E 57/1033
Register summary
- Holder
- Sandstone Exploration Pty Ltd
- Part of
- Brightstar Resources Limited (ASX:BTR) as at 2026-06-30
- Local government
- Shire of Sandstone
- Application received
- 2 June 2015
- Commenced
- 20 Sept 2016
- Expiry
- 19 Sept 2026
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A133046 | 2022 | Alto Metals Limited | Sandstone | <1% | Sandstone Gold Project E57/1030 Partial surrender report for the period ending 07/10/2022. |
| A129532 | 2022 | Alto Metals Limited | Edale Shear Zone | <1% | Alto Metals Edale Co-funded Drilling Report, R22 |
| A133108 | 2022 | Alto Metals Limited | Sandstone | <1% | Sandstone Gold Project E57/1031 Partial Surrender report for the period ending 06/10/2022. |
| A133180 | 2022 | Alto Metals Limited | Sandstone | 15% | Sandstone Gold Project E57/1033 Partial Surrender report for the period ending 07/10/2022. |
| A133184 | 2022 | Alto Metals Limited | Sandstone | <1% | Sandstone Gold Project E57/1044 Partial Surrender Report for the period ending 07/10/2022. |
88 more reports
| A121731 | 2019 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report For the Period 20 September 2018 to 19 September 2019, E 57 |
| A121869 | 2019 | Alto Metals Limited | Sandstone Group 2 | 4.2% | Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2018 to 19 September 2019 |
| A118569 | 2018 | Alto Metals Limited | Sandstone | 4.2% | Sandstone Project C24/2017 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/0 |
| A118570 | 2018 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report for the period 20 September 2017 to 19 September 2018, E57/ |
| A115490 | 2017 | Alto Metals Limited | Sandstone | <1% | Sandstone Project C139/2016 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/ |
| A115491 | 2017 | Alto Metals Limited | Sandstone 2 | 4.2% | Sandstone Project C24/2017 Combined Annual Report for the Period 20 September 2016 to 19 September 2017, E57/0 |
| A108818 | 2016 | Black Oak Minerals Limited | Sandstone | <1% | SANDSTONE PROJECT C28/2005 Combined Annual Report for the period 1 January 2015 to 31 December 2015, E57/580, |
| A105480 | 2015 | Black Oak Minerals Limited | Sandstone | <1% | Combined Annual Report for the Sandstone Project C281/2005 for the period 1 January 2014 to 31 December 2014, |
| A102287 | 2014 | Southern Goldfields Ltd | Sandstone | <1% | Partial Surrender Report, Sandstone Project, E57/704, for the period 20 February 2008 to 19 February 2014. |
| A103801 | 2014 | Southern Cross Goldfields Ltd | Sandstone | <1% | SANDSTONE PROJECT E57/704-I East Murchison Mineral Field Final Surrender Report for the period 20/02/2008 to 2 |
| A101991 | 2014 | Southern Cross Goldfields Ltd | Sandstone | <1% | Combined annual report for the Sandstone Project, East Murchison Mineral Field, for the period 1 January 2013 |
| A98388 | 2013 | Southern Cross Goldfields Ltd | Sandstone | <1% | Final Surrender Report for the Sandstone Project, E57/584, for the period 5 October 2005 to 15 March 2013 |
| A96462 | 2013 | Mithril Resources Ltd | Cork Tree Well | <1% | E57/826 – Cork Tree Well Year 2 Annual Report For the Period 21/12/2011 – 20/12/2012 |
| A97309 | 2013 | Troy Resources Ltd.; Western Areas Limited | Sandstone | <1% | Sandstone Project, Annual Report for the period 1st January 2012 to 31st December 2012, E57/485......E57/877; |
| A98534 | 2013 | Mithril Resources Ltd | Cork Tree Well | <1% | E57/826 – Cork Tree Well Surrender Report for the period 21/12/2010 – 31/05/2013 |
| A100211 | 2013 | Southern Cross Goldfields Ltd | Sandstone | 15% | Final Surrender Report for the Sandstone Project, E57/642-I, for the period 5 September 2007 to 25 September 2 |
| A100212 | 2013 | Southern Cross Goldfields Ltd | Sandstone | <1% | Final Surrender Report for the Sandstone Project, E57/641-I, for the period 30 October 2008 to 29 October 2013 |
| A92793 | 2012 | Mithril Resources Ltd | Cork Tree Well | <1% | E57/826 – CORK TREE WELL, YEAR 1 ANNUAL REPORT, For the Period 21/12/2010 – 20/12/2011 |
| A96222 | 2012 | Troy Resources Ltd. | Sandstone | <1% | Sandstone Project, Nickel Exploration Drillhole WADD0002, for the period 1st January 2010 to 31st December 201 |
| A96259 | 2012 | Western Areas Nl | Sandstone | <1% | Report for 2012 Drill Campaign Sandstone stratigraphic hole WADD0013 E57/0704, Report Period: 1st June 2012 to |
| A93563 | 2012 | Troy Resources Nl | Sandstone | <1% | Sandstone Project Combined Annual Report for the period 1 January 2011 to 31 December 2011, C28/2005 |
| A89872 | 2011 | Troy Resources Nl; Western Areas Nl | Sandstone | <1% | Sandstone Project Combined Annual Report: C28/2005_2010A 1 January 2010 to 31 December 2010 |
| A86313 | 2010 | Troy Resources Nl | Sandstone | <1% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the period 1 january 2009 to 31 De |
| A84490 | 2009 | Troy Exploration Nl | Sandstone | <1% | E57/584 Sandstone W.A, Partial Surrender Report For the Period 5 October 2005 to 4 October 2009 (C28/2005) |
| A77701 | 2008 | Troy Resources Nl | Sandstone Project | <1% | SANDSTONE PROJECT WESTERN AUSTRALIA COMBINED ANNUAL REPORT C28/2005 For the Period 1 January 2007 to 31 Decemb |
| A74809 | 2007 | Troy Resources Nl | Sandstone | 1% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 Jan 2006 to 31 Decemb |
| A73496 | 2006 | Troy Resources Nl | Sandstone | 5.3% | Sandstone Project, Surrender Report, For the Period 14 May 1984 to 8 June 2006, (Troy Resources Report No. SS/ |
| A72098 | 2006 | Troy Resources Nl | Sandstone/Clackline/Black Hill | 1.1% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report For Period 1 January 2005 to 31 Decemb |
| A73928 | 2006 | Troy Resources Nl | Sandstone | <1% | Sandstone Project Sandstone, Western Australia, Annual Report, for the Period 5 October 2005 to 4 October 2006 |
| A70072 | 2005 | Troy Resources Nl | Raffertys Patch | <1% | Combined annual report for the period 01/01/04 - 31/12/04 Wirraminna Group Project, C179/1996, E57/202, E57/25 |
| A70220 | 2005 | Troy Resources Nl | Sandstone | <1% | Sandstone Project, Sandstone, Western Australia, Combined Annual Report for the Period 1 January 2004 to 31 De |
| A68294 | 2004 | Troy Resources Nl | Sandstone | <1% | Annual Report for the period 01/01/2003-31/12/2003 Sandstone Project(C1/1999), E57/189, E57/267, M57/254, M57/ |
| A68574 | 2004 | Troy Resources Nl | Wirraminna Group | <1% | Annual report for the period 01/01/2003-31/12/2003 Wirraminna Group (C179/1996), E57/426, M57/2, M57/191, M57/ |
| A69551 | 2004 | Troy Resources Nl | Lightning Well / Magnet Road | 5.4% | Magnet Road Project, E57/208, E57/429, E57/430, Lightning Well Project E57/220, Annual report for the period 2 |
| A66349 | 2003 | Troy Resources Nl | Sandstone | <1% | Combined Annual Report for the period 1st January 2002 to 31st December 2002 Sandstone Project C1/1999: Dairy |
| A66340 | 2003 | Troy Resources Nl | Raffertys Patch | <1% | Wirraminna Group, Sandstone, Combined Annual Report for the period 1st January 2002 to 31st December 2002 C179 |
| A67237 | 2003 | Troy Resources Nl | Magnet Road - Lighning Well | 5.4% | Annual Report for the period 29 July 2002 to 28 July 2003, Magnet Road Project, E57/208,429,430 & Lighning W |
| A64333 | 2002 | Troy Resources Nl | Wirraminna | 3.9% | Combined Annual Report for the period 1st January 2001 to 31st December 2001 exploration licences 57/309 & 310 |
| A64598 | 2002 | Troy Resources Nl | Sandstone | <1% | Sandstone Project Combined Annual For The Period 1st January 2001 to 31st December 2001. Tenements: Newtown: M |
| A65186 | 2002 | Troy Resources Nl | Magnet Road - Lighting Well | 5.4% | Magnet Road Project E57/208, 57/429 & 57/430 & Lighting Well Project E57/220 ,Annual Report for the period 29t |
| A62172 | 2001 | Troy Resources Nl | Sandstone | <1% | Sandstone Project Combined Annual Report for the period 1st January 2000 to 31st December 2000. Tenements Newt |
| A63535 | 2001 | Troy Resources Nl | Mount Klemptz | <1% | Annual Report ,Exploration Licence 57/257, Mining Licences 57/415, 416, 417, 418 and 419, Mt Klemptz Project, |
| A63559 | 2001 | Troy Resources Nl | Magnet Road - Lightning Well | 5.4% | Combined Annual Report Magnet Road Project E57/208, 57/429 & 57/430 and Lightning Well Project E57/220 Sandsto |
| A62024 | 2001 | Troy Resources Nl | Wirraminna | 3.9% | Wirraminna Project, East Murchison Mineral Field, Western Australia. Combined Annual Report exploration licen |
| A60116 | 2000 | Troy Resources Nl | Sandstone | <1% | Annual Report, Sandstone Project, East Murchison Mineral Field, Western Australia 01/01/1999 to 31/12/1999. Te |
| A61180 | 2000 | Troy Resources Nl | Magnet Road - Lightning Well | 5.4% | Annual Report, Magnet Road Project, E57/208,429,430 & Lightning Well Project E57/220, for the period 29th Jul |
| A61492 | 2000 | Herald Resources Ltd | Lightning Well | 7.1% | Lightning Well Project, Partial Surrender Report for the period 16th September 1993 to 17th June 1998, E57/220 |
| A60928 | 2000 | Troy Resources Nl | Wirraminna | 3.9% | Wirraminna Project East Murchison Mineral Field Western Australia Combined Annual Report Exploration Licences |
| A61041 | 2000 | Troy Resources Nl | Mount Klemptz | <1% | Annual Report E57/257 and M57/415,416,417,418 and 419 Mt Klemptz Project, for the period 6 February 1999 - 2 |
| A57655 | 1999 | Herald Resources Ltd | Sandstone | <1% | Exploration Activites Sandstone Project 01/1999 East Murchison Mineral Field M57/40, 128-130, 179, 192, |
| A58043 | 1999 | Troy Resources Nl | Wirraminna | 3.9% | Combined annual report E57/309 to 310, M57/111, 134, 234, 239, 249, 262 to 264, 266, P57/652, 683, 684, 685, 6 |
| A58309 | 1999 | Troy Resources Nl | Mount Klemptz | <1% | Annual Report Exploration Licence 57/257, Mt Klemptz Project, for the period 06/02/1998 to 05/02/1999. |
| A58816 | 1999 | Herald Resources Ltd | Magnet Road - Lightning Well | 5.4% | Annual Report, Magnet Road/Lightning Well Project, E57/208 and E57/220, 29 July 1998 to 28 July 1999, [C379/19 |
| A53855 | 1998 | Herald Resources Ltd | Sandstone | <1% | 1997 Annual Technical Report, Sandstone Project P57/872, East Murchison Mineral Field 02/1997 - 02/1998 |
| A54226 | 1998 | Battle Mountain Australia Inc | Mount Klemptz | <1% | Mt. Klemptz JV Project, W.A. Exploration Licence: 57/257 06/02/97 - 05/02/98 |
| A54231 | 1998 | Battle Mountain Australia Inc | Wirraminna | 3.9% | Wirraminna JV Project, W.A. 01/01/97 - 31/12/97 Exploration Licence: 57/309-310, Mining Lease: 57/111, 134, |
| A56100 | 1998 | Herald Resources Ltd | Sandstone - Lightning Well | 7.1% | Sandstone - Lightning Well Project, Annual Report , E57/220, for the period 16/09/97-15/09/98. |
| A50828 | 1997 | Stockdale Prospecting Ltd | Lake Mason | <1% | Lake Mason Project, First and Final Report E36/300, E36/301;E57/272-276, E57/278-280 & E57/282-289, March 1997 |
| A51420 | 1997 | Battle Mountain Australia Inc | Mount Klemptz | <1% | Mt Klemptz Joint Venture Project Western Australia Exploration Licence E57/257 Annual Mineral Exploration Repo |
| A52752 | 1997 | Herald Resources Ltd | Sandstone- Lightning Well | 7.1% | 1997 Annual Report for the period 16/09/1966 to 15/09/1997, Sandstone- Lightning Wel lProject, E57/220. |
| A49128 | 1996 | Herald Resources Ltd | Maninga Marley | 7.1% | Annual Technical Report E57/220 16 September 1995 to 15 September 1996 (Maninga Marley) |
| A45775 | 1995 | Mt Kersey Mining Nl | Sandstone | 5.3% | Exploration licences E57/208 & 220 Prospecting Licences P57/769 & 803-5. Sandstone Project, Annual Report for |
| A42887 | 1994 | Mt Kersey Mining Nl | Maninga Marley | 7.1% | E57/220,Maninga Marley Project, Annual report for the period 16 September 1993 to 15 September 1994. |
| A32812 | 1991 | Herald Resources Ltd | Sandstone | <1% | 1990 Annual report on mineral exploration activities Sandstone JV East Murchison Mineral Field |
| A30584 | 1990 | Herald Resources Ltd | Sandstone | <1% | Sandstone J.V. East Murchison Mineral Field 1989 annual report E57/31, M57/13, 34, 38 |
| A27732 | 1989 | Herald Resources Ltd | Sandstone | <1% | 1988 Annual report on Mineral Exploration Activities Sandstone JV East Murchison Mineral Field Herald Resource |
| A23925 | 1988 | Clackline Ltd | Sandstone - Black Hill | <1% | 1987 Annual Report on mineral exploration activities. Sandstone Joint Venture, East Murchison Mineral Field. ( |
| A19017 | 1986 | Clackline Refractories Ltd | Shannons - Sandstone | <1% | E57/31 Black Hills Minerals Ltd - Clackline Refractories Ltd Sandstone Joint Venture (1985) Shannons, Twin |
| A14906 | 1985 | Western Mining Corporation Ltd | Sandstone - Black Hill | 1% | Annual report Sandstone/Black Hill Minerals Joint Venture 7 December 1983 to 2 November 1984 Gold Mining Lease |
| A15425 | 1985 | Western Mining Corporation Ltd | Sandstone - Black Hill | <1% | Terminal Report Sandstone/Black Hill Minerals Joint Venture 3 November 1984 to 17 April 1985 Exploration Licen |
| A13356 | 1984 | Western Mining Corporation Ltd | Sandstone/Black Hill | 1% | Annual Report, Sandstone/Black Hills Minerals Joint Venture, GMLS: 57/1348-1350, 1352, 1353, 1374, 1387, 1388, |
| A11862 | 1983 | Western Mining Corporation Ltd | Sandstone | 4.1% | Annual Report Temporary Reserve 7380H Sandstone East Murchis on Mineral Field - Black Range District 18 Januar |
| A12104 | 1983 | Western Mining Corporation Ltd | Sandstone - Blackhill | 1.3% | Progress Report Sandstone / Black Hill Minerals JV East Murchison Mineral Field - Black Range District 23 June |
| A10963 | 1982 | Western Mining Corporation Ltd | Sandstone | 4.1% | Annual report Temporary reserve 7380H Sandstone East Murchison mineral field Black Range division 18th January |
| A9683 | 1981 | Western Mining Corporation Ltd | Sandstone | 1.4% | Annual Report Temporary Reserve 7378H East Murchison Goldfield, Black Range Division 18 January 1980 to 17 Jan |
| A3591 | 1972 | Kennecott Exp Aust Pty Ltd | Youanmi One | 2% | Youanmi One Project, Non-statutory Report: Stratigraphic Facing at Youanmi One, April 1972, MC57/165-170...... |
| A2455 | 1971 | Kennecott Exp Aust Pty Ltd | Youanmi Four Block | 27% | Youanmi Four Block Project, Annual Report for the period ending 31/12/1971, MC57/1183-1186, 1189-1190 & 1196. |
| A3371 | 1971 | Kennecott Exp Aust Pty Ltd | Youanmi 1 & 2 | 2% | Youanmi 1 & 2 Project, Non-statutory Report:Final Report, Boolygoo Examination for period ending June1971, MC |
| A6936 | 1971 | Kennecott Exp Aust Pty Ltd | Wiluna One (Boolygoo) | 3.4% | Wiluna One (Boolygoo) Project, Non-statutory Report: Exploration Data: Survey Datum Log, Geophysical Surveys, |
| A10529 | 1971 | Kennecott Exp Aust Pty Ltd | Boolygoo | 3.4% | Boolygoo Project, Non-statutory Report: 1970 Progress Report on Boolygoo Examination, February 1971, MC57/165- |
| A11458 | 1971 | Kennecott Exp Aust Pty Ltd | Boolygoo Examination | 3.6% | Boolygoo Examination Project, Annual (Progress) Report , 1970, MC57/ 396-399,400-411, 165-170, 173-177, 200-20 |
| A2567 | 1970 | Kennecott Exp Aust Pty Ltd | Youanmi One | 2% | Youanmi One Project, Annual Report ( Ground Geopysical Survey) for the period ending 31/12/1970, MC57/165-170 |
| A82122 | 1753 | Troy Resources Nl | SANDSTONE | <1% | SANDSTONE PROJECT SANDSTONE WESTERN AUSTRALIA COMBINED ANNUAL REPORT For the Period 1 January 2008 to 31 Decem |
| A50673 | 1753 | Battle Mountain Australia Inc | Wirraminna | 4% | Wirraminna JV Project E57/309, E57/310, M57/111, M57/134, M57/234, M57/239, M57/249, M57/262 to M57/264, M57/2 |
| A82964 | 1753 | Troy Resources Nl | Sandstone | <1% | E57/584 SANDSTONE WESTERN AUSTRALIA PARTIAL SURRENDER REPORT For the Period 5 October 2005 to 4 October 2008 |
| A9685 | 1753 | Western Mining Corporation Ltd | Sandstone | <1% | Sandstone Project, Non-statutory Report: Terminal Report for the period 18th January 1980 to 17th January 1981 |
| A24137 | 1753 | Clackline Ltd | Sandstone - Black Hill | <1% | 1987 partial surrender report. E51/31. East Murchison Mineral Field |
| A47813 | 1753 | Battle Mountain Australia Inc | Mount Klemptz | <1% | Mt Klemptz Project ,E57/257, Annual Mineral Exploration Report 6 February 1995 to 5 February 1996 . |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- Past expiry date · 19 Sept 2026
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 57/1033 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 57/1033? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.