E 58/662
Register summary
- Holder
- Nemex Pty Ltd
- Application received
- 26 Aug 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150203 | 2025 | Platina Resources Limited | <1% | Final Surrender Report for E58/552 & E58/553 Challa Project for the period ending 14/07/2025. C242/2021 | |
| A151797 | 2025 | Santa Fe Minerals Ltd | 20% | Partial Surrender Report for E 58/502 Challa North Group 1 for the period ending 01/09/2025. | |
| A151815 | 2025 | Santa Fe Minerals Ltd | 20% | Partial Surrender Report for E 58/503 Challa North Group 2 Project for the period ending 01/09/2025 | |
| A144560 | 2024 | Platina Resources Limited | <1% | Combined Annual Report C242/2021 Challa Project for the period ending 14/07/2024. E 58/552,E 58/553 | |
| A136714 | 2023 | Platina Resources Limited | <1% | Challa Project C242/2021 Annual Report for the period ending 14 July 2023 |
133 more reports
| A132104 | 2022 | Platina Resources Limited | <1% | Challa Project C242/2021 Annual Report for the period 15 July 2021 to 14 July 2022. E 58/552,E 58/553 | |
| A128405 | 2021 | Platina Resources Limited | <1% | Challa Gold Project - E58/553 Annual Report for the period 15 July 2020 to 14 July 2021 | |
| A123022 | 2020 | Flinders Canegrass Pty Ltd | <1% | Canegrass C137/210 Annual Technical Report for the period 5 February 2019 to 4 February 2020, E58/00232, E58/0 | |
| A124440 | 2020 | Santa Fe Minerals Ltd | <1% | Final Surrender Report for E58/504, E58/472 Challa North Group 1 Project for the period ending 08/05/2020 | |
| A124567 | 2020 | Santa Fe Minerals Ltd | 20% | Partial Surrender Report for E 58/502 for the period 1 October 2019 to 8 May 2020 | |
| A124600 | 2020 | Santa Fe Minerals Ltd | 20% | Partial Surrender Report for E58/501 E 58/503 Challa North Group 2 for the period ending 08/05/2020 | |
| A125624 | 2020 | Santa Fe Minerals Ltd | 20% | Annual Report For E58/502 Challa North Group 1 Project for the period ending 30/09/2020 | |
| A125679 | 2020 | Santa Fe Minerals Ltd | 20% | Annual Report for C45/2018, E58/501 and E58/503 Challa North Group 2 project for the period 1/10/2019 to the | |
| A118998 | 2019 | Flinders Mines Limited | <1% | Canegrass C137/2010 Annual Technical Report for the period 29 August 2017 to 31 December 2018, E58/00232, E58/ | |
| A121927 | 2019 | Santa Fe Minerals Ltd | 19% | Challa North (Group 1) Project Combined Annual Report C44/2018 for the period 1 October 2018 to 30 September 2 | |
| A122061 | 2019 | Santa Fe Minerals Ltd | 20% | Challa North (Group 2) Project Combined Annual Report C45/2018 for the period 1 October 2018 to 30 September 2 | |
| A116953 | 2018 | Flinders Canegrass Pty Ltd | <1% | Partial Surrender - Canegrass C137/2010, E58/00282, E58/00236 | |
| A118608 | 2018 | Santa Fe Minerals Ltd | 19% | Challa North Project Annual Report on Exploration for the period 1 October 2017 to 30 September 2018, WA Explo | |
| A118610 | 2018 | Santa Fe Minerals Ltd | 20% | Challa North Project Annual Report on Exploration for the period 1 October 2017 to 30 September 2018, WA Expl | |
| A114802 | 2017 | Perring R J; Legendre B; Corporate & Resource Consultants Pt | 20% | First Annual Report - E58/501 Challa North Project for the period 30/08/2016 - 29/08/2017 | |
| A114823 | 2017 | Corporate & Resource Consultants Pty Ltd; Legendre B; Perrin | <1% | First Annual Report - E58/504 Challa North for the period 30 August 2016 to 29 August 2017 | |
| A114873 | 2017 | Pegmatite Holdings Pty Ltd | 20% | First Annual Report - E58/502 Challa Project for the period 01/09/2016 - 31/08/2017 | |
| A114934 | 2017 | Pegmatite Holdings Pty Ltd | 20% | First Annual Report - E58/503 Challa North Project for the period 1 September 2016 to 31 August 2017 | |
| A115114 | 2017 | Flinders Mines Limited | <1% | Canegrass Project C137/210, E58/00232, E58/00236, E58/00282 Annual Report for the period 22 March 2016 to 28 A | |
| A108166 | 2016 | Flinders Mines Ltd | <1% | ANNUAL REPORT For the Period 1 January to 31 December 2015 C137/2010 E58/232, E58/235, E58/236, E58/271, E58/2 | |
| A104925 | 2015 | Flinders Mines Limited | <1% | 2014 Annual Report for the period 1 January to 31 December 2014 (C137/2010) E58/232, E58/235, E58/236, E58/271 | |
| A105006 | 2015 | Flinders Mines Ltd | <1% | Partial Surrender Report E58/236 Canegrass Project For the Period ending 21st March 2015 | |
| A105013 | 2015 | Gold & Mineral Resources Pty Ltd | 77% | Annual Technical Report For the Period 20.11.13 to 19.11.14, E58/431 Windimurra Complex Project. | |
| A106883 | 2015 | Wiltshire K M | 100% | Annual Report for the period 10 August 2014 to 9 August 2015, Paynesville M58/207 . | |
| A101157 | 2014 | Flinders Mines Limited | <1% | 2013 Annual Report For the Period 1 January to 31 December 2013, C137/2010 Canegrass Magnetite Project E58/232 | |
| A103378 | 2014 | Maximus Resources Ltd | 13% | Windimurra Complex Project 2014 Annual Report For the Period 1 July 2012 to 30 June 2013 C29/2003 E58, E58/356 | |
| A96220 | 2013 | Wildpink Enterprises Pty Ltd | 100% | Paynesville - Hannah May Project, Annual Report for the period 9th November 2011 to 8th November 2012, M58/264 | |
| A99140 | 2013 | Maximus Resources Ltd | 13% | 2013 Annual Report For the Period 1 July 2012 to 30 June 2013 C29/2003, E58/356 Windimurra Complex Project | |
| A99473 | 2013 | Wiltshire Km | 100% | Paynesville Gold Project M58/207 Annual Report for the period 10/08/2012 to 09/08/2013 | |
| A92840 | 2012 | Flinders Mines Limited | <1% | 2011 ANNUAL REPORT For the Period 1 January to 31 December 2011 C137/2011 CANEGRASS MAGNETITE PROJECT | |
| A93346 | 2012 | Maximus Resources Ltd | 5.4% | FINAL SURRENDER REPORT, For the Period 22 March 2002 to 31 January 2012, C29/2003, E58/237, E58/273, E58/274, | |
| A94220 | 2012 | Maximus Resources Ltd | 43% | FINAL SURRENDER REPORT For the Period 11 March 2002 to 7 March 2012 C29/2003 E58/240 WINDIMURRA COMPLEX PROJEC | |
| A94625 | 2012 | Wildpink Enterprises Pty Ltd | 100% | Paynesville Project, Annual Report for the period 22nd June to 21st June 2012, M58/230. | |
| A94882 | 2012 | Maximus Resources Ltd | 13% | PARTIAL SURRENDER REPORT For the Period 25 February 2010 to 30 January 2012 C29/2003, E58/356 WINDIMURRA COMPL | |
| A94883 | 2012 | Maximus Resources Ltd | 23% | 2012 ANNUAL REPORT For the Period 1 July 2011 to 30 June 2012 C29/2003, E58/294, E58/356 WINDIMURRA COMPLEX PR | |
| A89742 | 2011 | Flinders Mines Limited | <1% | 2010 Annual Report For the Period 1 January to 31 December 2010 C137/2010, Canegrass Magnetite Project | |
| A91498 | 2011 | Wiltshire Km | 100% | Annual Report for the Period 10/08/2010 to 09/08/2011, M58/207, Paynesville | |
| A86832 | 2010 | Seivwright Mg | 100% | M58/298 Paynesville Project Annual report for the period 26/02/2009 to 25/02/2010 | |
| A77035 | 2008 | Maximus Resources Ltd | 69% | 2007 Annual Report for the period 5.11.2006 to 4.11.2007 P58/1147 - Challa E1, Narndee Project Report Number: | |
| A79626 | 2008 | Wiltshire Km | 100% | Annual report M58/207 for year ending 9/8/2008 | |
| A75856 | 2007 | Maximus Resources Ltd | 8.8% | 2007 Annual Report For the Period 1.07.2006 to 30.6.2007 C29/2003 E58/232, E58/235, E58/236, E58/237, E58/240 | |
| A76858 | 2007 | Mr Wiltshire Km | 100% | Annual report for the period 10 August 2006 to 9 August 2007 Paynesville Project, M58/207 | |
| A73359 | 2006 | Maximus Resources Ltd | 8.8% | Partial Surrender Report 2006, Combined Reporting No. C29/2003, Windimurra Complex E58/232,235-237,240,274, (M | |
| A73503 | 2006 | Maximus Resources Ltd | 8.8% | Narndee E58/232,235-237,240,274, Annual Report, 1 July 2005 to 30 June 2006, Combined Reporting No. C29/2003, | |
| A73908 | 2006 | Mr Wiltshire Km | 100% | Annual Report for the Period 10 August 2005 to 9 August 2006 , Paynesville Project M58/207, (Youanmi). | |
| A73962 | 2006 | Mr Youngs Pw | 69% | Annual Report, Period 05/11/05 to 04/11/06, Elsie East Project P58/1147, (Kirkalocka). | |
| A70649 | 2005 | Apex Minerals Nl | <1% | Windimurra Project, Annual ( & Interim ) Report, E59/908,1078,1081-1085, with new amalgamated tenements E58/23 | |
| A70679 | 2005 | Apex Minerals Nl | 43% | E58/240 Partial relinquishment report, Windimurra Project (11/03/02 - 09/03/05, Cue, Peak Hill mineral field). | |
| A70936 | 2005 | Apex Minerals Nl | <1% | E58/236 Partial relinquishment report, Windimurra Project. (For the period 22/03/2002 - 21/03/2005, Kirkalocka | |
| A71555 | 2005 | Mr Youngs Pw | 69% | Annual report (05/11/04 to 04/11/05, P58/1147, Elsie East South Project, Kirkalocka). | |
| A68969 | 2004 | Apex Minerals Nl | 7% | Combined Annual report for the period 01/07/2003-30/06/2004 Windimurra Project (C29/2003), E58/232, E58/235, E | |
| A67149 | 2003 | Apex Minerals Nl | 7% | Combined Annual Report for the period 1/7/2002 to 30/6/2003 Windimurra Project C29/2003: E58/232,235,236,237,2 | |
| A60070 | 2000 | Australian Gold Resources Ltd | 3.1% | Exploration Licences: E58/203,204,206, C139/1998 - Windimurra 1, Joint Annual Report for the Period 29/01/1999 | |
| A58965 | 1999 | Australian Gold Resources Ltd | 13% | E58/164,203-204,206, Windimurra 1 Project, Annual Report for the period 29 January 1998 to 28 January 1999.[C1 | |
| A59119 | 1999 | Australian Gold Resources Ltd | 43% | E58/164 Windimurra Surrender Report for the period 29th January 1996 to 25th June 1999. | |
| A55389 | 1998 | Windimurra Resources Pty Ltd | <1% | Windimurra - Narndee Project,Non-statutory Report: Geological Report, June 1998, E58/164, 203, 204, 206, E59/7 | |
| A50538 | 1997 | Australian Gold Resources Ltd | 43% | Kantie Murdana Project, Annual Report Exploration Licence E58/164 fo the period 29/01/1996 to 28/01/1997. | |
| A51699 | 1997 | Aarex Resources Nl | 6.5% | Annual report 27/04/96 to 26/04/97 Exploration Licence E58/140, Windimurra Project. | |
| A47795 | 1996 | Gold State Nl | 6.5% | Second Annual Report E58/140 Western Australia (Challa North) Year ended 26 April 1996 | |
| A48275 | 1996 | Gold State Nl | <1% | Challa East Project, Surrender Report for the period 29th June 1995 to 12th January 1996, E58/146. | |
| A49091 | 1996 | Mr King Rm | 74% | Annual report, August 1996, Paynesville, M58/226 | |
| A43475 | 1995 | Peregrine Resources Nl | 100% | Paynesville Project, Annual Report Prospecting Licence P58/816 covering period 22/09/1993 to 21/09/1994. | |
| A44794 | 1995 | Peregrine Resources Nl | 100% | Annual report on prospecting licence 58/846 Paynesville, W.A covering the period 23/03/94 to 22/03/95 | |
| A44795 | 1995 | Peregrine Resources Nl | 100% | Annual report on Prospecting Licence 58/755, Paynesville, Western Australia, covering the period 26/03/94 to 2 | |
| A45055 | 1995 | Gold State Nl | 6.5% | First Annual Report E58-140 Western Australia (Challa North) Year ended 26 April 1995 | |
| A45143 | 1995 | Gold State Nl | <1% | Challa East Project, First Annual Report E58/146 for period 29th June 1994 to 28th June 1995. | |
| A40956 | 1994 | Peregrine Gold Nl | 100% | Annual Report, Paynesville - W A Period 29 Jan 1993 to 28 Jan 1994 | |
| A42091 | 1994 | Peregrine Resources Nl | 100% | Annual report for the period 29/04/93-28/04/94 Paynesville Project P58/757 | |
| A42092 | 1994 | Peregrine Resources Nl | 100% | Annual report for the period 29/04/93-28/04/94 Paynesville Project P58/758 | |
| A42308 | 1994 | Peregrine Resources Nl | 64% | Paynesville Project, Annual Report for the period 23/06/1993 to 22/06/1994, E58/126. | |
| A44796 | 1994 | Peregrine Resources Nl | 17% | Partial Surrender Report for the period 30/12/93-16/12/94 Paynesville Project E58/138 | |
| A44797 | 1994 | Peregrine Resources Nl | 17% | Paynesville Project, Annual Report E58/138 covering period 30/12/1993 to 29/12/1994. | |
| A37328 | 1992 | Anglo Australian Resources Nl | 24% | Mt Carron Project, Final Surrender Report, March 1992, E58/114. | |
| A33611 | 1991 | Geopeko | <1% | Killarney - Wilndimurra Project, Non-statutory Report: Exploration Work for the period September 1990 to Decem | |
| A34212 | 1991 | Geopeko | <1% | Paddy Bore Project, Annual Report for the period 1st August 1990 to 31st July 1991, E58/75. | |
| A29609 | 1990 | Pancontinental Mining Ltd | <1% | Killarney Project, Partial Surrender Report for the period November 1986 to November 1989, E58/40. | |
| A31896 | 1990 | Pancontinental Mining Ltd | <1% | Killarney Project,Partial Surrender Report for the period November 1986 to November 1990,E58/40 | |
| A26311 | 1989 | Pancontinental Mining Ltd | 1.6% | Challa, Second Annual Report, E58/50, Feb 1988 to Feb 1989, | |
| A27296 | 1989 | Metana Minerals Nl | 33% | Final Exploration report on Lucky Eagle Project P58/335; GML58/1774 (Surrender Report for 1989) | |
| A28015 | 1989 | Pancontinental Mining Ltd | <1% | Third Annual Report, Windimurra, E58/31,41,56,75 and 78, June 1988 to June 1989. | |
| A28816 | 1989 | Brunswick Nl | 32% | Lucky Eagle Extended, Annual report 1988/89, P58/335 | |
| A29219 | 1989 | Pancontinental Mining Ltd | <1% | Third annual report, E58/40, Killarney, November 1988 to November 1989 | |
| A30086 | 1989 | Precious Metals Aust Ltd | <1% | Windimurra Hills - Wagoo Hills Project, Non-statutory Report: Exploration Report for the period 01/04/1989 to | |
| A22985 | 1988 | Precious Metals Aust Ltd | <1% | Paynesville, Report on preliminary exploration - 1987, Murchison Mineral Field | |
| A23221 | 1988 | Precious Metals Aust Ltd | <1% | Non-statutory Report : An Appraisal of the Windimurra Project [110], February 1988, E58/28, 47-49 & 53; M58/53 | |
| A23356 | 1988 | Century Metals And Mining Nl | 35% | Mount Carron Prospect, Final report for period 2 May 1987 to 1 May 1988, E58/18 | |
| A24077 | 1988 | Sandhurst Mining Nl | 1.6% | Windimurra, Annual report for period ending 22 February 1988, E58/50 | |
| A25010 | 1988 | Dalrymple Resources Nl | 106% | Paynesville, Final report, September 1988, P58/425, P58/602-603 | |
| A25311 | 1988 | Brunswick Nl | 55% | Elsie Project, Final report 1987-1988, P58/265 and P58/419 | |
| A25601 | 1988 | Pancontinental Mining Ltd | <1% | Second annual report, E58/40 - Killarney, Nov 1987 to Nov 1988 | |
| A26053 | 1988 | Mr Waddell Rk | 94% | Lewis Find Project, Non-statutory Report: Exploration Report,April 1988, M58/95 | |
| A19421 | 1987 | Yinnex Nl | <1% | Windsor Property, [Non-statutory] geological report prepared for prospectus purposes, E58/22, P58/344-349 | |
| A20849 | 1987 | Samson Exploration Nl | 92% | Jumbulyer Project, [Non-statutory report], P58/39 and 58/122 | |
| A21194 | 1987 | Century Metals And Mining Nl | 35% | Mt Carron Project, Annual Report for the period 2nd May 1987 to 1st May 1987, E58/18. | |
| A21680 | 1987 | Yinnex Nl | 100% | South Australian Project, Non-statutory Report: Preliminary Report , P58/128 | |
| A22299 | 1987 | Austplat Minerals Nl | <1% | Windimurra (Windsor) Prospect, Annual report for period ending 23 September 1987, Covering tenements E58/22, P | |
| A22340 | 1987 | Auralia Resources Nl | <1% | Annual report for Killarney E58/40, for period 27 November 1986 to 26 November 1987 | |
| A22662 | 1987 | Bhp Minerals Pty Ltd | <1% | Wondinong area, Windimurra Project, Annual report for the period 1 July 1986 to 30 June 1987, E58/5 | |
| A23220 | 1987 | Precious Metals Aust Ltd | <1% | Windimurra Project, Non-statutory Report: Geological Report for the Precious Metals Australia Ltd, Prospectus | |
| A20869 | 1986 | Yinnex Nl | 100% | P58/128, Paynesville, [Final surrender report], August 1986 | |
| A23219 | 1986 | Precious Metals Aust Ltd | <1% | Non-statutory Report: An Appraisal of Pacific Quest Tenement Areas, Windimurra, Murchison Mineral Field, Weste | |
| A17377 | 1985 | Yinnietharra Exp Pty Ltd | <1% | Paynesville Project, Annual Report for the period 07/12/1984 to 06/12/1985, E58/22. | |
| A13821 | 1984 | Cra Exploration Pty Ltd | 36% | Mount Carron Project, Annual Report for the period ending 09/12/1983, MC58/2448-2451, MC58/2573-2599, ELA58/18 | |
| A13936 | 1984 | Cra Exploration Pty Ltd | 36% | Mount Carron Project, Annual Report for the (six month) period ending 11th May 1984, MC58/2448-2451, 2573-2599 | |
| A14768 | 1984 | Cra Exploration Pty Ltd | 35% | Mount Carron Project, Final Report for the period ending 20/12/1984, E58/18. | |
| A12114 | 1983 | Yinnex Nl | 100% | Paynesville Project, Annual Report, February 1983, GML58/2436. | |
| A12386 | 1983 | Anaconda Aust Inc | 5.1% | Windimurra Project, Final Surrender Report for the year ending 10th April 1983, E58/7-12, 14; E59/12-15. | |
| A12530 | 1983 | V & D Ridolfo Pty Ltd | 93% | Lewis Find Project, Final Surrender Report, February 1983, P58/14 ( MC58/2317). | |
| A12585 | 1983 | V & D Ridolfo Pty Ltd | 100% | Kanti Murdana Project, Final Surrender Report, February 1983, P58/19 ( MC58/2474). | |
| A13164 | 1983 | Alcoa Of Australia Ltd | <1% | Windimurra Complex Project, (1st) Annual Report for the period 18/12/1982 to 17/12/1983, E58/2, 4, 5 & 6. | |
| A11341 | 1982 | Alcoa Of Australia Ltd | <1% | Windimurra Complex Project, (1st) Annual Report for the period ending 18/12/1982, TR70/8083-8084, 8558, & 8756 | |
| A11348 | 1982 | Anaconda Aust Inc | 3% | Windimurra Project, Annual Report for theyear ending 10th April 1982, TR70/8240-8250H. | |
| A7554 | 1978 | Newmont Pty Ltd | 39% | Kantie Murdana Project, Non-statutory Report: Annual Report for the year ending 31/12/1977, TR70/6399H. | |
| A7797 | 1978 | Newmont Pty Ltd | 23% | Windsor Project, Annual Report for the year ending 31/12/1977, MC58/2046 - 2096. | |
| A17203 | 1977 | North Flinders Mines Ltd | <1% | Yilgarn -Yalgoo Project, Non-statutory Report: Reconnaissance Report on Copper-Zinc Massive Sulphide Target A | |
| A4589 | 1973 | Westfield Minerals ( W.A.) N.L. | <1% | Caron Project, Annual Report for the year ending 31/12/1973, MC58/1847, 1849, 1852-1856 & 1860-1861. (Part 1). | |
| A4590 | 1973 | Westfield Minerals ( W.A.) N.L. | <1% | Caron Project, Annual Report for the period ending 31/12/1973, MC58/1847, 1849, 1852-1856 & 1860-1861. (Part 2 | |
| A4591 | 1973 | Westfield Minerals ( W.A.) N.L. | <1% | Caron - Kantie Murdana Project, Annual Report for theyear ending 1973, MC58/1847, 1849, 1852-1856, & 1860-1861 | |
| A968 | 1972 | Western Mining Corporation Ltd | <1% | Menzies - Comet Vale - Ora Banda Project, Non-statutory Report: | |
| A141 | 1970 | Aust Geophysical Pty Ltd | 2.2% | Youanmi Area Project, Non-statutory Report: Progress Report for the year ending 31/12/1969, TR70/3930,3931 & 5 | |
| A140 | 1969 | Aust Geophysical Pty Ltd | 2.2% | Youanmi Area Project, Non-statutory Report: Progress Report for the period 01/08/1968 to 28/02/1969, TR70/3930 | |
| A139 | 1967 | Aust Geophysical Pty Ltd | 2.2% | Youanmi Area Project, Non-statutory Report: Geological Appraisal, May 1967,TR70/3930 & 3931H. | |
| A1884 | 1962 | Mangore Australia Pty Ltd | <1% | Coates - Gabanintha Project, Non-statutory Report:Quarterly Report(s) covering the period 02/07/1961 to 28/03/ | |
| A1885 | 1962 | Mangore Australia Pty Ltd | <1% | Coates - Gabanintha Project, Non-statutory Report:An Economic Evaluation of Vanadifeous Magnetite Deposits of | |
| A1886 | 1962 | Mangore Australia Pty Ltd | <1% | Gabanintha Project, Non-statutory Report: Quarterly Progress Report for the period 01/04/1962 to 30/06/1962, T | |
| A1883 | 1960 | Mangore Australia Pty Ltd | <1% | Coates - Gabanintha Project, Non-statutory Report:Geological Outline, [Gabanintha, Andover], circa 1960, TR70/ | |
| A7980 | 1753 | Amax Iron Ore Corporation | 61% | Paynesville Project, Non-statutory Report: Final Report , July 1978, MC58/2028-2040, 2043-2045, 2106-2109. | |
| A79521 | 1753 | Maximus Resources Ltd | 8.8% | 2008 ANNUAL REPORT For the Period 1.07.2007 to 30.6.2008 For the Period 1.07.2007 to 30.6.2008 E58/232, E58/23 | |
| A80738 | 1753 | Maximus Resources Ltd | 69% | 2008 ANNUAL REPORT For the Period 5.11.2007 to 30.10.2008 P58/1147 – Challa E1 NARNDEE PROJECT | |
| A84548 | 1753 | Maximus Resources Ltd | 5.1% | 2009 ANNUAL REPORT For the Period 1.07.2008 to 30.6.2009 C29/2003 NARNDEE PROJECT | |
| A88203 | 1753 | Maximus Resources Ltd | 5% | 2010 ANNUAL REPORT For the Period 1 July 2009 to 30 June 2010 C29/2003 E58/232, E58/235, E58/236, E58/237, E58 | |
| A91678 | 1753 | Maximus Resources Ltd | 10% | 2011 Annual Report For the Period 1 July 2010 to 30 June 2011 C29/2003 Windimurra Complex Project. | |
| A96896 | 1753 | Flinders Mines Limited | <1% | Canegrass Project, Annual Report for the period 1st January 2012 to 31st December 2012, E58/232......359; P58/ |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 58/662 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 58/662 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 58/662? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.