E 53/2095
Register summary
- Holder
- High-Tech Metals Ltd
- Local government
- Shire of Wiluna
- Application received
- 20 Aug 2019
- Commenced
- 6 Apr 2020
- Expiry
- 5 Apr 2030
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A123225 | 2020 | Cullen Resources Limited; Rox Resources Limited | Mount Eureka - Gunbarrel | 3.6% | Combined Report Mount Eureka / Gunbarrel Project C40/2018 for the period ending 29/12/2019 |
| A119516 | 2019 | Cullen Exploration Pty Limited | Mount Eureka - Gunbarrel | 3% | Annual Technical Report C40/2018 Mount Eureka (Gunbarrel) Project for the period 30 December 2017 to 29 Decemb |
| A116543 | 2018 | Kairos Minerals Limited | Dingo Range | 1.6% | Dingo Range C135/2017 Annual Technical Report For the Period 1 January 2017 to 31 December 2017, E53/01928, E5 |
| A116637 | 2018 | Cullen Exploration Pty Limited | Irwin Bore | <1% | Irwin Bore C82/2008 Annual Report for the period 13/02/2017 - 12/02/2018, E53/01209, E53/01637 |
| A116827 | 2018 | Kairos Minerals Limited | Dingo Range | 8.3% | Dingo Range E53/1814 Annual Report for the period 10 March 2017 to 9 March 2018 |
74 more reports
| A118132 | 2018 | Kairos Minerals Limited | Dingo Range | 1.6% | Final Report E53/1731 Dingo Range for the period 30/07/2014 - 19/10/2018 |
| A118135 | 2018 | Kairos Minerals Limited | Dingo Range | 8.3% | E53/1814 Surrender Report for the period 11 March 2016 to 19 October 2018 |
| A116294 | 2018 | Cullen Exploration Pty Limited | Gunbarrel | 2.3% | Annual Technical Report Gunbarrel C162/2009 for the period 1 January 2017 to 31 December 2017, E53/01300, E53/ |
| A112425 | 2017 | Cullen Exploration Pty Limited | Gunbarrel | 2.3% | Gunbarrel Project- Annual Technical Report For the Period 1 January 2016 to 31 December 2016, E53/01299, E53/0 |
| A114490 | 2017 | Rox Resources Limited | Mount Eureka | 15% | Mount Eureka Project C98/2017 Final Surrender Report For the Period 8 August 2016 to 30 June 2017, E53/01875, |
| A112784 | 2017 | Cullen Exploration Pty Limited | Irwin Bore | <1% | Irwin Bore Project C82/2008 Annual Report for the period ending March 2017, E53/01209, E53/01637 |
| A113849 | 2017 | Kairos Minerals Limited | Dingo Range | 8.3% | Dingo Range E53/1814 - Annual Technical Report for the period 11/03/2016 - 10/03/2017 |
| A114558 | 2017 | Kairos Minerals Limited | Dingo Range | 1.6% | E53/1731 - Dingo Range Annual Report for the period 29/07/2016 - 30/07/2017 |
| A108434 | 2016 | Cullen Resources Ltd | Gunbarrel | 1.6% | GUNBARREL PROJECT NORTH EAST GOLDFIELDS, WA ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/01/2015 - 31/12/2015, E5 |
| A108824 | 2016 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | East Murchison Mineral Field, WA North Eastern Goldfields IRWIN BORE PROJECT E53/1209, 1637, P53/1264, 1265 AN |
| A110253 | 2016 | Kairos Minerals Limited | Dingo Range | 1.6% | Dingo Range E53/01731 Annual Report For the Period 29 July 2015 to 27 July 2016 |
| A104619 | 2015 | Cullen Exploration Pty Ltd | Gunbarrel | 5% | Gunbarrel Project E53/1299 Partial Surrender Report For the Period 16th December 2008 to 15th December 2014 |
| A104620 | 2015 | Cullen Exploration Pty Ltd | Gunbarrel | 1.6% | Gunbarrel Project (C162/2009) E53/1299, E53/1300, E53/1630 & E53/1635 Annual Technical Report for the period 1 |
| A104648 | 2015 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project -E53/1209, E53/1637, P53/1264 and P53/1265 Annual Technical Report 13th February 2014 to 1 |
| A106891 | 2015 | Coal First Pty Ltd | Dingo Range | 1.6% | Dingo Range E53/1731 Annual Report For the Period 30 July 2014 to 29 July 2015 |
| A101492 | 2014 | Cullen Resources Ltd | Gunbarrel | 1.6% | Gunbarrel Project Annual Technical Report for the period 1st January 2013 to 31st December 2013, C162/2009. |
| A102308 | 2014 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | North Eastern Goldfields Irwin Bore Project E53/1209, 1637, P53/1264, 1265 Annual Technical Report for the per |
| A97071 | 2013 | Cullen Resources Ltd | Gunbarrel | 3.4% | Gunbarrel Project, Annual Report for theperuiod 1st January 2012 to 31st December 2012, E53/1299 & 1300. [C162 |
| A97798 | 2013 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project E53/1209 P53/1264, 1265 Annual Technical ReportReporting Period 13th February 2012 to 12th |
| A99922 | 2013 | Cullen Resources Ltd | Eureka | 5% | Eureka Project E53/1299 North East Goldfields WA Final Technical Report for co-funded government - industry Dr |
| A93392 | 2012 | Cullen Resources Ltd | Gunbarrel | 3.4% | Gunbarrel Project, Annual Report for the period 1st January 2011 to 31st January 2011, E53/1299 & 1300. [C162/ |
| A93533 | 2012 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project E53/1209, P53/1264, 1265 Annual Technical Report for the period 13th February 2011 to 12th |
| A89509 | 2011 | Cullen Resources Ltd | Gunbarrel | 3.4% | GUNBARREL PROJECT NORTH EAST GOLDFIELDS, W.A. ANNUAL TECHNICAL REPORT, For the Period 1st January 2010 to 31 |
| A89993 | 2011 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project, Annual Report for the period 13th February 2010 to 12th February 2011, E53/1209; P53/1251, |
| A85920 | 2010 | Bhp Billiton Nickel West Pty Ltd | Gunbarrel JV | 3.4% | Gunbarrel JV – Annual Mineral Exploration Report 1 January 2009 – 31 December 2009, C162/2009, E53/1299, E53/1 |
| A86107 | 2010 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project E53/1040, 1137, 1209, P53/1154, 1219, 1251, 1264, 1265, C82/2008 Annual Technical Report - |
| A82272 | 2009 | Cullen Exploration Pty Ltd | IRWIN BORE | <1% | IRWIN BORE PROJECT E53/1040, 1137, 1209 P53/1154, 1219, 1251, 1264, 1265 ANNUAL TECHNICAL REPORT, Period 13th |
| A81569 | 2009 | Bhp Billiton Nickel West P/L | Gunbarrel JV | 2.1% | Combined Mineral Exploration Report - Gunbarrel JV, 1 January 2008 to 31 December 2008 |
| A77297 | 2008 | Bhp Billiton Nickel West Pty Ltd | Gunbarrel | 2.1% | GunbarrelJV Project Annual Report for the period 1st January 2007 to 31st December 2007 , E53/535, E53/568, |
| A77882 | 2008 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | North Eastern Goldfields Irwin Bore Project E53/1209 East Murchison Mineral Field, WA Annual Technical Report |
| A78971 | 2008 | Cullen Exploration Pty Ltd | Irwin Bore | 6.3% | IRWIN BORE PROJECT P53/1251 ANNUAL TECHNICAL REPORT Reporting Period 23rd May 2007 to 22nd May 2008 |
| A74137 | 2007 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Irwin Bore Project E53/403 Annual Report for the Period 9th Nov 2005 to 8th Nov 2006 Report No. NEG/IB/07/3A ( |
| A74547 | 2007 | Bhp Billiton Nickel West Pty Ltd | Gunbarrel | 2.1% | Gunbarrel Nickel JV Project, Annual Technical Report, Period 01/01/2006 - 31/12/2006. Tenements E53/535, E53/5 |
| A72054 | 2006 | Newmont Australia Ltd | Gunbarrel | 2.1% | Combined Annual Report on Gold Exploration for the period 01/01/2005 to 31/12/2005, Project C213/1995, Gunbarr |
| A71777 | 2006 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Gunbarrel Project Irwin Bore E53/403, East Murchison Mineral Field WA, Annual Technical Report, Period 9 Novem |
| A69951 | 2005 | Cullen Exploration Pty Ltd | Gunbarrel | <1% | Annual technical report for the period 09/11/03 - 08/11/04 Gunbarrel Project, Irwin Bore Prospect, E53/403, Ea |
| A70201 | 2005 | Wmc Resources Ltd | Gunbarrel | 2.1% | Gunbarrel joint venture project, Annual technical report, Period 01/01/04 - 31/12/04 Tenements: E53/535, E53/5 |
| A68017 | 2004 | Cullen Exploration Pty Ltd | Irwin Bore | <1% | Gunbarrel Project, Irwin Bore (E53/403), East Murchison Mineral Field , WA. Annual Mineral Exploration Report |
| A68306 | 2004 | Wmc Resources Ltd | Gunbarrel | 2.1% | Annual Technical Report for the period 01/01/2003-31/12/2003 Gunbarrel JV Project E53/535, E53/568, E53/818, E |
| A66116 | 2003 | Cullen Exploration Pty Ltd | Gunbarrel | <1% | Gunbarrel Project, Irwin Bore (E53/403), East Murchison Mineral Field , WA. Annual Mineral Exploration Report |
| A66603 | 2003 | Wmc Resources Ltd | Gunbarrel/Mount Eureka | 2.1% | Annual Report for the period 1 January 2002 to 31 December 2002 NBU Exploration, Exploration Licences E53/535, |
| A64541 | 2002 | Revesco Group Ltd | Irwin Bore | <1% | 2000/2001 Annual Report Irwin Bore Project Area E53/403 East Murchison Mineral Field Western Australia |
| A62046 | 2001 | Cullen Exploration Pty Ltd | Gunbarrel | 25% | Gunbarrel Project Eureka Joint Venture (E53/535) Annual Technical Report for period ending 5 October 2000. QC |
| A64300 | 2001 | Cullen Exploration Pty Ltd | Mount Eureka | 2.1% | Annual Technical Report for the period ending December 2001 Gunbarrel Project Eureka Group (E53/535, 568, 818, |
| A62081 | 2001 | Pacmin Mining Corporation Ltd | Irwin Bore | <1% | 1999/2000 Annual Report Irwin Bore Project Area E53/403 report for period 09/11/99 to 08/11/00 East Murchison |
| A59785 | 2000 | Pacmin Mining Corporation Ltd | Irwin Bore | <1% | 1998/99 Annual Report Irwin Bore Project Area E53/403 Reporting for period 9 December 1998 to 8 December 1999. |
| A59568 | 1999 | Cullen Resources Pty Ltd | Gunbarrel | 25% | Gunbarrel project, Eureka joint venture, E53/535, Annual Technical Report for the Period ending 5/10/1999. |
| A56150 | 1998 | Cullen Exploration Pty Ltd | Gunbarrel | 25% | Gunbarrel Project. Review of exploration - Eureka JV. E53/535. Annual Technical Report for period ending 05/10 |
| A56739 | 1998 | Aberfoyle Resources Ltd | Irwin Bore | <1% | Irwin Bore Project E53/403 Annual Report Period Ending: 08/11/98 |
| A53267 | 1997 | Pegasus Gold Australia Pty Ltd | Mount Eureka | 25% | Mt Eureka Project, Wiluna Region, W.A. Annual Technical Report 06/10/96 - 05/10/97 EL53/535 |
| A53135 | 1997 | Aberfoyle Resources Ltd | Irwin Bore | <1% | Irwin Bore Project, E53/403 Annual Report 08/11/1997 |
| A49761 | 1996 | Aberfoyle Resources Ltd | Irwin Bore | <1% | Irwin Bore Project, E53/403, Annual Report for the period ending 8th November 1996. |
| A47400 | 1995 | Zapopan Nl | Mount Eureka | 25% | EL53/535 PL53/788 Mt Eureka Project Wiluna Region Western Australia Annual Technical Report for period ending |
| A46206 | 1995 | Marymia Exploration Nl | Irwin Bore | <1% | Annual report Irwin Bore Gold Project Exploration Licence E53/403 November 1994 to November 1995 |
| A42946 | 1994 | Marymia Exploration Nl | James Bore | 30% | Surrender Report for the period 1994 James Bore Project E53/510 |
| A43547 | 1994 | Marymia Exploration Nl | Irwin Bore | <1% | Irwin Bore Project, E53/403 Lag soil sampling programme Annual report (Part A) for year ending November 1994 |
| A7039 | 1977 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report: Cross Sections, (Undated), TR70/4583H. |
| A4168 | 1973 | Tenneco Australia Inc | Irwin Bore | 1.7% | Irwin Bore Project, Non-statutory Report: Maps / Plans/ Surveys, November 1969, TR70/4583H. |
| A7079 | 1973 | Minops Pty Ltd | Mount Eureka ( Irwin Bore) | 1.7% | Mount Eureka ( Irwin Bore) Project, Non-statutory Report: Completion Report July 1973, TR70/4583H. |
| A3771 | 1973 | Tenneco Australia Inc | Irwin Bore | 1.7% | Irwin Bore Project, Annual Report for the period ending 20th May 1973, TR70/4583H. |
| A7038 | 1973 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report: Geochemistry Sampling Sheets, ( Eureka & James Bore), to May 1973 |
| A2602 | 1972 | International Oils Exp Nl | Irwin Bore | 1.7% | Irwin Bore Project, Annual Report for the year ending 20th May 1972, TR70/4583H. |
| A7041 | 1972 | Minops Pty Ltd | Mount Eureka | 1.7% | Mt Eureka Project, Non-statutory Report: Turam Electomagnetic Survey- Phase Angle & Normalised Ratio Stacked P |
| A7036 | 1972 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report: Drill Records - Holes EA1 & EA2 , ( Eureka "A" Zone) & Hole EB1, |
| A7037 | 1972 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report:Report on Elfram Electromagnetic Surveys, Eureka " A" , James Bore |
| A1080 | 1971 | Tenneco Australia Inc | Irwin Bore - Mount Eureka | 1.7% | Irwin Bore - Mount Eureka Project, Annual Report for the year ending 20/05/1971, TR70/4583H. |
| A7035 | 1971 | Minops Pty Ltd | Mount Eureka | 1.7% | Mt Eureka Project, Non-statutory Report: Drilling Data & Field Sample Sheets , 1971, TR70/4583H. |
| A7034 | 1970 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report : Magnetic Surveys, April 1970, TR70/4583H. |
| A7030 | 1970 | Minops Pty Ltd | Mount Eureka | 1.7% | Mt Eureka Project, Non-statutory Report: Investigation Report, September 1970, TR70/ 4583H. |
| A7031 | 1970 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report; Geochemical Soil Samples, July 1970, TR70/4583H. |
| A7032 | 1970 | Minops Pty Ltd | Mount Eureka | 1.7% | Mt Eureka Project, Non-statutory Report: Induced Polarization Profiles, February & July 1970, TR70/4583H. |
| A7033 | 1970 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report: Magnetic Surveys, April 1970, TR70/4583H. |
| A73 | 1970 | Minops Pty Ltd | Irwin Bore | 1.7% | Irwin Bore Project, Non-statutory Report: Report on Regional Mapping , January 1970, TR70/4583H. |
| A7040 | 1969 | Minops Pty Ltd | Mount Eureka | 1.7% | Mount Eureka Project, Non-statutory Report: Geochemical & Ground Magnetometer Traverses, February 1969, TR70/4 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 5 Apr 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 53/2095 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 53/2095? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.