NextMaps›WA Tenements›E 45/7168

E 45/7168

PendingExploration LicenceShire of East PilbaraMarble Bar District
Area
3,720ha
Applied
Sept 2025
13 months ago
WAMEX reports
100
WA median is 53
Report drilling
19
of 100 reports
East Pilbara Explore on the live map

Register summary

Holder
Baracus Pty Ltd
Local government
Shire of East Pilbara
Application received
5 Sept 2025

Exploration history on this ground

100 historical WAMEX exploration reports intersect E 45/7168: 72 report geochemistry or sampling, 69 include a digital data package.
When this ground was worked · 97 of 100 reports dated
11960s
11970s
11980s
161990s
192000s
482010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A146262 2025 Haoma Mining Nl North Shaw <1% Partial Surrender E45/04879 for the period ending 10/12/2024
A138222 2024 Infinity Metals Group - Hong-Jim Saw Panorama <1% Partial Surrender E45/4779 Panorama for the period ending 12/01/2024.
A132966 2022 Atlas Iron Pty Ltd Mt Webber - E45/4952 100% Final Surrender Report for E45/4952 Mt Webber for the period of 8/02/2018 to 11/11/2022.
A129293 2022 Haoma Mining Nl E45/4477 39% Partial Surrender E45/4477 for the period 16 November 2015 to 15 November 2021
A122720 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Hillside - Soansville 8.9% Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019
95 more reports
A123522 2020 Fmg Pilbara Pty Ltd Glacier Extended <1% Glacier Extended Annual Mineral Exploration Report, C5/2012, 1 April 2019 to 31 March 2020
A124033 2020 Atlas Iron Pty Ltd Mount Webber 5.4% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2020
A124831 2020 Minrex Resources Limited Daltons <1% Annual Report for Daltons Project E45/4681 for the period 13 July 2019 to 12 July 2020
A122483 2020 Haoma Mining Nl Agrippa Ridge <1% Annual Report For E45/4879 (Agrippa Ridge) for the period 11 December 2018 to 10 December 2019
A123898 2020 Fe Limited; Macarthur Lithium Pty Ltd Panorama <1% Annual Technical Report Panorama C73/2019 for the period ending 31/12/2020
A124328 2020 Fortescue Metals Group Ltd Glacier Extended <1% C5/2012 Glacier Extended Combined Final Surrender Report for the period ending 06/06/2020, E45/03641, E45/0446
A119187 2019 Haoma Mining Nl; Elazac Mining Pty Ltd Soansville 8.9% Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018
A120318 2019 Atlas Iron Pty Ltd Mount Webber 5.4% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2019, E 45/02922, M45/01197, E45/04
A119417 2019 Macarthur Lithium Pty Ltd; Artemis Resources Limited E45/4779 <1% E45/4779 Annual Report for the period 16 January 2018 to 15 January 2019
A120900 2019 Minrex Resources Limited Daltons <1% 2019 Annual Report on the Daltons Project E45/04681 for the period 13 July 2018 to 12 July 2019
A121311 2019 Fmg Pilbara Pty Ltd Glacier Extended <1% P45/2932 Glacier Extended Final Surrender for the period 22 September 2015 to 13 September 2019
A116690 2018 Haoma Mining Nl Soansville 9.2% C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/
A115566 2018 Fortescue Metals Group Ltd Glacier Extended 100% C5/2012 Glacier Extended Final Surrender Report, E45/2945 for the period 13/03/2012-12/03/2017
A117470 2018 Minrex Resources Limited Daltons <1% Annual Report on Daltons Gold Project E45/4681 For the Period 12 July 2017 to 11 July 2018
A112687 2017 Haoma Mining Nl Market Creek <1% Market Creek E45/3660 Final Surrender Report For the Period 20 February 2012 to 17 February 2017
A112488 2017 Haoma Mining Nl Tambourah - Soansville - Mercury Hill - 9.2% C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/
A108317 2016 Haoma Mining Nl Tambourah/Soansville/Mercury Hill/Tank H <1% Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015
A108602 2016 Haoma Mining Nl Market Creek <1% Market Creek E45/3660 Annual Report for the period 20/02/2015 to 19/02/2016
A109941 2016 Fortescue Metals Group Ltd Glacier Extended <1% C5/2012 Glacier Extended Final Surrender Report For the Period 28 November 2011 to 28 June 2016, E45/03654, E4
A104665 2015 Haoma Mining Nl Soansville - Tambourah - Jeff’s Hill - T <1% Soansville / Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual report for the period 1st December 20
A105285 2015 Haoma Mining Nl Market Creek <1% E45/3660 Market Creek Project Annual Report for the period 20 February 2014 to 19 February 2015
A105712 2015 Fortescue Metals Group Ltd Glacier Extended 4.2% C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945
A105455 2015 Mallina Exploration Pty Ltd Dalton 24% Dalton Project P45/2743 Final Surrender Report for the Period 11th March 2010 to 9th April 2015
A101206 2014 Haoma Mining Nl Soansville - Tambourah - Jeff’s <1% Soansville / Tambourah / Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2012 to 30th Nov
A101463 2014 Haoma Mining Nl Market Creek <1% E45/3660 Market Creek Annual Report for the period 20 February 2013 to 19 February 2014
A101670 2014 Mallina Exploration Pty Ltd Dalton <1% Annual Report for the Period 1st March 2013 to the 29th February 2014, Dalton, E45/3580
A102007 2014 Fortescue Metals Group Ltd Glacier Extended 4.9% Combined Mineral Exploration Report: C5/2012 Glacier Extended for the period 01 April 2013 to 31 March 2014, E
A102085 2014 Atlas Iron Ltd Mount Webber 6.2% Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I
A103943 2014 Atlas Iron Ltd Mount Webber 8.7% Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014
A101933 2014 Mallina Exploration Pty Ltd Dalton 24% Annual Report For the period: 11th March 2013 to 10th March 2014 Dalton Project P45/2743
A104194 2014 Mallina Exploration Pty Ltd Dalton <1% Final Surrender Report for the Period 1st March 2011 to the 26th September 2014, Dalton project, E45/3580
A100051 2013 Atlas Iron Ltd Mount Webber 39% Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29
A97468 2013 Haoma Mining Nl Market Creek <1% Market Creek Project, Annual Report for the period 20th February 2012 to 19th February 2013, E45/3660.
A97509 2013 Atlas Iron Ltd Mount Webber 6.2% Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298
A97553 2013 Mallina Exploration Pty Ltd Dalton <1% Annual Report E45/3580-I Dalton Project for the period 1st March 2012 to 29th February 2013
A97703 2013 Atlas Iron Ltd Mount Webber 6.7% Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2
A97835 2013 Fortescue Metals Group Ltd Glacier Extended 14% Annual Report for C5/2012 - Glacier Extended for the period 1/4/2012 to 31/3/2013, E
A97867 2013 Arc Pty Ltd Dalton 24% Dalton Project, Annual Report for the period 11th March 2012 to 10th March 2013, P45/2743.
A93517 2012 Atlas Iron Ltd Mount Webber 6.2% MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/
A94689 2012 Haoma Mining Nl North Shaw <1% E45/2784 North Shaw Project Surrender Report 11th April 2007 - 10th April 2012
A94905 2012 Atlas Iron Ltd Mount Webber <1% Mount webber Project P45/2708, Annual Report for the period ending 29 August 2012.
A94133 2012 Acm Pty Ltd Dalton <1% Annual Report for the period 1st March 2011 to 29th February 2012, Dalton Project E45/3580
A95672 2012 Haoma Mining Nl North Shaw - Hillside <1% C71/2004 North Shaw/Hillside Project Annual Report E45/2955, E45/2784 for the period 1 August 2011 to 31 July
A89779 2011 Giralia Resources Nl Daltons 6.8% Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011
A90433 2011 Haoma Mining Nl North Shaw <1% North Shaw Project, Partial Surrender Report for the period 11th April 2007 to 28th March 2011, E45.2784. (C71
A90079 2011 Atlas Iron Ltd Mount Webber <1% MT WEBBER PROJECT E45/2496, ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 30 APRIL 2011
A91705 2011 Haoma Mining Nl North Shaw <1% Annual report for the period 1st August 2010 to 31st July 2011, Combined Reporting Group C71/2004, North Shaw
A87508 2010 Atlas Iron Ltd Mount Webber <1% Partial Surrender to the Department of Mines and Petroleum for the period 01/05/06 to 30/4/2010
A88569 2010 Haoma Mining Nl North Shaw <1% Annual report for the period 1st August 2009 to 31st July 2010, Combined Reporting Group C70/2000, North Shaw
A86300 2010 Acm Pty Ltd Dalton Creek <1% Final Surrender Report for the period 15 April 2005 to 9 December 2009, Dalton Creek Project E45/2544
A86548 2010 Giralia Resources Nl Daltons 6.8% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010
A86819 2010 Atlas Iron Ltd Mount Webber <1% Partial Surrender to the Department of Mines and Petroleum for the period 01/05/06 to 28/3/2010
A87516 2010 Atlas Iron Ltd Mount Webber <1% Mount Webber E45/2496 Annual Report to the Department of Mines and Petroleum for the period 01/05/09 to 30/04/
A87562 2010 Haoma Mining Nl North Shaw <1% North Shaw Project E45/2784 Surrender Report, From 11 April 2007 to 10 April 2010
A81669 2009 Giralia Resources Nl Daltons 6.8% Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009
A82306 2009 Baracus Pty Ltd Shaw River <1% Shaw River Project E45/2683, 3/04/2008 - 2/04/2009
A82625 2009 Atlas Iron Ltd Mt Webber <1% Mt Webber E45/2496 Annual Report for the period 01/05/08 to 30/04/09
A84086 2009 Acm Pty Ltd DALTON CREEK 2.3% ANNUAL REPORT FOR THE PERIOD 15 May 2008 TO 14 MAY 2009, DALTON CREEK PROJECT, E45/2544 and P45/2550, EAST PIL
A84777 2009 Baracus Pty Ltd Shaw River <1% Shaw River Project E45/2683 Partial Surrender Report 3/04/2006 – 24/06/2009
A78891 2008 Clara Resources Pty Ltd Dalton Creek 2.3% ANNUAL REPORT FOR THE PERIOD 15 May 2007 TO 14 MAY 2008 DALTON CREEK PROJECT E45/2544 and P45/2550 COMBINED RE
A80143 2008 Haoma Mining Nl North Shaw <1% ANNUAL REPORT FOR THE PERIOD 29 JULY 2007 1 AUGUST 2008
A80593 2008 Giralia Resources Nl Daltons 6.8% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003
A75374 2007 Atlas Iron Ltd Abydos <1% Annual Report For the period 01/05/06 to 30/04/07 Tenement:E45/2496
A75540 2007 Clara Resources Pty Ltd Dalton Creek 2.3% 2007 Annual Report Dalton Creek Report Project Exploration Licence 45/2544 and Prospecting Licence 45/2550 For
A75845 2007 Baracus Pty Ltd Shaw River <1% E45/2683 Annual Technical Report for the Period 3/04/2006 - 2/04/2007.
A75860 2007 Giralia Resources Nl Daltons 6.7% E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29
A72610 2006 Giralia Resources Nl Daltons 6.7% E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20
A71128 2005 Giralia Resources Nl Daltons 6.7% E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin
A68997 2004 Giralia Resources Nl Daltons 6.7% Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187
A67049 2003 Giralia Resources Nl Daltons 13% Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187
A59703 2000 Haoma Mining Nl Lalla Rookh - North Pole 1.1% Group 3, Lalla Rookh -North Pole, Tenements E45/1453 and E45/1513, Partial Surrender Report for the period end
A60184 2000 Haoma Mining Nl North Shaw <1% Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1
A60185 2000 Haoma Mining Nl North Pole,Lalla Rookh,Callina Creek,Nor <1% North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M
A57790 1999 Sipa Resources Ltd Panorama 7% 1998 Annual Report on the Daltons Exploration Area, Panorama Project( covering the period 1 January 1998 to 31
A58642 1999 Haoma Mining Nl North Shaw 1.1% Surrender Report E45/1453,1513 for period ending July 1999 ( North Shaw Project).
A57173 1999 Sipa Resources Ltd Panorama 5.1% E45/1048, 1065, 1066, 1851, (& 1151) Surrender Report Daltons Exploration Area Panorma Project (Covering the P
A54804 1998 Gold Partners Nl Market Creek/ North Shaw 1.8% North Shaw Project, Market Creek,Partial Surrender Report for the period 15th September 1994 to 27th March1998
A54819 1998 Sipa Resources Ltd Panorama 6.9% 1997 Annual Report on the Daltons Exploration Area, Panorama Project, (covering the period 1st January 1997 to
A53072 1997 Geographe Resources Ltd North Shaw <1% North Shaw Project, Annual Report for year ending 18th August 1997, E45/1453, 1513, & 1600.
A51154 1997 Sipa Resources Ltd Panorama / Daltons 3.5% Panorama / Daltons Project, 1996 Annual Report E45/1048, 1062, 1151 & 1286 covering the period 1st January 199
A49396 1996 Gold Partners Nl North Shaw 1.8% Market Creek Project Annual Report E45/1513 for Period 15/09/1995 to 14/09/1996, Soil Sampling, Geological Map
A47307 1996 Cra Exploration Pty Ltd Daltons 3.5% Dalton's Project, Annual Report, E45/1048, 1062, 1151, 1286 For Period ending 31 December 1995.
A46188 1995 Sipa Resources Ltd Daltons / Panorama 15% Daltons / Panorama Project, Partial Surrender Report E45/1048 covering period 14th June 1991 to 15th February
A46198 1995 Gold Partners Nl Market Creek 1.8% Market Creek Project, Annual Report E45/1513 for the year ending September 14th 1995.
A45111 1995 Sipa Resources Ltd Panorama 4.1% Panorama Project, 1994 Annual Report E45/1048, 1062, 1133, 1151, 1286, 1355 covering the period 1st January 19
A40876 1994 Sipa Resources Ltd Panorama - Daltons 4.1% Panorama - Daltons Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/1048,
A42000 1994 Sipa Resources Ltd Panorama-Daltons 16% E45/113 SURRENDER REPORT
A39175 1993 Sipa Resources Ltd Panorama - Daltons 4.8% Panorama - Daltons Project, Annual Report for the period 27th Novembre 1991 to 26th November 1992, E45/1048, 1
A34908 1991 Sipa Resources Ltd Panorama 2% Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9
A15044 1985 Terrex Resources Nl Soanesville 5.3% Annual Report on prospecting licences 45/65 and 45/464-467 and exploration licence 45/96 Soansville and Soansv
A531 1970 Project Development Corp Shaw River 21% Shaw River Project, Non-statutory Report: Completion Report , November 1970, TR70/4221H.
A13076 1968 Us Steel International Inc Pilbara <1% Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4
A78773 1753 Atlas Iron Ltd Abydos <1% ANNUAL REPORT to the Department of Industry and Resources for the Period 01/05/07 to 30/04/08 TENEMENT: E45/24
A79126 1753 Giralia Resources Nl Daltons 6.7% E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH
A84776 1753 Haoma Mining Nl NORTH SHAW - HILLSIDE <1% NORTH SHAW/ HILLSIDE PROJECT, ANNUAL REPORT FOR THE PERIOD 31 JULY 2008 – 1 AUGUST 2009, E45/2188, E45/2784, E
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 45/7168 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 45/7168 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 45/7168? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.