Annual report f
A47591 1996 Tectonic Resources Ltd Mt Dimer South 3.3% Mt Dimer South Project Annual report for the 1995 period Licence E77/472 E77/510 E77/570 E77/571 M77/427 M77/4
A48612 1996 Sons Of Gwalia Ltd Mount Dimer 6.7% Mt Dimer Project, Annual Report for the period 26/5/95 to 25/5/96, E77/431, 432, 439, 440, 441, & 490.
A44725 1995 Tectonic Resources Ltd Mount Dimer 31% Mt Dimer Gold Project Combined Annual Technical Report of Mineral Exploration on Mining leases M77/427 and M77
A45002 1995 Burmine Ltd Mount Dimer West 6.7% Mt Dimmer West Project Exploration Licences 77/431, 77/432, 77/439, 77/440, 77/441 & 77/490, Annual Report for
A45924 1995 Tectonic Resources Ltd Mount Dimer 8.3% Mount Dimer Project, Annual Report for the period 01/08/1993 to 01/08/1995, E77/510.
A46435 1995 Burmine Ltd Mount Dimer West 5.2% Partial Surrender Report for the period 04/03/92-24/05/95 Mt Dimer West Project E77/431-432,439-441
A41211 1994 Glengold Holdings Pty Ltd Mount Dimer 31% Annual report for the period 30/03/93 to 29/03/94 Mount Dimer Project M77/427 M77/428
A41525 1994 Burmine Ltd Mount Dimer West 6.7% Annual report for the period 26/05/93-25/05/94, Mt Dimer West Project, E77/431 E77/432 E77/439 E77/440 E77/441
A41574 1994 Fodina Minerals Pty Ltd Bungalbin 7.9% E77/472,Bungalbin Project, Annual Report for the Period 16 January 1993 to 15 January 1994.
A42045 1994 Fodina Minerals Pty Ltd Bungalbin 8.3% Exploration Licence E77/510 Bungalbin Project, Annual Report for the Period 4 August 1993 to 3 August 1994.
A38822 1993 Burmine Ltd Mount Dimer West 6.7% Annual Report for the period 04/03/92-25/05/93 Mt Dimer West Project E77/431-432,439-441,490
A33613 1991 Placer Exploration Ltd Mount Dimer-Bungalbin <1% Annual Report to 16th February 1991,E77/105 and E77/162 Mt. Dimer - Bungalbin Project.
A34149 1991 Western Mining Corporation Ltd Karli 31% Annual Technical Report on Karli Mining Leases M77/427 & 428 30/03/90 - 29/03/91
A30839 1990 Placer Exploration Ltd Mount Dimer - Bungalbin <1% Annual Report for the period 17/2/89 to 16/2/90, Mt. Dimer - Bungalbin Project, E77/105 & E77/162.
A31120 1990 Placer Exploration Ltd Mount Dimer - Bungalbin <1% Mt Dimer - Bungalbin Project, Partial Surrender Report for the period 17th February 1986 to 16th February 1990
A27513 1989 Placer Exploration Ltd Mount Dimer - Bulgalbin <1% Mount Dimer - Bulgalbin Project, Annual Report on exploration 17th February 1988 to 16th February 1989, E77/10
A26889 1988 Csr Ltd Mount Dimer - Bungalbin <1% Mount Dimer - Bungalbin Project, Annual Report on exploration 17th February 1987 to 16th February 1988, E77/1
A21416 1987 Csr Ltd Mount Dimer- Bungalbin <1% Annual Report for the period 17th February 1986 to 16th February 1987, Mount Dimer- Bungalbin Project, E77/10
A42852 1753 Navan Mines Pty Ltd Bungalbin 7.9% E77/472, Bungalbin Project , Annual Report for the period January 1994 to January 1995.
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/2999 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 77/2999 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 77/2999? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.