E 46/1351
Register summary
- Holder
- Fmg Pilbara Pty Ltd
- Part of
- Fortescue Ltd (ASX:FMG) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 20 Dec 2019
- Commenced
- 11 May 2020
- Expiry
- 10 May 2030
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148628 | 2025 | Fortescue Ltd | Dingo Bore | <1% | E46/1349 Dingo Bore Final Surrender Report for the period ending 16/04/2025. |
| A148634 | 2025 | Fortescue Ltd | Dingo Bore | <1% | E46/1241 Dingo Bore Partial Surrender Report for the period ending 24/03/2025. |
| A139046 | 2024 | Fortescue Ltd | Dingo Bore | <1% | C121/2011 Dingo Bore Combined Partial Surrender Report for the period ending 15/01/2024. E 46/1000,E 46/859,E |
| A131987 | 2022 | Fmg Pilbara Pty Ltd | Dingo Bore | 3.3% | C121/2011 Dingo Bore Combined Partial Surrender Report for the period 20 November 2009 to 7 July 2022 |
| A122806 | 2020 | Carawine Resources Ltd | Saddleback | 9.4% | Saddleback (E46/1069) Partial Surrender Report 11 November 2016 to 13 December 2019 |
105 more reports
| A122522 | 2020 | Carawine Resources Ltd | Mount Divide | <1% | Mt Divide (E46/1041) Final Surrender Report for the period 23 March 2016 to 13 December 2019 |
| A123190 | 2020 | Carawine Resources Ltd | Tongololo | 4% | Tongololo Annual Report , C218/2017, 1 January 2019 to 31 December 2019 |
| A118694 | 2019 | Fortescue Metals Group Ltd | Dingo Bore | <1% | E 46/965 (Dingo Bore) Partial Surrender Report for the period 16 November 2012 to 15 October 2018 |
| A119160 | 2019 | Carawine Resources Ltd | Saddleback | 9.4% | Saddleback E46-1069 Partial Surrender Report for the period 11 November 2016 to 8 November 2018 |
| A119177 | 2019 | Carawine Resources Limited | Mount Divide | <1% | Mount Divide E46_1041 Partial Surrender Report for the period 23 March 2016 to 8 November 2018 |
| A119097 | 2019 | Fortescue Metals Group Ltd | East Pilbara | <1% | C3/2005 East Pilbara (FMG State Agreement) Annual Mineral Exploration Report For the Period 21 November 2017 t |
| A119430 | 2019 | Carawine Resources Ltd | Tongololo | 4% | Tongololo C218/2017 Annual Report 1 January 2018 to 31 December 2018, E46/01041, E46/01069, E46/01119 |
| A115556 | 2018 | Carawine Resources Limited | Saddleback | 9.4% | Saddleback (E46/1069) Annual Report, 11/11/2016-10/11/2017 |
| A116166 | 2018 | Carawine Resources Limited | Tongololo | 4% | Tongololo Annual Report C218/2017 for the period 1 January 2017 to 31 December 2017, E46/01041, E46/01069, E46 |
| A116607 | 2018 | Atlas Iron Limited | Enacheddong | <1% | Final Surrender Report for Tenement E46/1040 for the period 27 May 2015 to 19 February 2018 |
| A117104 | 2018 | Fortescue Metals Group Ltd | Mount Divide | 8.8% | C142/2017 Mount Divide Annual Mineral Exploration Report for the period 01/05/2017 - 30/04/2018, E46/01045, E4 |
| A117871 | 2018 | Fortescue Metals Group Ltd | Mount Divide | 11% | C142/2017 Mount Divide Final Surrender Report For the Period 6 September 2016 to 27 July 2018, E46/01076, E46/ |
| A114139 | 2017 | Sheffield Resources Limited | Mount Divide | <1% | Mt Divide Project (E46/1041) Annual Report for the period 23/03/2016 to 22/03/2017 |
| A110007 | 2016 | Fortescue Metals Group Ltd | Dingo Bore | <1% | C121/2011 Dingo Bore Partial Surrender Report for the period 20 November 2009 to 10 June 2016, E46/00706, E46/ |
| A105240 | 2015 | Pilbara Manganese Pty Ltd | Woodie Woodie | 1.1% | COMBINED ANNUAL REPORT GROUP REPORTING NUMBER C62/2005 For Leases E45/2201-I, E45/2368-I, ... P45/2825-I and |
| A105328 | 2015 | Fortescue Metals Group Ltd | Dingo Bore | <1% | Annual Report for the Period 1 January 2014 to 31 December 2014, C121/2011 Dingo Bore, E46/517, E46/704, E46/7 |
| A105329 | 2015 | Fortescue Metals Group Ltd | East Pilbara | <1% | Combined Mineral Exploration Report: C3/2005 East Pilbara for the period 21st November 2013 to 20th November 2 |
| A107596 | 2015 | Fortescue Metals Group Ltd | East Pilbara | <1% | Combined Mineral Exploration Mineral Exploration Report C3/2005 East Pilbara for the period 21/11/2014 to 20/1 |
| A106685 | 2015 | Pilbara Manganese Pty Ltd | Woodie Woodie | 2% | C62/2005, Woodie Woodie Project Surrender and Partial Surrender for the period 12/11/2002 to 02/06/2015,E45/23 |
| A101286 | 2014 | Fortescue Metals Group Ltd | East Pilbara | <1% | East Pilbara Annual Report for the Period 21st November 2012 to 20th November 2013 – C3/2005 |
| A101434 | 2014 | Fortescue Metals Group Ltd | Dingo Bore | <1% | Annual Report for the Period 1 January 2013 to 31 December 2013, C121/2011 Dingo Bore, E46/517, E46/704, E46/7 |
| A101644 | 2014 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | COMBINED ANNUAL REPORT GROUP REPORTING NUMBER C62/2005 WOODIE WOODIE PROJECT FOR THE PERIOD 1 JANUARY 2013 TO |
| A104252 | 2014 | Pilbara Manganese Pty Ltd | Peelbegunja Hill | <1% | SURRENDER REPORT Peelbegunja Hill Project For The Licence E46/588 For The Period 23/11/2005 to 15/10/2014 |
| A99002 | 2013 | Rio Tinto Iron Ore | Noreena | <1% | Noreena Project Area Surrender Report Exploration Licences 46/574, 46/575, 46/576 & 46/633 for the period 1 De |
| A96852 | 2013 | Fortescue Metals Group Ltd | East Pilbara | <1% | East Pilbara Project, Annual Report for the period 21st November 2011 to 20th November 2012, C3/2005. |
| A97228 | 2013 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | Woodie Woodie Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/2201.......E45 |
| A93157 | 2012 | Fortescue Metals Group Ltd | East Pilbara | <1% | Annual report for the period 21 November 2010 to 20 November 2011, East Pilbara Project, C3/2005, E46/413, 623 |
| A94102 | 2012 | Jupiter Mines Ltd | Kallona | <1% | Final Surrender Report for Kallona Project E46/864 Period 07/04/11 to 03/04/12 |
| A93183 | 2012 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | Woodie Woodie Project , Annual Report for the period 1st January 2011 to 31st December 2011, C62/2005. |
| A96185 | 2012 | Rio Tinto Iron Ore | Noreena | <1% | Noreena Project, Annual Report for the period 01/12/2011 to 30/11/2012, E46/574-576 & 633. [C1/2005] |
| A91446 | 2011 | Condor Metals Ltd | Kallona Creek | <1% | Kallona Creek Project Exploration Licence 46/753 Annual report for the period ending 23 July 2011 |
| A92230 | 2011 | Rio Tinto Iron Ore | Noreena Downs | <1% | NOREENA DOWNS PROJECT COMBINED ANNUAL REPORT C1/2005 E46/574, E46/575, E46/576 and E46/633 East Pilbara Minera |
| A89318 | 2011 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | Combined Annual Report C62/2005, Woodie Woodie Project for the period 1 January 2010 to 31 December 2010 |
| A89428 | 2011 | Fortescue Metals Group Ltd | East Pilbara | <1% | Annual report for the period 21 November 2009 to 20 November 2010, East Pilbara Project, C3/2005 Tenement Num |
| A88806 | 2010 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Combined Annual Report (Noreena Project - C1/2005) For the period 1 December 2009 to 30 November 2010, E46/574 |
| A85418 | 2010 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Combined Annual Report (Noreena - C1/2005) for the Period 1 December 2008 to 30 November 2009, E46/574 (Twin P |
| A85833 | 2010 | Fortescue Metals Group Ltd | East Pilbara | <1% | Annual Report for the period 21 November 2008 to 20 November 2009, East Pilbara Project |
| A86144 | 2010 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | Woodie Woodie Project C62/2005, 1 January 2009 to 31 December 2009 E45/2201, E45/2368, E45/2373, E45/2417, E45 |
| A88215 | 2010 | Condor Nickel Ltd | Kallona Creek | <1% | E46/753: Annual Report for the period 24 July 2009 to 23 July 2010 |
| A80601 | 2009 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Combined Annual Report (Noreena - C1/2005) For the Period 1 December 2007 to 30 November 2008 E46/574 (Twin Pe |
| A80840 | 2009 | Fortescue Metals Group Ltd | East Pilbara | <1% | Annual report for the period 21 November 2007 to 20 November 2008, East Pilbara Project, C3/2005, E46/413, E46 |
| A81476 | 2009 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | WOODIE WOODIE PROJECT FOR THE PERIOD 1 JANUARY 2008 TO 31 DECEMBER 2008COMBINED ANNUAL REPORT GROUP REPORTING |
| A84446 | 2009 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Partial Surrender Report for the Period Ending 09 July 2009, E46/574 Twin Peaks, E46/575 Picallina and E46/576 |
| A77320 | 2008 | Fortescue Metals Group Ltd | East Pilbara | <1% | Annual report for the period 21 November 2006 to 20 November 2007, East Pilbara Project |
| A77797 | 2008 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | ANNUAL REPORT C62/2005 WOODIE WOODIE PROJECT FOR THE PERIOD 1 JANUARY 2007 TO 31 DECEMBER 2007 For Leases E45/ |
| A77015 | 2008 | Pilbara Manganese Pty Ltd | Woodie Woodie | 9.1% | E46/532, Woodie Woodie Project Partial Surrender Report 30 April 2003 TO 16 September 2007. |
| A74114 | 2007 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Noreena Project C01/2005 Annual Report for the Period 1st Dec 2005 to 30th Nov 2006 Report No.27974 (Balfour D |
| A74289 | 2007 | Fortescue Metals Group Ltd | East Pilbara | <1% | East Pilbara Project, Combined Group Reporting No. C3/2005, Annual Report for the Period 21 November 2005 to 2 |
| A74686 | 2007 | Pilbara Manganese Pty Ltd | Woodie Woodie | <1% | Woodie Woodie Project C62/2005 Annual Report for the Period 1 January 2006 to 31 December 2006 for leases E45/ |
| A75032 | 2007 | Fortescue Metals Group Ltd | Mount Nicholas - Mount Rove | <1% | Mt Nicholas - Mt Rove Annual Report for the period 17 March 2006 to 16 March 2007, P46/1509. |
| A76812 | 2007 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | Annual Report (Noreena - C1/2005) For the Period 1 December 2006 to 30 November 2007 E46/574 (Twin Peaks), E46 |
| A71655 | 2006 | Rio Tinto Exploration Pty Ltd | Noreena | <1% | First Annual Combined Report for the period ending 29 January 2006, E46/574(Twin Peaks),E46/575(Picallina) & E |
| A71705 | 2006 | Fortescue Metals Group Ltd | East Pilbara (Mount Nicholas - Mount Rov | <1% | East Pilbara Project, (Tenements: E46/413 ,E46/467, E46/516, E46/518-519, E46/568-569, E46/595, E46/600-601, E |
| A72086 | 2006 | Pilbara Manganese Pty Ltd | Ripon Hills/ Woodie Woodie | 1.7% | Annual Report C27/2004, Oakover Project, For the Period 1 January 2005 to 31 December 2005, (Nullagine). |
| A69947 | 2005 | Fortescue Metals Group Ltd | East Pilbara | <1% | East Pilbara Project, (Tenements: E46/467, E46/516, E46/518, E46/519, E46/568, E46/569) Combined reporting gro |
| A70334 | 2005 | Pilbara Manganese Pty Ltd | Ripon Hills/Woodie Woodie | 1.7% | Annual Report C27/2004, Oakover Project, For the Period 1 January 2004 to 31 December 2004, (Nullagine). |
| A70667 | 2005 | Mr Perkin Dj | Turumunda | 1.5% | Annual report for the year ending 9th February 2005, E46/413 Turumunda Project, Pilbara mineral field, WA (Bal |
| A68785 | 2004 | Pilbara Manganese Pty Ltd | Oakover | 1.8% | Annual Report C27/2004 for the Leases E45/2368, E45/2370...P 46/1377 to 1379 and P46/1383 Oakover Project for |
| A69118 | 2004 | Golden Reef Enterprises Pty Ltd | Turumunda gold | 1.5% | Annual report for the year ending 9th February 2004 EL46/413, Turumunda, Pilbara Mineral Field, Western Austra |
| A69200 | 2004 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Annual report for the year ending 9th February 2003 (Yr6) EL 46/413 Turumunda, Pilbara Mineral Field, Western |
| A63892 | 2002 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Annual Report for the year ending 9th February 2001 EL46/413 Turumunda, Pibara Mineral Field, Western Australi |
| A63895 | 2002 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Annual Report for the year ending 9th February 2000 EL46/413 Turumunda, Pilbara Mineral Field, Western Austral |
| A64025 | 2002 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Partial Surrender Report for the year ending 9th February 2000 EL46/413 Turumunda, Pilbara Mineral Field, West |
| A64779 | 2002 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | EL 46/413 Turumunda, Pilbara Mineral Field, WA Summary of Work Carried Out for the 5 years Ending 9th February |
| A64949 | 2002 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Annual Report for the Year Ending 9th February 2002 EL46/413 Turumunda, Pilbara Mineral Field, Western Austral |
| A63083 | 2001 | Golden Reef Enterprises Pty Ltd | Balfour Downs | 14% | Partial surrender report on the relinquished portion of E46/396 as part of the compulsory first 50% reduction |
| A64026 | 2001 | Golden Reef Enterprises Pty Ltd | Turumunda | 1.5% | Second Partial Surrender Report for the year ending 9th February 2001 EL46/413 Turumunda, Pilbara Mineral Fiel |
| A63085 | 2001 | Golden Reef Enterprises Pty Ltd | Balfour Downs | 14% | Annual Report for EL46/396 Saddleback Hill for the Period Ending 4 October 2000. |
| A59034 | 1999 | Golden Reef Enterprises Pty Ltd | Turummunda | 1.5% | Annual Report for the year ending 09/02/99 EL46/413 Turummunda, Pilbara Mineral Field, Western Australia |
| A63084 | 1999 | Golden Reef Enterprises Pty Ltd | Balfour Downs | 14% | Annual report for E46/396 Saddleback Hill for the period ending 4 October 1999 |
| A63086 | 1999 | Golden Reef Enterprises Pty Ltd | Balfour Downs | 14% | Report on partial surrender of the relinquished portion of E46/396 as part of the compulsory second 50% reduct |
| A54729 | 1998 | Hunter Exploration Nl | Turramunda | 1.5% | Annual Report, E46/413 Turramunda 10/02/97 to 09/02/98 Hunter Exploration NL for Golden Reef Enterprises Pty L |
| A56806 | 1998 | Hunter Exploration Nl | Balfour Downs | 14% | Annual report for E46/396 Saddleback Hill for the period ending 4 October 1998 |
| A53103 | 1997 | Hunter Exploration Nl | Balfour Downs | 14% | Annual report for E46/396 Saddleback Hill for the period ending 4 October 1997 |
| A40053 | 1994 | Geopeko | Coorapline Dam - Kunningina Hill | 1.2% | Coorapline Dam - Kunningina Hill Project, Annual Report for the year ending 1st August 1993, E46/251 & 286. |
| A41744 | 1994 | North Mining Ltd | Balfour Downs | 1.1% | Balfour Downs Project, Final Surrender Report for the period ending 21st July 1994, E46/251 ( Coorapline Dam). |
| A42959 | 1994 | Cra Exploration Pty Ltd | Noreena | 13% | Noreena Project, Final Surrender Report for the period ending 30th November 1994, E46/241 & 247. |
| A37819 | 1993 | Cra Exploration Pty Ltd | Noreena | 3.1% | Noreena Project, (1st) Annual Report for the period ending 30th November 1992, E46/237-243 & E46/246-247. |
| A39518 | 1993 | Cra Exploration Pty Ltd | Noreena | 3.7% | Noreena Project, Annual Report for the period ending 30th November 1993, E46/237-241 & E46/246-247. |
| A37166 | 1992 | Geopeko | Coorapline Dam | 2.6% | Coorapline Dam Project, Annual Report for the period 17/08/1991 to 16/08/1992, E46/251. |
| A33067 | 1991 | Panoz Ventures Pty Ltd | Coorapline Well | 2% | Coorapline Well Project, Final Surrender Report for the year ending 11/02/1991, E46/148. |
| A34482 | 1991 | Panoz Ventures Pty Ltd | Wheal | 12% | Wheal Project, Final Surrender Report for the year ending 21/08/1991, P46/761A. |
| A30149 | 1990 | Panoz Ventures Pty Ltd | Coorapline Well | 2% | Coorapline Well Project, Annual Report for the year ending 10/2/1990, E46/148. |
| A30150 | 1990 | Panoz Ventures Pty Ltd | Mount Rudall | <1% | Mt Rudall Project, Annual Report for the year ending 10/2/1990, E46/149. |
| A30630 | 1990 | Stockdale Prospecting Ltd | Noreena Downs | 2.9% | Noreena Downs Project, Final Surrender Report for the period ended 8th March 1990, E46/190 & 195. |
| A31812 | 1990 | Panoz Ventures Pty Ltd | Mount Divide | 22% | Mt Divide Project, Final Surrender Report for the year ending 06/06/1990, E46/162. |
| A31872 | 1990 | Panoz Ventures Pty Ltd | Wheal | 12% | Wheal Project, Annual Report for the year ending 21/08/1990, P46/761A. |
| A28091 | 1989 | Panoz Ventures Pty Ltd | Mount Divide | 22% | Mt Divide Project, Annual Report for the year ending 06/06/1989, E46/162. |
| A26880 | 1989 | Panoz Ventures Pty Ltd | Coorapline Well | 2% | Coorapline Well Project, Annual Report for the year ending 10/2/1989, E46/148. |
| A26881 | 1989 | Panoz Ventures Pty Ltd | Mount Rudall | <1% | Mount Rudall Project, Annual report for the year ending 10/2/89, E46/149. |
| A29356 | 1989 | Panoz Ventures Pty Ltd | Wheal | 12% | Wheal Project, Annual Report for the year ending 21/8/89. , P46/761A. |
| A7479 | 1978 | Dampier Mining Co Ltd | Mount Rudall | 7.9% | Mount Rudall Project, Non-statutory Report: Final Report, February 1978, TR70/6302H. |
| A7272 | 1977 | Dampier Mining Co Ltd | Turummunda | 1% | Turummunda Project, Non-statutory Report:Final Report, October 1977, TR70/6553H. |
| A7109 | 1977 | Dampier Mining Co Ltd | Mount Rudall | 7.9% | Mount Rudall Project, Annual Report for the year ending 13th May 1977, TR70/6302H. |
| A7107 | 1977 | Broken Hill Pty Co Ltd | Bugga Bugga Pool | <1% | Bugga Bugga Pool Project, Annual (Final) Report, June 1977, TR70/6300 & 6553H. |
| A10059 | 1977 | Dampier Mining Co Ltd | Mount Divide | 3.9% | Mount Divide Project, Non-statutory Report: 1976 Exploration Report , January 1977, TR70/ 6301 & 6302H, MC46/2 |
| A5253 | 1974 | Goldsworthy Mining Ltd | Nullagine - Balfour Downs | 1.4% | Sentinel Joint Venture, Final Geological Report [non-statutory], Mining Area E, TR70/4108 ... 70/4148 |
| A4873 | 1972 | Sentinel Mining Co Inc | Nullagine- Balfour Downs | 1.8% | Nullagine- Balfour Downs Project, Non-statutory Report: Report on Tenements held by sundry others within Senti |
| A1155 | 1968 | Sentinel Mining Co Inc | Nullagine - Balfour Downs | 1.8% | Nullagine - Balfour Downs Project, Non-statutory Report: Iron & Manganese Exploration, November 1968, TR70/411 |
| A1156 | 1968 | Sentinel Mining Co Inc | Nullagine - Balfour Downs | 1.2% | Nullagine - Balfour Downs Project, Non-statutory Report: General Location Map of Temporary Reserves, (August 1 |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
| A4856 | 1967 | Sentinel Mining Co Inc | Mount Rove | 3.6% | Mount Rove Project, Non-statutory Report: Exploration Report 1966-1967, Miscellaneous Data ( Memos, Reports & |
| A94902 | 1753 | Inca Minerals Ltd | Kallona Creek | <1% | Kallona Creek Project Annual report for the period ending 23 July 2012, E46/753 |
| A4863 | 1753 | Not Entered | Nullagine | <1% | Nullagine |
| A50177 | 1753 | Golden Reef Enterprises Pty Ltd | Balfour Downs | 14% | Annual report for the year ending 4 October 1996 E46/396 Mt Divide, Western Australia |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 4 years · 10 May 2030
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 46/1351 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 46/1351? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.