E 51/1842
Register summary
- Holder
- Parbo Taro Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 8 June 2017
- Commenced
- 16 Apr 2018
- Expiry
- 15 Apr 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143226 | 2024 | Strickland Metals Limited | Bryah Basin | 60% | E51/1842 Partial Surrender Report Bryah Basin for the period ending 12/04/2024. |
| A143355 | 2024 | Auris Minerals Limited | Morck Well | <1% | Partial Surrender Report for Morck Well Project Tenement, E52/1613-I, for period 29 March 2006 to 28 March 202 |
| A144131 | 2024 | Strickland Metals Limited | Bryah Basin | <1% | Partial Surrender Report E52/3510 - Bryah Basin Project for the period 4 July 2018 to 3 July 2024 |
| A140651 | 2024 | Enterprise Metals Limited | Doolgunna | <1% | Doolgunna Project Surrender Report for E51/1970 For the Period 5 April 2022 – 3 April 2024 |
| A136928 | 2023 | Auris Minerals Limited | Feather Cap | <1% | Combined Annual Report for the Feather Cap project, C149/2017 (E52/1910-I, E52/3275, E52/3327, E52/3350-3351, |
111 more reports
| A137626 | 2023 | Sandfire Resources Limited | Murchison | <1% | E52/3498 Murchison Project Final Surrender Report 11 October 2017 to 10 October 2023 |
| A138000 | 2023 | Sandfire Resources Limited | Murchison | <1% | C35/2015 Murchison Project Final Surrender Report 2023 |
| A130956 | 2022 | Sandfire Resources Limited | Murchison | <1% | E52/3330 Murchison Project Partial Surrender Report 2022 for the period ending 04/04/2022. |
| A132410 | 2022 | Auris Minerals Limited | Feather Cap | <1% | Annual report for the Feather Cap project, C14/2017 (E52/1910-I, E52/2472, E52/3275, E52/3327, E52/3350–3351, |
| A131284 | 2022 | Strickland Metals Limited | Bryah Basin | <1% | Partial Surrender Report for E52/3273 Bryah Basin Project for the period ending 01/04/2022. |
| A128458 | 2021 | Auris Minerals Limited | Feather Cap | <1% | Combined Annual Report for the Peak Hill Project, C149/2017 (E52/1910-I, E52/2472, E52/3275, E52/3327, E52/335 |
| A124267 | 2020 | Sandfire Resources Ltd | Morck Well | <1% | C53/2018 “Morck’s Well” Project Combined Annual Report for the period ending 15/7/2020 |
| A124995 | 2020 | Strickland Metals Limited | Bryah Basin | 25% | Bryah Basin Project C184/2017 Annual Group Report for the Period Ending 30th June 2020, E51/01842, E51/01738, |
| A125090 | 2020 | Auris Minerals Limited | Feather Cap | <1% | Combined Annual Report for the Peak Hill project, C149/2017 (E52/1910-I, E52/2472, E52/3275, E52/3327, E52/335 |
| A125096 | 2020 | Sandfire Resources Limited | Murchison | <1% | C35/2015 Murchison Project Annual Report for the period 9 August 2019 to 8 August 2020 |
| A125222 | 2020 | Strickland Metals Limited | Mount Padbury | <1% | Mt Padbury E52/3600 Annual Technical Report for the period ending 08/09/2020 |
| A120535 | 2019 | Omni Projects Pty Ltd | Bryah Basin | 25% | Bryah Group Annual Technical Report (C184/2017) for the period 1 July 2018 to 30 June 2019 E 51/01738,E 51/018 |
| A121358 | 2019 | Auris Exploration Pty Ltd | Peak Hill | <1% | Combined Annual Report for the Peak Hill project, C149/2017 (E52/1910-I, E52/2472, E52/3275, E52/3327, E52/335 |
| A120490 | 2019 | Sandfire Resources Nl | Morck Well | <1% | C53/2018 “Morck Well” Project Combined Annual Report for the period 15 April 2018 to 14 April 2019, E51/01033, |
| A120943 | 2019 | Omni Geox Pty Ltd | Mount Padbury | <1% | E52/03600 Mt Padbury Annual Technical Report for the period 9 September 2018 to 8 September 2019 |
| A116842 | 2018 | Sandfire Resources Nl | Morcks Well - Heines Find | <1% | Morcks Well Project E52/1613 (Heines Find) Annual Mineral Exploration Report for the period 29 March 2017 to 2 |
| A117925 | 2018 | Gateway Mining Limited | Bryah | <1% | Bryah Project C184/2017 Annual Report for the period 1 July 2017 to 30 June 2018, E51/01738, E52/03273 |
| A118404 | 2018 | Auris Exploration Pty Ltd | Peak Hill | <1% | Combined Annual Report for the Peak Hill Project, C149/2017 (E52/1910-I, E52/2472, E52/3275, E52/3327, E52/335 |
| A117223 | 2018 | Sandfire Resources Nl | Morck's Well | <1% | C53/2018 “Morck’s Well” Project Annual Report For the Period 15 April 2017 to 14 April 2018, E51/01033, E52/01 |
| A112170 | 2017 | Grosvenor Gold Pty Limited | Peak Hill | <1% | Peak Hill Project C15/2006 Annual Report for the period 1 January 2016 to 31 December 2016, E51/01053, E51/011 |
| A112486 | 2017 | Grosvenor Gold Pty Limited | Durack Well | <1% | Durack Well E52/01951 [C15/2006] Final Surrender Report for the period 26/02/2007 to 27/01/2017 |
| A113882 | 2017 | Auris Exploration Pty Ltd | Heines Find | <1% | E52/1613 Heines Find Project Annual Report for the period 29 March 2016 to 28 March 2017 |
| A114570 | 2017 | Auris Exploration Pty Ltd | Mount Padbury | <1% | Annual Report for the Mount Padbury Project E52/3273 for the period 1 July 2016 to 30 June 2017 |
| A114575 | 2017 | Auris Exploration Pty Ltd | Narracoota | <1% | Annual Report for the Narracoota Project E52/3001 for the period 9 June 2016 to 8 June 2017 |
| A114838 | 2017 | Auris Exploration Pty Ltd | Narracoota | <1% | Annual Report for the Narracoota Project, E52/1910, for the period 10 August 2016 to 9 August 2017 |
| A114897 | 2017 | Sandfire Resources Nl | Murchison | <1% | C35/2015 Murchison Project Annual Report for the period 9 August 2016 to 8 August 2017, E52/02880, E52/02881, |
| A109001 | 2016 | Montezuma Mining Company Ltd | Peak Hill Regional | 60% | Peak Hill Regional Project E51/1622 Annual Report for the period 10/04/2015 to 09/04/2016 |
| A109969 | 2016 | Grosvenor Gold Pty Limited | Peak Hill | <1% | PEAK HILL E52/1910 ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 9 AUGUST 2016 |
| A110000 | 2016 | Sandfire Resources Nl | Murchison | <1% | C35/2015 Murchison Project Annual Report For the Period 9 August 2015 to 8 August 2016, E52/02880, E51/01647, |
| A108438 | 2016 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL PROJECT TENEMENT NUMBERS E51/1053, E51/1120, E51/1134, E52 |
| A109101 | 2016 | Grosvenor Gold Pty Limited | Robinson Range | <1% | Robinson Range E52/1613 Annual Report for the period 29 March 2015 to 28 March 2016 |
| A109460 | 2016 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | E52_3001 Peak Hill Project Annual Report for the period 9 June 2015 to 8 June 2016 |
| A110019 | 2016 | Quadrio Resources Pty Ltd | Bryah | <1% | Bryah Project Combined Annual Report, C96/2011, E51/1290 & E51/1369 for the period 1 December 2015 to 30 Novem |
| A105167 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL PROJECT TENEMENT NUMBERS E51/1053, E51/1085, E51/1120, E51 |
| A105644 | 2015 | Rubianna Resources Ltd | Ruby Well North | <1% | Ruby Well North E52/2387 Surrender Report for the period 12th April 2010 to 20th March 2015 |
| A105687 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill E52/1613 Annual Technical Report for the period 29 March 2014 to 28 March 2015 |
| A106158 | 2015 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT PEAK HILL PROJECT, TENEMENT NUMBER E52/3001 [for the period 9 June 2014 to 8 June 2015 |
| A106917 | 2015 | Grosvenor Gold Pty Ltd | Robinson Range | <1% | Robinson Range E52/1910 Annual Technical Report for the period ending 09/08/2015 |
| A107051 | 2015 | Sandfire Resources Nl | Murchison | <1% | Murchison Project Combined Annual Mineral Exploration Report C35/2015, E52/2880 & E52/2881 for the Period 9/08 |
| A102004 | 2014 | Rubianna Resources Ltd | Murchison – North Ruby Well | <1% | Murchison Project, North Ruby Well, E52/2387, Annual Report for the Period 12th April 2012 to 11th April 2013 |
| A102179 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | E52/1613 Peak Hill Annual Technical Report for the period 29 March 2013 to 28 March 2014 |
| A100685 | 2014 | Quadrio Resources Pty Ltd | Bryah | <1% | Bryah Project, Annual Report for the period 04/12/2012 to 03/12/2013, E51/290, 1344, & 1369. [C96/2011] |
| A101868 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 01/01/2013 to 31/12/2013, E51/1053, 1085, 1120, 1134, 1818, 19 |
| A103476 | 2014 | Grosvenor Gold Pty Ltd | Peak Hill - Robinson Range | <1% | ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 9 AUGUST 2014 PEAK HILL PROJECT TENEMENT NUMBER E52/1910 |
| A104177 | 2014 | Quadrio Resources Pty Ltd | Bryah | <1% | Bryah Project Combined Annual Report C96/2011 E51/1290, E51/1344 & E51/1369 for the period 4 December 2013 to |
| A97240 | 2013 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | COMBINED ANNUAL TECHNICAL REPORT C15/2006 PEAK HILL TENEMENT NUMBERS E51/1053, E51/1060, E51/1085, E51/1120, E |
| A98012 | 2013 | Grosvenor Gold Pty Ltd | Durack Well | <1% | Durack Well Project, Partial Surrender Report for the period 26th February 2007 to 25th February 2013, E52/195 |
| A99400 | 2013 | Grosvenor Gold Pty Ltd | Peak Hill _ Robinson Range | <1% | Peak Hill Project E52/1910 Annual Technical Report for the period ending 9 August 2013 |
| A100308 | 2013 | Rubianna Resources Ltd | Killara | <1% | Killara Gold/Copper Project E51/1348 (1 January 2013 – 31 December 2013) Final Report for EIP Grant DAG2013/00 |
| A98052 | 2013 | Grosvenor Gold Pty Ltd; Pepinnini Robinson Range Pty Ltd | Peak Hill | <1% | ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 28 MARCH 2013 PEAK HILL TENEMENT NUMBER E52/1613 |
| A98313 | 2013 | Rubianna Resources Ltd | North Ruby Well | <1% | North Ruby Well Project, Annual Report for the period 12th April 2012 to 11th April 2013, E52/2387. |
| A92859 | 2012 | Richmond Mining Ltd | Narracoota | 29% | Narracoota Project, Annual Report for the year ending 2nd December 2011, E52/1496. |
| A93622 | 2012 | Pepinnini Minerals Ltd | Bryah - Padbury Basin | <1% | Annual Technical Report for the Period Ending 28 March 2012, E52/1613, Bryah-Padbury Basin Peak Hill Mineral F |
| A94171 | 2012 | Rubianna Resources Ltd | Murchison – North Ruby Well | <1% | Murchison Project, North Ruby Well, E52/2387, Annual Report for the Period 12th April 2010 to 11th April 2011 |
| A94696 | 2012 | Grosvenor Gold Pty Ltd | Naracoota | <1% | Annual Technical Report for the Period Ending 9 August 2012, E52/1910 ‘Naracoota’ Bryah-Padbury Basin Peak Hi |
| A96018 | 2012 | Quadrio Resources Pty Ltd | Bryah | <1% | Bryah Project, Annual Report for the period 01/12/2011 to 30/11/2012, E51/1290, 1344 & 1369. [C96/2011] |
| A96181 | 2012 | Latin Gold Ltd | Narracoota | 29% | Narracoota Project, Annual Report for the period ending 3rd December 2012, E52/1496. |
| A121323 | 2012 | Latin Gold Ltd | Narracoota | 29% | Narracoota Project, Co-Funded Drilling Report for the period ending 3rd December 2012, E52/1496 (R4) |
| A89059 | 2011 | Richmond Mining Ltd | Narracoota | 29% | Narracoota Project, Annual Report for the period 3rd December 2009 to 2nd December 2010, E52/1496. |
| A89944 | 2011 | Fe Limited | Ten Mile Well | <1% | Ten Mile Well Project P27/1688, P26/3369, P27/1682 – Annual Report, 04 April 2009 – 19 April 2010 |
| A90044 | 2011 | Pepinnini Robinson Range Pty Ltd | Doolgunna | <1% | Doolgunna Project, Annual Report for the period 29th March 2010 to 28th March 2011, E52/1613. |
| A90295 | 2011 | Rubianna Resources Ltd | Murchison - North Ruby Well | <1% | E52/2387 Murchison - North Ruby Well Project, Annual Report for the period 12th April 2010 to 11th April 2011 |
| A91471 | 2011 | Pepinnini Robinson Range Pty Ltd | Robinson Range - Naracoota | <1% | Annual Technical Report for the Period Ending 9 August 2011, EL52/1910 ‘Narracoota’, Bryah-Padbury Basin, Peak |
| A92125 | 2011 | Quadrio Resources Pty Ltd | Bryah | <1% | Bryah Project Combined Annual Report C96/2011 E51/1290 & E51/1369 Covering the period 1 December 2010 to 30 N |
| A93220 | 2011 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Annual Report C15/2006 Peak Hill C15/2006 E51/1053, 1060, 1085, 1120, 1134, E52/1818, 1951, P52/1161-1165,1167 |
| A88919 | 2011 | Pepinnini Robinson Range Pty Ltd | Narracoota | <1% | Narracoota Project, Annual Report for the period ending 9th August 2010, E52/1910. |
| A89934 | 2011 | Pepinnini Robinson Range Pty Ltd | E52/1613 | <1% | Annual Technical Report for the Period Ending 28 March 2011, E52/1613, Bryah-Padbury Basin |
| A85588 | 2010 | Richmond Mining Ltd | Narracoota | 29% | Narracoota Project Annual Technical Report on Exploration Licence 52/1496 for the period 03 December 2008 to 0 |
| A86492 | 2010 | Pepinnini Minerals Ltd | Robinson Range | <1% | IronOre Farm-in, Technical Report Robinson Range E51/1033, E52/1613, E52/1670, E52/1672, E52/1723, E52/1910 an |
| A80751 | 2009 | Richmond Mining Ltd | Narracoota | 29% | Narracoota Project Annual Technical Report on Exploration Licence 52/1496 for the period 03 December 2007 to 0 |
| A81827 | 2009 | Grosvenor Gold Pty Ltd | Peak Hill | <1% | Peak Hill Project 2008 Annual Report, 1 January 2008 – 31 December 2008 |
| A82325 | 2009 | Grosvenor Gold Pty Ltd | HEINES FIND | <1% | HEINES FIND PROJECT E52/1613 Partial Surrender Report For the period 29th March 2006 to 28th March 2009 |
| A77368 | 2008 | Eagle Gold Mines Pty Ltd. | Peak Hill | <1% | Peak Hill Project 2007 Annual Report 1 January 2007 – 31 December 2007 C15/2006 E51/1033, E51/1053, E51/1060, |
| A79027 | 2008 | Meteoric Resources Nl | Ruby Well | <1% | ANNUAL REPORT RUBY WELL E51/1111 Reporting period 8 May 2007 to 7 May 2008 |
| A80020 | 2008 | Eagle Gold Mines Pty Ltd | Narracoota | <1% | Annual Report (part of C15/2006) For the period 10th August 2007 to 9th August 2008 |
| A80138 | 2008 | Eagle Gold Mines Pty Ltd | Narracoota | <1% | NARRACOOTA PROJECT E52/1910 Annual Report (part of C15/2006), For the period 10th August 2007 to 9th August 20 |
| A77692 | 2008 | Richmond Resources Pty Ltd | Narracoota | 29% | Narracoota Project Annual Technical Report on Exploration Licence 52/1496 for the period 03 December 2006 to 0 |
| A80178 | 2008 | Meteoric Resources Nl | Ruby Well | <1% | Surrender Report Ruby Well Project E51/1111 Peak Hill Mineral Field Reporting period 8 May 2006 to 16 October |
| A74840 | 2007 | Gleneagle Gold Ltd | Cheroona Well | <1% | Cheroona Well Project 2006 Annual Report, (C15/2006), Report Period: 1 January 2006 - 31 December 2006 (Peak |
| A76104 | 2007 | Meteoric Resources Nl | Ruby Well | <1% | Annual Report Ruby Well E51/1111 Reporting period 8 May 2006 to 7 May 2007 |
| A72158 | 2006 | Gleneagle Gold Ltd | Cheroona Well | <1% | Cheroona Well Project, 2005 - 2006 Annual Report, Period 20 July 2005 to 31 March 2006, (E51/1053,1060,1085) ( |
| A72282 | 2006 | Helix Resources Ltd | Narracoota | 29% | Narracoota Project, Annual Technical Report on E52/1496 for the Period 03/12/04 to 02/12/05, (Peak Hill). |
| A72664 | 2006 | Helix Resources Ltd | Narracoota | 29% | Narracoota Project, Partial Surrender Report Exploration Licence 52/1496, (Period 2006, Peak Hill). |
| A73827 | 2006 | Helix Resources Ltd | Bilyuin (Narracoota) | 29% | Bilyuin Project E52/1496 Annual Technical Report for the Period 03/12/05 - 02/12/2006 (Peak Hill) |
| A70014 | 2005 | Helix Resources Ltd | Narracoota | 10% | Narracoota Project Combined Annual Technical Report on Exploration Licences E51/946, E52/1495 and E52/1496 fo |
| A68038 | 2004 | Helix Resources Ltd | Narracoota | 10% | Combined Annual Technical Report for the period 03/12/2002 to02/12/2003 Narracoota Project E51/946, E52/1495 |
| A61060 | 2000 | Homestake Gold Of Australia Ltd | Peak Hill | 2.4% | Project 6596, Peak Hill Mine JV Project, E52/13,35,56,116,28 287,324,345-347,452,465,474,541,581-582,P52/514-5 |
| A58208 | 1999 | St Barbara Mines Ltd | Mikhaburra | 9.1% | Mikhaburra Project Area - Final Report 18/03/1992 - 02/10/1998 E51/310 |
| A52428 | 1997 | St Barbara Mines Ltd | Mikhaburra | 9% | Annual Report, 1 August, 1996 to 30 June, 1997, Mikhaburra Project , E51/310, M51/40, P51/1553. |
| A52869 | 1997 | Plutonic Operations Ltd | Mikhaburra | 14% | Mikhaburra Project, Annual Report for the period 07/06/1996 to 06/09/1997, E51/480. |
| A53289 | 1997 | Mr Wilson Sw | Narracoota | 92% | Narracoota Prospect - Peak Hill Mineral Field W.A. Exploration Licence: 52/1080, Annual Report, Period Ending: |
| A49720 | 1996 | Richmond Resources Pty Ltd | Mount Padbury | 44% | Annual Report for the Period 5 August 1995 to 4 Augst 1996 Mt Padbury E52/854 |
| A47065 | 1996 | Richmond Resources Pty Ltd | Mount Padbury | 44% | Mount Padbury Project, Annual Report for the period 5 August 1994 to 4 August 1995, E52/854. |
| A48082 | 1996 | Swan Gold Nl | Narracoota | 11% | Narracoota Project, Annual Report for the period 15th March 1995 to 14th March 1996, E52/833. |
| A48615 | 1996 | St Barbara Mines Ltd | Mikhaburra | 9.1% | Partial Surrender Report 18 March 1992 to 17 March 1996, Mikhaburra Project , E51/310. |
| A49123 | 1996 | Plutonic Operations Ltd | Mikhaburra | 14% | Twin RIvers Joint Venture- Mikhaburra E51/480 Annual Report Period 07/09/95 - 06/19/96 |
| A50994 | 1996 | Oryx Resources Nl | Cashman | 2.5% | Cashman Project,1996 Partial Surrender Report E51/420, September 1996. |
| A50995 | 1996 | Striker Resources Nl | Cashman | 2.5% | Cashman Project, (Annual) Retention Report E51/420 for period 5th October 1995 to 4th October 1996. |
| A44458 | 1995 | Swan Gold Nl | Narracoota | 11% | Narracoota Project, Annual Report Exploration Licence E52/833 for the period 15th March 1994 to 14th March 199 |
| A46888 | 1995 | Mr Wilson Sw | Bubbawandle | 2.5% | Bubbawandle Project, Annual Report, December 1995, Exploration Licence 51/420. |
| A41555 | 1994 | North Mining Ltd | Wonsog-Holden Well | 19% | Final report on the Glengarry Nickel Project, E52 Wonsog & E51/384 Holden Well |
| A41672 | 1994 | St Barbara Mines Ltd | Mikhaburra | 9% | ANNUAL REPORT, 1 OCTOBER, 1993 TO 31 JULY, 1994, MIKHABURRA PROJECT, E51/0310, M51/0040, P51/1553. |
| A43376 | 1994 | Anglo Australian Resources Nl | Bubbawandle | 2.5% | Bubbawandle Project, Progress Report E51/420, December 1994. |
| A39329 | 1993 | St Barbara Mines Ltd | Mikhaburra | 9% | E51/310, M51/40, P51/1553, Mikhaburra Project Area, Annual Report, Period: 1992 to 30 September 1993. |
| A3089 | 1972 | Western Mining Corporation Ltd | Bilyuin Pool | 6.3% | Bilyuin Pool Project, Non-statutory Report: Auger Drilling Data Sheets ( File 2), MC51/1337-1340, 1342 & 1344- |
| A3086 | 1972 | Western Mining Corporation Ltd | Bilyuin Pool | 6.3% | Bilyuin Pool Project, Annual Report for the year ending 30th June 1972, MC51/1337-1340, 1342, 1344-1359. |
| A1910 | 1971 | Western Mining Corporation Ltd | Bilyuin Pool | 5.6% | Bilyuin Pool Project, Annual Report for the period ending 30th June 1971, MC51/1334-1337, 1340,1342, 1344-1345 |
| A1901 | 1971 | Western Mining Corporation Ltd | Cogla Downs | 1.6% | Cogla Downs Project, Annual Report for the year ending 30th June 1971, MC51/648-693 & 1297-1321. |
| A2219 | 1971 | Academus Minerals Nl | Cashmans Find | 13% | Cashmans Find Project, Non-statutory Report: Progress Report on Geological Investigations, September 1971, MC5 |
| A2521 | 1971 | Le Nickel Aust Exp Pty Ltd | Narracoota | <1% | Narracoota Project, Annual Report for the period ending 31/12/1971, MC51/402-407, 733-741, 797-805, 848, 1840- |
| A2008 | 1970 | Jododex Australia Pty Ltd | Narracoota | 38% | Narracoota Project, Non-statutory Report: Annual Report for the period 01/03/1970 to 31/12/1970, MC51/472-477. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 19 months · 15 Apr 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 51/1842 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 51/1842? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.