E 59/2864
Register summary
- Holder
- Viking Mines Limited
- Local government
- Shire of Mount Magnet
- Application received
- 3 Nov 2023
- Commenced
- 4 Jan 2024
- Expiry
- 3 Jan 2029
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148822 | 2025 | Western Yilgarn Nl | Boodanoo Northeast | <1% | Partial Surrender Report E59/2881 Boodanoo Northeast Project for the Period Ending 27 February 2025 |
| A149806 | 2025 | Golden Mile Resources Ltd | Narndee North | <1% | 2025 Narndee North Project First Voluntary Partial Surrender Report E 59/2531 for the period ending 22 April 2 |
| A139176 | 2024 | Aam Resources Pty Ltd | Boodanoo | <1% | Boodanoo Project (E 59/2496 E 59/2838) Combined Annual Technical Report (C255/2023) to the Department of Mines |
| A143128 | 2024 | Aldoro Resources Limited | Narndee | <1% | Final Surrender Report Narndee E59/2238 for the period 7 April 2023 to 6 June 2024 |
| A133550 | 2023 | Seremin Pty Ltd | Narndee | <1% | Narndee E59/2277 Final Mineral Exploration Report for the period ending 11/10/2022 |
95 more reports
| A134258 | 2023 | Aam Resources Pty Ltd | Boodanoo | <1% | Boodanoo Project E59/2496 Annual Technical Report for the Period Ending 6 January 2023. |
| A134935 | 2023 | Aldoro Resources Limited | Narndee | <1% | Partial Surrender Narndee Project E59/2238 for the period ending 06/04/2023. |
| A136220 | 2023 | Aldoro Resources Limited | Narndee | <1% | E59/2223 Final Report NarndeeProject for the period ending 19/07/2023 |
| A136801 | 2023 | Aldoro Resources Limited | Narndee | 29% | Partial Surrender Narndee Project E59/2258 for the period ending 4/9/2023 |
| A129467 | 2022 | Seremin Pty Ltd | Narndee | <1% | Annual Report for E59/2277 Narndee Project for the period ending 11/10/2021 |
| A124418 | 2020 | Santa Fe Minerals Ltd | Challa South Group 4 | <1% | Final Surrender Report for E 59/02124, E 59/02125, E 59/02259 For the Period 6 March 2016 to 8 May 2020 |
| A125563 | 2020 | Seremin Pty Ltd | Narndee | <1% | Narndee Project Annual Report E59/2277 for the period 12 October 2019 to 11 October 2020 |
| A122042 | 2019 | Altilium Metals Limited | Narndee Area | 29% | Narndee Area E59/2258 Annual Report For the Period 6 September 2018 to 5 September 2019 |
| A119071 | 2019 | Seremin Pty Ltd | Narndee | <1% | Annual Report: Narndee Project E59/2277 for the period 12 August 2017 to 11 August 2018 |
| A119348 | 2019 | Challa Minerals Pty Ltd | Challa South | <1% | Challa South E59/2259 First Annual Report for the period 27 December 2017 to 26 December 2018 |
| A120400 | 2019 | Altilium Metals Limited | Narndee Area | <1% | Narndee Area E59/2238 Annual Report for the period 7 April 2018 to 6 April 2019 |
| A121305 | 2019 | Altilium Metals Limited | Narndee Area | <1% | Narndee Area E59/2223 Annual Report for the period 20 July 2018 to 19 July 2019 |
| A121583 | 2019 | Altilium Metals Limited | Johnsons Well | <1% | Final Surrender Report - E59/2260 & 2261 Johnsons Well for the period 20 July 2017 to 17 July 2019 |
| A122215 | 2019 | Seremin Pty Ltd | Narndee | <1% | Annual Mineral Exploration Report Narndee Project, E59/2277, 12 October 2018 to 11 October 2019 |
| A116883 | 2018 | Gunex Pty Ltd | Kiabye Well | <1% | Kiabye Well E59/2238 Annual Technical Report for the Period 8 April 2017 to 7 April 2018 |
| A117667 | 2018 | Gunex Pty Ltd | Milgoo East | <1% | E59/2223 Annual Technical Report, Milgoo East, 21 July 2017 - 20 July 2018 |
| A117668 | 2018 | Gunex Pty Ltd | E59/2260 | <1% | E59/2260 Annual Technical Report, 21 July 2017 - 20 July 2018 |
| A118239 | 2018 | Gunex Pty Ltd | Milgoo | 29% | Milgoo E59/2258 Annual Technical Report for the period 06/09/2017 - 05/09/2018 |
| A110327 | 2016 | Maximus Resources Limited | Narndee | 5.9% | Combined Annual Technical Report C152/2012 E59/1829, E59/1830, E53/1831 Narndee Project C152/2012 For the Peri |
| A105759 | 2015 | Maximus Resources Ltd | Narndee | 6.1% | 2014 Annual Report For the Period 1/01/2014 to 31/12/2014, C30/2003 E59/908, E59/1335, Narndee Project |
| A106661 | 2015 | Corporate & Resource Consultants Pty Ltd | Narndee | <1% | Annual Technical Report on E59/1834 For the period 9/08/2014 to 8/08/2015 Narndee, WA |
| A106689 | 2015 | Perring R J; Legendre B | Narndee | <1% | Annual Technical Report on E59/1834 Narndee for the period 9 August 2014 to 8 August 2015 |
| A107352 | 2015 | Maximus Resources Ltd | Narndee | 5.6% | FINAL SURRENDER REPORT E59/1335 For the Period 17.04.2008 to 17.07.2015 NARNDEE PROJECT |
| A101686 | 2014 | Maximus Resources Ltd | Narndee | 15% | 2013 ANNUAL REPORT For the Period 1.01.2013 to 31.12.2013 C30/2003 E59/908, E59/1335, E59/1415, NARNDEE PROJEC |
| A101190 | 2014 | Gold & Mineral Resources Pty Ltd | Narndee | 3.3% | Combined Annual Technical Report For the Period 08.08.2012 to 07.08.2013, C152/2012 E59/1829, E59/1830, E59/18 |
| A102334 | 2014 | Gold & Mineral Resources Pty Ltd | Narndee | <1% | 2013/2014 ANNUAL REPORT For the Period 11.04.13 to 10.04.14 E59/1854 NARNDEE PROJECT |
| A103325 | 2014 | Gold & Mineral Resources Pty Ltd | Milgoo | 3.3% | COMBINED ANNUAL TECHNICAL REPORT For the Period 08.08.2013 to 07.08.2014 C152/2012 E59/1829, E59/1830, E59/183 |
| A103623 | 2014 | Te Johnston And Associates Pty Ltd | Narndee | <1% | Annual Technical Report on E59/1834 Narndee For the period 9/8/2013 to 8/8/2014 |
| A96197 | 2013 | West Peak Iron Ltd | Narndee | 100% | Narndee Project, Annual Report for the period 15th December 2011 to 14th December 2012, E59/1748. |
| A97404 | 2013 | West Peak Iron Ltd | Narndee | <1% | Narndee Project, Annual Report for the period 15th December 2011 to 14th December 2012, E59/1748. |
| A97855 | 2013 | Maximus Resources Ltd | Narndee | 7.7% | Narndee Project, Annual Report for the period 01/01/2012 to 31/12/2012, E59/908, 1231, 1238, 1335 & 1415. |
| A98217 | 2013 | Maximus Resources Ltd | Narndee | 89% | Narndee Project, Final Surrender Report for the period 03/03/2010 to 07/06/2013, E59/1415. [C30/2003] |
| A98216 | 2013 | Maximus Resources Ltd | Narndee | 5.6% | Narndee Project, Partial Surrender Report for the period 17/04/2008 to 28/03/2013, E59/1335. [C30/2003] |
| A99504 | 2013 | Te Johnston And Associates Pty Ltd | Narndee | <1% | Annual technical report on E59/1834 For the period 9/8/2012 to 8/8/2013 Narndee, WA |
| A99882 | 2013 | West Peak Iron Ltd | Narndee | 100% | Surrender Report – 2nd September 2011 to 13th September 2013 Narndee Project – E59/1747 |
| A99883 | 2013 | West Peak Iron Ltd | Narndee | <1% | Surrender Report – 15th December 2011 to 13th September 2013 Narndee Project – E59/1748 |
| A95690 | 2012 | Maximus Resources Ltd | Narndee | 3.8% | Narndee Project Final Surrender report for the period 14/11/2002 to 23/03/2010, E59/1078, E59/1081, E59/1084 |
| A92854 | 2012 | Maximus Resources Ltd | Narndee | 6.6% | Final Report For the Period 14/11/2002 to 13/11/2011, C30/2003, E59/1083, 1085, 1173. 1174, and 1365 |
| A92938 | 2012 | Maximus Resources Ltd | Narndee | <1% | FINAL REPORT, For the Period 22.01.07 to 31.01.12, C30/2003, E59/1231 and E59/1238, NARNDEE PROJECT |
| A93507 | 2012 | Maximus Resources Ltd | Narndee | 5.9% | Narndee Project C30/2003, annual report for the period 1/1/2011 to 31/12/2011, E59/908, 1083, 1085, 1173. 1174 |
| A96088 | 2012 | West Peak Iron Ltd | Narndee | 100% | Annual report for the period 2nd September 2011 to 1st September 2012, Narndee Project, E59/1747 |
| A89935 | 2011 | Maximus Resources Ltd | Narndee | <1% | Partial Surrender Report for the period 23.11.2006 to 22.11.2010, E59/1173, Narndee Project |
| A89936 | 2011 | Maximus Resources Ltd | Narndee | 43% | Partial Surrender Report For the Period 23.11.2006 to 22.11.2010 E59/1174 Narndee Project |
| A89938 | 2011 | Maximus Resources Ltd | Narndee | <1% | Partial Surrender Report For the Period 8.02.2007 to 7.02.2011 E59/1231 Narndee Project |
| A86044 | 2010 | Maximus Resources Ltd | Narndee | 4.5% | 2009 ANNUAL REPORT For the Period 1.01.2009 to 31.12.2009 C30/2003 E59/908, E59/1078, E59/1081, E59/1083, E59/ |
| A87816 | 2010 | Sulphide Resources Pty Ltd | NARNDEE NORTH | 4.3% | Combined Annual report for the period 29 July 2009 to 28 July 2010. C79/2010 Narndee North E59/1460 & 1461 |
| A77076 | 2008 | Maximus Resources Ltd | Narndee | <1% | 2007 Annual Report E59/1173 Narndee Project For the Period 23.11.2006 to 22.11.2007 Report Number: MXR07 |
| A77077 | 2008 | Maximus Resources Ltd | Narndee | 43% | 2007 Annual Report For the Period 23.11.2006 to 22.11.2007 Exploration License E59/1174 NARNDEE PROJECT |
| A77282 | 2008 | Maximus Resources Ltd | Narndee | 2.9% | PARTIAL RELINQUISHMENT REPORT For the Period 14.11.2002 to 13.11.2007 E59/1083 - Narndee West NARNDEE PROJECT |
| A77525 | 2008 | Maximus Resources Ltd | Narndee | 4.1% | 2007 ANNUAL REPORT For the Period 1.01.2007 to 31.12.2007 C30/2003, E59/908, E59/1078, E59/1081-85, NARNDEE P |
| A77943 | 2008 | Maximus Resources Ltd | NARNDEE | <1% | 2008 Annual Report For the period 8.02.2007 to 7.02.2008 Exploration Licence E59/1231 Narndee Project |
| A74285 | 2007 | Maximus Resources Ltd | Narndee/Windimurra | 4.1% | 2006 Annual Report, For the Period 01/01/2006 to 31/12/2006, Combined Reporting No. C30/2003, E59/908,1078,108 |
| A74318 | 2007 | Maximus Resources Ltd | Narndee | 4% | 2006 Partial Surrender Report for the Period 14/11/2002 to 13/11/2006, Combined Reporting No. C30/2003, Narnde |
| A70649 | 2005 | Apex Minerals Nl | Windimurra | 2.2% | Windimurra Project, Annual ( & Interim ) Report, E59/908,1078,1081-1085, with new amalgamated tenements E58/23 |
| A68139 | 2004 | Falconbridge Aust Pty Ltd | Narndee/Windimurra | 3.2% | Combined Annual Report for the period 01/01/2003-31/12/2003, Narndee Project, E57/529, E59/908, E59/1078, E59/ |
| A69643 | 2004 | Apex Minerals Nl | Narndee | 6% | Partial Relinquishment Report Narndee Project, E59/908 For the period end 28/7/2004 (Mount Magnet, Windimurra) |
| A65574 | 2002 | Falconbridge Aust Pty Ltd | Milgoo Bore | 6% | E59/908 (Milgoo Bore) Annual Report For The Period September 8/2001 to September 7/2002 |
| A64376 | 2002 | Wedgetail Resources Pty Ltd | Narndee | 6% | Annual Report. 8 September 2000-7 September 2001 Narndee Project E59/908 Murchison Mineral Field Mt Magnet Dis |
| A59592 | 2000 | Marymia Exploration Nl | Narndee | 27% | Annual Report for Narndee Project E59/806 for the Year ending October 1999. |
| A59591 | 2000 | Marymia Exploration Nl | Narndee | 1.5% | Annual Report for Narndee Project E59/813 for the Year ending November 1999. |
| A47306 | 1996 | Tibooburra Gold Nl | Coolybie Well | 1.5% | Coolybie Well Project, Annual Report, Period 3 January 1995 to 2 January 1996, E59/618. |
| A38027 | 1993 | Poseidon Exploration Ltd | Narndee | 24% | Narndee (JV) Project, Annual Report for the period 1st January 1992 to 31st December 1992, E59/302, 415 & 420. |
| A37038 | 1992 | Poseidon Exploration Ltd | Narndee | 19% | Narndee (JV) Project, (Partial) Annual Report for the period 1st September 1990 to 31st December 1990 and |
| A30411 | 1990 | Billiton Australia Pty Ltd | Narndee | 13% | Narndee (JV) Project, 1989 Annual Report, March 1990, E59/120, 302, 304; P59/832-872. |
| A32814 | 1990 | Billiton Australia Pty Ltd | Narndee | 12% | Narndee (JV) Project, Partial Surrender Report, November 1990, E59/120 & E59/302 & Final Surrender Report, No |
| A27394 | 1989 | Bhp Minerals Pty Ltd | Narndee | 5.1% | Narndee, Relinquishment Report for Portions of E59/97-100, March 1989. |
| A26839 | 1989 | Anglo Australian Resources Nl | Narndee | 25% | Narndee, Annual Report, exploration licence E59/120, prospecting licence P59/832 to P59/872. |
| A28724 | 1989 | Hunter Resources Ltd | Narndee | 5.1% | Narndee, E59/97-100, Annual Report, 1989. |
| A25669 | 1988 | Bhp Minerals Pty Ltd | Narndee | 5.1% | Narndee Mafic-Ultramafic Intrusion, Annual report for the period July 1987 - June 1988, E59/97-100 |
| A22145 | 1988 | Anglo Australian Resources Nl | Narndee | 22% | Narndee Project, Annual report for period ending 14 January 1988, E59/120 |
| A20263 | 1987 | Anglo Australian Resources Nl | Narndee | 22% | Narndee Project, Annual report for period ended 14/1/1987, E59/120. |
| A22673 | 1987 | Bhp Minerals Pty Ltd | Narndee | 11% | Ground magnetics, susceptibility measurements and induced polarization surveys, Narndee, E59/99-100 |
| A22872 | 1987 | Bhp Minerals Pty Ltd | Narndee | 5.1% | Report on the Narndee layered mafic-ultramafic intrusion, period ending December 1987, E59/97-100 |
| A19438 | 1986 | Bhp Minerals Pty Ltd | Narndee | 5.1% | Narndee aeromagnetic and radiometric survey, [non-statutory report], November 1986, E59/97-100 |
| A10648 | 1982 | Esso Exploration & Production Australlia Inc | Twin Tanks | 62% | Twin Tanks Project, Annual Report for the year ending 31st December 1981, MC59/2259, 2262, 2263, 4908, 5080, & |
| A11528 | 1982 | Esso Australia Ltd | Narndee | 13% | Narndee Project, Non-statutory Report: Final Report, August 1982,TR70/7789H. |
| A9843 | 1981 | Esso Exploration & Production Australlia Inc | Twins Tanks | 61% | Twins Tanks (JV) Project, Annual Report for the period ending 31st December 1980, MC59/2259, 2262-2263, 4908 |
| A10014 | 1981 | Cra Exploration Pty Ltd | Milgoo | 20% | Milgoo Project, Non-statutory Report: Final Report for the period 09/07/1980 to 15/07/1981, TR70/7697H. |
| A10408 | 1981 | Esso Exploration & Production Australlia Inc | Narndee | 13% | Narndee Project, Annual Report for the period ending 8th August 1981, TR70/7789H. |
| A7801 | 1978 | Newmont Pty Ltd | Narndee | 24% | Narndee Project, Annual Report for the year ending 31/12/1977, (Field Operations), MC59/6685-6706, 6744-6786, |
| A6801 | 1977 | Whim Creek Consolidated Nl | Narndee -Mullermurra | 29% | Narndee -Mullermurra Project, Annual Report for the year ending 31/12/1976, MC59/4904-4905, 4996, 4998-4999, & |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | 1.5% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A6133 | 1976 | Whim Creek Consolidated Nl | Narndee - Mulermrurra | 20% | Narndee - Mulermurra Project, Annual Report for the year ending 31/12/1975, MC59/4892, 4894, 4897-4899, 4901, |
| A6167 | 1976 | Westralian Nickel Exploration Nl | Narndee- Twin Tanks | 61% | Narndee- Twin Tanks Project, Annual Report ( Diamond Drilling ) May - July 1975, MC 59/2259, 2262 -2263, 4908 |
| A38867 | 1976 | Electrolytic Zinc Co | Golden Grove | <1% | Golden Grove (JV) Project, Non-statutory Report: Progress Report, November 1976, MC59/4305..........MC59/6570. |
| A38868 | 1976 | Electrolytic Zinc Co | Golden Grove | <1% | Golden Grove Project, Non-statutory Report:Progress Report , June 1976, MC59/4305.....MC59/6570. |
| A4432 | 1974 | Westralian Nickel Exp Nl | Narndee | 7.8% | Narndee Project, Non-statutory Report: Exploration Report, February 1974, MC59/178-180, 262-264, 318-327, 354- |
| A5518 | 1974 | Westfield Minerals Nl | Narndee and Mullermurra | 21% | Narndee and Mullermurra, Annual report 1974, MC59/4890 ...59/5012 |
| A4585 | 1973 | Westfield Minerals Nl | Narndee - Mulermurra | 20% | Narndee - Mulermurra Project, Annual Report for the period ending 31/12/1973, MC59/4890-4902, 4904-4906, 4990- |
| A5412 | 1973 | Westralian Nickel Exp Nl | Narndee Twin Tanks | 61% | Narndee Twin Tanks Prospect, Interim [non-statutory] report, November 1973, MC59/2259 ... 59/5080 |
| A968 | 1972 | Western Mining Corporation Ltd | Menzies - Comet Vale - Ora Banda | <1% | Menzies - Comet Vale - Ora Banda Project, Non-statutory Report: |
| A2020 | 1970 | Amparts Pty Ltd | Mount Barloweerie | 100% | Annual Report: Geological Report of the Mount Barloweerie Project, MC59/1834-1835 & 2009-2024, |
| A89970 | 1753 | Maximus Resources Ltd | NARNDEE | 5.9% | Narndee Project, 2010 ANNUAL REPORT, For the Period 1.01.2010 to 31.12.2010, C30/2003, E59/908, E59/1083, E59/ |
| A81908 | 1753 | Maximus Resources Ltd | NARNDEE | 4.8% | 2008 ANNUAL REPORT For the Period 1.01.2008 to 31.12.2008 C30/2003 E59/908, E59/1078, E59/1081, E59/1083, E59/ |
| A82159 | 1753 | Maximus Resources Ltd | NARNDEE | <1% | 2009 ANNUAL REPORT For the Period 8.02.2008 to 7.02.2009 Exploration Licence E59/1231 NARNDEE PROJECT |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 2 years · 3 Jan 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/2864 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.