E 52/4550
Register summary
- Holder
- Catalyst (Old Highway) Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 19 Dec 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148436 | 2025 | Bryah Resources Limited | Bryah Basin | 2.5% | Partial Surrender Report for E 52/3453 Bryah Basin for the period ending 17/01/2025. |
| A139257 | 2024 | Alchemy Resources (Three Rivers) Pty Ltd | Horseshoe | 35% | Horseshoe Project E 52/1810 Surrender Report for the period ending 01/02/2024. (C36/2015) |
| A133892 | 2023 | Bryah Resources Limited | Bryah Basin | 16% | Partial Surrender Report – E52/3401 Bryah Basin for the period ending 21/11/2022 |
| A134086 | 2023 | Bryah Resources Limited | Bryah Basin | 2.5% | Partial Surrender Report – E52/3453 Bryah Basin for the period ending 21/11/2022. |
| A135856 | 2023 | Bryah Resources Limited | Bryah Basin Project | 4.5% | EIS Co-funded drilling final report (R25) Windalah Deeps |
136 more reports
| A128837 | 2021 | Sandfire Resources Limited | Horseshoe | 15% | Horseshoe Project P52/1467, P52/1468, P52/1469 and P52/1470 Final Surrender Report for the period ending 22/09 |
| A127741 | 2021 | Bryah Resources Limited | Bryah Basin | 3.6% | Partial Surrender Report E52/3236 & E52/3238 Bryah Basin Project for the period 31 March 2015 to 29 March 2021 |
| A123395 | 2020 | Sandfire Resources Limited | Horseshoe | 27% | C36/2015 Horseshoe Project Combined Annual Report for the period ending 15/02/2020 |
| A123202 | 2020 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 for the period 1 January 2019 to 31 Dec |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | 5.1% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
| A123066 | 2020 | Austsino Resources Group Limited | Peak Hill | 1.5% | Annual Report for the Peak Hill Iron Project C230/2007 for the period ending 31/12/2019, E 52/01557, E 52/0186 |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A119233 | 2019 | Austsino Resources Group Limited | Peak Hill | 1.5% | Annual Report for the Peak Hill Iron Project C230/2007 For the Period 1 January 2018 to 31 December 2018, E52/ |
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A119276 | 2019 | Bryah Resources Limited | Aquarius | 3.1% | EIS Co-Funded Drilling Final Report (R#17) Aquarius Project C205/2017, Report Period: 1 January 2018 to 31 Dec |
| A115961 | 2018 | Desert Resources Ltd | Peak Hill | 1.5% | Peak Hill Iron Project C230/2007, E52/01557, E52/01860, E52/02368, E52/02993 Annual Report for the period 1 Ja |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | 4.1% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A115718 | 2018 | Bryah Resources Limited | Peak Hill | 16% | Annual Report E52/3401 Peak Hill Project for the period 28/11/2016 - 28/11/2016 |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | 5.7% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A112081 | 2017 | Billabong Gold Pty Ltd | Three Rivers | 5.9% | Annual Mineral Exploration Report for the Three Rivers Project C183/2009 For the Period 1 January 2016 to 31 D |
| A113942 | 2017 | Pet Fc Pty Ltd | Peak Hill | 4.5% | Peak Hill E52/3236 Annual Report for the period 01/04/2016 to 31/03/2017 |
| A107836 | 2016 | Woolmaton Pty Ltd | Jinglegunna Well | 27% | Final Surrender Report for Jinglegunna Well E52/3114 for the period 19 September 2014 to 18 September 2015 |
| A108092 | 2016 | Northern Star Resources Ltd | Three Rivers | 6% | ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015 THREE RIVERS PROJECT C183/2009, E 52/01668.... |
| A108743 | 2016 | Allkarri Holdings Pty Ltd | Peak Hill | 14% | Final Surrender Report for Peak Hill Project E52/02884 for the period 20/12/2013 to 13/01/2016 |
| A108777 | 2016 | Padbury Mining Limited | Peak Hill | 1.5% | 2015 Combined Annual Mineral Exploration Report C230/2007, Peak Hill Project, Annual Report for the Period 1 J |
| A109209 | 2016 | Pet Fc Pty Ltd | Ravelstone | 4.5% | Annual Report for Ravelstone Project E52/03236 for the period 31/03/2015 to 30/03/2016 |
| A109853 | 2016 | Allkarri Holdings Pty Ltd | Milgun | 2.5% | Final Surrender Report for Milgun Project E52/2774 for the period 31 May 2012 to 30 May 2016 |
| A104522 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | 14% | Peak Hill E52/2884 Annual Report for the period 20/12/2013 to 19/12/2014 |
| A104861 | 2015 | Padbury Mining Ltd | Peak Hill | 1.7% | Peak Hill Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/1557, 1860, 2368, 2436; P52/1329 |
| A105098 | 2015 | Padbury Mining Ltd | E52/1557 | 3.8% | Partial Surrender Report for E52/1557 from 9/11/2004 to 11/12/2014 |
| A105246 | 2015 | Alchemy Resources (Three Rivers) Pty Ltd; Independence Group | Three Rivers | 5.1% | COMBINED ANNUAL REPORT ON C183/2009, BRYAH (THREE RIVERS) PROJECT, FOR THE PERIOD 1 JANUARY 2014 TO 31 DECEMBE |
| A105824 | 2015 | Rni Nl | Horseshoe West | 100% | E52/2668 Annual Technical Report 2015 for the period 20/04/2014 to 19/04/2015 |
| A106053 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Annual Report E52/2774 Peak Hill for the period ended 30/05/2015 |
| A106366 | 2015 | Lodestar Minerals Ltd | Peak Hill - Doolgunna - Dynamite Bore | 1.6% | Peak Hill - Doolgunna - Dynamite Bore Project E52/3112 Final Surrender Report for the period 19/09/2014 - 08/0 |
| A100913 | 2014 | Padbury Mining Ltd | Peak Hill | 3.6% | 2013 Annual Repor t C230/2007 For the per iod 01/01/2013 to 31/12/2013 Peak Hi l l Project Western Australia, |
| A101219 | 2014 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Three Rivers Project Combined Annual Report for the Period 1st January 2013 to 31st December 2013, C183/2009, |
| A102855 | 2014 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Peak Hill Project, Annual Report for the period 01/06/2012 to 31/05/2014, E52/2774. |
| A104597 | 2014 | Independence Group Nl | Bryah | 96% | Annual Report on P52/1468, Bryah Project for the period 17 October 2013 to 16 October 2014 |
| A104599 | 2014 | Independence Group Nl | Bryah | <1% | Annual Report on P52/1467, Bryah Project, for the period 21 October 2013 to 20 October 2014 |
| A102414 | 2014 | Resource And Investment Nl | Horseshoe West | 100% | E52/2668 Horseshoe West Annual Technical Report for the period 20th April 2013 to 19th April 2014 |
| A103091 | 2014 | Padbury Mining Ltd | Peak Hill | 27% | 2014 Final Surrender Report E52_2396 for the period 28 July 2009 - 21 July 2014 |
| A96614 | 2013 | Alchemy Resources (Three Rivers) Pty Ltd | Three Rivers | 5.1% | Combined Annual Report for the Period 1st January 2012 to 31st December 2012, Three Rivers Project M52/685, M5 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | 4% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A97360 | 2013 | Auvex Manganese Limited | Buffs Lease | <1% | E52/2547, Buffs Lease, Annual Report for the period 6th April 2012 to 5th April 2013. |
| A97742 | 2013 | Padbury Mining Ltd | Peak Hill | 11% | E52/1518 Final Surrender for the period 17th November 2003 – 16th November 2012 |
| A98796 | 2013 | Allkarri Holdings Pty Ltd | Peak Hill | 2.5% | Annual Report Peak Hill E52/2774 for the period June 1, 2012 – May 31, 2013 |
| A99877 | 2013 | Alchemy Resources Ltd | Three Rivers | 1.8% | Three Rivers Project, Voluntary Partial Surrender Report, E52/1668, for the period 23rd February 2004 to 17th |
| A98693 | 2013 | Alchemy Resources Ltd | Three Rivers | 12% | Exploration Incentive Scheme: Final Report Bryah Basin Copper-Gold Project for the period 1st of July 2012 to |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | 4% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A93971 | 2012 | Auvex Manganese Limited | Buffs Lease | <1% | E52/2547 Buffs Lease Annual Report for the period 6th April 2011 to 5th April 2012 |
| A93998 | 2012 | Padbury Mining Ltd | Peak Hill | 1.8% | Final Surrender Report E52/1481 Peak Hill Project Western Australia |
| A94110 | 2012 | Alchemy Resources (Three Rivers) Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project Combined Annual Report for the Period 1st July 2011 to 30th June 2012 |
| A95582 | 2012 | Naracoota Resources Ltd | Horseshoe | <1% | P52/1402 Horseshoe project Annual Report for the period 14th September 2011 to 13th September 2012 |
| A95587 | 2012 | Naracoota Resources Ltd | Horseshoe | 96% | Horseshoe P52/1397 Annual Report for the period 14th Sept 2011 to 13th Sept 2012 |
| A89074 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | 9% | Peak Hill NWN Project 2010 Annual Report C17/2008, Report Period: 1 July 2009 – 30 June 2010, E52/1668, E52/16 |
| A90190 | 2011 | Auvex Resources Ltd | Buff's Lease | <1% | ANNUAL REPORT FOR THE PERIOD 6th April 2010 to 5th April 2011 Buff’s Lease E52/2547 |
| A91724 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project CR17/2008 2010 Annual Report Report Period: 1 July 2010 – 30 June 2011 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | 4% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | 2.9% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | 2.3% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A82100 | 2009 | Aurium Resources Ltd | PEAK HILL | 100% | FINAL SURRENDER REPORT FOR E52/1728 PEAK HILL, 30th January 2008 to 29th January 2009 |
| A84440 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill NWN | 9% | Peak Hill NWN Project 2009 Annual Report, 1 July 2008 – 30 June 2009 |
| A82518 | 2009 | Grosvenor Gold Pty Ltd | BRYAH | 35% | BRYAH PROJECT E52/1810 Partial Surrender Report, For the period 3rd February 2005 to 31st March 2009 |
| A77367 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 8.3% | Peak Hill Project 2006 Annual Report, 20 January 2007 - 19 January 2008, C21/2006 |
| A77494 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 3.8% | Annual Technical Report on Exploration Licence E52/1557 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77729 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 1.8% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1481 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77730 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 11% | ANNUAL TECHNICAL REPORT on EXPLORATION LICENCE E52/1518 ON THE PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77717 | 2008 | Haven Resources Ltd | Peak Hill | 100% | Annual Report E52/1728 Peak Hill For the period 30th January 2007 to 29th January 2008 |
| A79777 | 2008 | Eagle Gold Mines Pty Ltd | Peak Hill | 8% | PEAK HILL NWN PROJECT E52/1668, E52/1678, E52/1722, E52/1723, E52/1730, E52/1810, E52/1852, E52/1881 Combined |
| A74693 | 2007 | Gleneagle Gold Ltd | Peak Hill | 8.2% | Peak Hill Project C21/2006 Annual Report for the Period 1 Dec 2005 to 19 Jan 2007 (Peak Hill) |
| A74651 | 2007 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual Report E52/1782 Peak Hill for the period 30th January 2006 to 29th January 2007 (Peak Hill Project). |
| A72248 | 2006 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual Report, E52/1728 Peak Hill, For the Period 30 January 2005 to 29 January 2006. |
| A71687 | 2006 | Greater Pacific Gold Ltd | Peak Hill | 1.8% | Annual Technical report on Exploration Licence E52/1481 on the Peak Hill Sheet, For the year ending November 2 |
| A71688 | 2006 | Greater Pacific Gold Nl | Peak Hill | 11% | Annual Report on Exploration Licence E52/1518 on the Peak Hill Sheet for the year ending November 2005, (Peak |
| A71689 | 2006 | Greater Pacific Gold Ltd | Peak Hill | 3.8% | Annual Report on Exploration Licence E52/1557 for the year ending November 2005. |
| A69882 | 2005 | Peak Hill Manganese Pty Ltd | Peak Hill | 11% | Annual report for the period 15/10/03 - 16/10/04 Peak Hill Project, E52/1518. |
| A70221 | 2005 | Jamora Nominees Pty Ltd | Peak Hill | 100% | Annual report, E52/1728, Peak Hill, for the period 30th January 2004 to 29th January 2005, Meekatharra |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A61900 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596, Peak Hill Mine Joint Venture Project, E52/697, M52/13,116,287,324,345,346,465,541,581-582, P52/5 |
| A58699 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541,581-582 P52/51 |
| A58705 | 1999 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 6596 Peak Hill Mine Joint Venture Project E52/697 Fifth Year and Final Relinquishment Report Period 24 |
| A57938 | 1999 | Zygot Ltd | Bryah | 35% | Final Report for 16/03/94-08/12/98 ,Bryah Project , E52/677. |
| A54838 | 1998 | Troy Resources Nl | Orchard-Reefer | 17% | Orchard-Reefer Project, Peak Hill District, W.A. Annual Report 1997-1998 P52/845-856, ELA52/1093 |
| A55334 | 1998 | Troy Resources Nl | Wongawar Bore | 3.1% | Wongawar Bore Project, Filnal Surrender Report , June 1998, E52/1017. |
| A55346 | 1998 | Resolute Ltd | Marymia Hill JV | <1% | Marymia Hill Joint Venture, Annual Report 01/01/97 - 31/12/97 M52/185, 233-235, 269-276, 340-342, 365-366, 478 |
| A55845 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine JV Project E52/697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,581 582 P52 |
| A55789 | 1998 | Homestake Gold Of Australia Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/697 Fourth Year Partial Relinquishment Report Period 24/0 |
| A56556 | 1998 | St Barbara Mines Ltd | Bryah | 28% | Bryah Project Area E52/601, 677; M52/344, 350, 445, 463, for the period 01/10/1997 - 30/09/1998. |
| A52184 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Joint Venture Project E52/686,697 M52/13,35,56,116,287,324,345-347,452,465,474,541-542,5 |
| A52258 | 1997 | Plutonic Operations Ltd | Peak Hill | <1% | Third Year Partial Relinquishment Report Period 24/06/94 to 23/06/97 |
| A52798 | 1997 | St Barbara Mines Ltd | Bryah | 23% | Annual Report 01/10/96-30/09/97. Bryah Project Area. E52/601,628,677. M52/344,350,445,463. P52/550-555. |
| A53211 | 1997 | St Barbara Mines Ltd | Peak Hill | 13% | Peak Hill Project, Non-statutory Report: Geochemical Exploration Peak Hill/Glengarry Area W.A., 03/1996 - 03/ |
| A50066 | 1997 | Plutonic Operations Ltd | Twin Rivers | <1% | Twin Rivers Joint Venture Horseshoe Range Project E52/771 Annual Report Period 12/12/1995 - 11/12/1996 |
| A50496 | 1997 | Plutonic Operations Ltd | Twin Rivers/Fraser Well | 6.8% | Twin Rivers/Fraser Well Project, Annual Report Period 18/01/1996 - 17/01/1997, P36/1350, E52/911. |
| A50497 | 1997 | Plutonic Operations Ltd | Twin Rivers/Horseshoe Range | 5.2% | Twin Rivers/Horseshoe Project, Annual Report Period 17/01/1996 to 16/01/1997, E52/912. |
| A51016 | 1997 | Troy Resources Nl | Orchard-Reefer | 28% | Orchard-Reefer Project Peak Hill District W.A Annual Report 1996-1997 Tenements P's 52/845 - 52/856 ELA 52/109 |
| A51240 | 1997 | Plutonic Operations Ltd | Peak Hill | 3.1% | Peak Hill (JV) Project, Final Surrender Report for the period 16/03/1996 to 02/10/1996, E52/641. |
| A51347 | 1997 | Troy Resources Nl | Bullgullan Bore SW | 95% | Bullgullan Bore SW, Prospecting Licences P 52/820-P52/824 Annual Report for period March 1996 to March 1997. |
| A51348 | 1997 | Troy Resources Nl | Peak Hill | 3.1% | Peak Hill Project, Annual Report for the period 01/02/1996 to 01/03/1997, E52/1017. |
| A51814 | 1997 | Mines & Resources Australia Pty Ltd | Bullgullan Bore | 1.9% | Bullgullan Bore Project, Annual Report for the period 03/06/1996 to 02/06/1997, E52/757, P52/807 & 808. |
| A52870 | 1997 | Plutonic Operations Ltd | Fraser Well North | 6.8% | Fraser Well North Project, Annual Report for the period 17/01/1997 to 16/01/1998, E52/911. |
| A52871 | 1997 | Plutonic Operations Ltd | Horseshoe Range | 5.2% | Horseshoe Range Project, Annual Report for the period 17/01/1997 to 16/01/1998, E52/912. |
| A46896 | 1996 | Plutonic Operations Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 12/12/94 - 11/12/95, E52/771. |
| A46926 | 1996 | Plutonic Operations Ltd | Peak Hill | 1% | Peak Hill Project, Annual Technical Report for period 30/11/1994 - 29/11/1995, E52/737. |
| A47293 | 1996 | Plutonic Operations Ltd | Twin Rivers/Fraser Well | 6.8% | Twin Rivers/Fraser Well North Project, Annual Report Period 17/01/1995 - 16/01/1996, E52/911. |
| A47294 | 1996 | Plutonic Operations Ltd | Twin Rivers/Horseshoe Range | 5.2% | Twin Rivers Joint Venture/Horseshoe Range Project, Annual Report Period 17/01/1995 - 16/01/1996, E52/912. |
| A47593 | 1996 | Swan Gold Nl | Bryah | 90% | Bryah Project, Annual Report for the period 01/02/1995 to 31/01/1996, E52/794. |
| A47797 | 1996 | Plutonic Operations Ltd | Peak Hill | 7.8% | Annual Report. Period 16/03/1995-15/03/1996. |
| A47820 | 1996 | Solomon Pacific Resources Nl | Orchard-Reefer | 28% | Park Hill (Solomon Pacificferenco) Joint Venture Orchard Reefer project Annual report 1995-1996 Tenements: P52 |
| A48143 | 1996 | Mines & Resources Australia Pty Ltd | Bullgullan | 1.9% | Bullgullan Project, Annual Report for the period 3rd June 1995 to 2nd June 1996, E52/757, P52/807, P52/808. |
| A48742 | 1996 | Plutonic Operations Ltd | Peak Hill | <1% | Project 596 Peak Hill Mine Joint Venture Project E52/442 E52/686 E52/697 M52/13 M52/35 M52/56 M52/116 M52/287 |
| A49652 | 1996 | Plutonic Operations Ltd | Bullgullan | 35% | Bullgullan E52/695 Final Report from 15/09/95- 14/09/96 |
| A44283 | 1995 | Plutonic Operations Ltd | Peak Hill | 9.6% | Peak Hill (JV) Project, Partial Surrender Report for the period 16/3/1988 to 16/2/1995, E52/260. |
| A45019 | 1995 | Afmeco Pty Ltd | Bullgullan | 1.9% | Bullgullan Project, Annual Report E52/757, P52/807, & P52/808 for the period 03/06/1994 to 02/06/1995. |
| A45781 | 1995 | Plutonic Operations Ltd | Bullgullan | 35% | Bullgullan Project, Annual Report E52/695 for the period 15/09/1994 to 14/09/1995. |
| A44284 | 1995 | Plutonic Operations Ltd | Peak Hill | 3.1% | Peak Hill (JV) Project, Partial Tenement Relinquishment Report E52/641 for period 21/03/1992 to 20/03/1995. |
| A44341 | 1995 | Mr Wilson Sw | Bryah | 90% | Bryah Project, Annual Report Exploration Licence E52/794 for the period 1st February 1994 to 31st January 1995 |
| A44395 | 1995 | Plutonic Operations Ltd | Peak Hill | 10% | Peak Hill (JV) Project, Annual Report for the period 16/03/1994 to 15/03/1995, E52/260, E52/404, E52/641, P52/ |
| A45313 | 1995 | Plutonic Operations Ltd | Peak Hill Mine Joint Venture | <1% | Project 596 Peak Hill Mine Joint Venture Project Annual report E52/442 E52/686 E52/697 E52/737 M52/13 M52/35 M |
| A40990 | 1994 | Newcrest Mining Ltd | St Crispin - Ravelstone | 17% | Ravelstone E52/672, St. Crispin - Ravelstone JV Project, . Final Report for the period ending March 1994 |
| A41117 | 1994 | Afmeco Pty Ltd | Peak Hill South | 10% | Peak Hill South (JV) Project, Annual Report, E52/260, E52/404, E52/641. P52/7272 (Group 1) for the period 16/0 |
| A41571 | 1994 | St Barbara Mines Ltd | Bryah | 2.3% | Annual report for the period 14/10/92-31/12/93, Bryah Project, E52/376 E52/601 M52/344 M52/350 M52/445 P52/55 |
| A42607 | 1994 | St Barbara Mines Ltd | Bryah | 1.4% | Annual Report for the period 1st January 1994 to 31st October 1994, Bryah Project . |
| A42648 | 1994 | Dominion Mining Ltd | Divide | 5.9% | Divide Project, Final Surrender Report for the period 3rd July 1992 to 10th June 1994, E52/605. |
| A38278 | 1993 | Afmeco Pty Ltd | M6077/14: Peak Hill gold exploration | 10% | Annual report Peak Hill South JV |
| A35601 | 1992 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South (JV) Project, E52/260 & 404; P52/475 (Group 1)for the period 17/03/1991 to 16/03/1992. |
| A37286 | 1992 | Afmeco Pty Ltd | Peak Hill West | 16% | Partial Surrender Report, Peak Hill West Project, E52/404 for the period 25/10/89 to 24/10/92. |
| A37368 | 1992 | Perilya Mines Nl | Reefer | 12% | Surrender Report, Reefer Project , for the period 19/1/92 to 26/10/92, E52/589. |
| A36773 | 1992 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 30/05/1992, E52/260. |
| A33821 | 1991 | Great Central Mines Nl | Plutonic West | 3% | Plutonic West Project, Annual Report for the period 9th July 1990 to 8th July 1991, E52/346, 348 & 362-365. |
| A33455 | 1991 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South Project, Annual Report for the period 17/03/1990 to 16/03/1991, E52/260 & 404; P52/475-477. |
| A33947 | 1991 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Peak Hill South Project, Partial Surrender Report for the period 16/03/1988 to 15/03/1991, E52/260. |
| A29996 | 1990 | Afmeco Pty Ltd | Peak Hill South | 12% | Peak Hill South Project, Annual Report for the period 1st January 1989 to 31st December 1989, E52/260,404; P52 |
| A31666 | 1990 | Great Central Mines Nl | Plutonic West | 3% | Plutonic West Project, Annual Report for the period ending 25 September 1990, E52/346, 348 & 362-365. |
| A26830 | 1989 | Afmeco Pty Ltd | Peak Hill South | 9.6% | Annual Report for the period 16/03/88-16/03/89 Peak Hill South Project E52/260 |
| A11007 | 1982 | Western Mining Corporation Ltd | Horseshoe | 17% | Horseshoe Project, Final Surrender Report for the period 10th December 1980 to 23rd April 1982, MC52/4123-413 |
| A11347 | 1982 | Stockdale Prospecting Ltd | Horseshoe Townsite | 28% | Horseshoe Townsite, Non-statutory Report: Final Report for the period 18th December 1981 to 17th June 1982, TR |
| A8764 | 1980 | Broken Hill Pty Co Ltd | Peak Hill | <1% | Peak Hill Project, Final Surrender Report, February 1980, MC52/2617-2623 & 2651-2664. |
| A912 | 1967 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 1.7% | Horseshoe Lights Project, Non-statutory Report: Geological Report, August 1967, TR70/3528H. |
| A911 | 1966 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 1.7% | Horseshoe Lights Project, Non-statutory Report: Brief Exploration Report. March 1966, TR70/3528H. |
| A38012 | 1753 | Plutonic Operations Ltd | Plutonic West | 2% | Annual Report for Plutonic West Project,E52/346, 348, 362-365; M52/330-337.for the period 01/01/92 to 31/12/9 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 52/4550 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4550 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4550? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.