E 52/4484
Register summary
- Holder
- Lithophile Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 17 July 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150701 | 2025 | Auris Minerals Limited | Doolgunna | <1% | Final Surrender Report for Cow Hole Bore (Doolgunna) Project Tenement, E52/2438, for period 1 January 2019 to |
| A139499 | 2024 | Auris Minerals Limited | Doolgunna | <1% | Combined Annual Report for the Doolgunna Project, E52/2438, for the period 11 February 2023 to 10 February 202 |
| A144349 | 2024 | Enterprise Metals Limited | Doolgunna | <1% | Final Surrender Report E52/3347 for the Period 2 June 2016 to 30 May 2024 |
| A138905 | 2024 | Sandfire Resources Limited | Springfield | 14% | E 52/2466 Springfield Project Surrender Report for the period ending 16/01/2024. |
| A135032 | 2023 | Sandfire Resources Ltd | Springfield | 60% | Springfield E52/3467 Partial Surrender Report 10 March 2017 to 9 May 2023 |
104 more reports
| A131442 | 2022 | Sandfire Resources Limited | Doolgunna | <1% | E52/3347 Doolgunna EFI Project Partial Surrender Report for the period 15 July 2016 to 14 July 2022 |
| A123147 | 2020 | Sandfire Resources Limited | Doolgunna | 1.3% | Doolgunna C261/2011 Combined Annual Mineral Exploration Report 2019 |
| A122726 | 2020 | Sandfire Resources Nl | Springfield | 35% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2018 to 24 November 2019, E52/0 |
| A124910 | 2020 | Sandfire Resources Limited | Doolgunna | <1% | Doolgunna EFI Project E52/3347 Partial Surrender Mineral Report for the period ending 21/07/2020 |
| A125205 | 2020 | Sandfire Resources Limited | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period ending 09/09/2020 |
| A119132 | 2019 | Sandfire Resources Nl | Springfield | 35% | Springfield Project C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2017 to 24 |
| A121641 | 2019 | Sandfire Resources Nl | Doolgunna EFI | <1% | Doolgunna EFI Project C213/2008 Annual Report for the period 10 September 2018 to 9 September 2019 |
| A119580 | 2019 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna C261/2011 Annual Report for the period 1 January 2018 to 31 December 2018, E52/01698, E52/01699, E52 |
| A115945 | 2018 | Sandfire Resources Nl; Talisman Mining Ltd | Springfield | 35% | C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2016 to 24 November 2017, E52/0 |
| A116351 | 2018 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna C261/2011 Combined Annual Mineral Exploration Report for the period 1 January 2017 to 31 December 20 |
| A116430 | 2018 | Auris Minerals Limited | Cow Hole Bore - Doolgunna | <1% | Annual Report for the Cow Hole Bore Project E52/2438 for the period 11 February 2017 to 10 February 2018 |
| A118149 | 2018 | Sandfire Resources Nl | Doolgunna EFI | <1% | Annual Report for the Doolgunna EFI Project C213/2008 For the Period 10 September 2017 to 9 September 2018 |
| A112046 | 2017 | Sandfire Resources Nl | Springfield | 35% | Springfield C97/2010 Combined Annual Mineral Exploration Report for the period 25 November 2015 to 24 November |
| A112454 | 2017 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project C261/2011 Combined Annual Mineral Exploration Report 2016, E51/01582, E51/01583, E52/01698, |
| A112657 | 2017 | Rni Nl | Doolgunna | <1% | Doolgunna E52/2438 Annual Technical Report For the Period 11 February 2016 to 10 February 2017 |
| A115159 | 2017 | Sandfire Resources Nl | Doolgunna - EFI | <1% | Doolgunna - EFI C213/2008 Combined Annual Mineral Exploration Report for the period 10 September 2016 to 9 Sep |
| A107735 | 2016 | Sandfire Resources Nl | Springfield | 38% | Springfield E52/2282 Partial Surrender Report for the period 25 November 2009 to 20 November 2015 |
| A110237 | 2016 | Enterprise Metals Limited | Doolgunna | <1% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report for |
| A107736 | 2016 | Sandfire Resources Nl | Springfield | 14% | Springfield E52/2313 Partial Surrender Report for the period 25 November 2009 to 20 November 2015 |
| A107989 | 2016 | Sandfire Resources Nl | Springfield | 35% | Springfield C97/2010, E52/2313, E52/2466, E52/2282 Combined Annual Mineral Exploration Report for the period 2 |
| A108242 | 2016 | Sandfire Resources Nl | Doolgunna | <1% | Doolgunna Project Co-Funded Government – Industry Drilling Program DAG2014/003266645 Final Report (round 8) |
| A108459 | 2016 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project C261/2011 Combined Mineral Exploration Annual Report 01/01/2015 to 31/12/2015, E51/1582, E51 |
| A108595 | 2016 | Rni Nl | Doolgunna | <1% | Annual Technical Report for the period ending 10 February 2016 Doolgunna Project Tenement Number E52/2438 |
| A108944 | 2016 | Sandfire Resources Nl | Springfield | 14% | Springfield Project E52/2466 Partial Surrender Report for the Period 06/04/2010 to 31/03/2016 |
| A105141 | 2015 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project 2014 Mineral Exploration Annual Report Combined Report Group C261/2011 for the period 01/01/ |
| A105384 | 2015 | Rni Nl | Salmon | <1% | Annual Technical Report for the period ending 10 February 2015 Doolgunna Project (Salmon Prospect) E52/2438 |
| A104797 | 2015 | Sandfire Resources Nl | Springfield | 35% | Springfield Project (C97/2010) E52/2313, E52/2466, E52/2282 Annual Mineral Exploration Report for the period 2 |
| A105932 | 2015 | Enterprise Metals Ltd | Doolgunna | 7.8% | Doolgunna Project E52/2404, E52/2406 Combined Surrender Report C166/2012 for the period 10th June 2010 to 9th |
| A107219 | 2015 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report C213 |
| A101119 | 2014 | Talisman Mining Ltd | Springfield | 35% | Springfield Project, Annual Report for the period 25/11/2012 to 24/11/2013, E52/2282, 2313, 2466. [C97/2010] |
| A103095 | 2014 | Enterprise Metals Ltd | Doolgunna | 7.8% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report C166/2012 for the period 1st July 2013 to 30th Jun |
| A103176 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Final Report Royalties For Regions Co-Funded Government-Industry Drilling Program 2013/14 Doolgunna Drilling P |
| A103929 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | DOOLGUNNA PROJECT E51/1079, E51/1168, E51/1301, E51/1303-1304, E52/2049 & P51/2624–2627 COMBINED ANNUAL REPORT |
| A101509 | 2014 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project 2013 Mineral Exploration Annual Report Combined Report Group for the period 01/01/2013 to 3 |
| A103726 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, E52/2049 Partial Surrender Report for the period 27th October 2008 to 28th September 2014 |
| A98732 | 2013 | Enterprise Metals Ltd | Doolgunna | 7.8% | Doolgunna Project E52/2404, E52/2406 Combined Annual Report (C166/2012) for the period 10th June 2012 to 9th J |
| A97521 | 2013 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project 2012 Mineral Exploration Annual Report Combined Report Group C261/2011 E52/1698, E52/1699, |
| A99937 | 2013 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049, P51/2516-2517, P51/2624-242 |
| A92783 | 2012 | Talisman Mining Ltd | Springfield | 35% | Annual Exploration Report for the period 25 November 2010 to 24 November 2011, Springfield Combined Reporting |
| A93251 | 2012 | Sandfire Resources Ltd | Doolgunna | 1.3% | Doolgunna Project, Annual Report for the period 01/04/2011 to 31/12/2011, E52/1698-1699, 1715, 2208-2209, 2358 |
| A93282 | 2012 | Ascidian Prospecting Pty Ltd; Resource And Investment Nl | Cow Hole Bore (Doolgunna) | <1% | Cow Hole Bore (Doolgunna) Project, Annual Report for the period 11th February 2011 to 10th February 2012, E52/ |
| A95573 | 2012 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, Combined Annual Report C213/2008, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52 |
| A96770 | 2012 | Talisman Mining Ltd | Springfield | 35% | Springfield Project, Annual Report for the period 25th November 2011 to 24th November 2012, E52/2313, E52/2466 |
| A97558 | 2012 | Resource And Investment Nl | Doolgunna - Cow Hole Bore | <1% | Annual Report for Exploration License E52/2438 for the Period 11 February 2012 to 10 February 2013 [Doolgunna |
| A94824 | 2012 | Enterprise Metals Ltd | Doolgunna | 9% | Doolgunna Project E52/2404 Annual Report For the Period 10th June 2011 to 9th June 2012 |
| A89154 | 2011 | Talisman Mining Ltd | Springfield | 35% | Springfield, Annual Exploration Report for the period 25 November 2009 to 24 November 2010 (C97/2010) |
| A89909 | 2011 | Ascidian Prospecting Pty Ltd; Resource And Investment Nl | Doolgunna | <1% | Annual Report for Exploration Licence E52/2438, 11 February 2010 to 10 February 2011 |
| A90315 | 2011 | Sandfire Resources Nl | Doolgunna | 1.3% | Doolgunna Project, Annual Report for the period 31/03/2010 to 30/03/2011, E52/1698-1699, 1715, 2208-2209, 2358 |
| A90896 | 2011 | Enterprise Metals Ltd | Doolgunna | 9% | Doolgunna Project E52/2404 Annual Report for the period 10th June 2010 to 9th June 2011 |
| A91803 | 2011 | Enterprise Metals Ltd | Revere | <1% | Revere Project , E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049 M51/818, P51/2516-2517, P51/2 |
| A87341 | 2010 | Sandfire Resources Nl | Doolgunna | 1.3% | Combined Annual Mineral Exploration Report Doolgunna Project C164/2005 2010A, Report Period 31 March 2009 to 3 |
| A88652 | 2010 | Enterprise Metals Ltd | Revere | <1% | Revere Project E52/2049 Annual Report for the period 27 October 2009 to 26 October 2010 |
| A81452 | 2009 | Peak Resources Ltd | DOOLGUNNA | 29% | Doolgunna Project Surrender Report on Exploration 29th October 2004 to 24th October 2008 E52/1650, E52/1661 & |
| A82285 | 2009 | Sandfire Resources Nl | DOOLGUNNA | 1.4% | COMBINED ANNUAL MINERAL EXPLORATION REPORT DOOLGUNNA PROJECT C164/2005, REPORTING PERIOD: 31 MARCH 2008 to 30 |
| A84199 | 2009 | Sandfire Resources Nl | DOOLGUNNA | 7.1% | Voluntary Partial Surrender Mineral Exploration Report Doolgunna Project E52/1698, Reporting Period: 01 August |
| A85357 | 2009 | Enterprise Metals Ltd | Revere | <1% | Revere Project E52/2049 Annual Report for the period 27 October 2008 to 26 October 2009 |
| A78498 | 2008 | Peak Resources Ltd | Doolgunna | 29% | Doolgunna - Annual Report on Exploration Report Period:1st March 2007 to 28th February 2008 E52/1650, E52/1661 |
| A78846 | 2008 | Sandfire Resources Nl | Doolgunna | 1.2% | COMBINED ANNUAL MINERAL EXPLORATION REPORT REPORTING PERIOD: 31 MARCH 2007 TO 30 MARCH 2008 DOOLGUNNA PROJECT |
| A80486 | 2008 | Aurora Minerals Ltd | Doolgunna | 1.6% | SURRENDER REPORT Doolgunna E52/1954, E52/1953, E52/2013, E52/2014, E51/1193 and E51/1194 Combined Annual Repor |
| A78054 | 2008 | Aurora Minerals Ltd | Doolgunna | 1.6% | ANNUAL TECHNICAL REPORT Doolgunna E52/1954, E52/1953, E52/2013, E52/2014, E51/1193 and E51/1194 Combined Annua |
| A78511 | 2008 | Peak Resources Ltd | Doolgunna | 5.7% | Doolgunna Project, Partial Surrender Report for the period 29th October 2004 to 28th October 2007, E52/1650. |
| A79938 | 2008 | Sandfire Resources Nl | Doolgunna | 7.1% | PARTIAL SURRENDER MINERAL EXPLORATION REPORT REPORTING PERIOD: 01 AUGUST 2005 TO 31 JULY 2008 |
| A74147 | 2007 | Peak Resources Ltd | Doolgunna | 5.7% | Doolgunna Project E52/1650 Annual Report for the Period 29th Oct 2005 - 28th Oct 2006 (Peak Hill) |
| A74149 | 2007 | Peak Resources Ltd | Doolgunna | 68% | Doolgunna Project E52/1661 Annual Report for the Period 27th Oct 2005 to 26th Oct 2007 (Peak Hill) |
| A75252 | 2007 | Peak Resources Ltd | Doolgunna | 29% | Annual Report - C6/2007, 1st Anniversary - 28th February 2007, Doolgunna, E52/1650, E52/1661, E52/1838. |
| A75198 | 2007 | Sandfire Resources Nl | Doolgunna | 1.2% | Combined Annual Mineral Exploration Report Reporting Period: 31 March 2006 to 30 March 2007 Doolgunna Project |
| A72536 | 2006 | Sandfire Resources Nl | Doolgunna | 1.2% | Combined Annual Mineral Exploration Report, 31 March 2005 to 30 March 2006, Doolgunna Project E52/1697-1699,17 |
| A72154 | 2006 | Mr Hocking Jc | Doolgunna | 5.7% | Doolgunna Project, Annual Report for the Period 29 October 2004 to 28 October 2005, E52/1650, (Peak Hill). |
| A63961 | 2001 | Rio Tinto Exploration Pty Ltd | Kayak | 52% | Fourth Annual Report for the period ending 10th September 2001 E52/1239, Kayak, Diamonds programme. Peak Hill |
| A63820 | 2001 | Rio Tinto Exploration Pty Ltd | Northern Star | 5.3% | Fourth Annual Report on the North Star JV exploration licence E52/1226 (Sakaldis) for the period ending 27/07/ |
| A60985 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | 5.3% | Partial Relinquishment Report on the North Star JV Exploration Licence E52/1226(Sakaldis) for the Period endin |
| A61219 | 2000 | Rio Tinto Exploration Pty Ltd | Sakaldis | 5.3% | Third Annual Report on the North Star JV Exploration Licence E52/1226 (Sakaldis) for the Period Ending 27/07/2 |
| A61570 | 2000 | Rio Tinto Exploration Pty Ltd | North Star | 52% | Third Annual report for the period ending 10/09/2000, E52/1239, Kayak, Peak Hill SG50-08, Western Australia, P |
| A59104 | 1999 | Rio Tinto Exploration Pty Ltd | Doolgunna | 5.3% | Second Annual Report on Exploration for Diamonds on North Star JV Exploration Licence E51/1225 (Sakalidis) for |
| A59231 | 1999 | Astro Mining Nl | Doolgunna | <1% | Joint Annual/Surrender Report, Doolgunna, E51/395, E52/740- 742, for the Period 19 April 1998 to 18 April 1999 |
| A59248 | 1999 | Rio Tinto Exploration Pty Ltd | North Star | 52% | Second Annual Report on Exploration for Diamods on North Star Joint Venture, Exploration Licence E52/1239 (Kay |
| A55923 | 1998 | Astro Mining Nl | Doolgunna | <1% | Exploration Licences E51/395, E52/740-742 'C288/1997 - Doolgunna' Joint Annual Report for the Period 19 April |
| A56249 | 1998 | Straits Exploration (Australia) Pty Ltd | Doolgunna Station | 7.7% | 2nd Annual and Final Surrender Report Exploration Licence E52/1075 (Ruby Bore), 7th August 1997 to 6th Augusr |
| A56279 | 1998 | North Star Resources Nl | Doolgunna | 52% | Doolgunna Project Exploration Licence E52/1239 :Kayak", Peak Hill Mineral Field Western Australia. |
| A56320 | 1998 | North Star Resources Nl | Doolgunna | 5.3% | North Star Resources N.L., Doolgunna project, Exploration Licence E52/1226, Sakalidis, Peak Hill Mineral Field |
| A52280 | 1997 | Straits Exploration (Australia) Pty Ltd | Ruby Bore | 7.7% | Ruby Bore Project, (Ist) Annual Report for period ending 6th August 1997, E52/1075. |
| A48755 | 1996 | Great Central Mines Nl | Sorenson Bore | <1% | Exploration Licences E51/395 and E42/741-742 (Inclusive) Sorenson Bore Project Joint Report for the Period 30 |
| A44944 | 1995 | Great Central Mines Nl | Noonyareena Hill | <1% | Exploration Licences E51/395, E52/733 and E52/741-742 (Inclusive) Noonyareena Hill Annual Report for the Perio |
| A46231 | 1995 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | 3% | Surrender Report for the period 01/10/95-20/11/95 Ruby Bore - Good Pool Project E51/391 E52/554-557 E52/668 E5 |
| A45882 | 1995 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | 1.6% | Annual report for the period 09/94-09/95 Ruby Bore - Good Pool Project E51/321 E51/357 E51/367 E57/391 E52/554 |
| A41104 | 1994 | Great Central Mines Nl | Noonyareena Hill | <1% | Exploration Licences E51/395 and E52/740 (inclusive) Noonyareena Hill, Annual Report for the Period 19 March 1 |
| A44020 | 1994 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | 1.6% | Annual report for the period 09/93-09/94 Ruby Bore-Good Pool Project. |
| A40646 | 1994 | Cra Exploration Pty Ltd | Ruby Bore - Good Pool | 1.6% | Annual report for the period 09/92-09/93 Ruby Bore-Good Pool Project. |
| A10592 | 1982 | Chevron Exploration Corp | Noonyereena | 19% | Noonyereena Project, Final Surrender Report for the period ending 22nd January 1982, TR70/7642H. |
| A9872 | 1981 | Chevron Exploration Corp | Noonyereena | 19% | Noonyereena Project, Annual Report, April 1981,TR70/7642H. |
| A2876 | 1972 | Western Mining Corporation Ltd | Doolgunna | 2.5% | Doolgunna Project, Non-statutory Report for the year ending 30th June 1972, MC52/455-462, 472-477 & 780-812. |
| A124 | 1971 | Western Mining Corporation Ltd | Thaduna | 8.7% | Thaduna Report |
| A1734 | 1971 | Western Mining Corporation Ltd | Thaduna | 12% | Thaduna Project, Non-statutory Report: Soil Sampling at Well 8, June 1971, TR70/5439H. |
| A1750 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.8% | Thaduna Project, Non-statutory Report: Final Report for the period 01/02/1969 to 31/01/1970, TR70/5439 & 5440H |
| A9473 | 1971 | Western Mining Corporation Ltd | Thaduna | 8.5% | Thaduna Project, Non-statutory Report: Terminal Report for the period 21/02/1969 to 30/03/1971, TR70/5439 & 54 |
| A1735 | 1971 | Western Mining Corporation Ltd | Thaduna | 12% | Thaduna Project, Non-statutory Report: Vacuum Drill Assay Sheets, File 2, June 1971, TR70/5439H. ( Vol 2) |
| A1744 | 1971 | Western Mining Corporation Ltd | Thaduna | 12% | Thaduna Project, Non-statutory Report: Vacuum Drill Hole Assay Sheets MJV612- MJV646 inc., June 1971, TR70/543 |
| A1746 | 1971 | Western Mining Corporation Ltd | Thaduna - Good Pool | 9.8% | Thaduna - Good Pool Project, Non-statutory Report: Soil Sampling at Good Pool, June 1971, TR70/5439 & 5440H. |
| A1747 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.8% | Thaduna Project, Non-statutory Report: Pecussion Drill Assay & Log Sheets, June 1971, TR70/5439 & 5440H. |
| A1748 | 1971 | Western Mining Corporation Ltd | Thaduna | 9.8% | Thaduna Project, Non-statutory Report: Geochemical Data Plans, June 1971, TR70/5439 & 5440H. |
| A1749 | 1971 | Western Mining Corporation Ltd | Thaduna - Red Bore | 9.8% | Thaduna - Red Bore Project, Non-statutory Report: Vacuum Drillilng Traverses,for period ending 01/03/1971, TR7 |
| A9504 | 1970 | Western Mining Corporation Ltd | Thaduna | 8.6% | Thaduna Project, Non-statutory Report:Report on Rock & Ironstone Assays, September 1970, Tr70/5439-5440H; MC5 |
| A51931 | 1753 | Astro Mining Nl | Sorenson Bore | <1% | Exploration Licences: E51/395, E52/741-742 ,C347/1995, Sorenson Bore Project Joint Annual Report for the Perio |
| A131754 | Sandfire Resources Limited | Monty, Doolgunna | 23% | Downhole drilling data for donated drillholes |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 52/4484 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4484 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4484? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.