E 51/2323
Register summary
- Holder
- Legendre, Bruce Robert
- Local government
- Shire of Meekatharra
- Application received
- 19 Mar 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149577 | 2025 | Kimberley Minerals And Energy Pty Ltd | Doolgunna | 37% | Doolgunna Exploration Licence 51/2151 Surrender Report for the Period to 3 July 2024 to 27 June 2025 |
| A143144 | 2024 | Enterprise Metals Ltd | Doolgunna | 11% | Doolgunna Project Final Surrender Report for E51/1303 for the period 19 October 2010 – 17 October 2023 |
| A143154 | 2024 | Yerrida Co Pty Ltd | Killara | 36% | E51/2016 Annual Report for the period ending 07/06/2024 |
| A144524 | 2024 | Meeka Metals Ltd | Andy Well | 75% | Final Surrender E51/1626 Andy Well Project for the period ending 16/07/2024 |
| A144913 | 2024 | Meeka Metals Ltd | Andy Well | 63% | E51/1596 Final Surrender Report Andy Well Project for the period ending 07/10/2024. |
154 more reports
| A139128 | 2024 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Final Surrender Report for E 51/1491 Mistletoe Project for the period ending 06/12/2023. (C100/2020) |
| A142827 | 2024 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Final Surrender Report Mistletoe Project C100/2020 for the period ending 12/04/2024 |
| A145450 | 2024 | Yerrida Co Pty Ltd | Yerrida | <1% | E51/1730 Final Surrender Report Yerrida Project for the period ending 28/10/2024. |
| A135104 | 2023 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report (C100/2020) Mistletoe Project for the period ending 31/12/2022. E 51/1491,E 51/1894,E 5 |
| A134056 | 2023 | Enterprise Metals Limited | Doolgunna | <1% | Doolgunna Project, Partial Surrender E51/1683 Mineral Exploration Report For the Period 1 June 2016 – 8 Novemb |
| A136175 | 2023 | Gold Road Resources Limited | Yerrida | 36% | Yerrida E51/2016 Annual Report for the period ending 8/6/2023 |
| A138000 | 2023 | Sandfire Resources Limited | Murchison | <1% | C35/2015 Murchison Project Final Surrender Report 2023 |
| A130160 | 2022 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report C100/2020 Mistletoe Project for the period ending 31/12/2021 |
| A130976 | 2022 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | 47% | E51/1648 Partial Surrender Andy Well North Project for the period 21/03/2021 to 20/03/2022 |
| A131296 | 2022 | Gascoyne Resources Limited | Andy Well North | 47% | Andy Well North E51/01648 Annual Report for the period ending 20/03/2022 |
| A131441 | 2022 | Sandfire Resources Limited | Doolgunna | <1% | E51/1683 Doolgunna EFI Project Partial Surrender Report For the Period 1 June 2016 to 17 May 2022 |
| A131649 | 2022 | Yandan Gold Mines Pty Ltd | E51/2016 | 36% | E51/2016 Annual Report for the period ending 07/06/2022. |
| A133047 | 2022 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | 47% | Final surrender Report Andy Well North E51/1648 for the period ending 20/03/2022. |
| A131061 | 2022 | Sandfire Resources Limited | Doolgunna EFI | 37% | Doolgunna EFI Project E51/1851 Annual Mineral Exploration Report for the period ending 15/04/2022. |
| A132965 | 2022 | Yandan Gold Mines Pty Ltd | Yerrida | <1% | Partial Surrender Report for Tenement E51/1748 Yerrida project for the period ending 17/11/2022. |
| A127168 | 2021 | Sandfire Resources Limited | Doolgunna EFI | 37% | DOOLGUNNA EFI PROJECT E51/1851 ANNUAL REPORT 2021 |
| A126641 | 2021 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Combined Annual Report C100/2020 Mistletoe Project, 1 January 2020 to 31 December 2020 |
| A127161 | 2021 | Gascoyne Resources (Wa) Ltd | Andy Well North | 47% | Andy Well North Annual Technical Report E51/1648 for the period 21 March 2020 to 20 March 2021 |
| A125709 | 2020 | Andy Well Mining Pty Ltd | Andy Well | 63% | Andy Well E51/1596 Partial Surrender Report for the period 8 October 2014 to 7 October 2020 |
| A124124 | 2020 | Yandan Gold Mines Pty Ltd | Padbury | <1% | C8/2017 Padbury Project 2020 Annual Report for the period ending 25/03/2020 |
| A122739 | 2020 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Annual Report for Mistletoe E 51/1491 for the period 16 December 2018 to 15 December 2019 |
| A123511 | 2020 | Silver Lake Resources Limited | Andy Well | 46% | Andy Well Combined Annual Report for year ending 31/12/2019, C48/2013 |
| A123720 | 2020 | Goldsmith S J | Quartz Well | 47% | Quartz Well E51/1648 Annual Report for the period ending 20/3/2020 |
| A124005 | 2020 | Sandfire Resources Limited | Doolgunna EFI | 37% | Doolgunna EFI Project E51/1851 Annual Mineral Exploration Report for the period ending 15/04/2020 |
| A125096 | 2020 | Sandfire Resources Limited | Murchison | <1% | C35/2015 Murchison Project Annual Report for the period 9 August 2019 to 8 August 2020 |
| A125205 | 2020 | Sandfire Resources Limited | Doolgunna EFI | 2.5% | Doolgunna EFI Project C213/2008 Annual Report for the period ending 09/09/2020 |
| A125298 | 2020 | Silver Lake (Doray) Pty Ltd | Gnaweeda | <1% | Gnaweeda Project C46/2005 Annual Technical Report for the period ending 30 July 2020 |
| A122941 | 2020 | Yandan Gold Mines Pty Ltd | Yerrida Basin 1 | <1% | Yerrida Basin 1 2018 Annual Report E51/01748 for the period ending 14/12/2019 |
| A121641 | 2019 | Sandfire Resources Nl | Doolgunna EFI | 2.5% | Doolgunna EFI Project C213/2008 Annual Report for the period 10 September 2018 to 9 September 2019 |
| A118995 | 2019 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Annual Report for Mistletoe E51/1491 for the period 6 November 2017 to 15 November 2018 |
| A120204 | 2019 | Yandan Gold Mines Pty Ltd | Padbury | <1% | Padbury Project C8/2017 Annual Report 26 March 2018 – 25 March 2019, E51/1590, E51/1729, E51/1730 |
| A119518 | 2019 | Doray Minerals Limited | Andy Well | 46% | Meekatharra North, Andy Well Project Combined Report C48/2013 For the Period 1 January 2018 to 31 December 201 |
| A119742 | 2019 | Yandan Gold Mines Pty Ltd | Yerrida Basin 1 | <1% | Yerrida Basin 1 Project E51/1748 Annual Report for the period 15 December 2018 – 14 December 2019 |
| A119967 | 2019 | Doray Minerals Limited | Quartz Well | 47% | Annual Technical Report – E51/1648 Quartz Well for the period 21 March 2018 to 20 April 2019 |
| A120274 | 2019 | Sandfire Resources Nl | Doolgunna - EFI | 37% | E51/01851 Doolgunna - EFI Project Annual Report for the period 16/04/2018 to 15/04/2019 |
| A121382 | 2019 | Silver Lake (Doray) Pty Ltd | Gnaweeda | <1% | Gnaweeda Project C46/2005 Annual Techncal Report for the period 31 July 2018 to 30 July 2019, E51/00926, E51/0 |
| A115852 | 2018 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | MISTLETOE PROJECT, E51/1491, ANNUAL TECHNICAL REPORT FOR 16/12/2016 TO 15/12/2017 |
| A116164 | 2018 | Doray Minerals Limited | Andy Well | 46% | C48/2013 Meekatharra North Andy Well Project Combined Report For the Period 1 January 2017 to 31 December 2017 |
| A118149 | 2018 | Sandfire Resources Nl | Doolgunna EFI | 2.5% | Annual Report for the Doolgunna EFI Project C213/2008 For the Period 10 September 2017 to 9 September 2018 |
| A115972 | 2018 | Yandal Metals Pty Ltd | Yerrida Basin 1 | <1% | Yerrida Basin 1 Project E51/1748 Annual Report for the period 5 May 2016 – 4 May 2017 |
| A116131 | 2018 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | Partial Surrender Report for Mistletoe Project E51/01491 for the period 16 December 2011 to 13 December 2017 |
| A116732 | 2018 | Doray Minerals Limited | Quartz Well | 47% | Quartz Well E51/1648 Annual Report for the period 21 March 2017 to 20 March 2018 |
| A117168 | 2018 | Yandan Gold Mines Pty Ltd | Padbury | <1% | Pradbury Project C08/2017 Annual Report for the period 26 March 2017 – 25 March 2018, E51/1590, E51/1729, E51/ |
| A118061 | 2018 | Doray Minerals Limited | Gnaweeda | <1% | Meekatharra North, Gnaweeda Project C46/2005 Annual Technical Report For the Period 31 July 2017 to 30 July 20 |
| A113862 | 2017 | Gascoyne Resources (Wa) Pty Ltd | Andy Well North | 47% | Annual Report for E51/1648 Andy Well North Project for the period 21/03/2016 - 21/03/2017 |
| A114188 | 2017 | Sandfire Resources Nl | Doolgunna - EFI | 9.5% | Doolgunna – EFI Project E51/1301 Partial Surrender Final Mineral Exploration Report 2017 |
| A115023 | 2017 | Doray Minerals Limited | Gnaweeda | <1% | Meekatharra North, Gnaweeda Project Annual Technical Report - C46/2005 For the Period 31 July 2016 to 30 July |
| A115159 | 2017 | Sandfire Resources Nl | Doolgunna - EFI | 2.5% | Doolgunna - EFI C213/2008 Combined Annual Mineral Exploration Report for the period 10 September 2016 to 9 Sep |
| A111938 | 2017 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | MISTLETOE PROJECT E51/1491 Annual Technical Report for the period 16/12/2015 to 15/12/2016 |
| A112435 | 2017 | Doray Minerals Limited; Andy Well Mining Pty Ltd | Andy Well | 46% | Meekatharra North, Andy Well Project C48/2013 Combined Report for the period 01/01/2016 to 31/12/2016, E51/012 |
| A114012 | 2017 | Yandan Gold Mines Pty Ltd | Johnson Cairn | <1% | Johnson Cairn Project C8/2017 Annual Report For the Period 26 March 2016 to 25 March 2017, E51/01729, E51/0159 |
| A114897 | 2017 | Sandfire Resources Nl | Murchison | <1% | C35/2015 Murchison Project Annual Report for the period 9 August 2016 to 8 August 2017, E52/02880, E52/02881, |
| A108017 | 2016 | Mistletoe Mining Pty Ltd | Mistletoe | <1% | ANNUAL REPORT For the Period 16 December 2014 to 15 December 2015 MISTLETOE PROJECT E51/01491 |
| A108458 | 2016 | Doray Minerals Ltd | Meekatharra North - Andy Well | 46% | Meekatharra North Andy Well Project Combined Report (C48/2013) M51/870, E51/1217, E51/1596, E51/1625 & E51/162 |
| A110000 | 2016 | Sandfire Resources Nl | Murchison | <1% | C35/2015 Murchison Project Annual Report For the Period 9 August 2015 to 8 August 2016, E52/02880, E51/01647, |
| A110066 | 2016 | Doray Minerals Limited | Gnaweeda | <1% | E51/00926, E51/00927, P51/02652 Gnaweeda Project C46/2005 Annual Technical Report For the Period 31 July 2015 |
| A110155 | 2016 | Enterprise Metals Limited | Doolgunna | 11% | Doolgunna Project E51/1303 Partial Surrender Report for the Period 19 October 2010 to 14 October 2016. |
| A110237 | 2016 | Enterprise Metals Limited | Doolgunna | 3.2% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report for |
| A104913 | 2015 | Rubianna Resources Ltd | Killara | 10% | Final Report for Killara Combined Reporting Group C215/2010 (E51/1345, E51/1347, E51/1348, E51/1349) for the p |
| A105167 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL PROJECT TENEMENT NUMBERS E51/1053, E51/1085, E51/1120, E51 |
| A106105 | 2015 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Final Report Co-Funding Drilling Programme, Gnaweeda Greenstone Belt, 10th to 30th June, 2013: E51/926 & E51/9 |
| A106113 | 2015 | Doray Minerals Ltd | Meekatharra North - Andy Well | 14% | Meekatharra North - Andy Well Project Combined Report - C48/2013, M51/870 & E51/1217 for the period 1st Januar |
| A107219 | 2015 | Enterprise Metals Ltd | Doolgunna | 3.2% | Doolgunna Project E51/1079, E51/1168, E51/1301, E51/1303-1304, E51/1539 & E52/2049 Combined Annual Report C213 |
| A107312 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | SURRENDER REPORT PEAK HILL PROJECT TENEMENT NUMBER E51/1085 |
| A105088 | 2015 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Gnaweeda Project E51/926, E51/927, E51/1419, E51/1420, and P51/2652 Annual Report for the period 31/07/2013 to |
| A107503 | 2015 | Doray Minerals Ltd | Gnaweeda | <1% | Meekatharra North Gnaweeda Project C46/2005 Annual Technical Report E51/926, E51/927, E51/1419, E51/1420 and P |
| A103176 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Final Report Royalties For Regions Co-Funded Government-Industry Drilling Program 2013/14 Doolgunna Drilling P |
| A103723 | 2014 | Rubianna Resources Ltd | Killara | 47% | Surrender Report for E51/1246 Killara for the period 4th August 2008 to 9th July 2014 |
| A103929 | 2014 | Enterprise Metals Ltd | Doolgunna | 3.2% | DOOLGUNNA PROJECT E51/1079, E51/1168, E51/1301, E51/1303-1304, E52/2049 & P51/2624–2627 COMBINED ANNUAL REPORT |
| A103968 | 2014 | Enterprise Metals Ltd | Doolgunna | <1% | Doolgunna Project, E51/1168 Partial Surrender Report for the period 11th November 2008 to 7th November 2014 |
| A104133 | 2014 | Rubianna Resources Ltd | Killara | 10% | Killara Project, Annual Report for the period 03/08/2013 to 02/08/2014, E51/1345, 1347, 1348 & 1349. [C215/201 |
| A105296 | 2014 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Mistletoe Project Annual Report for period 16/12/2013 to 15/12/2014, E51/1491 |
| A100917 | 2014 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Mistletoe Project, Annual Report for the period 16/12/2012 to 15/12/2013, E51/1491. |
| A101187 | 2014 | Andy Well Mining Pty Ltd | Andy Well | 14% | Partial Surrender Report, E51/1217, Meekatharra North, Andy Well Project 22/01/2008 – 02/02/2014 |
| A101578 | 2014 | Doray Minerals Ltd | Andy Well | 14% | Andy Well Project, Annual Report for the period 27/04/2013 to 31/12/2013, E51/1217 ; M51/870. [C48/2013] |
| A101868 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 01/01/2013 to 31/12/2013, E51/1053, 1085, 1120, 1134, 1818, 19 |
| A97240 | 2013 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL TENEMENT NUMBERS E51/1053, E51/1060, E51/1085, E51/1120, E |
| A97379 | 2013 | Velox Mining Services Pty Ltd | Mistletoe | <1% | Annual Report E51/1491 Mistletoe for the period 16 December 2011 to 15 December 2012 |
| A99693 | 2013 | Rubianna Resources Ltd | Killara | 7.8% | Killara Combined Project, C215/2010, Surrender Report for the period 4th August 2008 to 15th July 2013, E51/12 |
| A99789 | 2013 | Rubianna Resources Ltd | Killara | 15% | Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2012 to 2nd August 2013, E51/1244 |
| A100174 | 2013 | Enterprise Metals Ltd | Doolgunna | 11% | Doolgunna Project, E51/1303 Partial Surrender Report for the period 19th October 2010 to 14th October 2013 |
| A97164 | 2013 | Doray Minerals Ltd | Andy Well | 14% | Andy Well Project, Annual Report for the period 22/01/2012 to 21/01/2013, E51/1217. |
| A99937 | 2013 | Enterprise Metals Ltd | Doolgunna | 2.9% | Doolgunna Project, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049, P51/2516-2517, P51/2624-242 |
| A99969 | 2013 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005: Gnaweeda Project, E51/926, E51/927, E51/1419, E51/1420, and P51/2652 for the |
| A93100 | 2012 | Doray Minerals Ltd | Meekatharra North - Andy Well | 14% | Meekatharra North Andy Well Project Annual Report E51/1217 1st March 2011 to 29th February 2012 |
| A95203 | 2012 | Rubianna Resources Ltd | Killara | 15% | Killara Combined Project, C215/2010, Annual Report for the period 3rd August 2011 to 2nd August 2012, E51/1244 |
| A95573 | 2012 | Enterprise Metals Ltd | Doolgunna | 2.9% | Doolgunna Project, Combined Annual Report C213/2008, E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52 |
| A95431 | 2012 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005: Gnaweeda Project, E51/926, E51/927, E51/1419, E51/1420, and P51/2652 |
| A89672 | 2011 | Doray Minerals Ltd | Andy Well | 14% | Meekatharra North, Andy Well Project Annual Report, E51/1217 Report Period: 01/03/2010 – 28/02/2011 |
| A89944 | 2011 | Fe Limited | Ten Mile Well | <1% | Ten Mile Well Project P27/1688, P26/3369, P27/1682 – Annual Report, 04 April 2009 – 19 April 2010 |
| A91683 | 2011 | Rubianna Resources Ltd | Killara | 16% | Killara Combined Project, C215/2010, Annual Report 3rd August 2010 to 2nd August 2011, E51/1244, E51/1246, E51 |
| A91803 | 2011 | Enterprise Metals Ltd | Revere | 2.9% | Revere Project , E51/941, E51/1079, E51/1168, E51/1301-1304, E51/1337, E52/2049 M51/818, P51/2516-2517, P51/2 |
| A91806 | 2011 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005: Gnaweeda Project 31st July 2010 – 30th July 2011 |
| A93220 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Annual Report C15/2006 Peak Hill C15/2006 E51/1053, 1060, 1085, 1120, 1134, E52/1818, 1951, P52/1161-1165,1167 |
| A85464 | 2010 | Enterprise Metals Ltd | Revere | <1% | Revere Project E51/1168 Annual Report For the Period 11 November 2008 – 10 November 2009 |
| A86228 | 2010 | Doray Minerals Ltd | Andy Well | 14% | Annual Report E51/1217 - March 2009 to February 2010 |
| A87938 | 2010 | Rubianna Resources Ltd | Quartz Well | 47% | Quartz Well Project, E 51/1246, Annual Report for the period 4th August 2009 to 3rd August 2010 |
| A88599 | 2010 | Enterprise Metals Ltd | Revere | <1% | Revere Project Combined Annual Report C213/2008, 10th September 2009 to 9th September 2010, E51/802, 51/941, |
| A88900 | 2010 | Teck Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2009 – 30th July 2010 |
| A81265 | 2009 | Grosvenor Gold Pty Ltd | KARALUNDI | <1% | KARALUNDI PROJECT E51/1085 Partial Surrender Report, For the period 22nd September 2005 to 17th October 2008 |
| A84435 | 2009 | Everett Smith & Co Pty Ltd | RUBY WELL - QUARTZ WELL | 47% | RUBY WELL PROJECT, QUARTZ WELL PROSPECT E 51/1246, ANNUAL REPORT FOR THE PERIOD 4th AUG 2008 to 3rd AUG 2009 |
| A84726 | 2009 | Archean Star Resources Australia Pty Ltd | Gnaweeda | <1% | Annual Combined report for the period 31 July 2008 to 30 July 2009, Gnaweeda Project, E51/926 and E51/927 |
| A85368 | 2009 | Grosvenor Gold Pty Ltd | Karalundi | <1% | Karalundi Project E51/1085 Partial Surrender Report For the period 22nd September 2005 to 21st September 2009 |
| A81428 | 2009 | Accent Resources Nl | Andy Well | 14% | Annual Report for Exploration Licence E 51/1217, Andy Well for the period ending 21 January 2009 |
| A81827 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Project 2008 Annual Report, 1 January 2008 – 31 December 2008 |
| A79235 | 2008 | Desert Energy Ltd | Randalls | 30% | Annual Technical Report Randalls E51/1179 for the period 9 July 2007-8 July 2008 Being the first Annual Report |
| A77785 | 2008 | Oklo Uranium Ltd | Cheroona Well | <1% | Mineral Exploration Activities Report For the Period 22/09/2006 to 21/09/2007 E51/1085 'Cheroona Well'The Uppe |
| A80148 | 2008 | Teck Cominco Australia Pty Ltd | Gnaweeda | <1% | COMBINED ANNUAL REPORT C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2007 – 30th July 2008 |
| A81034 | 2008 | Desert Energy Ltd | Randalls | 30% | Surrender Report, Randalls, E51/1179 (Glengarry) |
| A74840 | 2007 | Gleneagle Gold Ltd | Cheroona Well | <1% | Cheroona Well Project 2006 Annual Report, (C15/2006), Report Period: 1 January 2006 - 31 December 2006 (Peak |
| A76157 | 2007 | Teck Cominco Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005 Gnaweeda Project E51/926 and E51/927 31st July 2006 30th July 2007 |
| A73439 | 2006 | Teck Cominco Australia Pty Ltd | Gnaweeda | <1% | Combined Annual Report C46/2005, Gnaweeda Project E51/926-927, 31 July 2005 to 30 July 2006, (Glengarry). |
| A72158 | 2006 | Gleneagle Gold Ltd | Cheroona Well | <1% | Cheroona Well Project, 2005 - 2006 Annual Report, Period 20 July 2005 to 31 March 2006, (E51/1053,1060,1085) ( |
| A70032 | 2005 | Perilya Ltd | Ruby Well | 42% | Annual Report for Ruby Well Project, for the period 12/12/03 - 31/12/04, C91/2004, E51/996, E51/998 (Meekathar |
| A70982 | 2005 | Bullion Minerals Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual technical report on exploration licences 51/926 and 51/927 for the period 31/07/04 to |
| A72577 | 2005 | Perilya Ltd | Ruby Well | 42% | Annual Report for Ruby Well Project, Period 1 January 2005 to 31 December 2005, Combined Reporting No. C91/200 |
| A69799 | 2005 | Perilya Ltd | Ruby Well | <1% | Final surrender report Ruby Well Project For the period 11 December 2002 to 16 November 2004 Tenement No E51/9 |
| A70086 | 2005 | Bullion Minerals Ltd | Gnaweeda | <1% | Annual technical report for the period 31/07/03 - 30/07/04 Gnaweeda Project, C46/2005, E51/926, E51/927. |
| A67940 | 2004 | Perilya Ltd | Ruby Well | <1% | Annual report Ruby Well Project for the period 11 December 2002 to 10 December 2003 Tenement No E51/997 |
| A66002 | 2003 | Australasian Gold Mines Nl | Meekatharra North JV | <1% | Annual Report for the period 01/01/02 to 31/12/02 Meekatharra North JV E51/290, 473 and 880. GSWA Ref: C147/19 |
| A65938 | 2003 | Australasian Gold Mines Nl | Meekatharra North JV | <1% | Annual Report for the period 01/01/02 to 31/12/02 Meekatharra North JV E51/290, 473 and 880 GSWA Ref C147/1999 |
| A67376 | 2003 | Helix Resources Ltd | Gnaweeda | <1% | Gnaweeda Project, Annual Technical Report on Exploration Licences E51/926, E51/927 for the period 31/07/02 to |
| A64050 | 2002 | Australasian Gold Mines Nl | Meekatharra North | <1% | Meekatharra North JV E51/290, 473, 880, M51/663 & 664 Annual Report for the period 01/01/01 to 31/12/01. |
| A59787 | 2000 | Australasian Gold Mines Nl | Meekatharra North | <1% | Meekatharra North Joint Venture Project, Annual Report for period ending 31/12/1999 .E51/290,E51/408-409,E51/4 |
| A57717 | 1999 | Australian Gold Resources Ltd | Gnaweeda | 18% | Gnaweeda Project, Annual Report for the period 11th November 1997 to 10th November 1998, E51/425-426, 468 & 76 |
| A58905 | 1999 | Newcrest Mining Ltd | Gnaweeda | 18% | Gnaweeda Project,Final Report to the Dept of Minerals and Energy for the period 10/11/93 to 20/07/99, Explorat |
| A53426 | 1998 | Australian Gold Resources Ltd | Gnaweeda | 16% | Gnaweeda Project, Annual Report for the period 11th November 1996 to 10th November 1997, E51/425,426 & 468. |
| A53513 | 1998 | Mines & Resources Australia Pty Ltd | Mistletoe | 34% | Mistletoe Project Partial Surrender Report E51/427 For the Period 1 December1993 to 30 November 1997 |
| A55361 | 1998 | Mines & Resources Australia Pty Ltd | Mistletoe | 5.3% | Mistletoe Project, Annual Report for the period 3rd July 1997 to 2nd July 1998, E53/313, 427, 476, 523, P51/19 |
| A56088 | 1998 | Australian Gold Resources Ltd | White Well | 1% | Australian Gold Resources Limited, Exploration Licences: E52/1073, E52/1074, E52/1274, E52/1275 |
| A56148 | 1998 | Wmc Resources Ltd | Meekatharra North | <1% | Annual Report for the period 30/06/97-30/06/98, Meekatharra North (JV) Project. E51/290,408,409,473. M51/663,6 |
| A56792 | 1998 | Anglo Australian Resources Nl | Ruby Well South | 5.9% | Ruby Well South COmbined Annual Report for the Period 14/10/1997-13/10/1997 E51/465, E51/477 |
| A52216 | 1997 | Wmc Resources Ltd | Meekatharra North | <1% | Annual report for the period 30/06/96-30/06/97 Meekatharra North Project Exploration Licences E51/290 E51/408 |
| A52292 | 1997 | Mines & Resources Australia Pty Ltd | Mistletoe | 5.3% | Mistletoe Project, Annual Report for the period 3rd July 1996 to 2nd July 1997, E51/313, 427, 476, 523 & P51/1 |
| A53336 | 1997 | Anglo Australian Resources Nl | Ruby Well South | 5.9% | Ruby Well South Combined Annual Report for the period 14/10/96 to 13/10/1997 E51/465 477. |
| A50235 | 1997 | Mines & Resources Australia Pty Ltd | Mistletoe | 34% | Mistletoe Project Partial Surrender Report E51/427 for the Period 1 December 1993 to 30 November 1996 |
| A49998 | 1997 | Newcrest Mining Ltd | Gnaweeda | 16% | Gnaweeda Project E51/425 -Erivilla, E51/426- Chiddle Well, E51/468-Poplar wekk Annual Report on Exploration fo |
| A50579 | 1997 | Anglo Australian Resources Nl | Ruby Well South | 5.9% | Ruby Well South Project, Annual Report E51/465, E51/477 for the period 14/10/1995 to 13/10/1996. |
| A47933 | 1996 | Titan Resources Nl | Ruby Well | 2.5% | Ruby Well Joint Venture Annual Report March 1995 to March 1996 E51/343, M51/411, M51/420, E51/388, E51/441, E5 |
| A47357 | 1996 | Anglo Australian Resources Nl | Ruby Well South | 5.9% | Ruby Well South Project, Annual Report to 31/12/1995, E51/465, E51/477. |
| A48650 | 1996 | Mines & Resources Australia Pty Ltd | Mistletoe | 5.3% | Mistletoe Project, Annual Report for the period 3rd July 1995 to 2nd July 1996, E51/313, 427, 476, 523, & P51/ |
| A48769 | 1996 | Wmc Resources Ltd | Meekatharra North | <1% | Annual Report for the period 30/06/1995 to 30/06/1996, Meekatharra North Project , E51/290 E51/408 E51/409 E51 |
| A45874 | 1995 | Cra Exploration Pty Ltd | Denham Pool | 53% | Final Surrender Report for the period 17/01/1995 to 18/10/1995, Denham Pool Project, E51/467. |
| A46130 | 1995 | Titan Resources Nl | Don Bore | 25% | Partial Surrender Report for the period 12/10/94-11/10/95 Don Bore Project E51/388 |
| A45418 | 1995 | Mines & Resources Australia Pty Ltd | Mistletoe | 8.1% | Mistletoe Project, Annual Report E51/313, E51/427, P51/1983 for period 03/07/1994 to 02/07/1995. |
| A45964 | 1995 | Newcrest Mining Ltd | Gnaweeda | 16% | Gnaweeda Project, Annual Report Exploration Licences E51/468, 425 & 426 for the period 10/11/1994 to 09/11/199 |
| A45981 | 1995 | Newcrest Mining Ltd | Poplar Well | 38% | Partial Surrender Report for the period 1995 Gnaweeda(Poplar Well) Project E51/468 |
| A49130 | 1995 | Mr Wilson Sw | Karalundi | 1.8% | ANNUAL REPORT FOR E51/277 ORD WELL, KARALUNDI FOR THE PERIOD ENDING 25/9/92 Karalundi prospect, exploration li |
| A40118 | 1994 | Titan Resources Nl | Ruby Well | 25% | Ruby Well Project, Annual Report for the period ending 11th October 1993, E51/388. |
| A42841 | 1994 | Titan Resources Nl | Don Bore | 25% | Don Bore Project, Annual Report for the period 12th October 1993 to 11th October 1994, E51/388. |
| A42402 | 1994 | Afmeco Pty Ltd | Mistletoe | 8.1% | Mistletoe Project, Annual Report for the period 03/07/1993 to 02/07/1994, E51/313, 427, & P51/1983. |
| A42989 | 1994 | Newcrest Mining Ltd | Gnaweeda | 16% | Gnaweeda Project, Annual Report for the period 10/11/1993 to 09/11/1994, E51/425,426, & 468. |
| A37768 | 1993 | Bhp Minerals Pty Ltd | Glengarry | 16% | Glengarry Project, Final Surrender Report for the period ending 18th December 1992, E51/351-355. |
| A8545 | 1979 | Esso Australia Ltd | Karalundi | 2.1% | Karalundi Project, Non-statutory Report : Final Report, August 1979, TR70/6959H. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 51/2323 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 51/2323 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.