Register summary
- Holder
- Baracus Pty Ltd
- Local government
- Shire of Ashburton
- Application received
- 28 Aug 2023
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125214 | 2020 | Baracus Pty Ltd | Turee Creek | <1% | Turee Creek E 47/2427 Annual Report for the period ending 18/08/2020 |
| A119774 | 2019 | Rio Tinto Exploration Pty Limited | Paraburdoo | <1% | Paraburdoo Surrender Report Exploration Licence 47/03715 (GDSR 6931) For the Period 16 March 2018 to 27 March |
| A120425 | 2019 | Rio Tinto Exploration Pty Limited | Mount Maguire | <1% | (C78/2017) Mount Maguire Project Combined Surrender Report Exploration Licences 47/3331, 52/3304 and 52/3305 f |
| A120164 | 2019 | Hylea Metals Limited | Ashburton | 8.1% | Ashburton Project C135/2012 Annual Report for the period 02/03/2018 to 01/03/2019, E08/02209, E08/02210, E08/0 |
| A121391 | 2019 | Baracus Pty Ltd | Turee Creek | <1% | Annual Technical Report for Turee Creek Project E47/02427 for the period 19 August 2018 to 18 August 2019 |
104 more reports
| A117469 | 2018 | Riva Resources Limited | Ashburton | 8.1% | Ashburton Project C135/2012 Combined Annual Report for the period ending 1/03/2018. |
| A117948 | 2018 | State Resources Pty Ltd | Turee Creek | <1% | Annual Technical Report for the Turee Creek Project E47/02427 for the period 19/08/2017 - 18/08/2018 |
| A117983 | 2018 | Rio Tinto Exploration Pty Limited | Mount Maguire | <1% | C78/2017 Mount Maguire Project Combined Annual Report Exploration Licences 47/3331, 52/3304 and 52/3305 for th |
| A110822 | 2017 | Fortescue Metals Group Ltd | Seven Mile | 31% | C15/2016 Seven Mile Final Surrender Report 11 November 2011 to 28 October 2016 |
| A113966 | 2017 | Riva Resources Ltd | Ashburton | 8.1% | Combined Annual Report for Ashburton Project C135/2012 for the period 2 March 2016 to 1 March 2017, E08/02209, |
| A114826 | 2017 | Baracus Pty Ltd | Turee Creek | <1% | Final report into drilling completed under Exploration Incentive Scheme grant DAG2016/0081536 (R#13) |
| A114123 | 2017 | Fortescue Metals Group Ltd | Seven Mile | <1% | C15/2016 Seven Mile Final Surrender Report For the Period 20 July 2011 to 15 May 2017, E47/01735, E47/03255, E |
| A115158 | 2017 | State Resources Pty Ltd | Turee Creek | <1% | Annual Technical Report for the Turee Creek Project E47/02427 for the period 19 August 2016 to 18 August 2017 |
| A108605 | 2016 | Dragon Energy Ltd | Ashburton | 8.1% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2015 to 0 |
| A107664 | 2016 | Fortescue Metals Group Ltd | Mininer | 2% | E08/2353 (Mininer) Final Surrender Report for the period 06/05/2013 to 17/07/2015 |
| A108189 | 2016 | Northern Star Resources Ltd | Paraburdoo | 17% | Annual Mineral Exploration Report for the Paraburdoo Group C145/1996 for the period 1 January 2015 to 31 Decem |
| A109379 | 2016 | State Resources Pty Ltd | Turee Creek | <1% | C68/2013 TUREE CREEK PROJECT E52/02624, E52/02625 for the period 12 April 2015 to 11 April 2016 |
| A110034 | 2016 | State Resources Pty Ltd | Turee Creek | <1% | Annual Mineral Exploration Report for Turee Creek Project E47/02427 For the Period 19 August 2015 to 18 August |
| A110057 | 2016 | Fortescue Metals Group Ltd | Seven Mile | 19% | C15/2016 Seven Mile Annual Report For the Period 1 June 2015 to 31 May 2016, E08/02696, E08/02697, E08/02700, |
| A104731 | 2015 | Dragon Energy Ltd | Ashburton | 8.1% | Partial Relinquishment Report- Ashburton Project, E08/2209 - 2211, E47/2417, for the period 02/12/2011 to 09/0 |
| A106445 | 2015 | Dragon Energy Ltd | Ashburton | 8.1% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2014 to 0 |
| A105062 | 2015 | Northern Star Resources Ltd | Paraburdoo | 13% | Paraburdoo Project C451/1996 Annual Report to the Department of Mines and Petroleum for the period 01/01/14 to |
| A105925 | 2015 | State Resources Pty Ltd | Turee Creek | <1% | Combined Annual Technical Report, Turee Creeek Project, C68/2013, E52/2624, 2625, 12 April 2014 to 11 April 20 |
| A106894 | 2015 | Amex Resources Ltd | Paraburdoo South | 13% | Paraburdoo South Project E47/2435 Surrender Report for the period 21 June 2012 to 18 June 2015 |
| A107498 | 2015 | State Resources Pty Ltd | Turee Creek Project | <1% | Annual Technical Report for Turee Creek Project |
| A101744 | 2014 | Dragon Energy Ltd | Ashburton | 8.1% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2013 to 0 |
| A103025 | 2014 | Amex Resources Ltd | Paraburdoo South | 13% | ANNUAL REPORT 21 June 2013 to 20 June 2014 PARABURDOO SOUTH PROJECT E47/2435-I |
| A101228 | 2014 | Northen Star Resources Ltd | Paraburdoo | 13% | Paraburdoo C451/1996 Annual Report to the Department of Mines and Petroleum for the period 01/01/13 to 31/12/1 |
| A102171 | 2014 | State Resources Pty Ltd | Turee Creek | <1% | Turee Creek Project Combined Annual Technical Report (C68/2013) E 52/2624 & E 52/2625 for the period 12 April |
| A103258 | 2014 | Brockman Mining Australia Pty Ltd | Paraburdoo | 33% | Paraburdoo Project E47/2081 Annual Report for the year ended 21st June 2013 – 20th June 2014 |
| A103928 | 2014 | Atlas Iron Ltd | Paraburdoo | <1% | Paraburdoo Project E47/1241 Annual Report to the Department of Mines and Petroleum for the Period Ending 16 Oc |
| A98046 | 2013 | State Resources Pty Ltd | Turee Creek | <1% | Turee Creek Project, Annual Report for the period 12th April 2012 to 11th April 2013, E52/2624 & 2625. [C68/2 |
| A98891 | 2013 | Amex Resources Ltd | Paraburdoo South | 13% | Annual Report, 21 June 2012 to 20 June 2013 Paraburdoo South Project E47/2435 |
| A97674 | 2013 | Dragon Energy Ltd | Ashburton | 8.1% | Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2012 to 0 |
| A99108 | 2013 | Brockman Mining Australia Pty Ltd | Paraburdoo | 33% | E47/2081–Annual Report for the year ended 20th June 2013 |
| A99656 | 2013 | Atlas Iron Ltd | Paraburdoo - Echo George | <1% | Paraburdoo Project (Echo George) E47/1241 Annual Report to the Department of Mines and Petroleum for the Perio |
| A92701 | 2012 | Fortescue Metals Group Ltd | Snowy Mountain | 13% | Snowy Mountain Combined Reporting Group Annual Report for the period 1 Nov 2010 to 31 Oct 2011 - Snowy Mountai |
| A96140 | 2012 | Fortescue Metals Group Ltd | Snowy Mountain | 13% | Snowy Mountain Project, Annual Report for the period 1st November 2011 to 31st October 2012, E47/1735, 1741, 1 |
| A95488 | 2012 | Atlas Iron Ltd | Paraburdoo | <1% | PARABURDOO PROJECT E47/1241 Annual Report to the Department of Mines and Petroleum for the Period Ending 16 Oc |
| A94926 | 2012 | Dragon Energy Ltd | Ashburton Project- Coorriga Bore | <1% | Annual Report- Ashburton Project- Coorriga Bore, E08/2211-I, for the period 28/07/2011 to 27/07/2012 |
| A89800 | 2011 | Fulcher Nominees Pty Ltd | Ashburton Downs | 2% | ANNUAL EXPLORATION REPORT FOR ASHBURTON DOWNS PROJECT TENEMENT E08/1882 FOR THE PERIOD ENDING 20TH JANUARY 201 |
| A91840 | 2011 | Atlas Iron Ltd | Paraburdoo - Echo Gorge | <1% | Paraburdoo Project Echo Gorge E47/1241 Annual Technical Report to DMP Period Ending 16 October 2011 |
| A88875 | 2011 | Giralia Resources Nl | Echo Gorge | <1% | Echo Gorge E47/1241 Partial Surrender Report to DMP Period 17 October 2006 to 23 August 2010 |
| A88400 | 2010 | Giralia Resources Nl | Echo Gorge | <1% | Echo Gorge E47/1241 Annual Technical Report to DMP Period Ending 16 October 2010 |
| A86370 | 2010 | Sipa Exploration Nl | Ashburton | 2.1% | Ashburton Project, Southeastern Exploration Area, M’s 52/639, 640, 734 & 735, E’s 08/1650, 47/1742, 52/1941, 5 |
| A87072 | 2010 | Dragon Energy | Ashburton | 6.9% | Combined Annual Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-I E47/1528-I For the perio |
| A87593 | 2010 | Giralia Resources Nl | Echo Gorge | <1% | Echo Gorge E47/1241 Partial Surrender Report to DMP Period 17 October 2006 to 16 August 2010 |
| A88262 | 2010 | Dragon Energy | Ashburton | 6.9% | Final Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-IE47/1528- For the period 1st March |
| A81811 | 2009 | Sipa Exploration Nl | ASHBURTON | 2.1% | ASHBURTON PROJECT SOUTHEASTERN EXPLORATION AREA C451/1996 M’s 52/639, 640, 734 & 735 E’s 08/1650, 47/1742, 52 |
| A82098 | 2009 | Polaris Metals Nl | ASHBURTON | <1% | ASHBURTON PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD, 2 FEBRUARY 2006 – 1 FEBRUARY 2008 FOR E08/1511-I TO |
| A82184 | 2009 | Polaris Metals Nl | ASHBURTON | 6.9% | ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 – 1 FEBRUARY 2008 FOR E08/1511-I, E08/ |
| A84737 | 2009 | Giralia Resources Nl | Echo Gorge | <1% | Echo Gorge E47/1241, Annual Technical Report to DMP Period Ending 16 October 2009 |
| A77705 | 2008 | Giralia Resources Nl | Echo Gorge | <1% | E47/1241 ECHO GORGE ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 16 OCTOBER 2007 |
| A78487 | 2008 | Polaris Metals Nl | Ashburton | <1% | ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 - 1 FEBRUARY 2008 FOR E08/1511-I, E08/ |
| A79371 | 2008 | Polaris Metals Nl | Ashburton | 58% | Annual Report for the period 2 June 2007 - 1 June 2008 for E47/1528 Ashburton Project |
| A79872 | 2008 | Giralia Resources Nl | Echo Gorge | <1% | ECHO GORGE PROJECT, E47/1241, ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDNG 16 OCTOBER, 2008 |
| A75375 | 2007 | Polaris Metals Nl | Ashburton | <1% | Ashburton project 2007 Annual report E08/1511-1513 01/03/2006-28/02/2007 Report No:2007-25 |
| A76075 | 2007 | Newcrest Mining Ltd | Ashburton | 59% | Ashburton Project South Eastern Exploration Area Exploration Licence E47/1086 Mininer Final Report for the per |
| A77609 | 2007 | Newcrest Mining Ltd | Ashburton | 7.4% | ASHBURTON PROJECT SOUTH EASTERN AREA Annual Technical Report For the Period Ending 31 December, 2007. C451/199 |
| A76472 | 2007 | Newcrest Mining Ltd | Ashburton | 100% | Ashburton Project SE Exploration Area E47/1691 Turee Creek West Surrender Report Period Ending 19 October 2007 |
| A72482 | 2006 | Newcrest Mining Ltd | Ashburton | 59% | Ashburton Project South Eastern Exploration Area, E47/1086 Mininer, Partial Relinquishment Report for the Peri |
| A74382 | 2006 | Newcrest Mining Ltd | Ashburton | 7.6% | Ashburton Project C451/1996 Annual Technical Report for the Period Ending 31st Dec 2006 Report No.G861/15 (Wyl |
| A70706 | 2005 | Newcrest Mining Ltd | Ashburton | 59% | Ashburton Project, South Eastern exploration area, Exploration licence E47/1086 Mininer. Partial relinquishmen |
| A70268 | 2005 | Newcrest Mining Ltd | Ashburton | <1% | Ashburton Project, Exploration licence E52/1085, Partial surrender report for the period ending 12 March, 2005 |
| A70081 | 2005 | Newcrest Mining Ltd | Ashburton | 7.6% | Annual technical report for the period 01/01/04 - 31/12/04 Ashburton Project, C451/1996, E08/821, E08/825, E08 |
| A71906 | 2005 | Newcrest Mining Ltd | Ashburton | 7.6% | Ashburton Project South Eastern Area, Annual Report for the period ending 31 December 2005, Combined Reporting |
| A67953 | 2004 | Sipa Exploration Nl | Mininer | 31% | Annual Report for the period 01/01/2003- 31/12/2003 Baring Downs & Mount Maguire Projects E08/1213, E47/1086 |
| A65844 | 2003 | Sipa Exploration Nl | Ashburton | 31% | Annual Report covering the period October 2001 to December 2002 Ashburton Regional Project E08/1213 'Baring Do |
| A68115 | 2003 | Newcrest Mining Ltd | Ashburton | 5.4% | Ashburton Project, Annual Report Exploration Licences E08/821, 825, 951-953, 1272; E47/825; E52/1077, 1085-108 |
| A66068 | 2003 | Sunrise Exploration Pty Ltd | Firegold | 7.7% | Surrender Report for Tenement E47/869 period 26/9/2000 to 27/1/2003 Combined Reporting No C79/2001 |
| A67323 | 2003 | Sunrise Exploration Pty Ltd | Firegold | 3% | Firegold JV Project, Annual Report for Tenements: E47/863, E52/1229,1230, Period 26/09/2002 to 27/09/2003. |
| A66254 | 2002 | Newcrest Mining Ltd | Ashburton | 5.4% | Ashburton Project , Southeastern exploration Area, E08/821, 825, 951, 952, ject C451/1996: E08/821, 825, 95 |
| A64352 | 2002 | Dragon Mining Nl | Ashburton | 3% | Annual Report Ashburton Project E52/1229; E52/1230 & E47/869 July 28th 2000 - July 27th 2001. |
| A64597 | 2002 | Dragon Mining Nl | Ashburton | 7.7% | E47/869 Partial Relingquishment Report Ashburton Project |
| A65379 | 2002 | Sunrise Exploration Pty Ltd | Firegold | 3% | Annual Report for Tenements E52/1229, E52/1130 & E47/869 Period 26/9/2001 to 27/09/2002 DMPR Combined Reportin |
| A64295 | 2001 | Newcrest Mining Ltd | Ashburton | 5.4% | Ashburton Project Southeastern exploration area Annual Technical Report to the Department of Minerals & Petrol |
| A61640 | 2001 | Sipa Exploration Nl | Ashburton | 7.7% | Ashburton Project E47/869 2000 Annual Report 1 January 2000 to 5 September 2000, Sheet SF50-15. |
| A61671 | 2001 | Sipa Exploration Nl | Ashburton | 7.7% | Ashburton Regional Project E47/869 Partial Relinquishment Report to August 2000. |
| A59548 | 2000 | Hamersley Iron Pty Ltd | Mount Maguire | 1.7% | Mount Maguire Proejct, E47/600, Surrender Report December 1999. |
| A59752 | 2000 | Sipa Exploration Nl | Ashburton | 5.1% | Ashburton Project Southeastern Exploration Area M52/639, M52/640, E52/1077, E52/1085, E52/1086, E52/1148, E52/ |
| A60843 | 2000 | Newcrest Mining Ltd | Ashburton | 55% | Ashburton Project, Partial Surrender Report for the period ending 10th July 2000, E47/825. [C451/1996] |
| A61012 | 2000 | Newcrest Mining Ltd | Ashburton | <1% | Ashburton Project Southeastern Exploration Area E52/1085 Par tial Relinquishment Report to the Department of M |
| A61884 | 2000 | Newcrest Mining Ltd | Ashburton | 5.4% | Annual Technical Report to the Department of Minerals & Energy for the period ending 31 December 2000 Ashburto |
| A57322 | 1999 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Project - West Pilbara Mineral Field W.A. Exploration Licence: E47/37, 600 Period End 31/12/98 |
| A58636 | 1999 | Sipa Exploration Nl | Ashburton | 4.9% | Ashburton Project - Southeastern Exploration Area 01/01/98 - 31/12/98 M52/639, 640, E52/1077, 1085, 1086, 1148 |
| A58735 | 1999 | Newcrest Mining Ltd | Ashburton | 55% | Ashburton Project, Final Surrender Report for the period ending 10/6/1999, E47/825. [C451/1996] |
| A59300 | 1999 | Newcrest Mining Ltd | Ashburton | <1% | Ashburton Project, Part of Southeastern Exploration Area, Exploration Licence 52/1085, Partial Surrender Repor |
| A53784 | 1998 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Project area Exploration Licences E47/37 E47/600 E47/704 West Pilbara Mineral Field WA Annual repor |
| A55814 | 1998 | Sipa Exploration Nl | Ashburton | 5.9% | Ashburton Project Southeastern Exploration area E08/821, 951 952, 953, E47/825, 869, E52/1085, 1152, 1243, 124 |
| A90339 | 1998 | Sipa Exploration Nl | Ashburton - Mount Olympus | 4.8% | Ashburton - Mount Olympus Project, Core Library Drilling Report: Annual Report (Part A) for period 01/01/1997 |
| A50277 | 1997 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Project, Exploration Licences E47/37, E47/600 and E52/704 West Pilbara and Peak Hill Mineral Fields |
| A51017 | 1997 | Hamersley Iron Pty Ltd | Mount Maguire/ Paraburdoo | 1.7% | Mt Maguire / Paraburdo Project, 1996 Partial Surrender Report E47/600, March 1997. |
| A51400 | 1997 | Sipa Exploration Nl | Ashburton | 8.6% | Ashburton Regional Project E08/821 E08/825 E47/825 E52/1077 E52/1085 E52/1086 1996 Annual report 4 January 199 |
| A47094 | 1996 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Project Exploration Licence E47/37, E47/600 and E52/704 West Pilbara & Peak Hill Mineral Fields Wes |
| A43683 | 1995 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Project Exploration Licence E47/34 E47/600 & E52/704 West Pilbara and Peak Hill Mineral Fields West |
| A48231 | 1995 | Hamersley Iron Pty Ltd | Mount Brockman | <1% | Annual Progress Report E47/535 to the period 09/05/1995 to 08/05/1996 GDSR No. 2599 |
| A40586 | 1994 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Annual report for the period 01/01/93-31/12/93 Paraburdoo Project E47/37 E47/600 E52/704 |
| A30024 | 1990 | Rt Mining Corp Pty Ltd | Silent Sisters | 3% | Silent Sisters Project, Final Surrender Report for the period 02/07/1989 to 26/01/1990, E08/346. |
| A21559 | 1987 | Alcoa Of Australia Ltd | Bangemall Basin | <1% | Bangemall Basin, [Non-statutory Report: Mapping, circa 1966] |
| A13414 | 1984 | Hamersley Exp Pty Ltd | Turee Creek | 1.3% | Turee Creek Project, 1983 Annual Report E47/37, February 1984, E47/37. |
| A14050 | 1983 | Hamersley Iron Pty Ltd | Turee Creek | 2.6% | T.R. 6983 H; Final Report, May 12, 1979 - May 11, 1983 |
| A10008 | 1981 | Hamersley Exp Pty Ltd | Turee Creek iron / gold / diamond / base | 7% | Temporary Reserve 6982H Annual Report May 12, 1980 to May 11 1981 .Temporary Reserve 6983H Annual Report May 1 |
| A9199 | 1979 | Hamersley Exp Pty Ltd | Turee Creek | <1% | Turee Creek Project, Non-statutory Report: Regional Mapping Report for the period 01/07/1978 to 01/10/1979, TR |
| A7449 | 1978 | Dampier Mining Co Ltd | Seven Mile Creek- Mount Maguire - Limeri | 14% | Seven Mile Creek - Mt Maguire - Limerick Hill Project, Non-statutory Report: Final Report for the year ending |
| A21557 | 1972 | Alcoa Of Australia Ltd | Bangemall Basin | <1% | Bangemall Basin Project, Non-statutory Report: Edmund Area, Plates 1- 5, January 1972, |
| A183 | 1969 | Hamersley Iron Pty Ltd | Paraburdoo | <1% | Paraburdoo Temporary Reserve 4968 H Hamersley Ranges Western Australia May, 1969 Evaluation of iron ore deposi |
| A566 | 1964 | Westfield Minerals Nl | Ashburton-Bangemall | <1% | Ashburton-Bangemall Project, Non-statutory Report: Summary Report for 1963 & Projected Development Programme 1 |
| A1524 | 1962 | Carpentaria Exp Co Pty Ltd | Ashburton | 2.8% | Ashburton Project, Non-statutory Report: Final Report, October 1962, TR70/ 2519H. |
| A9198 | 1753 | Hamersley Exp Pty Ltd | Turee Creek iron / gold / diamond / base | 1.3% | Temporary reserve 6982H Regional mapping report (Refer Temporary reserves 6674H,6675H,6984H); (Annual report - |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 47/5029 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 47/5029 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 47/5029? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.