E 59/3048
Register summary
- Holder
- Yarri Resources Pty Ltd
- Application received
- 13 Nov 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A152957 | 2025 | Warriedar Resources Limited | Fields Find | 24% | Fields Find E59/2382 Partial Surrender Report for the period ending 25/09/2025 |
| A128213 | 2021 | Minjar Gold Pty Ltd | Fields Find | <1% | Fields Find Project (C290/1995) E59/1984-I and E59/2064-I to E59/2067-I Final Surrender Report for the period |
| A124086 | 2020 | Minjar Gold Pty Ltd | Fields Find | <1% | 2019 Annual Combined Group Technical Report - Fields Find Project for the period ending 29/02/2020 |
| A125093 | 2020 | Warriedar Mining Pty Ltd | Warriedar | 29% | Annual Technical Report, C 168/2014 Warriedar project for the period 5 July 2019 to 4 July 2020, E 59/01723,E |
| A119649 | 2019 | Minjar Gold Pty Ltd | Fields Find | 2.9% | 2018 Combined Annual Technical Report For the Period 1 March 2018 to 28 February 2019 |
89 more reports
| A120804 | 2019 | Norwest Minerals Limited | Warriedar | 29% | Annual Technical Report C168/2014 for the period 5 July 2018 to 4 July 2019, E59/01696, E59/01723, E59/01966, |
| A116579 | 2018 | Minjar Gold Pty Ltd | Fields Find | 2.9% | 2017 C290/1995 Annual Report, Fields Find, 01 March 2017 to 28 February 2018 |
| A117699 | 2018 | Norwest Gold Pty Ltd | Warriedar | 29% | Norwest Gold Pty Ltd, Annual Technical Report, C 168/2014, Warriedar Project, 05 July 2017 - 04 July 2018 |
| A112675 | 2017 | Minjar Gold Pty Ltd | Fields Find | 2.9% | Fields Find C290/1995 Annual Report For the Period 1 March 2016 to 28 February 2017, E59/01268, E59/01938, E59 |
| A115100 | 2017 | Aphex Minerals Pty Ltd | Warriedar | 29% | Annual Report for the period 5th July 2016 to 4th July 2017, Warriedar Project, C168/2014, E59/01696, E59/0172 |
| A108667 | 2016 | Mount Gibson Mining Ltd | Fields Find | 2.9% | Combined Annual Technical Report C290/1995 Fields Find Project for the period 01/03/2015 to 28/02/2016, M59/63 |
| A109750 | 2016 | Aphex Minerals Pty Ltd | Warriedar | 29% | Warriedar Project C168/2014 Annual Report for the period 5 July 2015 to 4 July 2016, E59/01696, E59/01723, E59 |
| A105525 | 2015 | Mount Gibson Mining Ltd | Fields Find | 5.2% | Fields Find Project Annual Combined Report (C290/1995) M59/63, E59/1268, E59/1938, E59/1939, E59/1940, P59/199 |
| A106308 | 2015 | Gindalbie Metals Ltd | Karara | <1% | Karara Project C54/2009, E59/1584, E59/1585, E59/1950, P59/1847, E59/1798 Final Surrender Report for the perio |
| A106564 | 2015 | Aphex Minerals Pty Ltd | Warriedar | 33% | Warriedar Project – C168/2014 Annual Report – 5th July 2014 to 4th July 2015, E59/1696, E59/1723 & E59/1966 |
| A104753 | 2015 | Aphex Minerals Pty Ltd | Warriedar | 62% | Annual Report for the period 13th December 2013 to 12th December 2014, Warriedar Project, E59/1723 |
| A100922 | 2014 | Stratum Metals Ltd | Pinyalling | <1% | Pinyalling Project, Annual Report for the period 06/11/2012 to 15/11/2013, E59/1545 & 1618. |
| A101118 | 2014 | Aphex Minerals Pty Ltd | Warriedar | 62% | Warriedar Project, Annual Report for the period 13/12/2012 to 12/12/2013, E59/1723. |
| A103368 | 2014 | Gindalbie Metals Ltd | Lodestone | <1% | LODESTONE IRON ORE PROJECT, C54/2009 ANNUAL TECHNICAL REPORT for E59/1002, E59/1180, E59/1584, E59/1585, E59/1 |
| A97712 | 2013 | Crosslands Resources Ltd | Pinyalling Hill | <1% | Annual Report Pinyalling Hill Project E59/1629 for the period 2nd February 2012 – 1st February 2013 |
| A98308 | 2013 | Crosslands Resources Ltd | Pinyalling Hill | <1% | Pinyalling Hill Project, Final Surrender Report for the period 2nd February 2011 to 15th June 2013, E59/1629. |
| A99474 | 2013 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Iron Ore Project C54/2009 Annual Technical Report for the period to 31/08/2013, E59/1002, E59/1180, |
| A93425 | 2012 | Royal Resources Ltd | Fields Find | 5.8% | Annual Combined Report, Fields Find Project M59/63, E59/1108, E59/1154, E59/1155, E59/1268, E59/1269, P59/1885 |
| A96030 | 2012 | Stratum Metals Ltd | Pinyalling | <1% | Annual Report Pinyalling Project – 304/2011 Report Period: 6 November 2011 – 5 November 2012 |
| A93569 | 2012 | Crosslands Resources Ltd | Pinyalling Hill | <1% | Pinyalling Hill Project Annual Report, E59/1629 2nd February 2011 – 1st February 2012 |
| A95282 | 2012 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Iron Ore Project C54/2009, for the period 01/09/2011 to 31/08/2012. |
| A95304 | 2012 | Royal Resources Ltd | Fields Find | 13% | Relinquishment Report for EL59/1108-1 for the period 15 April 2003 to 13 July 2012 |
| A90171 | 2011 | Royal Resources Ltd | Fields Find - Baron - Pinyalling | 5.7% | Fields Find - Baron - Pinyalling Project, Annual Report for the perido 1st March to 28th February 2011, M59/63 |
| A92067 | 2011 | Gindalbie Metals Ltd | Midwest | <1% | Midwest Iron Ore Project Annual Technical Report for E59/1585 period 09/11/2010 to 08/11/2011 |
| A86450 | 2010 | Royal Resources Ltd | Fields Find / Baron / Pinyalling | 5.7% | Annual Combined Report, Fields Find, Baron and Pinyalling Projects M59/63, P59/1752, P59/1753, P59/1754, P59/1 |
| A81801 | 2009 | Royal Resources Ltd | FIELDS FIND, BARON AND PINYALLING | 5.7% | Annual Combined Report, Fields Find, Baron and Pinyalling Projects P59/1752, P59/1753, P59/1754, P59/1755, P59 |
| A77837 | 2008 | Royal Resources Ltd | Fields Find | 5.8% | ANNUAL REPORT, FIELDS FIND, BARON, AND PINYALLING PROJECTS, E59/1108, E59/1154, E59/1155, E59/1268, E59/1269, |
| A75125 | 2007 | Royal Resources Ltd | Baron West | 13% | Partial Surrender Report, Baron West Project, E59/1108, Yalgoo Mineral Field, Western Australia, for the Perio |
| A75241 | 2007 | Royal Resources Ltd | Fields Find, Baron | 4.6% | Annual Report, Fields Find and Baron Projects, E59/631, E59/633, E59/846, P59/1186, E59/1154, E59/1155, E59/11 |
| A72396 | 2006 | Royal Resources Pty Ltd | Fields Find | <1% | Annual Report, Fields Find Project E59/631, E59/633, E59/846, P59/1186, Combined Reporting No. C59/1995, For t |
| A73050 | 2006 | Royal Resources Ltd | Baron West | 13% | Annual Report, Baron West Project E59/1108, For the Period 15 April 2005 to 14 April 2006, (Kirkalocka). |
| A69870 | 2005 | Thundelarra Exploration Ltd | Baron West | 13% | Annual report Baron West Project, E59/1108,Yalgoo mineral field, WA for the period 15/04/03 - 14/04/04. |
| A71495 | 2005 | Aldershot Resources Ltd | Fields Find | <1% | Annual Report, Fields Find Project E59/631, E59/633, (MLA59/597-8), E59/846, (MLA59/615-7) & P59/1186, (MLA59/ |
| A69068 | 2004 | Thundelarra Exploration Ltd | Fields Find | <1% | Annual report, Fields Find Project, for the period 1 March 2003 to 28 February 2004, C59/1995, E59/631, E59/63 |
| A69179 | 2004 | Thundelarra Exploration Ltd | Baron | 15% | Annual report for the period 01/03/2003-28/02/2004 Baron Project (C59/2000), E59/807, E59/835, M59/63, P59/136 |
| A66488 | 2003 | Mr Morganti R | Warriedar Mongers Lake | 1% | Annual Report for the period 29/11/2001- 28/11/2002 Warriedar/Mongers Lake Project E59/1008 |
| A66628 | 2003 | Thundelarra Exploration Ltd | Fields Find | <1% | Annual report, Fields Find Project, For the period 1 March 2002 to 28 February 2003, C290/1995, E59/631, E59/6 |
| A67312 | 2003 | Thundelarra Exploration Ltd | Baron | 15% | Annual Report for the period 1 March 2002 - 28 February 2003 Baron Project C59/2000: E59/807,835 M59/63 P59/13 |
| A64939 | 2002 | Thundelarra Exploration Ltd | Baron | 19% | Partial Surrender Report E59/835 For The Period 14th May 1998 To 7th May 2002. |
| A65439 | 2002 | Thundelarra Exploration Ltd | Fields Find | <1% | Annual Report Fields Find Project E59/631, E59/633, E59/846, P59/1375, P59/1377, P59/1378, P59/1379, P59/1380, |
| A65438 | 2002 | Thundelarra Exploration Ltd | Baron | 15% | Annual Report Baron Project E59/807, E59,835, M59/63, P59/1369, P59/1370, P59/1371, P59/1372 And P59/1373 (C59 |
| A62660 | 2001 | Thundelarra Exploration Ltd | Baron - Jarabee Well | 15% | Annual Report Baron Project- Jarabee Well E59/807 & 835 Yalgoo Mineral Field Western Australia For The Period |
| A63809 | 2001 | Thundelarra Exploration Ltd | The Baron | 9.5% | The Baron Project, Partial Surrender Report for the period 13 October 1997 to 12 October 2001, E59/807. |
| A62754 | 2001 | Thundelarra Exploration Ltd | Fields Find | 1.1% | Annual Report , Fields Find Project ,M59/364-365, E59/631, E59/633, P59/1347-1387,for the period 1 March 2000 |
| A61336 | 2000 | Resource Exploration Nl | Fields Find | 1.1% | Fields Find Project, M59/364-365, E59/631,633, P59/1374-1387, for the period 01/03/1999 to 28/02/2000. |
| A61435 | 2000 | Thundelarra Exploration Ltd | Baron | 6.8% | Annual Report. The Baron Project Pinyalling E59/719,807, 835,848, M59/63, P59/1366-1367, 1369-1373. Yalgoo Min |
| A59045 | 1999 | Resource Exploration Nl | Fields Find | 1.1% | Annual report Fields Find Project M59/364-365 E59/631 E59/633 P59/1374-1387 Yalgoo Mineral Field Western Austr |
| A58646 | 1999 | Thundelarra Exploration Ltd | Baron | 6.8% | The Baron Project, Annual Report E59/719,835,807,848, M59,63, 1366-1367,1369-1373,For the Period 1/03/1998 to |
| A54217 | 1998 | Resource Exploration Nl | Fields Find | 1.1% | Annual Report, Fields Find Project, E59/631,633. M59/364-365. P59/1374-1387, for the period 01/03/96-28/02/97. |
| A55696 | 1998 | Attgold Pty Ltd | Pinyalling | 15% | Pinyalling Project, E59/807, E59/835 Preliminary Report on Exploration to 06/1998 |
| A54732 | 1998 | Resource Exploration Nl | Fields Find | 1.1% | Fields Find Project, Annual Report for the period 1/03/97 - 28/03/98, M59/364-365, E59/631, 633, P59/1374-1387 |
| A48603 | 1996 | Goldfields Exploration Pty Ltd | Pinyalling | 9.4% | Pinyalling Project, E59/273, 59/496, 59/501, 59/558, M59/330-332 Annual Technical Report for the Period 22.05. |
| A47704 | 1996 | Cove Mining Nl | Fields Find | 1.1% | Annual Report Fields Find Project M59/364 M59/365 E59/631 E59/633 P59/1374 to P59/1387 Yalgoo District Yalgoo |
| A44999 | 1995 | Goldfields Exploration Pty Ltd | Pinyalling | 9.4% | Pinyalling E59/273, E59/496, E59/501, E59/558,M59/330-332, Annual Technical Report for the Period 22.5.1994-21 |
| A40520 | 1994 | Samantha Gold Nl | Fields Find | 27% | Fields Find (JV) Project, Final Surrender Report for the period 4th October 1987 to 3rd October 1992, E59/162. |
| A41017 | 1994 | Samantha Gold Nl | Fields Find | <1% | Fields Find (JV) Project, Partial Surrender Report for the period 22/11/1990 to 21/11/1993, E59/364. |
| A41018 | 1994 | Samantha Gold Nl | Fields Find | 6.5% | Fields Find (JV) Project, Annual Report for the period 22nd November 1992 to 21st November 1993, E59/162, 350, |
| A38183 | 1993 | Capricorn Resources Aust Nl | Pinyalling Find | 12% | Pinyalling Find Project,Final Surrender Report for the period 16/03/1991 to 18/10/1991, E59/171. |
| A38590 | 1993 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | Pinyalling Project, Annual Report for the period 22/06/1992 to 21/05/1993, E59/273. |
| A41266 | 1993 | Capricorn Resources Aust Nl | Mount Gibson | 2% | Mt Gibson Project, Annual Report for the period 01/05/1991 to 31/09/1992, E59/284, 264, 168, 171, 320, 356 ,31 |
| A36662 | 1992 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | Pinyalling Project, Annual Report for the period 22/06/1991 to 21/06/1992, E59/273. |
| A37597 | 1992 | Samantha Gold Nl | Fields Find | 27% | Fields Find Project, Partial Surrender Report forthe period 4th October 1987 to 3rd October 1990, E59/162. |
| A37596 | 1992 | Samantha Gold Nl | Fields Find | 27% | Fields Find (JV) Project, Partial Surrender Report for the period 4th October 1987 to 3rd October 1991, E59/16 |
| A37598 | 1992 | Samantha Gold Nl | Fields Find | 6.5% | Fields Find Project, Annual Report for the period 22nd November 1990 to 21st November 1992, E59/162, 350, 364, |
| A37145 | 1992 | Rgc Exploration Pty Ltd | Pinyalling Well | 7.9% | Pinyalling Well Project, Partial Surrender Report for the period 21/05/1989 to 21/05/1992, E59/273. |
| A33831 | 1991 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | Pinyalling Project, Annual Report for the period 01/07/1990 to 21/05/1991, E59/273. |
| A30619 | 1990 | Capricorn Resources Aust Nl | Pinyallling Find | 12% | Pinyallling Find Project, Annual Report for the year ended 15th March 1990, E59/171. |
| A31075 | 1990 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | Pinyalling Project, Annual Report for the period 21/05/1989 to 30/06/1990, E59/273. |
| A32016 | 1990 | Samantha Gold Nl | Pinyalling | 6.4% | Gold Partners NL Joint Venture on E59/60 M59/63,181. (Pinyalling Project. 09/89-09/90). |
| A32023 | 1990 | Gold Partners Nl | Langs Find | 27% | Langs Find Project, Annual Report, March 1990, E59/162. |
| A30267 | 1990 | Capricorn Resources Aust Nl | Mount Gibson | 2.2% | [ Mount Gibson, Non-statutory report March 1990, P59/598 ...59/907, E59/163 ...312 ], Aeromagnetic tape format |
| A29393 | 1989 | Samantha Exploration Nl | Pinyalling | 6.4% | Pinyalling project, Progress Report - September 1989 Pinyalling J.V. E59/60 - Sections 1.2 and 2.1 |
| A32183 | 1989 | Gold Partners Nl | Mount Laws | 27% | Mt Laws Project, Annual Report for the period August 1988 to August 1989, E59/162, P59/ 450 & 613. |
| A29308 | 1989 | Gold Partners Nl | Mount Laws-South Bar | 4% | Mount Laws-South Bar Project, Non-statutory Report: Report on Soil Geochemistry carreid out over South BAr and |
| A25945 | 1988 | Gold Partners Nl | Tobins | 6.4% | Tobins Project, Annual Report for the year ending 30/09/1988, E59/60. |
| A21467 | 1987 | Gold Partners Nl | Fields Find | 4% | Fields Find Project, Annual Report [Laterite Sampling Programme], September 1987, E59/59 & 60. |
| A21468 | 1987 | Gold Partners Nl | Tobins | 6.4% | Tobins Project, Annual Report for the period 15/09/1986 to 14/09/1987, E59/60. |
| A21466 | 1987 | Gold Partners Nl | Pinyalling-Bullajungadeah - East Hills | 6.4% | Annual report 1987 Stream Sediment Sampling in the Pinyalling and Bullajungadeah - East Hills E59/60 |
| A19782 | 1986 | Oil Partners Nl | Fields Find - Pinyalling | 4% | Fields Find - Pinyalling Project E59/59 and E59/60, Annual report for 1986. |
| A18240 | 1985 | Oil Partners Nl | Pinyalling | 6.4% | Annual report to September 1985 Pinyalling Project, Exploration Licence E59/60 .September 1985. |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A16768 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report: Notes on Preliminary Investigation of Aeromagnetic Anomalie |
| A2397 | 1972 | Kennecott Exp Aust Pty Ltd | Fields Find | <1% | Fields Find Project, Non-statutory Report; Final Report ( Paynes Find Examination) April 1972, TR70/3801H |
| A122 | 1971 | H. Ward & T. Tomich | Fields Find | <1% | Fields Find project, Annual Report for the year ending 31/12/1970, TR70/3801H. |
| A163 | 1971 | Homestake Iron Ore Co. | Fields Find | <1% | Fields Find Project, Annual Report, April 1968, TR70/3801H. |
| A121 | 1969 | Geotechnics (Aust) Pty Ltd | Fields Find | <1% | Fields Find Project, Non-statutory Report: Summary of Geological & Geohpysical Investigations, March 1969, TR7 |
| A39098 | 1753 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | Pinyalling Project, M6698/1, E59/273, Partial Surrender Report Period 21/5/89 to 19/7/93, P14/93 |
| A42596 | 1753 | Rgc Exploration Pty Ltd | Pinyalling | 7.9% | PINYALLING PROJECT E59/273 SURRENDER REPORT PERIOD 22/5/89 TO 21/5/94 |
| A41570 | 1753 | Rgc Exploration Pty Ltd | Pinyalling | 9.9% | Annual Report for the Period 22/5/93-21/5/94 Pinyalling Project E59/273, 59/496, E59/501. M6698/1- P/8/94. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 59/3048 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/3048 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 59/3048? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.