E 77/2214
Register summary
- Holder
- Barto Gold Mining Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 22 Apr 2014
- Commenced
- 24 July 2014
- Expiry
- 23 July 2026
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A140679 | 2024 | Riversgold (Australia) Pty Ltd | Marvel Loch | <1% | E77/2597 Marvel Loch Final Surrender Report for the period ending 12/03/2024 |
| A143323 | 2024 | Riversgold (Australia) Pty Ltd | Bullfinch | <1% | Marvel Loch E77/2418 Partial Surrender Report for the period ending 30/04/2024. |
| A143378 | 2024 | Riversgold Pty Ltd | Bullfinch | <1% | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
| A138186 | 2024 | Rgl Mvl Pty Ltd | Marvel Loch | <1% | E77/2593 Annual Report Marvel Loch for the period ending 02/07/2023. |
| A139229 | 2024 | Riversgold (Australia) Pty Ltd | Marvel Loch | <1% | E 77/2596 Marvel Loch Final Surrender Report for the period ending 23/11/2023 |
87 more reports
| A139374 | 2024 | Riversgold Pty Ltd | Bull Finch | <1% | Annual Report for Bullfinch E77/2418 for the period ending 30/04/2023 |
| A140677 | 2024 | Riversgold (Australia) Pty Ltd | Marvel Loch | <1% | E77/2593 Marvel Loch Final Surrender Report for the period ending 12/03/2024. |
| A134775 | 2023 | Mining Equities Pty Ltd | Lady Luck | <1% | Annual Report for the Lady Luck Project (E77/2597) from 19/12/2021 to 18/12/2022 |
| A129208 | 2022 | Mining Equities Pty Ltd | Lady Luck | <1% | Annual Report for Lady Luck project (E77/2597) From 19/12/2020 to 18/12/2021 |
| A131489 | 2022 | Mining Equities Pty Ltd | Grace Road | <1% | Annual Report for Grace Road (E77/2593) from 03/07/2021 to 02/07/2022 |
| A131660 | 2022 | Mining Equities Pty Ltd | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2021 to 31/4/2022 |
| A127557 | 2021 | Mining Equities Pty Ltd | Grace Road | <1% | Annual Report for Grace Kelly (E77/2593) from 3/7/2020 to 2/7/2021 |
| A128773 | 2021 | Ev Metals Australia Pty Limited | Dalmore | <1% | Dalmore Annual Tenement Report E 77/02418 for the period 1 May 2020 to 30 April 2021. |
| A128985 | 2021 | Mining Equities Pty Ltd | MARVEL LOCH | <1% | Annual Report for Marvel Loch (E77/2596) from 14/1/2021 to 13/1/2022 |
| A124022 | 2020 | Minjar Gold Pty Ltd | Edwards Find | 6.4% | Edwards Find C216/2017 Annual Report for the period ending 29/02/2020 |
| A124216 | 2020 | Mining Equities Pty Ltd | Grace Road | <1% | Annual Report for Grace Road (E77/2593) from 3/7/2019 to 2/7/2020 |
| A124599 | 2020 | Bullfinch Metals | Dalmore | <1% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2019 to 30/4/2020 |
| A125432 | 2020 | Mining Equities Pty Ltd | Lady Luck | <1% | Annual Report for Lady Luck Project (E77/2597) From 19/12/2019 to 18/12/2020 |
| A125491 | 2020 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period ending 31/08/2020 |
| A120420 | 2019 | Minjar Gold Pty Ltd | Edwards Find | 6.4% | Edwards Find C216/2017 Annual Report for the period 1 March 2018 to 28 February 2019, M77/00160, M77/00265, M7 |
| A120452 | 2019 | Bullfinch Metals | Dalmore | <1% | Annual Report For the Dalmore Project (E77/2418) from 1/5/2018 to 30/4/2019 |
| A122094 | 2019 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period 1 September 2018 to 31 August 2019 |
| A116867 | 2018 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Edwards Find | 6.4% | Edwards Find C216/2017 Annual Report for the period 1 March 2017 to 28 February 2018, M77/00160, E77/01793, E7 |
| A118398 | 2018 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project for the period 01/09/2017 - 31/08/2018 |
| A115283 | 2017 | Bullseye Mining Limited | Southern Cross | <1% | Southern Cross Project C44/2017 Annual Report for the period 1 September 2016 to 31 August 2017, P77/04015, E7 |
| A115340 | 2017 | Hanking Gold Mining Pty Ltd | Southern Cross | 30% | Exploration Licence 77/2214 Annual Mineral Exploration Report for the period 24/07/2014 - 23/07/2016 |
| A112611 | 2017 | Bullseye Mining Limited | Rankin South | <1% | Rankin South E77/2342 Annual Report for the period 8 February 2016 to 7 February 2017 |
| A112612 | 2017 | Bullseye Mining Limited | Rankin South West | <1% | Rankin South West E77/2343 Annual Report for the period 8 February 2016 to 7 February 2017 |
| A115103 | 2017 | Tianye Sxo Australia Pty Ltd; Minjar Gold Pty Ltd | Marvel Loch | 30% | Exploration Licence 77/2214 Marvel Loch Project Annual Report for the period 24 July 2016 to 23 July 2017 |
| A115370 | 2017 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Southern Cross | 30% | Exploration Licence 77/2214 Southern Cross Project for the period 24 July 2014 to 21 August 2017 |
| A108761 | 2016 | Urban Minerals Pty Ltd | Edward | <1% | FINAL SURRENDER REPORT For the Period 22 February 2015 to 19 February 2016 EDWARD Surrender Report E77/2108 |
| A105628 | 2015 | Urban Minerals Pty Ltd | Edward | 4.3% | Edward Project 2015 Annual Report Combined Report Group C82/2013 P77/4111, E77/2015 and E77/2108. 22 February |
| A106588 | 2015 | Hanking Gold Mining Pty Ltd | Southern Cross North | <1% | Southern Cross North Project C160/2006 Annual Report for the period 01/07/2014 - 30/06/2015 |
| A100943 | 2014 | Southern Cross Goldfields Ltd | Mount Rankin | <1% | Mt Rankin Project, Annual Report for the period 24/10/2012 to 23/10/2013, E77/1289. |
| A102636 | 2014 | Urban Minerals Pty Ltd | Edward | 3.5% | Edward Project Annual Report Combined Report Group C82/2013 P77/4111, E77/1998, E77/2015 and E77/2108, 22 Febr |
| A103443 | 2014 | Cazaly Resources Ltd | Parker Range | <1% | Annual Report E77/2068 Parker Range Project For the Period 17th July 2013 to 30th June 2014 |
| A96715 | 2013 | Urban Minerals Pty Ltd | Edward | 79% | Edward Project Prospecting Licence P77/4111 for the period 16 December 2011 – 15 December 2012 |
| A96583 | 2013 | Southern Cross Goldfields Ltd | Mount Franklin | <1% | Mt Rankin E77/1289 Yilgarn Mineral Field Annual Report for the period 24 October 2011 to 23 October 2012 |
| A97757 | 2013 | Urban Minerals Pty Ltd | Edward Group | <1% | Edward Group Project Annual Report Exploration Licence E77/2015 for the period 17 January 2012 – 16 January 20 |
| A94157 | 2012 | Evolution Mining Pty Ltd | Jilbadji | <1% | E77/1132 Annual Report – 5th July 2011 to 5th July 2012 |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | 2.2% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A89102 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report E77/1289 Marvel Loch for the period 24 October 2009 to 23 October 2010 |
| A92169 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | 2011 Annual Report for E77/1289, 24 October 2010 to 23 October 2011 |
| A90011 | 2011 | Catalpa Resources Ltd | Jilbadgie | <1% | Jilbadgie Project, Annual Report for the period 2nd March 2010 to 1st March 2011, E77/1132. |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | 2.5% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A92101 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Partial Surrender Report for E77/1289 24 October 2007 to 23 October 2011 |
| A89224 | 2011 | Renaissance Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Partial Surrender Report for E77/1289, 24 October 2007 to 23 October 2010 |
| A85624 | 2010 | Gryphon Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report for the period 24 October 2008 to 23 October 2009 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | 2.4% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A81044 | 2009 | Gryphon Minerals Ltd | Marvel Loch | <1% | Marvel Loch, Annual Report for the period 24 October 2007 to 23 October 2008 |
| A82096 | 2009 | Catalpa Resources Ltd | Jilbadgie | <1% | Annual Report for E77/1132 Jilbadgie Project, Yilgarn Mineral Field, For the period 2 March 2008 to 1 March 20 |
| A82392 | 2009 | Catalpa Resources Ltd | Jilbadgie | <1% | Partial Surrender Report for E77/1132 Jilbadgie Project, Yilgarn Mineral Field, For the period 2 March 2006 to |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | 2.3% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A78117 | 2008 | Westonia Mines Ltd | Jilbadgie | <1% | Annual Report for E77/1132 Jilbadgie Project Yilgarn Mineral Field For the period 2 March 2007 to 1 March 2008 |
| A74054 | 2007 | Dominion Mining Ltd | Wockallary and Tamarin | 5% | Southern Cross (C177/2006) Group Annual Report, Wockallary E77/1152, Tamarin E77/1156, From 1 October 2005 to |
| A75239 | 2007 | Dominion Mining Ltd | Wockallary | <1% | Partial Surrender Report E77/1152 'Wockallary' From 23 February 2004 to 22 February 2007 Yilgarn Mineral Field |
| A76602 | 2007 | Dominion Mining Ltd | Wockallary | <1% | SURRENDER REPORT E77/1152 'WOCKALLARY' From 23 February 2004 to 20 September 2007 |
| A76795 | 2007 | Dominion Mining Ltd | Tamarin | 10% | SOUTHERN CROSS SURRENDER REPORT 'TAMARIN' From 21 September 2006 to 30 November 2007 |
| A75351 | 2007 | Westonia Mines Ltd | Jilbadgie | <1% | Annual report for E77/1132 Jilbadgie project Yilgarn mineral Field for the period 2nd March 2006 to 1st March |
| A70717 | 2005 | Dominion Mining Ltd | Wockallary | <1% | Annual report E77/1152, Wockallary, From 23 February 2004 to 22 February 2005 (Southern Cross). |
| A68694 | 2004 | Independence Group Nl | Tamarin | <1% | Annual report for the period 16/04/2003-15/04/2004 Tamarin Project E77/1108 |
| A66901 | 2003 | Sons Of Gwalia Ltd | Edwards Find | 20% | Edwards Find Project, Surrender Report for C344/1996, Tenements Surrendered on 10 February 2003 P77/2935-2939, |
| A67330 | 2003 | Sons Of Gwalia Ltd | Edwards Find | 4.6% | Annual Report for the period 16 August 2002 - 15 August 2003 Edwards Find Project C344/1996: M77/160,265,266,3 |
| A65341 | 2002 | Sons Of Gwalia Ltd | Moonargidding Rock | 20% | Moonargidding Rock Surrender Report For The Period 18 May 1991 - 19 August 2002. Tenements: E77/328, M77/800, |
| A65244 | 2002 | Sons Of Gwalia Ltd | Edwards Find | 4.6% | Edwards Find Project Annual Report For The Period 16 August 2001 - 15 August 2002 Tenements: M77/160, M77/265, |
| A63627 | 2001 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Annual Report for the period 26 October 2 000 - 25 October 2001, tenements E77/328, E77/493 |
| A59984 | 2000 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1998 to 25 October 1999. E77/328, E77/493, |
| A61411 | 2000 | Sons Of Gwalia Ltd | Edwards Find | 1.3% | Edwards Find Project, Annual Report for the Period 16/08/1999 to 15/08/2000, E77/454, M77/160,265,266,376, P77 |
| A59677 | 2000 | Sons Of Gwalia Ltd | Edwards Find | 1.3% | Edwards Find Project, Annual Report For The Period 16/8/1998 to 15/8/1999,E77/454, M77/160,265,266,376,2935- 2 |
| A62393 | 2000 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1999 to 25 October 2000. E77/328, E77/493, |
| A58138 | 1999 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1997 to 25 October 1998. E77/328, E77/493, |
| A54936 | 1998 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Annual Report for the period 26/10/96-25/10/97 Moonargidding Rock Project E77/328,493 M77/681,800,825 |
| A50751 | 1997 | Nugold Hill Mines Nl | Bells Find | <1% | Bells Find Project, Annual Report E77/554 for the period 28/02/1996 to 27/02/1997. |
| A50830 | 1997 | Sons Of Gwalia Ltd | Moonargidding Rocks | <1% | Moonargidding Rocks Project, Surrender Report P77/2931 for the period 01/10/1992 to 30/09/1996. |
| A47481 | 1996 | North Star Resources Nl | Bells Find | <1% | Bells Find Gold Project, Annual Report for Period 28/02/1995 to 27/02/1996, E77/554. |
| A49237 | 1996 | Sons Of Gwalia Ltd | Edwards Find | 1.3% | Edwards Find Project Yilgarn Mineral Field Annual Report for the period 16 August 1995 to 15 August 1996 E77/4 |
| A49631 | 1996 | Sons Of Gwalia Ltd | Moonargidding Rock | 13% | Annual Report for the period 10/95-10/96 Moonargidding Rock Project E77/179,328,493 M77/681 P77/2931-2934 |
| A43552 | 1995 | North Star Resources Nl | Bells Find / Strawberry Rocks | <1% | Bells Find / Strawberry Rocks Project, Annual Report Exploration Licence E77/554 for period 28/02/1994 to 27/0 |
| A45717 | 1995 | Sons Of Gwalia Ltd | Moonagidding Rock | 13% | Annual Report for the period 26/10/94-25/10/95 Moonargidding Rock Project E77/179,328,493 M77/681 P77/2931-293 |
| A45208 | 1995 | Sons Of Gwalia Ltd | Edwards Find | 1.3% | Edwards Find Project Annual report for the period 16 August 1994 to 15 August 1995 Tenements EL77/454 ML77/160 |
| A42615 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Strawberry Rocks | 17% | Annual Report for the period 10/93-10/94 Strawberry Rocks Project E77/328 |
| A41841 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Edwards Find/Sth Yilgarn | 1.3% | Annual Report for the period 16/08/93-15/08/94 Edwards Find/Sth Yilgarn Project M77/160,265,266,376 E77/454 P7 |
| A37686 | 1993 | Reynolds Australia Metals Ltd | Marvel Loch | 17% | Marvel Loch Project, Partial Surrender Report, February 1993, E77/328. |
| A37730 | 1993 | Reynolds Yilgarn Gold Operations Ltd | East Edwards-Moonagidding Rocks | 16% | Annual Report for the period 26/10/91-25/10/92 East Edwards-Moonagidding Rocks Project E77/179,289,328 M77/373 |
| A40619 | 1993 | Reynolds Yilgarn Gold Operations Ltd | East Edwards-Moonagidding Rocks | 15% | Annual Report for the period 26/10/92-25/10/93 East Edwards-Moonagidding Rocks Project E77/289,328,493 P77/293 |
| A37628 | 1992 | Reynolds Yilgarn Gold Operations Ltd | Edwards Find | 1.3% | Annual report for the period 16/08/91-15/08/92 Edwards Find South Yilgarn Project M77/160 M77/264-266 M77/376 |
| A35390 | 1991 | Reynolds Australia Metals Ltd | Edwards Find | 4.6% | Annual report for the period 16/08/90-15/05/91 Edwards Find Project M77/160 M77/264-266 M77/376 |
| A35389 | 1991 | Reynolds Yilgarn Gold Operations Ltd | Moonargidding Rocks | 16% | Moonargidding Rocks Project, Annual Report for the period 26th October 1990 to 25th October 1991, E77/179, 289 |
| A31869 | 1990 | Mawson Pacific Ltd | Edwards Find | 1.9% | Yilgarn Mineral Field. Edwards Find. M77/160,264-267,374-376,444-446. Annual Report to 15/08/90. |
| A2462 | 1972 | Anaconda Aust Inc | Coolgardie | 5.3% | Coolgardie Project, Annual Report (Vol 1) for theyear ending 31/12/1971, MC77/1304..................MC77/3007; |
| A2463 | 1972 | Anaconda Aust Inc | Coolgardie | 5.3% | Coolgardie Project, Annual Report (Vol 2) : Plates to accompany Report for year ending 31/12/1971-[ A2462] MC7 |
| A53287 | 1753 | Sons Of Gwalia Ltd | Edwards Find | 1.3% | Edwards Find Project - Annual Report 16/08/1996 - 15/08/1997 EL77/454, ML77/160, 265-266, 376, PL77/2935-2939, |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- Past expiry date · 23 July 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/2214 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/2214? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.