NextMaps›WA Tenements›E 47/5029

E 47/5029

PendingExploration LicenceShire of AshburtonWest Pilbara M.F. District
Area
13,330ha
Applied
Aug 2023
3 years ago
WAMEX reports
109
WA median is 53
Report drilling
40
of 109 reports
Ashburton Explore on the live map

Register summary

Holder
Baracus Pty Ltd
Local government
Shire of Ashburton
Application received
28 Aug 2023

Exploration history on this ground

109 historical WAMEX exploration reports intersect E 47/5029: 49 report geochemistry or sampling, 62 include a digital data package.
When this ground was worked · 108 of 109 reports dated
31960s
31970s
41980s
151990s
352000s
472010s
12020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A125214 2020 Baracus Pty Ltd Turee Creek <1% Turee Creek E 47/2427 Annual Report for the period ending 18/08/2020
A119774 2019 Rio Tinto Exploration Pty Limited Paraburdoo <1% Paraburdoo Surrender Report Exploration Licence 47/03715 (GDSR 6931) For the Period 16 March 2018 to 27 March
A120425 2019 Rio Tinto Exploration Pty Limited Mount Maguire <1% (C78/2017) Mount Maguire Project Combined Surrender Report Exploration Licences 47/3331, 52/3304 and 52/3305 f
A120164 2019 Hylea Metals Limited Ashburton 8.1% Ashburton Project C135/2012 Annual Report for the period 02/03/2018 to 01/03/2019, E08/02209, E08/02210, E08/0
A121391 2019 Baracus Pty Ltd Turee Creek <1% Annual Technical Report for Turee Creek Project E47/02427 for the period 19 August 2018 to 18 August 2019
104 more reports
A117469 2018 Riva Resources Limited Ashburton 8.1% Ashburton Project C135/2012 Combined Annual Report for the period ending 1/03/2018.
A117948 2018 State Resources Pty Ltd Turee Creek <1% Annual Technical Report for the Turee Creek Project E47/02427 for the period 19/08/2017 - 18/08/2018
A117983 2018 Rio Tinto Exploration Pty Limited Mount Maguire <1% C78/2017 Mount Maguire Project Combined Annual Report Exploration Licences 47/3331, 52/3304 and 52/3305 for th
A110822 2017 Fortescue Metals Group Ltd Seven Mile 31% C15/2016 Seven Mile Final Surrender Report 11 November 2011 to 28 October 2016
A113966 2017 Riva Resources Ltd Ashburton 8.1% Combined Annual Report for Ashburton Project C135/2012 for the period 2 March 2016 to 1 March 2017, E08/02209,
A114826 2017 Baracus Pty Ltd Turee Creek <1% Final report into drilling completed under Exploration Incentive Scheme grant DAG2016/0081536 (R#13)
A114123 2017 Fortescue Metals Group Ltd Seven Mile <1% C15/2016 Seven Mile Final Surrender Report For the Period 20 July 2011 to 15 May 2017, E47/01735, E47/03255, E
A115158 2017 State Resources Pty Ltd Turee Creek <1% Annual Technical Report for the Turee Creek Project E47/02427 for the period 19 August 2016 to 18 August 2017
A108605 2016 Dragon Energy Ltd Ashburton 8.1% Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2015 to 0
A107664 2016 Fortescue Metals Group Ltd Mininer 2% E08/2353 (Mininer) Final Surrender Report for the period 06/05/2013 to 17/07/2015
A108189 2016 Northern Star Resources Ltd Paraburdoo 17% Annual Mineral Exploration Report for the Paraburdoo Group C145/1996 for the period 1 January 2015 to 31 Decem
A109379 2016 State Resources Pty Ltd Turee Creek <1% C68/2013 TUREE CREEK PROJECT E52/02624, E52/02625 for the period 12 April 2015 to 11 April 2016
A110034 2016 State Resources Pty Ltd Turee Creek <1% Annual Mineral Exploration Report for Turee Creek Project E47/02427 For the Period 19 August 2015 to 18 August
A110057 2016 Fortescue Metals Group Ltd Seven Mile 19% C15/2016 Seven Mile Annual Report For the Period 1 June 2015 to 31 May 2016, E08/02696, E08/02697, E08/02700,
A104731 2015 Dragon Energy Ltd Ashburton 8.1% Partial Relinquishment Report- Ashburton Project, E08/2209 - 2211, E47/2417, for the period 02/12/2011 to 09/0
A106445 2015 Dragon Energy Ltd Ashburton 8.1% Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2014 to 0
A105062 2015 Northern Star Resources Ltd Paraburdoo 13% Paraburdoo Project C451/1996 Annual Report to the Department of Mines and Petroleum for the period 01/01/14 to
A105925 2015 State Resources Pty Ltd Turee Creek <1% Combined Annual Technical Report, Turee Creeek Project, C68/2013, E52/2624, 2625, 12 April 2014 to 11 April 20
A106894 2015 Amex Resources Ltd Paraburdoo South 13% Paraburdoo South Project E47/2435 Surrender Report for the period 21 June 2012 to 18 June 2015
A107498 2015 State Resources Pty Ltd Turee Creek Project <1% Annual Technical Report for Turee Creek Project
A101744 2014 Dragon Energy Ltd Ashburton 8.1% Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2013 to 0
A103025 2014 Amex Resources Ltd Paraburdoo South 13% ANNUAL REPORT 21 June 2013 to 20 June 2014 PARABURDOO SOUTH PROJECT E47/2435-I
A101228 2014 Northen Star Resources Ltd Paraburdoo 13% Paraburdoo C451/1996 Annual Report to the Department of Mines and Petroleum for the period 01/01/13 to 31/12/1
A102171 2014 State Resources Pty Ltd Turee Creek <1% Turee Creek Project Combined Annual Technical Report (C68/2013) E 52/2624 & E 52/2625 for the period 12 April
A103258 2014 Brockman Mining Australia Pty Ltd Paraburdoo 33% Paraburdoo Project E47/2081 Annual Report for the year ended 21st June 2013 – 20th June 2014
A103928 2014 Atlas Iron Ltd Paraburdoo <1% Paraburdoo Project E47/1241 Annual Report to the Department of Mines and Petroleum for the Period Ending 16 Oc
A98046 2013 State Resources Pty Ltd Turee Creek <1% Turee Creek Project, Annual Report for the period 12th April 2012 to 11th April 2013, E52/2624 & 2625. [C68/2
A98891 2013 Amex Resources Ltd Paraburdoo South 13% Annual Report, 21 June 2012 to 20 June 2013 Paraburdoo South Project E47/2435
A97674 2013 Dragon Energy Ltd Ashburton 8.1% Combined Annual Report (C135/2012) Ashburton Project E08/2209-2211, E47/2417 For the period 02 March 2012 to 0
A99108 2013 Brockman Mining Australia Pty Ltd Paraburdoo 33% E47/2081–Annual Report for the year ended 20th June 2013
A99656 2013 Atlas Iron Ltd Paraburdoo - Echo George <1% Paraburdoo Project (Echo George) E47/1241 Annual Report to the Department of Mines and Petroleum for the Perio
A92701 2012 Fortescue Metals Group Ltd Snowy Mountain 13% Snowy Mountain Combined Reporting Group Annual Report for the period 1 Nov 2010 to 31 Oct 2011 - Snowy Mountai
A96140 2012 Fortescue Metals Group Ltd Snowy Mountain 13% Snowy Mountain Project, Annual Report for the period 1st November 2011 to 31st October 2012, E47/1735, 1741, 1
A95488 2012 Atlas Iron Ltd Paraburdoo <1% PARABURDOO PROJECT E47/1241 Annual Report to the Department of Mines and Petroleum for the Period Ending 16 Oc
A94926 2012 Dragon Energy Ltd Ashburton Project- Coorriga Bore <1% Annual Report- Ashburton Project- Coorriga Bore, E08/2211-I, for the period 28/07/2011 to 27/07/2012
A89800 2011 Fulcher Nominees Pty Ltd Ashburton Downs 2% ANNUAL EXPLORATION REPORT FOR ASHBURTON DOWNS PROJECT TENEMENT E08/1882 FOR THE PERIOD ENDING 20TH JANUARY 201
A91840 2011 Atlas Iron Ltd Paraburdoo - Echo Gorge <1% Paraburdoo Project Echo Gorge E47/1241 Annual Technical Report to DMP Period Ending 16 October 2011
A88875 2011 Giralia Resources Nl Echo Gorge <1% Echo Gorge E47/1241 Partial Surrender Report to DMP Period 17 October 2006 to 23 August 2010
A88400 2010 Giralia Resources Nl Echo Gorge <1% Echo Gorge E47/1241 Annual Technical Report to DMP Period Ending 16 October 2010
A86370 2010 Sipa Exploration Nl Ashburton 2.1% Ashburton Project, Southeastern Exploration Area, M’s 52/639, 640, 734 & 735, E’s 08/1650, 47/1742, 52/1941, 5
A87072 2010 Dragon Energy Ashburton 6.9% Combined Annual Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-I E47/1528-I For the perio
A87593 2010 Giralia Resources Nl Echo Gorge <1% Echo Gorge E47/1241 Partial Surrender Report to DMP Period 17 October 2006 to 16 August 2010
A88262 2010 Dragon Energy Ashburton 6.9% Final Report (C52/2007) Ashburton Project; E08/1511-I E08/1512-I E08/1513-IE47/1528- For the period 1st March
A81811 2009 Sipa Exploration Nl ASHBURTON 2.1% ASHBURTON PROJECT SOUTHEASTERN EXPLORATION AREA C451/1996 M’s 52/639, 640, 734 & 735 E’s 08/1650, 47/1742, 52
A82098 2009 Polaris Metals Nl ASHBURTON <1% ASHBURTON PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD, 2 FEBRUARY 2006 – 1 FEBRUARY 2008 FOR E08/1511-I TO
A82184 2009 Polaris Metals Nl ASHBURTON 6.9% ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 – 1 FEBRUARY 2008 FOR E08/1511-I, E08/
A84737 2009 Giralia Resources Nl Echo Gorge <1% Echo Gorge E47/1241, Annual Technical Report to DMP Period Ending 16 October 2009
A77705 2008 Giralia Resources Nl Echo Gorge <1% E47/1241 ECHO GORGE ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 16 OCTOBER 2007
A78487 2008 Polaris Metals Nl Ashburton <1% ASHBURTON PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 2 FEBRUARY 2007 - 1 FEBRUARY 2008 FOR E08/1511-I, E08/
A79371 2008 Polaris Metals Nl Ashburton 58% Annual Report for the period 2 June 2007 - 1 June 2008 for E47/1528 Ashburton Project
A79872 2008 Giralia Resources Nl Echo Gorge <1% ECHO GORGE PROJECT, E47/1241, ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDNG 16 OCTOBER, 2008
A75375 2007 Polaris Metals Nl Ashburton <1% Ashburton project 2007 Annual report E08/1511-1513 01/03/2006-28/02/2007 Report No:2007-25
A76075 2007 Newcrest Mining Ltd Ashburton 59% Ashburton Project South Eastern Exploration Area Exploration Licence E47/1086 Mininer Final Report for the per
A77609 2007 Newcrest Mining Ltd Ashburton 7.4% ASHBURTON PROJECT SOUTH EASTERN AREA Annual Technical Report For the Period Ending 31 December, 2007. C451/199
A76472 2007 Newcrest Mining Ltd Ashburton 100% Ashburton Project SE Exploration Area E47/1691 Turee Creek West Surrender Report Period Ending 19 October 2007
A72482 2006 Newcrest Mining Ltd Ashburton 59% Ashburton Project South Eastern Exploration Area, E47/1086 Mininer, Partial Relinquishment Report for the Peri
A74382 2006 Newcrest Mining Ltd Ashburton 7.6% Ashburton Project C451/1996 Annual Technical Report for the Period Ending 31st Dec 2006 Report No.G861/15 (Wyl
A70706 2005 Newcrest Mining Ltd Ashburton 59% Ashburton Project, South Eastern exploration area, Exploration licence E47/1086 Mininer. Partial relinquishmen
A70268 2005 Newcrest Mining Ltd Ashburton <1% Ashburton Project, Exploration licence E52/1085, Partial surrender report for the period ending 12 March, 2005
A70081 2005 Newcrest Mining Ltd Ashburton 7.6% Annual technical report for the period 01/01/04 - 31/12/04 Ashburton Project, C451/1996, E08/821, E08/825, E08
A71906 2005 Newcrest Mining Ltd Ashburton 7.6% Ashburton Project South Eastern Area, Annual Report for the period ending 31 December 2005, Combined Reporting
A67953 2004 Sipa Exploration Nl Mininer 31% Annual Report for the period 01/01/2003- 31/12/2003 Baring Downs & Mount Maguire Projects E08/1213, E47/1086
A65844 2003 Sipa Exploration Nl Ashburton 31% Annual Report covering the period October 2001 to December 2002 Ashburton Regional Project E08/1213 'Baring Do
A68115 2003 Newcrest Mining Ltd Ashburton 5.4% Ashburton Project, Annual Report Exploration Licences E08/821, 825, 951-953, 1272; E47/825; E52/1077, 1085-108
A66068 2003 Sunrise Exploration Pty Ltd Firegold 7.7% Surrender Report for Tenement E47/869 period 26/9/2000 to 27/1/2003 Combined Reporting No C79/2001
A67323 2003 Sunrise Exploration Pty Ltd Firegold 3% Firegold JV Project, Annual Report for Tenements: E47/863, E52/1229,1230, Period 26/09/2002 to 27/09/2003.
A66254 2002 Newcrest Mining Ltd Ashburton 5.4% Ashburton Project , Southeastern exploration Area, E08/821, 825, 951, 952, ject C451/1996: E08/821, 825, 95
A64352 2002 Dragon Mining Nl Ashburton 3% Annual Report Ashburton Project E52/1229; E52/1230 & E47/869 July 28th 2000 - July 27th 2001.
A64597 2002 Dragon Mining Nl Ashburton 7.7% E47/869 Partial Relingquishment Report Ashburton Project
A65379 2002 Sunrise Exploration Pty Ltd Firegold 3% Annual Report for Tenements E52/1229, E52/1130 & E47/869 Period 26/9/2001 to 27/09/2002 DMPR Combined Reportin
A64295 2001 Newcrest Mining Ltd Ashburton 5.4% Ashburton Project Southeastern exploration area Annual Technical Report to the Department of Minerals & Petrol
A61640 2001 Sipa Exploration Nl Ashburton 7.7% Ashburton Project E47/869 2000 Annual Report 1 January 2000 to 5 September 2000, Sheet SF50-15.
A61671 2001 Sipa Exploration Nl Ashburton 7.7% Ashburton Regional Project E47/869 Partial Relinquishment Report to August 2000.
A59548 2000 Hamersley Iron Pty Ltd Mount Maguire 1.7% Mount Maguire Proejct, E47/600, Surrender Report December 1999.
A59752 2000 Sipa Exploration Nl Ashburton 5.1% Ashburton Project Southeastern Exploration Area M52/639, M52/640, E52/1077, E52/1085, E52/1086, E52/1148, E52/
A60843 2000 Newcrest Mining Ltd Ashburton 55% Ashburton Project, Partial Surrender Report for the period ending 10th July 2000, E47/825. [C451/1996]
A61012 2000 Newcrest Mining Ltd Ashburton <1% Ashburton Project Southeastern Exploration Area E52/1085 Par tial Relinquishment Report to the Department of M
A61884 2000 Newcrest Mining Ltd Ashburton 5.4% Annual Technical Report to the Department of Minerals & Energy for the period ending 31 December 2000 Ashburto
A57322 1999 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Project - West Pilbara Mineral Field W.A. Exploration Licence: E47/37, 600 Period End 31/12/98
A58636 1999 Sipa Exploration Nl Ashburton 4.9% Ashburton Project - Southeastern Exploration Area 01/01/98 - 31/12/98 M52/639, 640, E52/1077, 1085, 1086, 1148
A58735 1999 Newcrest Mining Ltd Ashburton 55% Ashburton Project, Final Surrender Report for the period ending 10/6/1999, E47/825. [C451/1996]
A59300 1999 Newcrest Mining Ltd Ashburton <1% Ashburton Project, Part of Southeastern Exploration Area, Exploration Licence 52/1085, Partial Surrender Repor
A53784 1998 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Project area Exploration Licences E47/37 E47/600 E47/704 West Pilbara Mineral Field WA Annual repor
A55814 1998 Sipa Exploration Nl Ashburton 5.9% Ashburton Project Southeastern Exploration area E08/821, 951 952, 953, E47/825, 869, E52/1085, 1152, 1243, 124
A90339 1998 Sipa Exploration Nl Ashburton - Mount Olympus 4.8% Ashburton - Mount Olympus Project, Core Library Drilling Report: Annual Report (Part A) for period 01/01/1997
A50277 1997 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Project, Exploration Licences E47/37, E47/600 and E52/704 West Pilbara and Peak Hill Mineral Fields
A51017 1997 Hamersley Iron Pty Ltd Mount Maguire/ Paraburdoo 1.7% Mt Maguire / Paraburdo Project, 1996 Partial Surrender Report E47/600, March 1997.
A51400 1997 Sipa Exploration Nl Ashburton 8.6% Ashburton Regional Project E08/821 E08/825 E47/825 E52/1077 E52/1085 E52/1086 1996 Annual report 4 January 199
A47094 1996 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Project Exploration Licence E47/37, E47/600 and E52/704 West Pilbara & Peak Hill Mineral Fields Wes
A43683 1995 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Project Exploration Licence E47/34 E47/600 & E52/704 West Pilbara and Peak Hill Mineral Fields West
A48231 1995 Hamersley Iron Pty Ltd Mount Brockman <1% Annual Progress Report E47/535 to the period 09/05/1995 to 08/05/1996 GDSR No. 2599
A40586 1994 Hamersley Iron Pty Ltd Paraburdoo <1% Annual report for the period 01/01/93-31/12/93 Paraburdoo Project E47/37 E47/600 E52/704
A30024 1990 Rt Mining Corp Pty Ltd Silent Sisters 3% Silent Sisters Project, Final Surrender Report for the period 02/07/1989 to 26/01/1990, E08/346.
A21559 1987 Alcoa Of Australia Ltd Bangemall Basin <1% Bangemall Basin, [Non-statutory Report: Mapping, circa 1966]
A13414 1984 Hamersley Exp Pty Ltd Turee Creek 1.3% Turee Creek Project, 1983 Annual Report E47/37, February 1984, E47/37.
A14050 1983 Hamersley Iron Pty Ltd Turee Creek 2.6% T.R. 6983 H; Final Report, May 12, 1979 - May 11, 1983
A10008 1981 Hamersley Exp Pty Ltd Turee Creek iron / gold / diamond / base 7% Temporary Reserve 6982H Annual Report May 12, 1980 to May 11 1981 .Temporary Reserve 6983H Annual Report May 1
A9199 1979 Hamersley Exp Pty Ltd Turee Creek <1% Turee Creek Project, Non-statutory Report: Regional Mapping Report for the period 01/07/1978 to 01/10/1979, TR
A7449 1978 Dampier Mining Co Ltd Seven Mile Creek- Mount Maguire - Limeri 14% Seven Mile Creek - Mt Maguire - Limerick Hill Project, Non-statutory Report: Final Report for the year ending
A21557 1972 Alcoa Of Australia Ltd Bangemall Basin <1% Bangemall Basin Project, Non-statutory Report: Edmund Area, Plates 1- 5, January 1972,
A183 1969 Hamersley Iron Pty Ltd Paraburdoo <1% Paraburdoo Temporary Reserve 4968 H Hamersley Ranges Western Australia May, 1969 Evaluation of iron ore deposi
A566 1964 Westfield Minerals Nl Ashburton-Bangemall <1% Ashburton-Bangemall Project, Non-statutory Report: Summary Report for 1963 & Projected Development Programme 1
A1524 1962 Carpentaria Exp Co Pty Ltd Ashburton 2.8% Ashburton Project, Non-statutory Report: Final Report, October 1962, TR70/ 2519H.
A9198 1753 Hamersley Exp Pty Ltd Turee Creek iron / gold / diamond / base 1.3% Temporary reserve 6982H Regional mapping report (Refer Temporary reserves 6674H,6675H,6984H); (Annual report -
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 47/5029 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 47/5029 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 47/5029? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.