E 45/7024
Register summary
- Holder
- Fmg Pilbara Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 18 Nov 2024
- Commenced
- 23 Apr 2026
- Expiry
- 22 Apr 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146070 | 2025 | Atlas Iron Pty Ltd | Abydos | 31% | Final Surrender Report for E45/4386 for the period 17/11/2014 to 16/11/2024 |
| A131097 | 2022 | Fortescue Metals Group Ltd | E45/4606 | <1% | E45/4606 (Glacier Valley) Partial Surrender Report for the period ending 02/05/2022. |
| A127204 | 2021 | Baracus Pty Ltd | Honeyeater Creek South | <1% | South Honeyeater Creek E45/04598 Annual Report for the period 3 June 2020 to 3 June 2021 |
| A127205 | 2021 | Baracus Pty Ltd | Wheal of Fortune | <1% | Wheal of Fortune Project E45/4599 Annual Report for the period ending 3/6/2021 |
| A124012 | 2020 | Atlas Iron Pty Ltd | Abydos | 8.9% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2020 |
83 more reports
| A123029 | 2020 | Baracus Pty Ltd | Honeyeater Creek | <1% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2019 to 16 January 20 |
| A124750 | 2020 | Bona Minerals Pty Ltd | Cleland Rock East | <1% | Cleland Rock East project, E45/5005 for the period 2 July 2019 to 1 July 2020 |
| A124769 | 2020 | Baracus Pty Ltd | Wheal of Fortune | <1% | Wheal of Fortune E45/04599 Annual Report for the period ending 02/05/2020 |
| A125253 | 2020 | Baracus Pty Ltd | Honeyeater Creek South | <1% | Honeyeater Creek South E45/04598 Annual Report for the period ending 02/05/2020 |
| A123057 | 2020 | Venturex Resources Limited | Sulphur Springs | <1% | Annual Technical Report: Sulphur Springs C139/2005 for the period 1 January 2019 to 31 December 2019 |
| A118854 | 2019 | Fortescue Metals Group Ltd | Glacier Valley | <1% | C120/2008 Glacier Valley Annual Report For the Period 1 December 2017 to 30 November 2018, E45/02510, E45/0253 |
| A121352 | 2019 | Baracus Pty Ltd | Wheal of Fortune | <1% | Wheal Of Fortune E 45/04599 Annual Report for the period 30 June 2018 to 29 June 2019 |
| A121492 | 2019 | Bona Minerals Pty Ltd | Cleland Rock (BM2) | <1% | Annual Technical Report Cleland Rock (BM2) Project for the period 02 July 2018 to 01 July 2019 |
| A119399 | 2019 | Baracus Pty Ltd | Honeyeater Creek | <1% | Annual Technical Report for Honeyeater Creek Project E45/04778 for the period 17 January 2018 to 16 January 20 |
| A120372 | 2019 | Atlas Iron Pty Ltd | Abydos | 8.9% | Abydos Project Annual report C40/2007 for the period ending 30 April 2019, E45/03298, E45/03619, M45/01179, M4 |
| A121351 | 2019 | Baracus Pty Ltd | South Honeyeater Creek | <1% | Annual Report For period of 30 June 2018 to 29 June 2019 Annual Report For period of 30 June 2018 to 29 June 2 |
| A119478 | 2019 | Venturex Resources Limited | Sulphur Springs | <1% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2018 to 31 December 2018 |
| A116250 | 2018 | Venturex Resources Limited | Sulphur Springs | <1% | Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2017 to 31 December 2017, M45/0049 |
| A117093 | 2018 | Baracus Pty Ltd | South Honeyeater Creek | <1% | South Honeyeater Creek E45/04598 Annual Report for the period 30 June 2017 to 29 June 2018 |
| A117092 | 2018 | Baracus Pty Ltd | Wheal Of Fortune | <1% | Annual Report Wheal of Fortune Project E45/04599 for the period 30 June 2017 to 29 June 2018 |
| A117215 | 2018 | Atlas Iron Limited | Abydos | 8.9% | Abydos Project Annual Report C40/2007 for the period ending 30 April 2018, E45/02728, E45/03298, E45/03619, E4 |
| A119170 | 2018 | Gswa | Panorama / Strelley | <1% | Core Library Sampling Results for EIS Drillholes BKD1, BKD2 (P913) |
| A110790 | 2017 | Venturex Resources Ltd | Sulphur Springs | <1% | Venturex Resources Ltd ANNUAL REPORT For the Period 1 January 2016 to 31 December 2016 Sulphur Springs C139/20 |
| A114417 | 2017 | Baracus Pty Ltd | Wheal Of Fortune | <1% | Wheal of Fortune Project E45/04599 Annual Report for the period 30 June 2016 to 29 June 2017 |
| A114418 | 2017 | Baracus Pty Ltd | South Honeyeater Creek | <1% | South Honeyeater Creek E45/04598 Annual Report for the period 30 June 2016 to 29 June 2017 |
| A112824 | 2017 | State Resources Pty Ltd | Strelley | <1% | Combined Annual Technical Report - Strelley Report C51/2013 for the period 07/03/2016 to 06/03/2017, E45/03828 |
| A114462 | 2017 | Atlas Iron Limited | Abydos | 6.8% | ABYDOS PROJECT C40/2007 Annual Technical Report to the DMP for the Period Ending 30 April 2017, E45/02308, E45 |
| A115137 | 2017 | State Resources Pty Ltd | Roadmaster | <1% | Final Surrender Report for Roadmaster Project E45/03828 For the Period 7 March 2017 to 10 August 2017 |
| A108062 | 2016 | Venturex Resources Limited | Sulphur Springs | <1% | SULPHUR SPRINGS PROJECT ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015, M 45/00494, M 45/0058 |
| A108699 | 2016 | State Resources Pty Ltd | Strelley | <1% | Combined Annual Technical Report Strelley Project C51/2013 For the Period 7 March 2015 to 6 March 2016, E45/03 |
| A109653 | 2016 | Atlas Iron Limited | Abydos | 4.4% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A104488 | 2015 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 1.3% | Sulphur Springs Project C139/2005 Annual Report for the period 1 Jan 2014 to 31 Dec 2014, M45/494, M45/653, M4 |
| A105712 | 2015 | Fortescue Metals Group Ltd | Glacier Extended | <1% | C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945 |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | 3.6% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A105595 | 2015 | State Resources Pty Ltd | Strelley Project | <1% | Combined Annual Technical Report - Strelley Project |
| A105629 | 2015 | Venturex Resources Limited | Sulphur Springs | 33% | Sulphur Springs P45/2607 Final Report for the period 30/04/2007 to 29/04/2015 |
| A101577 | 2014 | Venturex Sulphur Springs Pty Ltd | Sulphur Springs | 1.4% | Sulphur Springs Project, Annual Report for the period 01/01/2013 to 31/12/2013, M45/494,587 & 653;P45/2607, 2 |
| A101947 | 2014 | State Resources Pty Ltd | Strelley | <1% | Strelley Project Combined Annual Technical Report for Exploration Licences 45/3687-I, 45/3828 I, 45/3829-I & 4 |
| A102166 | 2014 | Zenith Minerals Limited | Cleland Rock | 30% | Cleland Rock Project, E45/3449, Final Surrender Report for the period 15 November 2010 to 17 April 2014 |
| A102356 | 2014 | Atlas Iron Ltd; Altura Mining Ltd | Abydos | <1% | Abydos Project, Annual Report for the period 01/05/2013 to 30/04/2014, E45/2308,2362-2363, 2728,2899, 3298, 33 |
| A104003 | 2014 | Atlas Iron Ltd | Abydos | <1% | Abydos Project E45/3356 3800 & 3801 (C40/2007) Surrender Report to the Department of Mines and Petroleum for t |
| A98064 | 2013 | Atlas Iron Ltd | Abydos | <1% | Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 32 |
| A100225 | 2013 | Zenith Minerals Limited | Cleland Rock | 30% | Annual Report for the period 15 November 2012 to 14 November 2013 , Cleland Rock Project, E45/3449. |
| A97715 | 2013 | State Resources Pty Ltd | Strelley | <1% | Strelley Project Combined Annual Technical Report E 45/3687-I, E 45/3828-I, E 45/3829-I & E 45/3830-I for the |
| A95653 | 2012 | Zenith Minerals Limited | Cleland Rock | 30% | Cleland Rock Project, Annual Report for the period 15 November 2011 to 14 November 2012, E45/3449. |
| A94018 | 2012 | Atlas Iron Ltd | Abydos | <1% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A92530 | 2011 | Zenith Minerals Limited | Cleland Rock | 30% | ANNUAL REPORT FOR PERIOD 15 November 2010 to 14 November 2011 CLELAND ROCK PROJECT E45/3449 |
| A88938 | 2010 | Sipa Resources Ltd | Panorama | 11% | Panorama Project Annual Report for the Period 1 January 2010 to 31 December 2010, C137/1993, M45/587, E45/2300 |
| A86752 | 2010 | Sipa Resources Ltd | Panorama | 10% | Panorama Project: E45/2474, Partial Surrender Report for the Period 17 January 2006 to 16 January 2010 |
| A81699 | 2009 | Sipa Resources Ltd | PANORAMA | 11% | Panorama Project Annual Report for the Period 1 January 2008 to 31 December 2009 |
| A85491 | 2009 | Sipa Resources Ltd | Panorama | 11% | Panorama Project C137/1993 M45/587, E45/2300, E45/2393, E45/2601,E45/2474, E45/2556, P45/2600-2617 Annual Repo |
| A77713 | 2008 | Sipa Resources Ltd | Panorama (Strelley) | 11% | Panorama Project Annual Report for the Period 1 January 2007 to 31 December 2007 |
| A74134 | 2007 | Sipa Resources Ltd | Panorama Project | <1% | Panorama Project C137/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 (Marble Bar) |
| A74133 | 2007 | Sipa Resources Ltd | Panorama | 10% | Panorama Project E45/2474 Annual Report for the Period 17th Jan 2006 to 16th Jan 2007 (Marble Bar) |
| A74605 | 2007 | Sipa Resources Ltd | Panorama | 29% | E45/2393 Annual Report for the Period 22 March 2006 to 21 March 2007, Panorama Project |
| A71565 | 2005 | Sipa Resources Ltd | Panorama Exploration Project | <1% | Panorama Exploration Project, 2005 Annual report (Covering the period 1 January 2005 to 31 December 2005, C137 |
| A68293 | 2004 | Sipa Resources Ltd | Panorama (Strelley) | <1% | Annual Report for the period 01/01/2003-31/12/2003 Panorama JV Project(c137/1993), E45/1852, E45/2029, M45/494 |
| A69467 | 2004 | Sipa Resources Ltd | Panorama / Strelley | 7.6% | Panorama Project, Strelley Exploration Area, Surrender report Panorama Project, C137/1993, E45/1291, E45/1478 |
| A65355 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama - Strelley | 31% | Panorama - Strelley Project, Partial Surrender Report for the period 7th September 1993 to 24th August 2001, M |
| A64887 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 7.3% | 2001 Annual Report On The Strelley Exploration Area Panorama Project (Covering The Period 1 January 2001 To 31 |
| A65354 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama - Strelley | 15% | Panorama - Strelley Project, Partial Surrender Report for the period 10th September 1992 to 9th September 2001 |
| A66373 | 2002 | Outokumpu Zinc Australia Pty Ltd | Panorama (Strelley) | 7.4% | Annual Report on the Strelley Exploration Area Panorama Project covering the period 1 January 2002 to 31 Decem |
| A62548 | 2001 | Outokumpu Exp Aust Pty Ltd | Panorama - Strelley | 7.2% | Panorama - Strelley Project, Annual Report (Parts 1 & 2) for the period 1st January 2000 to 31st December 2000 |
| A59696 | 2000 | Sipa Resources Ltd | Panorama | 7.2% | Department of Minerals and Energy, 1999 Annual Report on the Strelley Exploration Area, Panorama Project, cove |
| A57799 | 1999 | Sipa Resources Ltd | Panorama (Strelley) | 4.5% | Department of Minerals and Energy 1998 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | 2.2% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A56516 | 1998 | Sipa Resources Ltd | Panorama (Strelley) | 5% | Department of Minerals and Energy 1997 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A53198 | 1997 | Sipa Resources Ltd | Panorama | 25% | E45/1478-1479 Partial Surrender Report Strelley Exploration Area , Panorama Project (for the period 23 Februar |
| A51765 | 1997 | Sipa Resources Ltd | Panorama (Strelley) | 4.6% | Department of Minerals and Energy 1996 Annual Report on the Strelley Exploration Area, Panorama Project coveri |
| A48457 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 4.8% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A48458 | 1996 | Sipa Resources Ltd | Panorama (Strelley) | 4.8% | Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A46318 | 1995 | Sipa Resources Ltd | Panorama (Strelley) | 5.2% | Department of Mineral and Energy 1994 Annual Report on the Strelley Exploration Area, Panorama Project (coveri |
| A40986 | 1994 | Sipa Resources Ltd | Panorama - Strelley | 4% | Panorama - Strelley Project , Annual Report for the period 27th November 1992 to 31st December 1993, E45/715 |
| A39115 | 1993 | Sipa Resources Ltd | Panorama - Strelley | 3.5% | Panorama - Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/825, |
| A39174 | 1993 | Sipa Resources Ltd | Panorama- Strelley | 3.2% | Panorama- Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992. E45/581, 71 |
| A32544 | 1991 | Sipa Resources Ltd | Panorama -Strelly | <1% | Sipa-Ashling JV; Panorama Project E45/825 - 'Camel Flats'; Annual Technical Report -1990 |
| A32548 | 1991 | Sipa Resources Ltd | Panorama | <1% | Sipa-Ashling Joint Venture Panorama Project M45/494, E45/581 , 957, 971 Annual Technical Report - 1990 |
| A34908 | 1991 | Sipa Resources Ltd | Panorama | <1% | Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9 |
| A30016 | 1990 | Mr Maynard Aj | Leilira Creek | <1% | Leilira Creek Project, Annual Report for the period 10/07/1988 to 09/07/1989, E45/825 |
| A31203 | 1990 | Miralga Mining Nl | Panorama | 5.6% | Panorama Project, Partial Surrender Report for the period 27/11/1988 to 26/11/1989 E45/581 (Strelley Gorge), E |
| A27601 | 1989 | Homestake Australia Ltd | SULPHUR SPRINGS | 5.6% | Sulphur Springs JV Report for period 01/05/88 to 30/12/88 Tenements E45/419 E45/532 E45/535 E45/581 Miralga Mi |
| A27942 | 1989 | Lynas Gold Nl | Honeyeater Creek | <1% | Report on Stream Sediment Sampling on Mining Tenements, Honeyeater Creek. |
| A25326 | 1988 | Homestake Australia Ltd | SULPHUR SPRINGS | 5.6% | Sulphur Springs Joint Venture Annual Report as at 30 April 1988. E45/419, E45/532, E45/535, and E45/581. Homes |
| A15949 | 1985 | Duval Mining Australia Ltd | Strelley | 4.2% | Strelley Project, Annual Report for the period ending 11th March 1985, E45/101 & 102. |
| A16363 | 1985 | Duval Mining Australia Ltd | Strelley | 4.2% | Strelley Project, Final Surrender Report for the period ending 09/10/1985, E45/101 & 102. |
| A12464 | 1983 | Pancontinental Mining Ltd | Soanesville | 4.3% | Soanesville Project, Final Surrender Report for the period ending 26/07/1983, TR70/8811H & 8812H |
| A531 | 1970 | Project Development Corp | Shaw River | <1% | Shaw River Project, Non-statutory Report: Completion Report , November 1970, TR70/4221H. |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 22 Apr 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 45/7024 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 45/7024? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.