E 59/2110
Register summary
- Holder
- Crimson Metals Pty Ltd
- Local government
- Shire of Yalgoo
- Application received
- 23 Jan 2015
- Commenced
- 1 Dec 2015
- Expiry
- 30 Nov 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148160 | 2025 | Critica Limited | Lucky Draw | <1% | Lucky Draw Project E59/2782 Final Surrender Report for the period ending 07/03/2025 |
| A140700 | 2024 | Venture Minerals Limited | Lucky Draw | <1% | Annual Report E59/2782 Lucky Draw Project for the period ending 07/03/2024 |
| A134756 | 2023 | Viner A J | Mount Gibson Regional | <1% | P 59/2314 Annual Report Mount Gibson Regional for the period ending 06/12/2022. |
| A134373 | 2023 | Angelo Levissianos; Everest Metals Corporation Ltd; Laszlo S | Annual Mineral Exploration Report | <1% | Mineral Exploration Report E 59/2464 for the period ending 25/02/2023. |
| A134754 | 2023 | Andrew Viner | Mount Gibson Regional | <1% | E 59/2609 Annual Report Mount Gibson Regional for the period ending 05/01/2023. |
115 more reports
| A137598 | 2023 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Exploration Report E59/01717 Extension Hill East Project for the period ending 28/09/2023 |
| A129218 | 2022 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Exploration Report C299/2011 for the period 29 September 2020 to 28 September 2021, E 59/01717 |
| A131385 | 2022 | Angelo Levissianos; Laszlo Szalay | Trinity | <1% | Mineral Exploration Report E 59/2464 Trinity Project for the period ending 25/02/2022. |
| A133072 | 2022 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Exploration Repoprt Extension Hill East E59/01717 for the period ending 28/09/2022 |
| A133143 | 2022 | Top Iron Pty Ltd | Lucky Draw | <1% | Lucky Draw E59/1799 Surrender Report for the period ending 12/12/2022 |
| A128916 | 2021 | Top Iron Pty Ltd | Mummaloo | 54% | Partial Relinquishment Report for Jidby E59/2110 Mummaloo Project for the period 1 December 2015 to 30 Novembe |
| A124194 | 2020 | Top Iron Pty Ltd | Mummaloo | 10% | Annual Report on the Greater Mummaloo Project C20/2014 for the period ending 28 May 2020 |
| A125638 | 2020 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Exploration Report E59/01717 [CRG #: 299/2011] Extension Hill East Project for the period ending 28/09/ |
| A118767 | 2019 | Top Iron Pty Ltd | Jidby | 54% | Annual Report on Jidby Project E59/2110 for the period 1 December 2017 to 30 November 2018 |
| A120353 | 2019 | Accent Resources Nl | Magnetite Range | <1% | Surrender Report for E59/1878 Magnetite Range Project for Period 10 July 2013; Ending 4 December 2018 |
| A120540 | 2019 | Top Iron Pty Ltd | Mummaloo | 10% | Annual Report on the Greater Mummaloo Project (C20/2014) for the period 29 May 2018 to 28 May 2019 E 59/01799, |
| A122204 | 2019 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Exploration Report 2019, Extension Hill East, E59/1717, 29 September 2018 to 28 September 2019 |
| A122202 | 2019 | Accent Resources Nl | Magnetite Range | <1% | Combined Annual Report (C103/2010) for E59/875, E59/2303, E59/2043, E59/2044 and M59/166, Magnetite Range Proj |
| A118476 | 2018 | Accent Resources Nl | Magnetite Range | <1% | Combined Annual Report for (C103/2010) Magnetite Range Project for period ending 4th October 2018 |
| A116481 | 2018 | Minjar Gold Pty Ltd | Mount Magnet | <1% | Mount Magnet E59/1181 Annual Report for the period 14/02/2017 - 13/02/2018 |
| A117612 | 2018 | Minjar Gold Pty Ltd | E59/1181 | <1% | 2018 E59/1181 Final Report, 14 February 2012 - 11 July 2018 |
| A118156 | 2018 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Combined Reporting Group C54/2009 Annual Report for the period 01/09/2017 - 31/08/2018, E59/1002, E5 |
| A118408 | 2018 | Extension Hill Pty Ltd | Mount Harry | <1% | Annual Exploration Report E59/01717 Mount Harry Project for the period 29 September 2017 to 28 September 2018 |
| A116140 | 2018 | Top Iron Pty Ltd | Jidby | 54% | Annual Report on the Jidby Project E59/2110 for the period 1/12/16 – 30/11/17 |
| A117374 | 2017 | Top Iron Pty Ltd | Mummaloo | <1% | Annual Report on Greater Mummaloo C20/2014 Reporting Period: 29/05/17 – 28/05/18, M59/744, M59/747, E59/1695, |
| A112555 | 2017 | Minjar Gold Pty Ltd | Minjar | <1% | Minjar E59/1181 Annual Report For the Period 14 February 2016 to 13 February 2017 |
| A114396 | 2017 | Top Iron Pty Ltd | Greater Mummaloo | <1% | Annual Report on Greater Mummaloo C20/2014 Reporting Period: 29/05/16 – 28/05/17, M59/744, M59/747, E59/1695, |
| A114486 | 2017 | Top Iron Pty Ltd | Yidby Hill | <1% | Annual Report on Yidby Hill Project E59/2079 Reporting Period: 19/06/16 – 18/06/17 |
| A115233 | 2017 | Extension Hill Pty Ltd | Extension Hill East | <1% | Annual Mineral Exploration Report 2017 Extension Hill East E59/01717 [C299/2011] for the period 29/09/2016 - 2 |
| A115366 | 2017 | Gindalbie Metals Ltd | Karara | <1% | C54/2009 Karara Iron Project Annual Report For the Period 1 September 2016 to 31 August 2017, E59/01002, E59/0 |
| A115376 | 2017 | Accent Resources Nl | Magnetite Range | <1% | Combined Annual Report (C103/2010) for E59/875, E59/1878, E59/2043, E59/2044 and M59/166 Magnetite Range Proje |
| A107932 | 2016 | Minjar Gold Pty Ltd | MINJAR | <1% | Minjar Gold Project E59/1181 Partial Surrender Report for the period 14/02/2012 to 09/02/2016 |
| A110540 | 2016 | Extension Hill Pty Ltd | Extension Hill East | <1% | ANNUAL REPORT ON EXTENSION HILL EAST, E59/1717 FOR THE PERIOD 29-09-2015 TO 28-09-2016 |
| A108490 | 2016 | Minjar Gold Pty Ltd | Minjar | <1% | 2015 ANNUAL REPORT E59/1181 Tenement: E59/1181 14 FEBRUARY 2015 TO 13 FEBRUARY 2016 Yalgoo Mineral Field, WEST |
| A108653 | 2016 | Extension Hill Pty Ltd | Mount Gibson | <1% | Surrender Report, Exploration Licences E59/1713, 1714 and 1961 (C299/2011) for the period 17th August 2011 to |
| A109436 | 2016 | Top Iron Pty Ltd | Greater Mummaloo | <1% | Annual Report on Greater Mummaloo C20/2014 Reporting Period: 29/05/15 – 28/05/16, M59/744, M59/747, E59/1695, |
| A109837 | 2016 | Top Iron Pty Ltd | Yidby Hill | <1% | Annual Report on the Yidby Hill Project E59/2079 for the period 19/06/15 – 18/06/16 |
| A110205 | 2016 | Minjar Gold Pty Ltd | Karara | <1% | 2016 Combined Annual Technical Report C54/2009 KARARA IRON PROJECT Tenements: E59/1002, E59/1180 for the perio |
| A110414 | 2016 | Accent Resources Nl | Magnetite Range | <1% | Combined Annual Report (C103/2010) for E59/875, E59/1732, E59/1878, E59/2043, E59/2044 and M59/166, Magnetite |
| A110423 | 2016 | Gindalbie Metals Ltd; Minjar Gold Pty Ltd | Karara | <1% | C54/2009 Karara Iron Project Annual Report For the Period 1 September 2015 to 31 August 2016, E59/01002, E59/0 |
| A110655 | 2016 | Top Iron Pty Ltd | Jidby | 54% | Annual Report on the Jidby Project E59/2110 |
| A104724 | 2015 | Minjar Gold Pty Ltd | E59/1181 | <1% | E59/1181 Annual Report for the Period 14/2/2014 –13/2/2015 |
| A106315 | 2015 | Top Iron Pty Ltd | Greater Mummaloo | <1% | Annual Report on Greater Mummaloo C20/2014 Reporting Period: 29/05/14 – 28/05/15, M59/744, M59/747, E59/1695, |
| A107030 | 2015 | Gindalbie Metals Ltd | Karara Iron Project | <1% | C54/2009 Karara Iron Project Annual Report for the period 01/09/2014 to 31/08/2015, E59/01002, E59/01180, E59/ |
| A107478 | 2015 | Extension Hill Pty Ltd | Extension Hill East | <1% | Combined Annual Exploration Report C299/2011 Extension Hill East Project E59/1713, E59/1714, E59/1717 and E59/ |
| A106627 | 2015 | Accent Resources Nl | Yandhanoo Hill | <1% | Annual Report for E59/1878, Yandhanoo Hill Project for the Period Ending 9 July 2015 |
| A100695 | 2014 | West Peak Iron Ltd | Paynes Find | <1% | Final Surrender Report – 11th August 2011 to 13th September 2013 Paynes Find Project – E59/1721 |
| A101917 | 2014 | Gindalbie Metals Ltd | Bonnie - Wolfram King - Queen | <1% | Bonnie - Wolfram King - Queen Project, Final Surrender Report, E59/1421, E59/1422, P59/1881 & P59/1882, for th |
| A102024 | 2014 | Alphabrass Resources | Ninghan | <1% | Ninghan Project Relinquishment Report for E59/1868 for the period 20/8/2013 to 7/2/2014 |
| A104248 | 2014 | Extension Hill Pty Ltd | Extension Hill East | <1% | Extension Hill East Project, Annual Report for the period 30/09/2013 to 29/09/2014, E59/1713, 1714 , 1717 & 19 |
| A101380 | 2014 | Minjar Gold Pty Ltd | Minjar | <1% | 2013 Annual Report E59/1181 Annual Report for the Period 14/2/2013 –13/2/2014 |
| A102026 | 2014 | Mcintyre D | Ninghan | <1% | Ninghan Project Relinquishment Report for E59/1951 for the period 29/8/2013 to 7/2/2014 |
| A102983 | 2014 | Top Iron Pty Ltd | Mummaloo | <1% | Mummaloo Project, Annual Report for the period 29/05/2013 to 28/05/2014, M59/744, 747; E59/1695, 1799, 1815 & |
| A103234 | 2014 | Accent Resources Nl | Yandhanoo Hill | <1% | Annual Report for E59/1878, Yandhanoo Hill Project for the Period Ending 9 July 2014 |
| A103368 | 2014 | Gindalbie Metals Ltd | Lodestone | <1% | LODESTONE IRON ORE PROJECT, C54/2009 ANNUAL TECHNICAL REPORT for E59/1002, E59/1180, E59/1584, E59/1585, E59/1 |
| A99474 | 2013 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Iron Ore Project C54/2009 Annual Technical Report for the period to 31/08/2013, E59/1002, E59/1180, |
| A100432 | 2013 | Extension Hill Pty Ltd | Extension Hill East | <1% | Extension Hill East Project, Annual Report for the year ending 29/09/2013, E59/1713, 1714 & 1717. [C299/2011] |
| A97287 | 2013 | Gindalbie Metals Ltd | Midwest | <1% | Midwest Project, Annual report for E59/1181 for the period 14/02/2012 to 13/02/2013 |
| A101038 | 2013 | Top Iron Pty Ltd | Lucky Draw | <1% | Lucky Draw Project, Annual Report for the period 13/12/2012 to 12/12/2013, E59/1799. |
| A92448 | 2012 | Silver Swan Group Ltd | Kiaby Well | 18% | Partial Surrender Report Kiaby Well E59/934 |
| A95043 | 2012 | West Peak Iron Ltd | Paynes Find | <1% | Annual Report – 11th August 2011 to 11th August 2012 Paynes Find Project – E59/1721 |
| A96058 | 2012 | Extension Hill Pty Ltd | Extension Hill East | <1% | Extension Hill East Project C299/2011, Annual Mineral Exploration Report for the year ending 29 September 2012 |
| A94634 | 2012 | Atlas Iron Ltd | Snake Well | <1% | Snake Well Project E59/1123 1207 1344 467 M59/41 P59/1229-1234 1240-1251 Annual Technical Report To the Depart |
| A95282 | 2012 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Iron Ore Project C54/2009, for the period 01/09/2011 to 31/08/2012. |
| A95637 | 2012 | Prosperity Resources Ltd | Mount Gibson | 12% | Mount Gibson Project Annual Report to the Department of Mines and Petroleum for the period 01/07/2011 to 30/06 |
| A91228 | 2011 | Silver Swan Group Ltd | Kiaby Well | 18% | Kiaby Well Project, Annual Report for the period 04/07/2010 to 30/06/2011, E59/934. |
| A91729 | 2011 | Gindalbie Metals Ltd | Lodestone | <1% | Lodestone Iron Ore Project C54/2009 Annual Technical Report for period 01/09/2010 to 31/08/2011 |
| A91760 | 2011 | Prosperity Resources Ltd | Mount Gibson | 12% | Mount Gibson Project Annual Report to the Department of Mines and Petroleum for the period 01/07/2010 to 30/06 |
| A88076 | 2010 | Silver Swan Group Ltd | Kiaby Well | 18% | PARTIAL SURRENDER REPORT Kiaby Well E59/934 WESTERN AUSTRALIA Date September 2010 |
| A87661 | 2010 | Silver Swan Group Ltd | Kiaby Well | 18% | Kiaby Well Project, Annual Report for the period 04/07/2009 to 30/06/2010, E59/934. |
| A87768 | 2010 | Prosperity Resources Ltd | Mount Gibson | 35% | Mount Gibson Project Exploration Licence 59/878 Partial Surrender Report |
| A88123 | 2010 | Minjar Gold Pty Ltd | Lodestone | <1% | Annual C54/2009 2010 ANNUAL REPORT FOR E59/1002, E59/1421, E59/1422, P59/1847, P59/1848, P59/1849, P59/1877, P |
| A88224 | 2010 | Prosperity Resources Ltd | Mount Gibson | 12% | Annual Report to the Department of Mines and Petroleum for the period 01/07/09 to 30/06/10 |
| A84213 | 2009 | Prosperity Resources Ltd | Mount Gibson (Back Well) | 35% | MOUNT GIBSON PROJECT, Exploration Licence E59/878 (Back Well), Annual Technical Report for the period 04 July |
| A84719 | 2009 | Minjar Gold Pty Ltd | Yidby Road / Lodestone | <1% | YIDBY ROAD PROJECT (MINJAR GOLD LIMITED) LODESTONE IRON ORE PROJECT (GINDALBIE METALS LTD.) C54/2009 2009 ANNU |
| A79296 | 2008 | Silver Swan Group Ltd | Kiaby Well | 18% | Kiaby Well Project, Annual Report for the period 04/07/2007 to 31/06/2008, E59/934. |
| A79530 | 2008 | Minjar Gold Pty Ltd | Yidby Road and Lodestone Iron Ore Projec | <1% | YIDBY ROAD PROJECT (MINJAR GOLD LIMITED) LODESTONE IRON ORE PROJECT (GINDALBIE METALS LTD.) E59/1002 2007 ANNU |
| A76518 | 2007 | Monarch Gold Mining Company Ltd | Ninghan | <1% | E59/1002 2007 PARTIAL RELINQUISHMENT REPORT FOR PERIOD 13/08/03 to 16/07/07 Yalgoo Mineral Field Western Austr |
| A76539 | 2007 | Minjar Gold Pty Ltd | Yidby Road - Loadstone | <1% | Yidby Road - Loadstone Project, Annual Report for the period 13th August 2006 to 12th August 2007, E59/1002. |
| A73159 | 2006 | Gindalbie Metals Ltd | Ninghan | <1% | Ninghan Project, Annual Report for the period 13/08/2003 to 12/08/2004, E59/1002. |
| A73160 | 2006 | Gindalbie Metals Ltd | Ninghan | <1% | Ninghan Project, Annual Report for the period 13/08/2004 to 12/08/2005, E59/1002. |
| A73822 | 2006 | Monarch Gold Mining Company Ltd | Ninghan | <1% | E59/1002 (Ninghan Project) Annual Report for the Period 13/08/05-12/08/06 (Ninghan) |
| A56908 | 1998 | Normandy Gold Ltd | Ninghan | 3.9% | Ninghan Project, Partial Surrender Report for the period ended 27/10/1998, E59/473 & 474. [C487/1994] |
| A56909 | 1998 | Normandy Gold Ltd | Ninghan | 37% | Final and Surrender Report on Exploration for Prospecting Licences P59/1275-1278 & P59/1286-1291 for the perio |
| A57011 | 1998 | Normandy Gold Ltd | Ninghan | 3.9% | Ninghan JV E59/473, 474, P59/1275-1278, 1286-1291 Exploration For Period Ended 27/10/1998 |
| A53183 | 1997 | Normandy Exploration Ltd | Ninghan | 3.9% | Ninghan JV, Period Ended: 27/10/1997 E39/473, 474, P59/1275-1278, 1286-1291, |
| A53332 | 1997 | Bakarra Pty Ltd | Mount Singleton | 29% | A Geological Evaluation, Mount Singleton Project ,E59/699 (10/96 -10/97) Murchison Province Western Australia |
| A54372 | 1997 | Roebuck Resources Nl | Carlinga Well | 4.8% | Carlinga Well Project, Request for extensions on the final relinquishment of E59/465 to E59/467 April 1997 |
| A49678 | 1996 | Normandy Exploration Ltd | Ninghan | 3.9% | Combined annual report on exploration for period ended 27 October 1996 Ninghan JV E59/473, E59/474, P59/1275-1 |
| A46416 | 1995 | Western Mining Corporation Ltd | Ninghan | 3.9% | Annual report for the period 28 October 1994 to 27 October 1995 Ninghan Project Exploration Licences 59/473 an |
| A42889 | 1994 | Western Mining Corporation Ltd | Ninghan | 3.9% | Annual report for the period 28 October 1993 to 27 October 1994 Ninghan Project Exploration Licences E59/473 a |
| A38164 | 1993 | Capricorn Resources Aust Nl | Mount Gibson East | <1% | Mt Gibson East Project, Final Surrender Report for the period 06/0281991 to 05/02/1992, E59/264. |
| A40136 | 1993 | Western Mining Corporation Ltd | Ninghan | 3.9% | First Annual Report for the period 28 October 1992 to 27 October 1993, Ninghan Project, E59/473 & E59/474 |
| A38187 | 1993 | Capricorn Resources Aust Nl | Mount Singleton | 24% | Mt Singleton Project, Final Surrender Report for the period 09/07/1991 to 13/05/1992, E59/288. |
| A41266 | 1993 | Capricorn Resources Aust Nl | Mount Gibson | 4.1% | Mt Gibson Project, Annual Report for the period 01/05/1991 to 31/09/1992, E59/284, 264, 168, 171, 320, 356 ,31 |
| A35447 | 1992 | Croesus Mining Nl | Mount Gibson | 14% | Mt Gibson Project, Final Surrender Report for the period ending 4th April 1992, E59/275. |
| A30267 | 1990 | Capricorn Resources Aust Nl | Mount Gibson | 4.3% | [ Mount Gibson, Non-statutory report March 1990, P59/598 ...59/907, E59/163 ...312 ], Aeromagnetic tape format |
| A30405 | 1990 | Capricorn Resources Aust Nl | Mount Gibson East | <1% | Mt Gibson East Project, Annual Report for the year ended 5th February 1990, E59/264. |
| A30631 | 1990 | Capricorn Resources Aust Nl | Mount Gibson | 3% | Annual Report for the year ending 23/03/90, Mt Gibson Project, E59/232, P59/745, P59/746 & P59/941. |
| A32042 | 1990 | Invincible Gold Nl | Mount Gibson | 14% | Mt Gibson Project, Annual Report for the period September 1989 to October 1990, E59/275. |
| A32522 | 1990 | Reynolds Australia Metals Ltd | Yidby Hill | <1% | Yidby Hill (JV) Project, Annual Report for period ending 4th October 1990, E59/177. |
| A26497 | 1989 | Reynolds Australia Metals Ltd | Yidby Hills | <1% | Yidby Hills, Annual Report, E59/177, 16/10/87 to 15/10/88. |
| A29844 | 1989 | Reynolds Australia Metals Ltd | Yidby Hills | <1% | Yidby Hills (JV) Project, Annual Report for period ending 04/10/1989, E59/177. |
| A29910 | 1989 | Reynolds Australia Metals Ltd | Bonnie Venture | 4.4% | Bonnie Venture Project, Annual Report for period ending 15th September 1989, E59/58. |
| A27457 | 1987 | Gold Partners Nl | Bonnie | 4.4% | An Appraisal of Yandhanoo Hill Mineralisation Potential, E59/58. |
| A21469 | 1987 | Gold Partners Nl | Bonnie Venture | 4.4% | Bonnie Venture Gold Project, Annual Report, September 1987, E59/58 & P59/267. |
| A19781 | 1986 | Oil Partners Nl | Bonnie Venture | 4.4% | Bonnie Venture Gold Project, E59/58, Annual report for 1986 |
| A18238 | 1985 | Oil Partners Nl | Bonnie Venture - Ninghan | 4.4% | Ninghan, Bonnie Venture Project, E59/58, Annual report September 1985 |
| A12180 | 1983 | Pegmin Ltd | Mount Singleton | 49% | Mount Singleton Project, Annual Report for the period ending 31/12/1982, MC59/7571-7577, 7592-7594, 7370-7375, |
| A17203 | 1977 | North Flinders Mines Ltd | Yilgarn -Yalgoo | <1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A |
| A16765 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report; Notes on Photogeological Base Maps of Central-Western porti |
| A16768 | 1976 | North Flinders Mines Ltd | Mount Gibson-Yalgoo | <1% | Mount Gibson-Yalgoo Project, Non-statutory Report: Notes on Preliminary Investigation of Aeromagnetic Anomalie |
| A7080 | 1975 | Australian Selection Pty Ltd | Ninghan | 11% | Ninghan Project, Non-statutory Report: Progress Report , August 1975, MC59/6028-6062, 6082-6100 & 6129-6131. |
| A9645 | 1973 | Mount Singleton | 24% | Mt Singleton Project, Non-statutory Report: Final Report, April 1973, MC59/514, 603-624, 659-666, 682-698, 107 | |
| A1374 | 1970 | Iron Hill Pty Ltd | Mount Gibson | 3.2% | Mount Gibson Project, Non-statutory Report: Drill Hole Cross-Sectionsfor the period ending 31/12/1969, TR70/19 |
| A1375 | 1970 | Iron Hill Pty Ltd | Mount Gibson | 3.2% | Mount Gibson Project, Non-statutory Report: Report on Proposed Development of Mt Gibson Area, Low Grade Iron O |
| A2073 | 1970 | Hawkstone Minerals Ltd | Mount Singleton | 86% | Mount Singleton Project, Annual Report for the period ending 31/12/1970, MC59/603-608, 803-811............1081 |
| A79753 | 1753 | Prosperity Resources Ltd | Mount Gibson (Back Well) | 35% | Mount Gibson Project (Back Well), Exploration Licence 59/878, Annual Technical Report for the period 04 July 2 |
| A117587 | Top Iron Pty Ltd | Yidby Hill | <1% | Annual Report on the Yidby Hill Project, E59/2079, 19 June 2017 - 18 June 2018 | |
| A108136 | Extension Hill Pty Ltd | East Extension Hill | <1% | East Extension Hill E59/1717 Partial Surrender Report for the period 29 September 2011- 28 September 2015 (C29 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 15 months · 30 Nov 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 59/2110 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 59/2110? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.