E 57/1225
Register summary
- Holder
- Sandstone Operations Pty Ltd
- Local government
- Shire of Sandstone
- Application received
- 30 Mar 2022
- Commenced
- 12 Sept 2024
- Expiry
- 11 Sept 2029
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A130192 | 2022 | Venus Metals Corporation Limited | Sandstone | <1% | Annual Report for E57/1152 2022 Sandstone Gold Project for the period ending 04/02/022 |
| A129413 | 2022 | Venus Metals Corporation Limited | Sandstone Gold | 2.9% | Partial Surrender Report of 28 Blocks in E57/984 Sandstone Gold Project for the period ending 11/03/2021 |
| A133003 | 2022 | Alto Metals Limited | Sandstone | <1% | Sandstone Gold Project E57/1029 Partial Surrender Report 2022. |
| A123678 | 2020 | Venus Metals Corporation Limited | BellChamber | 2.9% | Annual Report E57/984, BellChamber Project, 17 March 2019 to 17 March 2020 |
| A125419 | 2020 | Australian Titanium Pty Ltd | Barrambie | <1% | Barrambie Project C150/2009 Annual Report for the period ending 17/08/2020 |
103 more reports
| A120291 | 2019 | Venus Metals Corporation Limited | Bell Chamber | 2.9% | Bell Chamber Project E57/00984 Annual Report for the period 17 March 2018 to 16 March 2019 |
| A121731 | 2019 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report For the Period 20 September 2018 to 19 September 2019, E 57 |
| A121781 | 2019 | Australian Titanium Pty Ltd | Barrambie | <1% | Barrambie C150/2009 Annual Report for the period 18 August 2018 to 17 August 2019 |
| A116926 | 2018 | Venus Metals Corporation Limited | Bell Chamber | 2.9% | E57/00984 Bell Chamber Project Annual Report for the period 17 March 2017 to 17 March 2018 |
| A117830 | 2018 | Neometals Ltd | Barrambie | <1% | Barrambie Project C150/2009 Annual Report for the period 18/08/2017 - 17/08/2018, E57/00769, E57/00770, M57/00 |
| A118570 | 2018 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/ |
| A115490 | 2017 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/ |
| A114003 | 2017 | Venus Metals Corporation Limited; Legendre Bruce | Bell Chamber | 2.9% | Annual Report E57/984 Bell Chamber Project for the period 17 March 2016 to 16 March 2017 |
| A108937 | 2016 | Venus Metals Corporation Limited | Bellchambers | 2.9% | Annual Report E57-984 Annual Report for the period 18 March 2015 to 17 March 2016 |
| A108818 | 2016 | Black Oak Minerals Limited | Sandstone | 29% | SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580, |
| A105480 | 2015 | Black Oak Minerals Limited | Sandstone | 29% | Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014, |
| A106418 | 2015 | Freshwater Minerals Nl | Breakaway Bore | 72% | Breakaway Bore Project E57/800 and E57/886 Final Surrender Report for the period ended 19 March 2015 (C206/201 |
| A104231 | 2014 | Reed Resources Ltd | Barrambie | 16% | Barrambie Project E57/819 Surrender Report for the period ended 08/09/2014 |
| A101991 | 2014 | Southern Cross Goldfields Ltd | Sandstone | 22% | Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013 |
| A103328 | 2014 | Freshwater Minerals | Breakaway Bore | 72% | Breakaway Bore Project, Annual Report for the period 10/08/2013 to 09/08/2014, E57/800 & 886. [C206/2012] |
| A103505 | 2014 | Reed Resources Ltd | Barrambie | 5.2% | ANNUAL TECHNICAL EPORT FOR THE BARRAMBIE PROJECT FOR THE PERIOD ENDED 17TH. AUGUST, 2014. COMBINED REPORT C 15 |
| A97114 | 2013 | Freshwater Minerals | Breakaway Bore | 100% | Annual Tenement Report Breakaway Bore E57/886 for the period 23/01/2012 to 22/01/2013 |
| A98387 | 2013 | Southern Cross Goldfields Ltd | Sandstone | 3.2% | Final Surrender Report for the Sandstone Project, E57/485, for the period 23 October 2003 to 15 March 2013 |
| A99557 | 2013 | Reed Resources Ltd | Barrambie | 5.2% | Annual report for the period 18th. August 2012 to 17th August 2013, Barrambie Project, M57/173, E57/769, E57/ |
| A100213 | 2013 | Southern Cross Goldfields Ltd | Sandstone | <1% | Final Surrender Report for the Sandstone Project, E57/640-I, for the period 30 October 2008 to 29 October 2013 |
| A96295 | 2013 | Freshwater Minerals | Breakaway Bore | 80% | Breakaway Bore Project, Final Surrender Report for the period 23/01/2012 to 14/01/2013, E57/885. [C206/2012] |
| A97309 | 2013 | Troy Resources Ltd.; Western Areas Limited | Sandstone | 8.6% | Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877; |
| A98859 | 2013 | Freshwater Minerals | Breakaway Bore | 72% | Annual Tenement Report for C206/2012 (E57/800 and E57/886), Breakaway Bore Uranium Project for the Period Endi |
| A93563 | 2012 | Troy Resources Nl | Sandstone | 8.1% | Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005 |
| A94538 | 2012 | Lonestar Enterprises Pty Ltd | Hummer Well | <1% | Annual Exploration Report for the period 29 March 2011 to 28 March 2012, Hummer Well E57/804 |
| A95093 | 2012 | Reed Resources Ltd | Barrambie | 5.2% | Barrambie Project, Annual Report for the period 18th August 2011 to 17th August 2012, M57/173, E57/769, E57/77 |
| A90728 | 2011 | Freshwater Minerals | Breakaway Bore | 70% | Annual Tenement Report for E57/800, Breakaway Bore Uranium Project, for the period ending 10/05/2011 |
| A90815 | 2011 | Lonestar Enterprises Pty Ltd | Hummer Well | <1% | Annual Exploration Report for the period 29 March 2010 to 28 March 2011, Hummer Well E57/804 |
| A91796 | 2011 | Reed Resources Ltd | Barrambie | 16% | Barrambie Project, Annual Report for the period 16th September 2010 to 15th September 2011, E57/819. [C150/200 |
| A89872 | 2011 | Troy Resources Nl; Western Areas Nl | Sandstone | 8% | Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010 |
| A93886 | 2011 | Freshwater Minerals | Breakaway Bore | 70% | Annual Tenement Report for E57/800, Breakaway Bore Uranium Project, for the period ending 10/05/2012 |
| A86313 | 2010 | Troy Resources Nl | Sandstone | 8% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De |
| A81032 | 2009 | Desert Energy Ltd | CHARLIE | <1% | SURRENDER REPORT CHARLIE E57/748 |
| A84637 | 2009 | Troy Resources Nl | Sandstone | 59% | E57/580 SANDSTONE WESTERN AUSTRALIA PARTIAL SURRENDER REPORT For the Period 30 September 2005 to 29 September |
| A86968 | 2009 | Troy Resources Nl | Sandstone | 19% | E57/583 Sandstone Western Australia Partial Surrender Report For the Period 5 October 2005 to 4 October 2009 |
| A78963 | 2008 | Troy Resources Nl | Sandstone Project | 2.6% | SANDSTONE PROJECT SURRENDER REPORT For the Period 10 January 2003 to 9 January 2008, Tenement: E57/463 |
| A77241 | 2008 | Troy Resources Nl | Sandstone | 3.2% | Sandstone Project, Partial Surrender Report for the period 23rd October 2003 to 22nd October 2007, E57/485. [ |
| A77701 | 2008 | Troy Resources Nl | Sandstone Project | 8.4% | SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb |
| A74712 | 2007 | Troy Resources Nl | Sandstone | 2.6% | Sandstone Project E57/463 Annual Report For the Period 10 Jan 2006 to 9 Jan 2007 Report No.SSH/REG/07/2/1 |
| A74809 | 2007 | Troy Resources Nl | Sandstone | 7.2% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb |
| A72098 | 2006 | Troy Resources Nl | Sandstone/Clackline/Black Hill | 8% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb |
| A72288 | 2006 | Voermans Geological Services Pty Ltd | Black Range | 2.6% | Annual Report, Black Range (E57/463), for the Period 10 January 2005 to 9 January 2006, Sandstone greenstone |
| A73928 | 2006 | Troy Resources Nl | Sandstone | 13% | Sandstone Project Sandstone, Western Australia, Annual Report, for the Period 5 October 2005 to 4 October 2006 |
| A74463 | 2006 | Troy Resources Nl | Sandstone | <1% | Sandstone Project, Non-statutory Report: Drilling Report on Caravan Park Reserve, December 2006, E57/202. {C28 |
| A70074 | 2005 | Troy Resources Nl | Bellchambers | 3.2% | E57/485, Sandstone, Western Australia, Annual report for the period 23/10/03 - 22/10/04.(Youanmi) |
| A69972 | 2005 | Voermans Geological Services Pty Ltd | Black Range | 2.6% | Annual report for the period 10/01/04 - 09/01/05 Black Range Project, E57/463, East Murchison mineral field, S |
| A70072 | 2005 | Troy Resources Nl | Raffertys Patch | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25 |
| A70626 | 2005 | Troy Resources Nl | Magnet Road | 4.9% | Magnet Road Project E57/208, Surrender report 29th July 2004 to 30th November 2004, C397/1994, (Youanmi, Repor |
| A68124 | 2004 | Voermans Geological Services Pty Ltd | Black Range | 2.6% | Annual Report Black Range ( E57/463) for the period 10 January 2003 to 9 January 2004 Sandstone Greenstone Bel |
| A68574 | 2004 | Troy Resources Nl | Wirraminna Group | <1% | Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/ |
| A69551 | 2004 | Troy Resources Nl | Lightning Well / Magnet Road | 1.2% | Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2 |
| A66340 | 2003 | Troy Resources Nl | Raffertys Patch | <1% | Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179 |
| A67237 | 2003 | Troy Resources Nl | Magnet Road - Lighning Well | 1.2% | Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W |
| A67688 | 2003 | Troy Resources Nl | Sandstone | <1% | Partial Surrender Report for the period 15/6/2000-15/6/2003 Sandstone Project , E57/426 |
| A64624 | 2002 | Abelle Ltd | Gidgee | <1% | Gidgee Project, Annual Report for the period 1st January 2001 to 31st December 2001. [19 Exploration Liceces |
| A65186 | 2002 | Troy Resources Nl | Magnet Road - Lighting Well | 1.2% | Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t |
| A63271 | 2001 | Troy Resources Nl | Jade Creek | <1% | Annual Report, E57/202 ,Jade Creek Project , for the period 30 April 2000 - 29 April 2001. |
| A61518 | 2001 | Troy Resources Nl | Kohler Well | 23% | Kohler Well Project, Partial Surrender Report, for the period 5th June 1996 to 4th June 2000, E57/306. |
| A62851 | 2001 | Troy Resources Nl | Kohler Well | 23% | Final Surrender Report,E57/306,Kohler Well Project, for the period 6th June 1996 to 4th June 2001. |
| A63559 | 2001 | Troy Resources Nl | Magnet Road - Lightning Well | 1.2% | Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto |
| A61180 | 2000 | Troy Resources Nl | Magnet Road - Lightning Well | 1.2% | Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul |
| A60884 | 2000 | Troy Resources Nl | Kohler Well | 23% | Annual Report E57/306, Kohler Well Project, for the period 5th June 1999 to 4th June 2000. |
| A61179 | 2000 | Troy Resources Nl | Jade Creek | <1% | Annual Report, Exploration Licence 57/202, Jade Creek Project , 30 April 1999- 29 April 2000. |
| A61491 | 2000 | Herald Resources Ltd | Magnet Road | 4.9% | Magnet Road Project, Partial Surrender Report for the period 29th July 1993 to 28 July 1998, E57/208. [C379/1 |
| A57816 | 1999 | Dragon Mining Nl | Sandstone | 11% | Surrender Report Sandstone E57/386. |
| A57147 | 1999 | Astro Mining Nl | Sandstone | 2.6% | Joint Annual Report for the Period 12 September 1997 to 11 September 1998, C299/1995- Sandstone, Exploration L |
| A58542 | 1999 | Troy Resources Nl | Jade Creek | <1% | Annual Report Exploration Licence 57/202 Jade Creek Project, Sandstone Region, W.A. 30/04/1998 - 29/04/1999 |
| A58816 | 1999 | Herald Resources Ltd | Magnet Road - Lightning Well | 1.2% | Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19 |
| A53927 | 1998 | Astro Mining Nl | Sandstone | 7.9% | Exploration Licence E57/245 Sandstone (Part of M9669; C299/1995- Sandstone Joint Reporting Group Reporting Per |
| A54281 | 1998 | Battle Mountain Australia Inc | Jade Creek | <1% | Jade Creek JV Project W.A. Exploration Licence: Annual mineral exploration report for the period 30 April 1997 |
| A56051 | 1998 | Herald Resources Ltd | Sandstone - Kohler Well | 23% | Sandstone- Kohler Well Project, Annual Report for the period 01/06/1997 to 01/06/1998, E57/306. |
| A56581 | 1998 | Herald Resources Ltd | Sandstone | 4.9% | Sandstone Project, Annual Report for the period 29/07/1997 to 28/07/1998, E57/208. |
| A53928 | 1998 | Astro Mining Nl | Sandstone | <1% | Exploration Licence E57/246 Sandstone ( Part of M 9669; C299/1995- Sandstone Joint Repweting Group Reporting P |
| A53930 | 1998 | Astro Mining Nl | Sandstone | 36% | Exploration Licence E57/248 Sandstone ( Part of M9669;C299/1995- Sandstone Joint Reporting Group Reporting Per |
| A53931 | 1998 | Astro Mining Nl | Sandstone | 67% | Exploration licence E57/256 Sandstone ( Part of M9669;C299/1995- Sandstone Joint Reporting Group Reporting Per |
| A50554 | 1997 | Herald Resources Ltd | Five Mile Bore | <1% | Five Mile Bore Project, Annual Report E57/292 for the year ending 21st March 1997 |
| A52359 | 1997 | Battle Mountain Australia Inc | Jade Creek | <1% | Jade Creek (JV) Project, Annual Report for the period 30/04/1996 to 29/04/1997, E57/202. |
| A52422 | 1997 | Herald Resources Ltd | Sandstone | <1% | Sandstone Project, Surrender Report for the period 22nd March 1996 to 3rd September 1997, E57/292 ( Five Mile |
| A52638 | 1997 | Herald Resources Ltd | Sandstone - Kohler Well | 4.9% | Partial surrender report, E57/208 29 July 1993 - 29 July 1996 |
| A52751 | 1997 | Herald Resources Ltd | Sandstone- Kohler Well | 23% | 1997 Annual Report ,Sandstone - Kohler Well Project, E57/306 |
| A52793 | 1997 | Astro Mining Nl | Sandstone | 3.7% | Sandstone Project,(Joint) Annual Report for the period 12th September 1996 to 11th September 1997, E57/244-253 |
| A52915 | 1997 | Herald Resources Ltd | Sandstone | 4.9% | Sandstone Project, Annual Report for the period 29/07/1996 to 28/07/1997, E57/208. |
| A47759 | 1996 | Jade Creek Resources Nl | Sandstone | <1% | Sandstone Project E57/202 Annual report for the year ended 30 Arpril 1996 |
| A49113 | 1996 | Herald Resources Ltd | Sandstone | 4.9% | Sandstone Project, Annual Report for the period 29th July 1995 to 28th July 1996, E57/208. |
| A49288 | 1996 | Astro Mining Nl | Sandstone | 3.7% | Exploration Licences E57/244-E57/253 E57/256 and E58/151-E58/153 "Sandstone Diamonds Project" Joint Annual Rep |
| A44819 | 1995 | Mt Kersey Mining Nl | Mickey Well - Tuckanarra | <1% | Mickey Well - Tuckanarra Project, E20/227 & E57/237,Final Surrender Report for the period 22/3/94 to 21/3/95. |
| A45775 | 1995 | Mt Kersey Mining Nl | Sandstone | 1.2% | Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for |
| A47499 | 1995 | Astro Mining Nl | Sandstone | <1% | Sandstone Project, Annual Report for the period 12th September 1994 to 11th September 1995, E57/244-253, E57/2 |
| A44766 | 1995 | Jade Creek Resources Nl | Sandstone | <1% | Sandstone Project E57/202 Annual Report for the year ended 30 April 1995 |
| A45798 | 1995 | Mt Kersey Mining Nl | Sandstone | 4.9% | E57/208, Sandstone Project, Annual Report for the period 29th July 1994 to 28th July 1995. |
| A41337 | 1994 | Jade Creek Exploration Nl | Sandstone | <1% | Annual report for the period ending 30/04/94 Sandstone Project E57/202 |
| A41994 | 1994 | Mt Kersey Mining Nl | Sandstone | 4.9% | Annual report for the period 29/07/93-28/07/94 Sandstone Project E57/208 |
| A11860 | 1983 | Western Mining Corporation Ltd | Sandstone | 6.2% | Annual Report Temporary Reserve 7378H East Murchison Mineral Field - Black Range District 18 January to 17 Dec |
| A12104 | 1983 | Western Mining Corporation Ltd | Sandstone - Blackhill | 2.4% | Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June |
| A9683 | 1981 | Western Mining Corporation Ltd | Sandstone | 2.7% | Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan |
| A5099 | 1974 | Nissho-Iwai Co Aust Pty Ltd | Black Range | 1% | Expiry report [non-statutory] of temporary reserves no. 5718H, Black Range, [ TR70/5718 ] |
| A1884 | 1962 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:Quarterly Report(s) covering the period 02/07/1961 to 28/03/ |
| A1885 | 1962 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:An Economic Evaluation of Vanadifeous Magnetite Deposits of |
| A1886 | 1962 | Mangore Australia Pty Ltd | Coates -Gabanintha | <1% | Gabanintha Project, Non-statutory Report: Quarterly Progress Report for the period 01/04/1962 to 30/06/1962, T |
| A1883 | 1960 | Mangore Australia Pty Ltd | Coates - Gabanintha | <1% | Coates - Gabanintha Project, Non-statutory Report:Geological Outline, [Gabanintha, Andover], circa 1960, TR70/ |
| A82122 | 1753 | Troy Resources Nl | SANDSTONE | 8.3% | SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem |
| A82963 | 1753 | Troy Resources Nl | Sandstone | 59% | E57/580 SANDSTONE WESTERN AUSTRALIA PARTIAL SURRENDER REPORT For the Period 30 September 2005 to 29 September |
| A82965 | 1753 | Troy Resources Nl | Sandstone | 19% | E57/583 SANDSTONE WESTERN AUSTRALIA PARTIAL SURRENDER REPORT, For the Period 5 October 2005 to 4 October 2008, |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 11 Sept 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 57/1225 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 57/1225? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.