NextMaps›WA Tenements›E 69/4092

E 69/4092

PendingExploration LicenceShire of NgaanyatjarrakuWarburton M.F. District
Area
55,800ha
Applied
Sept 2022
4 years ago
WAMEX reports
157
WA median is 53
Report drilling
51
of 157 reports
Ngaanyatjarraku Explore on the live map

Register summary

Holder
Oz Exploration Pty Ltd
Local government
Shire of Ngaanyatjarraku
Application received
1 Sept 2022

Exploration history on this ground

157 historical WAMEX exploration reports intersect E 69/4092: 81 report geochemistry or sampling, 100 include a digital data package.
When this ground was worked · 155 of 157 reports dated
51950s
61960s
21970s
1980s
61990s
472000s
782010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A154255 2026 Terra Metals Limited Dante <1% Partial Surrender Report Dante Cu-Au-PGE-Ni Project E69/3552 for the period ending 10/02/2026.
A148329 2025 Bhp Nickel West Pty Ltd West Musgraves <1% Partial Surrender Report E69/3535 for the period ending 18/02/2025
A149904 2025 Terra Metals Limited Dante Cu-PGE-Au-Ni-Ti-V <1% Final Report - Dante Diamond Drill Hole - EIS Application 29DAG0093#2024-25 (R29)
A139274 2024 Opis Resources Pty Ltd Mount Squires Project <1% Caspin Resources Round 27 EIS Co-Funded Drilling: Handpump Geophyiscal Anomalies and Duchess Project
A145817 2024 Opis Resources Pty Ltd Mount Squires Project - Ground Gravity ( <1% Caspin Resources EIS Co-Funded Geophysics Program (Mineral) Venture 1 - Mount Squires Project Ground Gravity S
152 more reports
A134003 2023 Opis Resources Pty Ltd Duchess <1% Caspin Resources 2022 Round 24 EIS Co-Funded Drilling: Duchess Prospect
A136082 2023 Opis Resources Pty Ltd Mount Squires <1% E69/3424 Partial Surrender Mount Squires Project for the period ending 01/06/2023.
A136096 2023 Opis Resources Pty Ltd Mount Squires <1% Mount Squires E69/3425 Partial Surrender for the period ending 19/01/2023.
A122999 2020 Cassini Resources Limited Mount Squires <1% Mount Squires Annual Report - C23/2017 for the period ending 31/12/2019, E69/03424, E69/03425
A123847 2020 97992001 Pty Ltd Dante <1% Dante Vanadium Project E69/3401 Annual Technical Report for the period ending 10/2/2020
A124268 2020 Cassini Resources Limited Mount Squires <1% Geochemical analysis of core samples from MDDH0030
A119259 2019 Cassini Resources Limited Mount Squires <1% Annual Report - C23/2017 Mount Squires Project for the period 1 January 2018 to 31 December 2018, E69/03424, E
A119424 2019 Cassini Resources Limited West Musgrave 1.7% Combined Annual Report - C333/1997 West Musgrave Project for the period 1 January 2018 to 31 December 2018
A116209 2018 Cassini Resources Limited West Musgrave 1.7% Combined Annual Report - C333/1997 West Musgrave Project For the Period 1 January 2017 to 31 December 2017, E6
A115965 2018 Cassini Resources Limited Mount Squires <1% Annual Report for the Mount Squires Project - C23/2017 For the Period 1 January 2017 to 31 December 2017, E69/
A119161 2018 Polito, P Musgrave <1% Core library Sampling Results for EIS Drillhole TMD001 (K946 and K1019)
A112233 2017 Cassini Resources Limited West Musgrave 1.7% Combined Annual Report - C333/1997 West Musgrave Project 1 January 2016 to 31 December 2016, E69/01505.....E69
A108086 2016 Cassini Resources Limited West Musgrave 1.9% COMBINED ANNUAL REPORT C333/1997 - 1ST January 2015 to 31st December 2015 WEST MUSGRAVE PROJECT E69/1505, E69/
A108771 2016 Nicul Minerals Ltd Spinifex Range <1% Surrender Report E69/2864 ‘Spinifex Range’ for the Period up to 24th February 2016, West Musgrave Province, WA
A110093 2016 Nicul Minerals Limited Jameson 1.8% Final Surrender Report For E69/3191 Jameson Project for the period 13 October 2014 to 28 June 2016
A114766 2016 Traka Resources Ltd Latitude Hill and Camel <1% Core Library Sampling Results for Sampling Approvals K884, K911, K1019
A107264 2015 Nicul Minerals Ltd Jameson 1.8% Annual Technical Report E69/3191 "Jameson" for the Period Ending 12th October, 2015, West Musgrave Province, W
A104765 2015 Cassini Resources Limited West Musgrave 1.4% Combined Annual Report - C333/1997 for the period 1st January 2014 to 31st December 2014 West Musgrave Project
A105535 2015 Nicul Minerals Ltd Spinifex Range <1% Annual Technical Report E69/2864 "Spinifex Range" for the Period Ending 6th March, 2015, West Musgrave Provinc
A106853 2015 Traka Resources Limited Musgrave <1% Surrender Report of E69/2032 Musgrave Project [for the period 15/08/2007 to 12/08/2015]
A100645 2014 Rubicon Resources Ltd Mount Kathleen <1% Mt Kathleen Project, Final Surrender Report for the period 03/11/2010 to 18/11/2013, E69/2656.
A100717 2014 Bhp Billiton Nickel West Pty Ltd West Musgrave 17% Mineral Exploration Report – Partial Surrender Exploration Licence 69/2313 Reporting Period – 13 December 2007
A101096 2014 Palgrave Resources Ltd West Musgrave <1% WEST MUSGRAVE PROJECT - WA 2013 Annual Technical Report For Exploration Licence E69/2893 For the Period 13/12/
A101097 2014 Palgrave Resources Ltd West Musgrave 20% WEST MUSGRAVE PROJECT - WA 2013 Annual Technical Report For Exploration Licence E69/3058 For the Period 11/12/
A101099 2014 Palgrave Resources Ltd West Musgrave 100% WEST MUSGRAVE PROJECT - WA 2013 Annual Technical Report For Exploration Licence E69/3060 For the Period 11/12/
A102129 2014 Anglo American Exploration (Australia) Pty Ltd Spinifex Range <1% Annual Exploration Report- E69/2864, West Musgraves for the period 7th March 2013- 6th March 2014
A104166 2014 Palgrave Resources Ltd West Musgrave 50% WEST MUSGRAVE PROJECT - WA 2014 Annual Technical Report For Exploration Licence E69/2177 For the Period 17/10/
A104168 2014 Palgrave Resources Ltd West Musgrave 8.6% WEST MUSGRAVE PROJECT - WA 2014 Annual Technical Report For Exploration Licence E69/2179 For the Period 17/10/
A104169 2014 Palgrave Resources Ltd West Musgrave 16% WEST MUSGRAVE PROJECT - WA 2014 Annual Technical Report For Exploration Licence E69/2180 For the Period 17/10/
A104603 2014 Traka Resources Ltd Caesar Hill 64% Surrender Report EL 69/2253 19/7/2007– 3/11/2014 Caesar Hill Project
A104604 2014 Western Areas Limited Musgraves <1% Musgraves Project Annual Technical Report C178/2012 for period 1st January 2014 to 31st December 2014, E69/203
A100644 2014 Rubicon Resources Ltd Mount Glyde <1% Mt Glyde Project, Final Surrender Report for the period 03/11/2010 to 18/11/2013, E69/2885.
A101103 2014 Palgrave Resources Ltd West Musgrave 41% WEST MUSGRAVE PROJECT - WA 2013 Annual Technical Report For Exploration Licence E69/3064 For the Period 11/12/
A101215 2014 Western Areas Limited Musgraves 13% Musgraves (JV) Project, Annual Report for the period 01/01/2013 to 31/12/2013, E69/2032, 2230, 2253, 2618 & 27
A101440 2014 Bhp Billiton Nickel West Pty Ltd West Musgrave 1.4% West Musgrave Project C333/1997 Annual Mineral Exploration Report 1 January 2013 to 31 December 2013, E69/1505
A101573 2014 Anglo American Exploration (Australia) Pty Ltd Manchego- Musgraves <1% Manchego- Musgraves Project, Co-Funded Drilling Report for the period 01/07/2013 to 30/06/2014, E69/2864. [Rou
A102482 2014 Western Areas Limited Caesar Hill 64% Caesar Hill Project Musgraves, Report on Drilling at Caesar Hill E69/ 2253 for the period 1st December 2013 to
A104170 2014 Palgrave Resources Ltd West Musgrave 94% 2014 Annual Technical Report For Exploration Licence E69/2181 For the Period 17/10/2013 to 16/10/2014
A96539 2013 Dalkeith Resources Pty Ltd West Musgrave <1% West Musgrave Project – Annual Technical Report for E69/2893 for the period 13/12/11 to 12/12/12
A97790 2013 Anglo American Exploration (Australia) Pty Ltd Spinifex Range 1.8% Relinquishment Report-Spinifex Range –West Musgraves E69/2863 for the period 7th March 2012- 6th March 2013
A100364 2013 Palgrave Resources Ltd West Musgrave 50% West Musgrave Project, Annual Report for the period 17/10/2012 to 16/10/2013, E69/2177.
A100368 2013 Palgrave Resources Ltd West Musgrave 94% West Musgrave Project, Annual Report for the period 17/10/2012 to 16/10/2013, E69/2181.
A96328 2013 Quadrio Resources Pty Ltd Bentley <1% Bentley Project Annual Report E69/2656 From - 3 November 2011 to 2 November 2012
A96827 2013 Traka Resources Ltd Musgrave 12% Musgrave Project C178/2012 Annual Exploration Report 2013 for the period 1 October 2011 – 28 February 2013, EL
A97170 2013 Bhp Billiton Minerals Pty Ltd West Musgrave 1.4% West Musgrave Project, Annual Report for the period 1st January 2012 to 31st December2012, E69/1505, 1530, 206
A98019 2013 Anglo American Exploration (Australia) Pty Ltd Spinifex Range <1% Spinifex Range Project, Annual Report for the period 7th March 2012 to 6th March 2013, E69/2862, 2863 & 2864.
A98610 2013 Quadrio Resources Pty Ltd Bentley <1% Bentley Project Annual Report E69/2885 covering the period 13 June 2012 to 12 June 2013
A98931 2013 Traka Resources Ltd Caesar Hill 64% Partial Surrender Report EL 69/2253 for the period 19 July 2007 – 18 July 2013
A99139 2013 Beadell Resources Ltd West Musgraves - Handpump <1% West Musgraves - Handpump Project E69/2066, E69/2067 (C136/2008) Annual Report for the period 1/06/2012 to 31
A100366 2013 Palgrave Resources Ltd West Musgrave 8.6% West Musgrave Project, Annual Report for the period 17/10/2012 to 16/10/2013, E69/2179.
A100367 2013 Palgrave Resources Ltd West Musgrave 16% West Musgrave Project, Annual Report for the period 17/10/2012 to 16/10/2013, E69/2180.
A95979 2012 Strzelecki Metals Ltd West Musgrave 8.6% West Musgrave Project, Annual Report for the period 17/10/2011 to 16/10/2012, E69/2179.
A95980 2012 Strzelecki Metals Ltd West Musgrave 16% West Musgrave Project, Annual Report for the period 17/10/2011 to 16/10/2012, E69/2180.
A95981 2012 Strzelecki Metals Ltd West Musgrave 94% West Musgrave Project, Annual Report for the period 17th October 2011 to 16th October 2012, E69/2181.
A93232 2012 Bhp Billiton Minerals Pty Ltd West Musgrave 1.4% Combined Mineral Exploration Report C333/1997 for the period 1st January 2011 to 31st December 2011, E69/1505,
A94357 2012 Beadell Resources Ltd West Musgraves - Handpump <1% Project West Musgraves - Handpump Prospect E69/2066, E69/2067Annual Report on Exploration for Period 31/06/201
A94593 2012 Traka Resources Ltd Caesar Hill 64% Annual Exploration Report 19/7/2011– 18/7/2012 Exploration Licence 69/2253 Caesar Hill Project
A95074 2012 Traka Resources Ltd Musgrave <1% Annual Exploration Report 15/8/2011 – 14/8/2012, Musgrave Project EL69/2032
A95977 2012 Strzelecki Metals Ltd West Musgrave 50% West Musgrave Project, Annual Report for the period 17/10/2011 to 16/10/2012, E69/2177.
A89186 2011 Strzelecki Metals Ltd Western Musgrave 16% West Musgrave Project – Partial Surrender Report for the period 17/10/09 to 16/10/10 (E69/2180)
A89187 2011 Strzelecki Metals Ltd Western Musgrave 8.6% West Musgrave Project – Partial Surrender Report for the period 17/10/09 to 16/10/10 (E69/2179)
A89189 2011 Strzelecki Metals Ltd Western Musgrave 50% West Musgrave Project – Partial Surrender Report for the period 17/10/09 to 16/10/10 (E69/2177)
A89797 2011 Bhp Billiton Minerals West Musgrave 1.4% Combined Mineral Exploration Report C333/1997, 30 December 2009 to 29 December 2010, C333/1997, E69/1505, E69/
A90426 2011 Rubicon Resources Ltd Warburton <1% Warburton Project, Annual Report for the period 1st June 2010 to 31st May 2011, E69/2192, 2252, 2443 & 2656. (
A91468 2011 Rubicon Resources Ltd Caesar Hill 64% Annual Technical Report, Caesar Hill Project E69/2253, 19 July 2010 – 18 July 2011
A92111 2011 Strzelecki Metals Ltd; Tortuga Advisors Limited West Musgrave 8.6% West Musgrave Project – Annual Report for the period 17/10/10 to 16/10/11 (E69/2179)
A92112 2011 Strzelecki Metals Ltd; Tortuga Advisors Limited West Musgrave 16% West Musgrave Project – Annual Report for the period 17/10/10 to 16/10/11 (E69/2180)
A92113 2011 Strzelecki Metals Ltd; Tortuga Advisors Limited West Musgrave 94% West Musgrave Project – Annual Report for the period 17/10/10 to 16/10/11 (E69/2181)
A92583 2011 Beadell Resources Limited West Musgraves - Handpump <1% Exploration Incentive Scheme Interim Report West Musgraves - Handpump Prospect E69/2066 for the period 16/11/2
A89185 2011 Strzelecki Metals Ltd Western Musgrave 94% West Musgrave Project – Partial Surrender Report for the period 17/10/09 to 16/10/10 (E69/2181)
A90883 2011 Beadell Resources Ltd West Musgraves - Handpump <1% Annual Report on Exploration for Period 31/06/2010 to 31/05/2011.Project West Musgraves - Handpump Prospect E6
A91403 2011 Traka Resources Ltd Musgrave <1% Annual Exploration Report 15/8/2010 – 14/8/2011, Musgrave Project E69/2032
A92109 2011 Strzelecki Metals Ltd; Tortuga Advisors Limited West Musgrave 50% West Musgrave Project E69/02177 Annual Report for the period 17/10/10 to 16/10/11
A93024 2011 Traka Resources Ltd Jameson <1% Co-Funded Government – Industry Drilling Program of the Jameson Project Drilling Program 2011 (Round 3)
A86165 2010 Strzelecki Metals Ltd Warburton <1% Warburton Project - Report on E69/221, period ending 12/06/2009
A86203 2010 Bhp Billiton Minerals Pty Ltd West Musgrave 2% West Musgrave Combined Mineral Exploration Report C333/1997, E69/1505, E69/1530, E69/2201, E69/2313 and 69/233
A88559 2010 Tortuga Advisors Limited West Musgrave 50% West Musgrave E69/2177 Annual Report for period 17 October 2009 to 16 October 2010
A88561 2010 Tortuga Advisors Limited West Musgrave 8.6% West Musgrave E69/2179 – Annual Technical Report for period 17 October 2009 to 16 October 2010
A88562 2010 Tortuga Advisors Limited West Musgrave 16% West Musgrave E69/2180 Annual Report for period 17 October 2009 to 16 October 2010
A88563 2010 Tortuga Advisors Limited West Musgrave 94% West Musgrave E69/2181 Annual Report for period 17 October 2009 to 16 October 2010
A86164 2010 Strzelecki Metals Ltd Warburton <1% Annual Report Warburton Project E69/2211, Period 18/06/08 to 17/06/09
A87482 2010 Beadell Resources Ltd West Musgraves <1% ANNUAL REPORT FOR PERIOD 1/06/2009 to 31/05/2010. PROJECT WEST MUSGRAVES - HANDPUMP PROSPECT E69/2066, E69/206
A87531 2010 Beadell Resources Ltd West Musgraves - Handpump <1% Exploration Incentive Scheme Final Report 30th March 2010 Project, West Musgraves - Handpump Project E69/2066
A87847 2010 Traka Resources Ltd Musgrave <1% Annual Exploration Report 15/8/2009 - 14/8/2010 Musgrave Project, E69/2032
A81769 2009 Bhp Billiton Minerals Pty Ltd West Musgrave 2% West Musgrave C333/1997 Combined Annual Report for the period 30 December 2007 to 29 December 2008, E69/1505,
A81904 2009 Polaris Metals Nl JAMIESON RANGE <1% JAMIESON RANGE PROJECT E69/2032I, ANNUAL REPORT FOR THE PERIOD, 15 AUGUST 2007 – 14 AUGUST 2008
A83032 2009 Beadell Resources Limited West Musgraves - Handpump Prospect <1% ANNUAL REPORT FOR PERIOD 1/06/2008 - 31/05/2009
A84831 2009 Strzelecki Metals Ltd West Musgrave 82% West Musgrave E69/1564 Annual Report for period 12 September 2008 to 11 September 2009
A85216 2009 Strzelecki Metals Ltd West Musgrave 50% West Musgrave E69/2177 Annual Report for period 17 October 2008 to 16 October 2009
A85219 2009 Strzelecki Metals Ltd West Musgrave 16% West Musgrave E69/2180 Annual Report for period 17 October 2008 to 16 October 2009
A85220 2009 Strzelecki Metals Ltd West Musgrave 94% West Musgrave E69/2181 Annual Report for period 17 October 2008 to 16 October 2009
A85218 2009 Strzelecki Metals Ltd West Musgrave 8.6% West Musgrave E69/2179 Annual Report for period 17 October 2008 to 16 October 2009
A77616 2008 Bhp Billiton Ltd West Musgrave 2% COMBINED ANNUAL REPORT: C333/1997 FOR THE PERIOD 30 December 2006 TO 29 December 2007 West Musgrave Project
A80397 2008 Marathon Resources Limited Mount Glyde / Warburton JV 50% EXPLORATION LICENCE E69/2177, Mount Glyde, Warburton JV, 1st ANNUAL TECHNICAL REPORT For the period 17th Octob
A80400 2008 Marathon Resources Limited Barrow Range Warburton JV 16% E69/2180 Annual Report for period 17th October 2007 to 16th October 2008
A80401 2008 Marathon Resources Limited Mt Eliza J/V 94% E69/2181 Annual Report for period 17th October 2007 to 16th October 2008
A78872 2008 Beadell Resources Limited West Musgrave <1% ANNUAL REPORT FOR PERIOD 12/05/2007 TO 11/05/2008 PROJECT WEST MUSGRAVE E69/2066 Reference: West Musgrave Annu
A78873 2008 Beadell Resources Limited West Musgrave <1% ANNUAL REPORT FOR PERIOD 12/05/2007 TO 11/05/2008 PROJECT WEST MUSGRAVE E69/2067 Reference: West Musgrave Annu
A79152 2008 Primary Resources Ltd Warburton <1% ANNUAL REPORT TO THE DEPARTMENT OF INDUSTRY AND RESOURCES WARBURTON PROJECT WA. E69/2211 PERIOD 18/06/07 TO 1
A79427 2008 Rubicon Resources Ltd Caesar Hill 64% CAESAR HILL ANNUAL REPORT E69/2253 ANNUAL REPORT 19th July 2007 - 18th July 2008
A79945 2008 Marathon Resources Limited Windich Hill 82% E69/1564, Windich Hill, 7th Annual Technical Report for period 12 September 2007 to 11 September 2008.
A80399 2008 Marathon Resources Limited Barrow North Warburton J/V 8.6% EXPLORATION LICENCE E69/2179 Barrow North Warburton J/V ANNUAL TECHNICAL REPORT, For the period 17th October 2
A75461 2007 Oxiana Ltd West Musgrave <1% West Musgrave Project, Annual Report For the period 12/05/2006 TO 11/05/2007, E69/2067.
A75460 2007 Oxiana Ltd West Musgraves <1% Annual Report for the period 12/05/2006 to 11/05/2007 Project West Musgrave E69/2066
A76259 2007 Urex Pty Ltd Warburton 82% Annual Report for the Warburton Project E69/1564 Period 12/0 9/06 to 11/09/07 Group Reporting Number C166/2002
A72243 2006 Bhp Billiton Ltd West Musgrave 8.2% Combined Annual Report C333/1997, For the Period 30 December 2004 to 29 December 2005, West Musgrave Project,
A72562 2006 Redstone Resources Ltd Red Rock <1% Musgraves Project, Annual Technical Report, Red Rock E69/1386, For the Period 4 June 2005 to 3 June 2006, (Sco
A73460 2006 Primary Resources Ltd Warburton 82% Annual Report, Warburton Project E69/1564, Period 12/09/05 to 11/09/06, Combined Reporting No. C166/2002, (Ben
A70509 2005 Newmont Gold Exploration Pty Ltd Musgrave <1% Surrender report for the period to 15/02/05 Musgrave Project, Barrow Hill E69/1554, Talbot, Report number 3191
A70510 2005 Newmont Gold Exploration Pty Ltd Musgrave West copper / gold exploration 3.5% Combined surrender report on exploration for the period to 15/02/05, C163/2001, Musgrave Project, E69/1555, E6
A70142 2005 Wmc Resources Ltd West Musgrave 8.2% Combined annual report for the period 30/12/03 - 29/12/04 West Musgrave Project,( C333/1997), E69/1150, 1152 -
A70456 2005 Wmc Resources Ltd West Musgrave 9.5% Relinquishment report, C333/1997, for the period 02/05/96 - 07/04/05 West Musgrave Project, E69/1150, 1153, 11
A71343 2005 Farno Pty Ltd Warburton 22% Annual report to the Department of Technology and Resources Warburton Project WA. E69/1557 to 1565, Period 12/
A71429 2005 Bhp Billiton Minerals Pty Ltd West Musgraves 18% Relinquishment report, C333/1997, For the period 2 May 1996 to 16 September 2005, West Musgraves project, Full
A68044 2004 Leyshon Resources Ltd Musgrave 3.5% Annual Report on exploration for the period ending 11/01/2004, Musgrave Project, E69/1555,E69/1556, (C163/200
A68043 2004 Leyshon Resources Ltd Musgrave <1% Annual Report for the period ending 11/01/2004 Musgrave Project E69/1554
A68406 2004 Wmc Resources Ltd West Musgrave 3.7% West Musgrave Project, Annual Report for the period 30/12/2002 to 29/12/2003, E69/1150........E69/1847; M69/72
A69466 2004 Farno Pty Ltd Warburton 22% Annual report for the period 12/09/03 - 11/09/04 Warburton Project, C166/2002, E69/1557, E69/1558, E69/1559 E6
A66140 2003 Leyshon Resources Ltd Musgrave West 3.5% Annual Report on Exploration for period ended 11/01/2003 Musgrave Project C163/2001: E69/1555 and E69/1556
A67863 2003 Farno Pty Ltd Warburton 22% Annual Report for the period 12/09/2002- 11/09/2003 Warburton Project E69/1557-1565
A66139 2003 Leyshon Resources Ltd Musgrave <1% Annual Report on Exploration for period ended 11/01/2003 Musgrave Project E69/1554
A66615 2003 Wmc Resources Ltd West Musgrave 3.8% Combined Annual Report, C333/1997: for the period 30 December 2001 to 29 December 2002, West Musgrave Project
A67087 2003 Broadlake Holdings Pty Ltd Red Rock <1% Annual Mineral Exploration Report for the period 4 June 2002 to 3 June 2003 E69/1386
A65685 2002 Farno Pty Ltd Warburton 22% Annual Report for the period 22/8/01 to 21/8/02 Warburton Project, WA E69/1557 to 1565.
A64127 2002 Normandy Gold Exploration Pty Ltd Barrow Hill <1% Annual Report on exploration for period ended 11/01/2002 Project Barrow Hill E69/1554. Report no 29447a.
A64133 2002 Normandy Gold Exploration Pty Ltd Musgrave West 3.5% Annual Report on exploration for period ended 11/01/2002 Project Musgrave West C163/2001 E69/1555, E69/1556.
A64677 2002 Wmc Resources Ltd West Musgrave 3.8% Combined Annual Report: C333/1997 For The Period 30 December 2000 To 29 December 2001. West Musgrave Project E
A65031 2002 Broadlake Holdings Pty Ltd Red Rock <1% Annual Mineral Exploration Report 4 June 2001 to 3 June 2002 Exploration Licence 69/1386
A62103 2001 Wmc Resources Ltd Musgrave 5.7% Combined Annual Report:C333/1997 for the period 30 December 1999 to 29 December 2000 West Musgrave Project, ex
A63522 2001 Broadlake Holdings Pty Ltd Red Rock <1% Annual Mineral Exploration Report 4 June 2000 to 3 June 2001 Exploration Licence 69/1386.
A60645 2000 Wmc Resources Ltd West Musgrave 16% Combined Annual Report C333/1997 For the Period 30/12/1998 to 29/12/1999 due 31/03/2000 West Musgrave Project
A57712 1999 Wmc Resources Ltd Jamieson Range <1% Combined Annual report C333/1997 for the period 30 December 1997 to 29 December 1998 Jamieson Range Exploratio
A58684 1999 Wmc Resources Ltd Caesar Hill 31% Caesar Hill - C54/1997 02/05/1996 - 01/05/1999
A59116 1999 Wmc Resources Ltd Caesar Hill 24% Combined Annual Report C54/1997 for the period 02/05/98- 01/05/99 Caesar Hill Exploration Licences E69/1148-11
A54631 1998 Wmc Resources Ltd Jamieson Range <1% Jamieson Range, 30/12/96 - 29/12/97 Exploration Licence: E69/1202-1204, 1257-1260 Bentley, Scott
A55989 1998 Wmc Resources Ltd Caesar Hill 24% Caesar Hill, Combined Annual Report: C54/1997, For the period 02/05/97 - 01/05/98 Exploration Licence: E69/114
A51596 1997 Wmc Resources Ltd Caesar Hill 21% Caesar Hill Project, Annual Report for the period 2nd May 1996 to 1st May 1997, E69/996, 999,1008, 1148-1156,
A8256 1976 Nickel Mines Of Australia N.L. Wingelina <1% Wingelina Project, Non-statutory Report: Miscellaneous Quarterly & Monthly Reports, 1955-1976, TRr70/1498, 149
A3082 1972 Nickel Mines Australia Nl Wingelina <1% Quarterly Report Sept 72 Wingellina Nickel Prospect
A1132 1968 Westfield Minerals Nl Jameson Range 17% Jameson Range Project, Non-statutory Report: Report for the period ending 31/12/1967, TR70/4167H.
A1133 1968 Westfield Minerals Nl Jameson Range 17% Jameson Range Project, Non-statutory Report: Total Magnetic Intensity, Aeromagnetic Surveys 1-4, TR70/4167H.
A8272 1964 Southwestern Mining Limited Wingelina <1% Wingelina Project, Non-statutory Report: Annual Report for the period 1955-1960, TR70/1660-1662H.
A8271 1961 Southwestern Mining Limited Wingelina <1% Wingelina Project, Non-statutory Report: Summary Report for the period 1955-1960, TR70/1660-1662H.
A1134 1960 Southwestern Mining Limited Wingelina <1% Wingelina Project, Annual Report for the year ending 31/12/1960, TR70/1660-1662H.
A8274 1960 Southwest Mining Pty Ltd Wingelina <1% Wingelina Project, Annual Report for the year ending 31/12/1959, TR70/1660-1662H.
A1605 1958 South Western Mining Ltd Wingelina <1% Annual report on exploration in Temporary Reserves 1498H, 1499H and 1500H during the year 1957
A784 1958 South Western Mining Ltd Wingelina <1% Wingelina Project, Annual Report for the period ending 31/12/1958, TR70/1498, 1499, & 1500H.
A783 1957 South Western Mining Ltd Wingelina <1% Wingelina Project, Annual Report, 1957, Mag & EM Survey Sheets & Mag Profiles, TR70/1498, 1499 & 1500H.
A8273 1957 Southwestern Mining Limited Wingelina <1% Wingelina Project, Annual Report for the year ending 31/12/1956, TR70/1498, 1499, & 1500H.
A8270 1954 Geosurveys Of Australia Ltd Tomkinson Range <1% Tomkinson Range Project, Non-statutory Report: Investigation Report for the period 01/09/1954 to 30/11/1954.
A88564 1753 Tortuga Advisors Limited West Musgrave 82% E69/1564 – Final Annual Technical Report for period 12 September 2009 to 11 September 2010
A138590 Gcx Metals Pty Ltd Dante <1% Core Library Drilling Results For Sampling Approval K1718
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 69/4092 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 69/4092 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 69/4092? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.