E 52/4542
Register summary
- Holder
- Albright Metals Ltd
- Local government
- Shire of Meekatharra
- Application received
- 28 Nov 2025
- Commenced
- 17 Feb 2026
- Expiry
- 16 Feb 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148437 | 2025 | Bryah Resources Limited | Bryah Basin | 33% | Partial Surrender Report for E 52/3240 Bryah Basin for the period ending 11/03/2025. |
| A137813 | 2023 | Auris Minerals Limited | Forrest | <1% | Partial Surrender report for Forrest Project tenement, (E52/1671) for the period 23 November 2004 to 22 Novemb |
| A129582 | 2022 | Auris Minerals Limited | Horseshoe Well | <1% | Annual report for the Horseshoe Well project, E52/3166, for the period 18 December 2020 to 17 December 2021 |
| A126516 | 2021 | Auris Minerals Limited | Horseshoe Well | <1% | Annual report for the Horseshoe Well Project, E52/3166, for the period 18 December 2019 to 17 December 2020 |
| A127779 | 2021 | Bryah Resources Limited | West Bryah | <1% | Partial Surrender Report E52/3237 West Bryah Project for the period 31 March 2015 to 29 March 2021 |
159 more reports
| A127741 | 2021 | Bryah Resources Limited | Bryah Basin | <1% | Partial Surrender Report E52/3236 & E52/3238 Bryah Basin Project for the period 31 March 2015 to 29 March 2021 |
| A123395 | 2020 | Sandfire Resources Limited | Horseshoe | <1% | C36/2015 Horseshoe Project Combined Annual Report for the period ending 15/02/2020 |
| A122538 | 2020 | Auris Minerals Limited | Milgun | <1% | Annual Report for the Milgun Project E52/3166 for the period 18 December 2018 to 17 December 2019 |
| A122829 | 2020 | Auris Minerals Limited | Forrest | <1% | Annual report for the Forrest Project, C16/2008 (E52/1659, E52/1671 and P52/1494–1496), for the period 1 Janua |
| A124043 | 2020 | Bryah Resources Limited | Bryah Basin | 1.5% | Bryah Basin Project C205/2017 Annual Report for the period ended 31/03/2020 |
| A124044 | 2020 | Bryah Resources Limited | West Bryah | <1% | West Bryah Project C72/2020 Annual Report for the period ending 31/03/2020 |
| A125642 | 2020 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2019 to 15 October 2020 |
| A123066 | 2020 | Austsino Resources Group Limited | Peak Hill | 14% | Annual Report for the Peak Hill Iron Project C230/2007 for the period ending 31/12/2019, E 52/01557, E 52/0186 |
| A119297 | 2019 | Auris Exploration Pty Ltd | Forrest | <1% | Annual Report for the Forrest Project C16/2008 (E52/1659, E52/1671 and P52/1494–1496) for the period 1 January |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | 1.2% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A120582 | 2019 | Blue Valley Pty Ltd | Milgun | <1% | Final Surrender Report for Milgun Project E52/2346 for the period 08/04/2018-07/04/2019 |
| A119033 | 2019 | Auris Exploration Pty Ltd | Horseshoe Well - Milgun | <1% | Annual Report for the Horseshoe Well (Milgun) Project, E52/3166, for the period 18 December 2017 to 17 Decembe |
| A119063 | 2019 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2017 to 15 October 2018 |
| A119233 | 2019 | Austsino Resources Group Limited | Peak Hill | 14% | Annual Report for the Peak Hill Iron Project C230/2007 For the Period 1 January 2018 to 31 December 2018, E52/ |
| A119243 | 2019 | Billabong Gold Pty Ltd | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2005 For the Period 1 January 2018 to 31 Dec |
| A119276 | 2019 | Bryah Resources Limited | Aquarius | <1% | EIS Co-Funded Drilling Final Report (R#17) Aquarius Project C205/2017, Report Period: 1 January 2018 to 31 Dec |
| A122115 | 2019 | Bryah Resources Limited | Horseshoe South | <1% | Annual Report for Horseshoe South M52/00806 for the period 16 October 2018 to 15 October 2019 |
| A115961 | 2018 | Desert Resources Ltd | Peak Hill | 15% | Peak Hill Iron Project C230/2007, E52/01557, E52/01860, E52/02368, E52/02993 Annual Report for the period 1 Ja |
| A116440 | 2018 | Auris Exploration Pty Ltd | Forrest | <1% | Combined Annual Report for the Forrest Project, C16/2008 (E52/1659, E52/1671 and P52/1494–1496) for the period |
| A116990 | 2018 | Blue Valley Pty. Ltd. | Milgun | <1% | Annual Report for Milgun Project E52/02346 for the period 8 April 2017 to 7 April 2018 |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | 1.2% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A115660 | 2018 | Independence Group Nl | Bryah Project | <1% | E52/3472 Bryah Project Annual Report for the period 06/12/2016 - 05/12/2017 |
| A115873 | 2018 | Auris Exploration Pty Ltd | Milgun | <1% | Annual Report for the Milgun Project E52/3166 for the period 18 December 2016 to 17 December 2017 |
| A116042 | 2018 | Billabong Gold Pty Ltd; Independence Group Nl | Three Rivers | <1% | Annual Mineral Exploration Report for the Three Rivers Group C183/2009 For the Period 1 January 2017 to 31 Dec |
| A112135 | 2017 | Grosvenor Gold Pty Limited | Forrest | <1% | Forrest Project C16/2008 Annual Mineral Exploration Report for the period 1 January 2016 to 31 December 2016, |
| A113943 | 2017 | Pet Fc Pty Ltd | Peak Hill | <1% | Peak Hill E52/3237 Annual Report for the period 01/04/2016 - 31/03/2017 |
| A113944 | 2017 | Pet Fc Pty Ltd | Peak Hill | <1% | Peak Hill E52/3238 Annual Report for the period 01/04/2016 - 31/03/2017 |
| A113945 | 2017 | Pet Fc Pty Ltd | Peak Hill | 33% | Annual Report E52/3240 Peak Hill Project for the period 01/04/2016 - 31/03/2017 |
| A114203 | 2017 | Blue Valley Pty. Ltd. | Milgun | <1% | Annual Report for Milgun Project E52/02346 for the period 08/04/2016 - 07/04/2017 |
| A115464 | 2017 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South M52/806 For the Period 6 October 2016 to 15 October 2017 |
| A111981 | 2017 | Grosvenor Gold Pty Limited | Horseshoe Well | <1% | Horseshoe Well E52/3166 Annual Technical Report for the period For the Period 18 December 2015 to 17 December |
| A107726 | 2016 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South M52/806 Annual Report for the period 16/10/2014 to 15/10/2015 |
| A107967 | 2016 | Grosvenor Gold Pty Ltd | Fortnum | <1% | COMBINED ANNUAL TECHNICAL REPORT C16/2008 FORTNUM TENEMENT NUMBERS E52/1659 and E52/1671 (for the period 01/01 |
| A108777 | 2016 | Padbury Mining Limited | Peak Hill | 15% | 2015 Combined Annual Mineral Exploration Report C230/2007, Peak Hill Project, Annual Report for the Period 1 J |
| A109211 | 2016 | Pet Fc Pty Ltd | Crain Bore | <1% | Annual Report for Crain Bore Project E52/03238 for the period 31/03/2015 to 30/03/2016 |
| A109212 | 2016 | Pet Fc Pty Ltd | Horseshoe Runway | 33% | Annual Report for Horseshoe Runway Project E52/03240 for the period 31 March 2015 to 30 March 2016 |
| A109988 | 2016 | Metals X Limited | Horseshoe Range | 2.6% | Horseshoe Range C153/2015 Final Surrender Report, E52/3005, P52/1257, P52/1259, P52/1340, P52/1341 & P52/1383 |
| A110143 | 2016 | Metals X Limited | Horseshoe | 1.3% | Annual Mineral Exploration Report 2016, C153/2015 (Horseshoe Project) for the period 3 August 2015 to 2 August |
| A107912 | 2016 | Grosvenor Gold Pty Ltd | Horseshoe Well | <1% | Horseshoe Well Project E52/3166 Annual Technical Report for the period 18 December 2014 to 17 December 2015 |
| A109210 | 2016 | Pet Fc Pty Ltd | Dandy Well | <1% | Annual Report for Dandy Well Project E52/03237 for the period 31/03/2015 to 30/03/2016 |
| A109443 | 2016 | Blue Valley Pty. Ltd. | Milgun | <1% | Annual Report for Milgun Project E52/02346 for the period 8 April 2015 to 7 April 2016 |
| A110543 | 2016 | Process Minerals International Pty Ltd | Horseshoe South | <1% | Annual Report for Horseshoe South Project M52/00806 for the period 16/10/2015 to 15/10/2016 |
| A104861 | 2015 | Padbury Mining Ltd | Peak Hill | 17% | Peak Hill Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/1557, 1860, 2368, 2436; P52/1329 |
| A104865 | 2015 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Combined Annual Technical Report (C16/2008) E52/1659 and E52/1671 for the period 1 January 2014 to 31 December |
| A107465 | 2015 | Rni Nl | Horseshoe West | 1.6% | Horseshoe West Project C134/2013 Combined Annual Technical Report for the period 26 October 2014 to 25 October |
| A105097 | 2015 | Desert Resources Ltd | E52/1860 | 32% | E52/1860 Partial Surrender Report for the period 25/08/2005 – 11/12/2014 |
| A105900 | 2015 | Blue Valley Pty. Ltd. | Milgun | <1% | Milgun Project Annual Report E52/2346 for the period 8 April 2014 to 7 April 2015 |
| A100913 | 2014 | Padbury Mining Ltd | Peak Hill | 15% | 2013 Annual Repor t C230/2007 For the per iod 01/01/2013 to 31/12/2013 Peak Hi l l Project Western Australia, |
| A101495 | 2014 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project Combined Annual Technical Report C16/2008 (E52/1659 and E52/1671) for the period 1 January 201 |
| A104211 | 2014 | Process Minerals International | Horseshoe South | <1% | Horseshoe South Project M52/806 Annual Report for the period 16 Oct 2013 – 15 Oct 2014 |
| A104305 | 2014 | Resource And Investment Nl | Horseshoe West | 1.9% | Horseshoe West Project, Annual Report for the period 26/10/2013 to 25/10/2014, M52/251; P52/1239, 1257, 1259, |
| A104727 | 2014 | Rni Nl | Horseshoe West | <1% | Horseshoe West Project Annual Technical Report E52/3005 for the period 17 December 2013 to 16 December 2014 |
| A101608 | 2014 | Blue Valley Pty Ltd | Peak Hill | <1% | Annual Report E52/2346 Peak Hill for the period 8th April 2013 to 7th April 2014 |
| A96741 | 2013 | Auvex Manganese Limited | Horseshoe Range | <1% | E52/1561 Horseshoe Range Annual Report for the period 6th January 2012 to 5th January 2013 |
| A96801 | 2013 | Naracoota Resources Ltd | Horseshoe Range - Mount Beasley | 14% | P52/1259 Horseshoe Project Annual Report for the period 19th January 2012 to 18th January 2013 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | 6.6% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A96997 | 2013 | Grosvenor Gold Pty Ltd | Fortnum | <1% | COMBINED ANNUAL TECHNICAL REPORT C16/2008 FORTNUM TENEMENT NUMBERS E52/1655, E52/1659 and E52/1671 PEAK HILL M |
| A98152 | 2013 | Montezuma Mining Company Ltd | Horseshoe Lights North | <1% | Horseshoe Lights North Project, Annual Report for the period 29th March 2012 to 28th March 2013, E52/2759. |
| A98303 | 2013 | Blue Valley Pty Ltd | Peak Hill | <1% | ANNUAL REPORT E52/2346 PEAK HILL Western Australia for the period 8th April 2012 to 7th April 2013 on behalf o |
| A98834 | 2013 | Kupang Resources Ltd | Peak Hill | <1% | Annual Report E52/1740 Peak Hill Project for the period 12th July 2012 to 11th July 2013 |
| A100232 | 2013 | Peak Hill Manganese Pty Ltd | Horseshoe South Peak Hill | <1% | Annual Report for tenement M52/806 Horseshoe South Peak Hill for the period 16 October 2012 to15 October 2013 |
| A100269 | 2013 | Resource & Investment Nl | Horseshoe West | 1.9% | Combined Annual Technical Report C134/2013 Horseshoe West for the period 26 October 2012 to 25 October 2013 |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | 6.6% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A93218 | 2012 | Grosvenor Gold Pty Ltd | Fortnum NWN | <1% | Annual Report C16/2008 2010 Annual Report for the period 1st January 2011 - 31st December 2011, E52/1655, E52/ |
| A95946 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 13/10/2011 to 12/10/2012, P25/1257. |
| A95947 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011 to 25/10/2012, P52/1341. |
| A95948 | 2012 | Naracoota Resources Ltd | Horseshoe Range | <1% | Horseshoe Range Project, Annual Report for the period 26/10/2011 to 25/10/2012, P52/1340. |
| A96079 | 2012 | Peak Hill Manganese Pty Ltd | Horseshoe South | <1% | Annual Report for tenement M52/806, Horseshoe South Project Peak Hill for the period 16 October 2011 to 15 Oct |
| A92978 | 2012 | United Orogen Ltd | Horseshoe West | <1% | HORSESHOE WEST PROJECT FINAL ANNUAL TECHNICAL REPORT FOR EXPLORATION ACTIVITY EXPLORATION LICENCE 52/2016 FOR |
| A93034 | 2012 | Auvex Manganese Limited | Horseshoe | <1% | E52/1561 Horseshoe Annual Report 6th January 2011 to 5th January 2012 |
| A94312 | 2012 | Blue Valley Pty Ltd | Peak Hill | <1% | Annual Report E52/2346 Peak Hill for the period 8th April 2011 to 7th April 2012 |
| A95232 | 2012 | Auvex Manganese Limited | Horseshoe | <1% | Annual Report for the period 9th October 2011 to 8th October 2012, Horseshoe P52/1279 |
| A95399 | 2012 | Kupang Resources Ltd | Peak Hill | <1% | Annual Report Peak Hill E52/1740 for the period 12th July 2011 to 11th July 2012 |
| A89195 | 2011 | Auvex Resources Ltd | Horseshoe | <1% | E52/1561, HORSESHOE ANNUAL REPORT, FOR THE PERIOD 6th January 2010 to 5th January 2011 |
| A89769 | 2011 | United Orogen Ltd | Horseshoe West | <1% | Annual Technical Report for Horseshoe West Project E52/2016, Period Ending 18 February 2011 |
| A89775 | 2011 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum NWN Project C16/2008 E52/1655, 1659, 1671, Annual Report C16/2008, Annual report for the period 1st Ja |
| A91571 | 2011 | Blue Valley Pty Ltd | Peak Hill | <1% | Annual Report E52/2346 Peak Hill WA for the period 8th April 2010 to 7th April 2011 |
| A92198 | 2011 | Peak Hill Manganese Pty Ltd | Horseshoe South | <1% | Annual Report for M52/806 Horseshoe South Peak Hill for the period 16 October 2010 to15 October 2011 |
| A92283 | 2011 | Auvex Manganese Limited | Horseshoe | <1% | ANNUAL REPORT FOR THE PERIOD 9th October 2010 to 8th October 2011 HORSESHOE P52/1279 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | 6.6% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A91769 | 2011 | Chameleon Mining Nl | PEAK HILL | <1% | ANNUAL REPORT FOR CHAMELEON MINING NL E52/1740 PEAK HILL FOR THE PERIOD 12th July 2010 to 11th July 2011 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | 4.7% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A86501 | 2010 | United Orogen Ltd | Horsehoe West | <1% | Annual Technical Report for Horseshoe West Project E52/2016, Period Ending 18 February 2009 |
| A87187 | 2010 | Blue Valley Pty Ltd | Peak Hill | <1% | First Annual Report for Exploration Licence 52/2346 Peak Hill for the period 8 April 2009 to 7 April 2010 |
| A87708 | 2010 | Chameleon Mining Nl | Peak Hill | <1% | Annual Report E52/1740 Peak Hill for the period 12th July 2009 to 11th July 2010 |
| A88620 | 2010 | Peak Hill Manganese Pty Ltd | Horseshoe South - Peak Hill | <1% | Annual Report for tenement M52/806 Horseshoe South Peak hill for the period 16 October 2009 to 15 October 2010 |
| A88128 | 2010 | Auvex Resources Ltd | Horseshoe | <1% | Annual Report for the Period 9th October 2009 to 8th October 2010 |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | 4.9% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A84827 | 2009 | Auvex Resources Ltd | PEAK HILL | <1% | ANNUAL REPORT P52/1279 PEAK HILL FOR THE PERIOD - 9th October 2008 to 8th October 2009 |
| A85192 | 2009 | Peak Hill Manganese Pty Ltd | Horseshoe South Peak Hill | <1% | Annual Report for the tenement M52/806 Horseshoe South Peak Hill for the period for the period 16 October 2008 |
| A85390 | 2009 | Auvex Resources Ltd | Horseshoe Range | <1% | E52/1561 Horseshoe Range for the period 6th January 2009 to 5th January 2010 |
| A81330 | 2009 | Chameleon Mining Nl | Horseshoe | <1% | E52/1740 “Horseshoe” Partial Surrender Report 12/07/2007 – 11/07/2008 |
| A81730 | 2009 | Grosvenor Gold Pty Ltd | Fortnum NWN | <1% | Fortnum NWN Project C16/2008 E52/1655, E52/1659, E52/1671 Annual Report, Report Period: 1 January 2008 – 31 De |
| A81808 | 2009 | United Orogen Ltd | Horseshoe West | <1% | Annual Report for E52/2016 Horseshoe West, 19 February 2008 to 18 February 2009 |
| A84397 | 2009 | Chameleon Mining Nl | Horseshoe | <1% | E52/1740 “Horseshoe” Mineral Exploration Report 12/07/2008 – 11/07/2009 |
| A77369 | 2008 | Eagle Gold Mines Pty Ltd | Fortnum | <1% | Fortnum Project C591/1994 2007 Annual Report 1 January 2007 - 31 December 2007 E52/1655, E52/1659, E52/1671, E |
| A80414 | 2008 | Peak Hill Manganese Pty Ltd | HORSESHOE SOUTH / PEAK HILL | <1% | ANNUAL REPORT FOR TENEMENT M 52/806 HORSESHOE SOUTH PEAK HILL for the period 16 October 2007 to 15 October 200 |
| A78010 | 2008 | Uranium Oil & Gas Ltd | Horseshoe West | <1% | Annual Report for E52/2016 19 February 2007 to 18 February 2008 |
| A74648 | 2007 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2006 Annual Report (C591/1994) Report Period: 1 January 2006 - 31 December 2006 (Robinson Rang |
| A76744 | 2007 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | ANNUAL REPORT M52/806 PEAK HILL FOR THE PERIOD 16th October 2006 to 15th October 2007 |
| A71717 | 2006 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual Report, M52/806 Peak Hill, For the period 16 October 2004 to 15 October 2005. |
| A71950 | 2006 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2005 Annual Report, 1 January 2005 to 31 December 2005, Combined Reporting No. C591/1994, (Rob |
| A73831 | 2006 | Peak Hill Manganese Pty Ltd | Peak Hill | <1% | Annual Report, M52/806, Peak Hill, for the period 16 October 2005 to 15 October 2006. |
| A69549 | 2004 | Peak Hill Manganese Pty Ltd | Horseshoe | <1% | Annual report for the period 16/10/03 - 15/10/04, Horseshoe Manganese Project, C99/2004, M52/806, Peak Hill |
| A71662 | 2004 | Peak Hill Manganese Pty Ltd | Horseshoe Range | <1% | Relinquishment Report for EL52/1452 ,Horseshoe Range Project, for the period 3 February 2000 to 2 February 200 |
| A66115 | 2003 | Peak Hill Manganese Pty Ltd | Horseshoe | <1% | Annual Report for Horseshoe Manganese E52/1452 Peak Hill for the period 3rd February 2002 to 2nd February 2003 |
| A66302 | 2003 | Perilya Ltd | Dandy Well | 6.6% | Final Surrender Report for Dandy Well E52/1040, Fortnum Project, C591/1994, for the period 16/04/96 - 11/11/02 |
| A64539 | 2002 | Tuart Resources Pty Ltd | Peak Hill | <1% | Annual Report For Horseshoe EL52/1452 Peak Hill For The Period 3rd February 2001 to 2nd February 2002. |
| A65650 | 2002 | Perilya Ltd | Fortnum | <1% | A Final Surrender Report For E52/1473 To E52/1475, P52/556 To P52/563, M52/562 To M52/565. Outer Area Dandy We |
| A64278 | 2002 | Perilya Ltd | Fortnum | 1.6% | Annual Report for Fortnum Project for the period 01/01/2001 - 31/12/2001 project number C591/1994 (formerly M3 |
| A62421 | 2001 | Perilya Mines Nl | Fortnum | 1.6% | Annual Report For Fortnum Project For The Period 01/01/2000 -31/12/2000 Project Number C591/1994 (formerly M36 |
| A62318 | 2001 | Tuart Resources Pty Ltd | Horseshoe | <1% | Annual Report For Horseshoe EL52/1452 Peak Hill. |
| A61138 | 2000 | Perilya Mines Nl | Fortnum | 6.6% | A Partial Surrender Report for E52/1040 Dandy Well as part of the Fortnum Project C591/1994 for the period 16 |
| A59903 | 2000 | Perilya Mines Nl | Fortnum | 1.8% | Annual Report for Fortnum Project P52/556, P52/557, P52/558, P52/559, P52/560, P52/561, P52/562, P52/563, P52/ |
| A57742 | 1999 | Perilya Mines Nl | Fortnum | 2.1% | Annual report for the Fortnum project C591/1994. For period 1 January 1998 to 31 December 1998. |
| A58124 | 1999 | Perilya Mines Nl | Fortnum | 6.6% | A Partial Surrender Report For E 52/1040 Dany Well As Apart Of the Fortnum Project For the Period 16/04/1996 t |
| A58125 | 1999 | Perilya Mines Nl | Fortnum | 6.5% | Surrender Report For E52/838 Dandy Well As a Part Of the Fortnum For the Period 29/02/1996 to 15/03/1999 |
| A53778 | 1998 | Plutonic Operations Ltd | Milgun | 14% | Project 578 Milgun Joint Venture Project, Activity Report E52/782 (Surrender Report) Period to 26/08/1997. |
| A54371 | 1998 | Perilya Mines Nl | Fortnum | 1.5% | Annual Report, Fortnum Project M3638/1 01/01/97 - 31/12/97 P52/556-563 (MLA52/561-562), P52/586-599 (MLA52/578 |
| A56790 | 1998 | Zygot Ltd | Horseshoe Range | 22% | Annual report 1 December 1997 to 30 November 1998 Horseshoe Range Project Area E52/795, E52/796, E52/978. |
| A55717 | 1998 | Perilya Mines Nl | Dandy Well | 6.5% | Dandy Well, Partial Surrender Report E52/838 29/02/96 - 20/04/98 |
| A55718 | 1998 | Perilya Mines Nl | Dandy Well | 6.6% | Dandy Well, Partial Surrender Report, E52/1040 16/04/96 - 06/03/98 |
| A50287 | 1997 | Perilya Mines Nl | Fortnum | 1.5% | Annual report for the Fortum Project for period 1 January to 31 December 1996 P52/556 to P52/563 P52/586 to P5 |
| A52145 | 1997 | Zygot Ltd | Horseshoe Range | 42% | Annual report 14 March 1996 to 13 March 1997 E52/978 Horseshoe Range Project Area. |
| A53211 | 1997 | St Barbara Mines Ltd | Peak Hill | 7% | Peak Hill Project, Non-statutory Report: Geochemical Exploration Peak Hill/Glengarry Area W.A., 03/1996 - 03/ |
| A53261 | 1997 | Mining And Precision Blasting Services Pty Ltd | Horseshoe Range | <1% | Horseshoe Range Project Annual Report Exploration Licence E52/875 Period from 13/10/1996 to 12/10/1997 |
| A51010 | 1997 | Valiant Consolidated Ltd | Horseshoe | 100% | Horseshoe Project, 1997, M52/266 |
| A51538 | 1997 | Grange Resources Nl | Twin Rivers | 87% | Twin Rivers Prospect, Annual Report Exploration Licence E52/1014 for the period 02/02/1996 to 01/02/1997. |
| A50086 | 1996 | Mining And Precision Blasting Services Pty Ltd | Horseshoe Range | 2.6% | Annual Report Exploration Licences E52/875 & E52/887 Period from 13/10/1995 to 12/10/1996 |
| A46699 | 1996 | Plutonic Operations Ltd | Milgun | 14% | Milgun (JV) Project, Annual Report for period 05/10/1994 to 04/10/1995, E52/782. |
| A47994 | 1996 | Plutonic Operations Ltd | Horseshoe Range | 4.4% | Horseshoe Range Project , P52/778 , Annual Report for the period 07/04/95 to 06/04/96. |
| A47432 | 1996 | Perilya Mines Nl | Fortnum | 2.2% | Annual report for the Fortum Project for period 1 January 1995 to 31 December 1995 P52/556 to P52/563 P52/586 |
| A48480 | 1996 | Plutonic Operations Ltd | Pluto | 45% | Pluto Project, Annual Report for the period 09/09/1995 to 08/09/1996, P52/779-786. |
| A48506 | 1996 | Star Resources Pty Ltd | Horseshoe Range | 2.6% | Horseshoe Range Project, Annual Report for the period 13th October 1994 to 12th October 1995, E52/875 & 887. |
| A49078 | 1996 | Plutonic Operations Ltd | Pluto | 4.7% | Twin Rivers Joint Venture Horsehoe Mine Region Pluto Prospect Annual Report Period 11/08/95-10/08/96 |
| A49660 | 1996 | Valiant Consolidated Ltd | Horseshoe | 31% | 1996 Annual report of Activities Mining Lease M52/266 and M52/267 Horseshoe Manganese Mine Peak Hill Mineral F |
| A49840 | 1996 | Giralia Resources Nl | Saltwater Pool | 3.9% | Saltwater Pool Project Meekatharra District EL52/887 Report for Period Ending September 14, 1996 |
| A44680 | 1995 | Archaean Gold Nl | Dandy Well | 6.5% | Dandy Well Project, Annual Report for the period 21 April 1994 to 18 June 1995, E52/838. |
| A45510 | 1995 | Sabminco Nl | Pluto - Stink Well | 4.7% | Pluto Project, M52/374, and Stink Well Joint Venture, M52/466, Peak Hill Mineral Field, WA, Annual Report on W |
| A46705 | 1995 | Sabminco Nl | Jupiter - Horseshoe - Saturn - Pluto - M | 5.1% | Review of Compilation of Technical Data, Jupiter Project, E52/760, Horseshoe South Project, P52/770-777, E52/7 |
| A43731 | 1995 | Sabminco Nl | Saturn West | 17% | Saturn West Project, P52/709-710, 783-786, Peak Hill Mineral Field, WA, Report on Exploration Activity for the |
| A44682 | 1995 | Archaean Gold Nl | Dandy Well | 6.5% | Dandy Well Project, E52/838, Partial Surrender Report for the period 21/04/1994 to 18/04/1995. |
| A44809 | 1995 | Sabminco Nl | Horseshoe Range | 39% | Horseshoe Range Project,M52/302, Report on Field Work carried out for the period to May 1995. |
| A46190 | 1995 | Valiant Consolidated Ltd | Horseshoe | 31% | Annual report of Activities Mining Lease M52/266 and M52/267 Horseshoe Manganese Mine Peak Hill Mineral Field |
| A40886 | 1994 | Dominion Mining Ltd | Horseshoe Well | 6.9% | Annual Report for the period 01/01/93-31/12/93 Horseshoe Range Project M52/252,338,434,535-538,614,742-747,778 |
| A41956 | 1994 | Dominion Mining Ltd | Horseshoe Range | 16% | Horseshoe Range Project, Final Surrender Report for the period 14/10/1992 to 12/06/1994, P52/742-744, 746-747. |
| A41846 | 1994 | Sabminco Nl | Horseshoe - Pluto | 65% | Report to Sabminco NL, Horseshoe Joint Venture, Summary of Results of a Geochemical Survey, Pluto Prospect, Pe |
| A41896 | 1994 | Sabminco Nl | Saturn West | 17% | Saturn West Project, P52/709-710, 783-786, Interpretation of TEM and Ground Magnetic Surveys |
| A42790 | 1994 | Troy Resources Nl | Labouchere | 14% | Labouchere Project, Annual Report for the period 5th October 1993 to 4th October 1994, E52/782. |
| A38161 | 1993 | Dominion Mining Ltd | Horseshoe Range | 7% | Horseshoe Range Project, Annual Report for the period M52/252 M52/338 P52/535-538 P52/614 P52/742-747. |
| A41892 | 1993 | Sabminco Nl | Horseshoe - Pluto | 4.7% | Report to Sabminco NL, Horseshoe Joint Venture, Summary of Results of a Geochemical Survey, Pluto Prospect, Pe |
| A37934 | 1992 | Sabminco Nl | Horseshoe | 31% | Annual report for the period ending 10/92 Horseshoe Manganese Project M52/266 M52/267 P52/487 |
| A31103 | 1989 | Barrack Exploration Pty Ltd | Aquarius - Horseshoe Lights | 5.8% | Progress Report on Results of BLEG Soil Programmes, Aquarius Prospect, Horseshoe Lights Area, WA |
| A31106 | 1989 | Barrack Exploration Pty Ltd | Aquarius | 5.8% | Aquarius Project, Progress Report on Geological Mapping, 1989 |
| A11007 | 1982 | Western Mining Corporation Ltd | Horseshoe | 20% | Horseshoe Project, Final Surrender Report for the period 10th December 1980 to 23rd April 1982, MC52/4123-413 |
| A912 | 1967 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 5% | Horseshoe Lights Project, Non-statutory Report: Geological Report, August 1967, TR70/3528H. |
| A911 | 1966 | Electrolytic Zinc Company Of Australasia Ltd | Horseshoe Lights | 5% | Horseshoe Lights Project, Non-statutory Report: Brief Exploration Report. March 1966, TR70/3528H. |
| A40602 | 1753 | Goldstream Mining Nl | Horseshoe | 48% | The Horseshoe prospect, Peak Hill Mineral Field, Western Australia |
| A77495 | 1753 | Greater Pacific Gold Ltd | Peak Hill | 32% | Annual Technical Report on Exploration Licence E52/1860 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 16 Feb 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4542 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4542? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.