NextMaps›WA Tenements›E 45/6885

E 45/6885

PendingExploration LicenceShire of East PilbaraMarble Bar District
Area
4,030ha
Applied
Jan 2024
3 years ago
WAMEX reports
118
WA median is 53
Report drilling
38
of 118 reports
East Pilbara Explore on the live map

Register summary

Holder
Baracus Pty Ltd
Local government
Shire of East Pilbara
Application received
12 Jan 2024

Exploration history on this ground

118 historical WAMEX exploration reports intersect E 45/6885: 76 report geochemistry or sampling, 67 include a digital data package.
When this ground was worked · 116 of 118 reports dated
11960s
11970s
31980s
301990s
302000s
422010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A146262 2025 Haoma Mining Nl North Shaw <1% Partial Surrender E45/04879 for the period ending 10/12/2024
A138222 2024 Infinity Metals Group - Hong-Jim Saw Panorama 32% Partial Surrender E45/4779 Panorama for the period ending 12/01/2024.
A131685 2022 Develop Global Limited P45/2911 86% Final Surrender Report P45/2911 for the period ending 30/06/2022.
A129293 2022 Haoma Mining Nl E45/4477 <1% Partial Surrender E45/4477 for the period 16 November 2015 to 15 November 2021
A122720 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Hillside - Soansville <1% Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019
113 more reports
A123057 2020 Venturex Resources Limited Sulphur Springs 2.7% Annual Technical Report: Sulphur Springs C139/2005 for the period 1 January 2019 to 31 December 2019
A122483 2020 Haoma Mining Nl Agrippa Ridge <1% Annual Report For E45/4879 (Agrippa Ridge) for the period 11 December 2018 to 10 December 2019
A123898 2020 Fe Limited; Macarthur Lithium Pty Ltd Panorama 16% Annual Technical Report Panorama C73/2019 for the period ending 31/12/2020
A124765 2020 Baracus Pty Ltd Jameson South <1% Jameson South E45/4814 Annual Report for the period ending 07/07/2020
A119187 2019 Haoma Mining Nl; Elazac Mining Pty Ltd Soansville <1% Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018
A119478 2019 Venturex Resources Limited Sulphur Springs 2.7% Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2018 to 31 December 2018
A119417 2019 Macarthur Lithium Pty Ltd; Artemis Resources Limited E45/4779 32% E45/4779 Annual Report for the period 16 January 2018 to 15 January 2019
A121942 2019 State Resources Pty Ltd Strelley South <1% Strelley South Project E 45/04814 Annual Report for the period 07/06/2018-06/06/2019
A116250 2018 Venturex Resources Limited Sulphur Springs 2.9% Annual Technical Report Sulphur Springs C139/2005 for the period 1 January 2017 to 31 December 2017, M45/0049
A116690 2018 Haoma Mining Nl Soansville <1% C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/
A110790 2017 Venturex Resources Ltd Sulphur Springs 4.6% Venturex Resources Ltd ANNUAL REPORT For the Period 1 January 2016 to 31 December 2016 Sulphur Springs C139/20
A112687 2017 Haoma Mining Nl Market Creek <1% Market Creek E45/3660 Final Surrender Report For the Period 20 February 2012 to 17 February 2017
A112488 2017 Haoma Mining Nl Tambourah - Soansville - Mercury Hill - <1% C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/
A112824 2017 State Resources Pty Ltd Strelley <1% Combined Annual Technical Report - Strelley Report C51/2013 for the period 07/03/2016 to 06/03/2017, E45/03828
A108062 2016 Venturex Resources Limited Sulphur Springs 4.6% SULPHUR SPRINGS PROJECT ANNUAL REPORT For the Period 1 January 2015 to 31 December 2015, M 45/00494, M 45/0058
A108317 2016 Haoma Mining Nl Tambourah/Soansville/Mercury Hill/Tank H <1% Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015
A108602 2016 Haoma Mining Nl Market Creek <1% Market Creek E45/3660 Annual Report for the period 20/02/2015 to 19/02/2016
A108699 2016 State Resources Pty Ltd Strelley <1% Combined Annual Technical Report Strelley Project C51/2013 For the Period 7 March 2015 to 6 March 2016, E45/03
A109941 2016 Fortescue Metals Group Ltd Glacier Extended 35% C5/2012 Glacier Extended Final Surrender Report For the Period 28 November 2011 to 28 June 2016, E45/03654, E4
A104488 2015 Venturex Sulphur Springs Pty Ltd Sulphur Springs 4.4% Sulphur Springs Project C139/2005 Annual Report for the period 1 Jan 2014 to 31 Dec 2014, M45/494, M45/653, M4
A105285 2015 Haoma Mining Nl Market Creek <1% E45/3660 Market Creek Project Annual Report for the period 20 February 2014 to 19 February 2015
A105712 2015 Fortescue Metals Group Ltd Glacier Extended 18% C5/2012 Glacier Extended Project Combined Annual Report for the period 1 April 2014 to 31 March 2015, E45/2945
A105595 2015 State Resources Pty Ltd Strelley Project <1% Combined Annual Technical Report - Strelley Project
A101463 2014 Haoma Mining Nl Market Creek <1% E45/3660 Market Creek Annual Report for the period 20 February 2013 to 19 February 2014
A101577 2014 Venturex Sulphur Springs Pty Ltd Sulphur Springs 1.4% Sulphur Springs Project, Annual Report for the period 01/01/2013 to 31/12/2013, M45/494,587 & 653;P45/2607, 2
A101947 2014 State Resources Pty Ltd Strelley <1% Strelley Project Combined Annual Technical Report for Exploration Licences 45/3687-I, 45/3828 I, 45/3829-I & 4
A102007 2014 Fortescue Metals Group Ltd Glacier Extended 21% Combined Mineral Exploration Report: C5/2012 Glacier Extended for the period 01 April 2013 to 31 March 2014, E
A102085 2014 Atlas Iron Ltd Mount Webber <1% Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I
A103943 2014 Atlas Iron Ltd Mount Webber <1% Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014
A100051 2013 Atlas Iron Ltd Mount Webber <1% Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29
A97468 2013 Haoma Mining Nl Market Creek <1% Market Creek Project, Annual Report for the period 20th February 2012 to 19th February 2013, E45/3660.
A97509 2013 Atlas Iron Ltd Mount Webber <1% Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298
A97703 2013 Atlas Iron Ltd Mount Webber <1% Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2
A97715 2013 State Resources Pty Ltd Strelley <1% Strelley Project Combined Annual Technical Report E 45/3687-I, E 45/3828-I, E 45/3829-I & E 45/3830-I for the
A97835 2013 Fortescue Metals Group Ltd Glacier Extended <1% Annual Report for C5/2012 - Glacier Extended for the period 1/4/2012 to 31/3/2013, E
A93517 2012 Atlas Iron Ltd Mount Webber <1% MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/
A94689 2012 Haoma Mining Nl North Shaw <1% E45/2784 North Shaw Project Surrender Report 11th April 2007 - 10th April 2012
A95672 2012 Haoma Mining Nl North Shaw - Hillside <1% C71/2004 North Shaw/Hillside Project Annual Report E45/2955, E45/2784 for the period 1 August 2011 to 31 July
A89779 2011 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011
A90433 2011 Haoma Mining Nl North Shaw <1% North Shaw Project, Partial Surrender Report for the period 11th April 2007 to 28th March 2011, E45.2784. (C71
A91705 2011 Haoma Mining Nl North Shaw <1% Annual report for the period 1st August 2010 to 31st July 2011, Combined Reporting Group C71/2004, North Shaw
A88938 2010 Sipa Resources Ltd Panorama 1.2% Panorama Project Annual Report for the Period 1 January 2010 to 31 December 2010, C137/1993, M45/587, E45/2300
A88569 2010 Haoma Mining Nl North Shaw 12% Annual report for the period 1st August 2009 to 31st July 2010, Combined Reporting Group C70/2000, North Shaw
A86548 2010 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010
A86752 2010 Sipa Resources Ltd Panorama <1% Panorama Project: E45/2474, Partial Surrender Report for the Period 17 January 2006 to 16 January 2010
A87562 2010 Haoma Mining Nl North Shaw <1% North Shaw Project E45/2784 Surrender Report, From 11 April 2007 to 10 April 2010
A81669 2009 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009
A81699 2009 Sipa Resources Ltd PANORAMA 1.2% Panorama Project Annual Report for the Period 1 January 2008 to 31 December 2009
A82306 2009 Baracus Pty Ltd Shaw River 55% Shaw River Project E45/2683, 3/04/2008 - 2/04/2009
A85491 2009 Sipa Resources Ltd Panorama 1.2% Panorama Project C137/1993 M45/587, E45/2300, E45/2393, E45/2601,E45/2474, E45/2556, P45/2600-2617 Annual Repo
A84777 2009 Baracus Pty Ltd Shaw River 55% Shaw River Project E45/2683 Partial Surrender Report 3/04/2006 – 24/06/2009
A77713 2008 Sipa Resources Ltd Panorama (Strelley) 1.2% Panorama Project Annual Report for the Period 1 January 2007 to 31 December 2007
A80143 2008 Haoma Mining Nl North Shaw 12% ANNUAL REPORT FOR THE PERIOD 29 JULY 2007 1 AUGUST 2008
A80593 2008 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003
A76646 2007 Haoma Mining Nl North Shaw 16% NORTH SHAW PROJECT ANNUAL REPORT FOR THE PERIOD 31 JULY 2006 - 1 AUGUST 2007
A74133 2007 Sipa Resources Ltd Panorama <1% Panorama Project E45/2474 Annual Report for the Period 17th Jan 2006 to 16th Jan 2007 (Marble Bar)
A74605 2007 Sipa Resources Ltd Panorama 5.6% E45/2393 Annual Report for the Period 22 March 2006 to 21 March 2007, Panorama Project
A75845 2007 Baracus Pty Ltd Shaw River 55% E45/2683 Annual Technical Report for the Period 3/04/2006 - 2/04/2007.
A75860 2007 Giralia Resources Nl Daltons <1% E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29
A72610 2006 Giralia Resources Nl Daltons <1% E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20
A73912 2006 Haoma Mining Nl North Shaw 8.2% North Shaw Project E45/2188-2189, Annual Report for the Period 31 July 2005 to 1 August 2006, Combined Reporti
A70820 2005 Haoma Mining Nl North Shaw 16% North Shaw Project, E45/2188, Annual report for the period ending July 2005 (Report No. 05-02-2005-03, Marble
A71128 2005 Giralia Resources Nl Daltons <1% E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin
A68997 2004 Giralia Resources Nl Daltons <1% Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187
A69093 2004 Haoma Mining Nl North Shaw Gold Mining Centre 16% Annual Report for the Period 05/04/2003 to 05/04/2004 North Shaw Gold Mining Centre E45/2188
A69467 2004 Sipa Resources Ltd Panorama / Strelley 1.8% Panorama Project, Strelley Exploration Area, Surrender report Panorama Project, C137/1993, E45/1291, E45/1478
A67027 2003 Haoma Mining Nl North Shaw 16% Annual Report for the period ending 05/06/2003 E45/2188 North Shaw East Pilbara District
A67049 2003 Giralia Resources Nl Daltons <1% Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187
A64887 2002 Outokumpu Zinc Australia Pty Ltd Panorama (Strelley) 1.5% 2001 Annual Report On The Strelley Exploration Area Panorama Project (Covering The Period 1 January 2001 To 31
A66373 2002 Outokumpu Zinc Australia Pty Ltd Panorama (Strelley) 1.5% Annual Report on the Strelley Exploration Area Panorama Project covering the period 1 January 2002 to 31 Decem
A65028 2002 De Beers Australia Exploration Ltd North Shaw 16% Annual Report for Exploration Licence 45/2188 May 2002.
A65354 2002 Outokumpu Zinc Australia Pty Ltd Panorama - Strelley 3.7% Panorama - Strelley Project, Partial Surrender Report for the period 10th September 1992 to 9th September 2001
A62548 2001 Outokumpu Exp Aust Pty Ltd Panorama - Strelley 1.7% Panorama - Strelley Project, Annual Report (Parts 1 & 2) for the period 1st January 2000 to 31st December 2000
A59696 2000 Sipa Resources Ltd Panorama 1.7% Department of Minerals and Energy, 1999 Annual Report on the Strelley Exploration Area, Panorama Project, cove
A60184 2000 Haoma Mining Nl North Shaw 4.4% Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1
A60185 2000 Haoma Mining Nl North Pole,Lalla Rookh,Callina Creek,Nor 3.8% North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M
A57502 1999 Haoma Mining Nl North Pole, Lalla Rookh, Callina Creek, 2.7% North Pole, Lalla Rookh, Callina Creek, Normay, and Mickeys Find. Annual Report for the period ending 11/98.
A57790 1999 Sipa Resources Ltd Panorama 3.1% 1998 Annual Report on the Daltons Exploration Area, Panorama Project( covering the period 1 January 1998 to 31
A57799 1999 Sipa Resources Ltd Panorama (Strelley) 1.3% Department of Minerals and Energy 1998 Annual Report on the Strelley Exploration Area, Panorama Project coveri
A57800 1999 Sipa Resources Ltd Panorama 1.7% SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029
A57173 1999 Sipa Resources Ltd Panorama 2.3% E45/1048, 1065, 1066, 1851, (& 1151) Surrender Report Daltons Exploration Area Panorma Project (Covering the P
A54819 1998 Sipa Resources Ltd Panorama 3.1% 1997 Annual Report on the Daltons Exploration Area, Panorama Project, (covering the period 1st January 1997 to
A54106 1998 Haoma Mining Nl North Pole, Lala Rookh, Callina Creek, N 2.3% Group3 - North Pole, Lala Rookh, Callina Creek, Normay, & Mickeys Find. Annual report for the period ending 11
A56516 1998 Sipa Resources Ltd Panorama (Strelley) 1.4% Department of Minerals and Energy 1997 Annual Report on the Strelley Exploration Area, Panorama Project coveri
A50969 1997 Sipa Resources Ltd Panorama / Strelley 25% Panorama / Strelley Project, Surrender Report E45/1477, 1540 & 1579 for the period ending December 1996.
A51154 1997 Sipa Resources Ltd Panorama / Daltons <1% Panorama / Daltons Project, 1996 Annual Report E45/1048, 1062, 1151 & 1286 covering the period 1st January 199
A51765 1997 Sipa Resources Ltd Panorama (Strelley) 3.5% Department of Minerals and Energy 1996 Annual Report on the Strelley Exploration Area, Panorama Project coveri
A52152 1997 Haoma Mining Nl North Pole, Lalla Rookh, Callina Creek, 2.4% Annual report for period ending 30/11/96 Group 3 : North Pole, Lalla Rookh, Callina Creek, Normay & Mickey's F
A48457 1996 Sipa Resources Ltd Panorama (Strelley) 3.7% Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri
A47307 1996 Cra Exploration Pty Ltd Daltons <1% Dalton's Project, Annual Report, E45/1048, 1062, 1151, 1286 For Period ending 31 December 1995.
A47374 1996 Sipa Resources Ltd Panorama <1% Panorama Project, Annual Report 1995 covering the period 1 January 1995 to 31 Decenber 1996.
A48458 1996 Sipa Resources Ltd Panorama (Strelley) 3.7% Department of Mineral and Energy 1995 Annual Report on the Strelley Exploration Area, Panorama Project (coveri
A51423 1996 Sipa Resources Ltd Soansville/ Panorama <1% 1996 Annual Report on the Soansville Exploration Area, Panorama Project,E45/1065 & 1066, covering period 01/01
A45048 1995 Sipa Resources Ltd Panorama - Soansville <1% Panorama - Soansville Project, Annual Report for the period 01/01/1994 to 31/12/1994, E45/1065 & 1066.
A46188 1995 Sipa Resources Ltd Daltons / Panorama 3.3% Daltons / Panorama Project, Partial Surrender Report E45/1048 covering period 14th June 1991 to 15th February
A46318 1995 Sipa Resources Ltd Panorama (Strelley) 1.5% Department of Mineral and Energy 1994 Annual Report on the Strelley Exploration Area, Panorama Project (coveri
A45111 1995 Sipa Resources Ltd Panorama 4.5% Panorama Project, 1994 Annual Report E45/1048, 1062, 1133, 1151, 1286, 1355 covering the period 1st January 19
A40876 1994 Sipa Resources Ltd Panorama - Daltons 4.5% Panorama - Daltons Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/1048,
A42000 1994 Sipa Resources Ltd Panorama-Daltons 18% E45/113 SURRENDER REPORT
A42099 1994 Sipa Resources Ltd Panorama - Strelley 3.7% E45/1040 PARTIAL SURRENDER REPORT
A40984 1994 Sipa Resources Ltd Soansville <1% Soansville Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/1065 & 1066.
A40986 1994 Sipa Resources Ltd Panorama - Strelley 1.6% Panorama - Strelley Project , Annual Report for the period 27th November 1992 to 31st December 1993, E45/715
A39115 1993 Sipa Resources Ltd Panorama - Strelley 2.1% Panorama - Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/825,
A39174 1993 Sipa Resources Ltd Panorama- Strelley 2% Panorama- Strelley Project, Annual Report for the period 27th November 1991 to 26th November 1992. E45/581, 71
A39175 1993 Sipa Resources Ltd Panorama - Daltons 5.3% Panorama - Daltons Project, Annual Report for the period 27th Novembre 1991 to 26th November 1992, E45/1048, 1
A34908 1991 Sipa Resources Ltd Panorama <1% Sipa-Ashling Joint Venture Panorama Project Annual Report 1991 Volume 1 of 6 (E45/581, E45/715, E45/825, E45/9
A15949 1985 Duval Mining Australia Ltd Strelley 5.1% Strelley Project, Annual Report for the period ending 11th March 1985, E45/101 & 102.
A16363 1985 Duval Mining Australia Ltd Strelley 5.1% Strelley Project, Final Surrender Report for the period ending 09/10/1985, E45/101 & 102.
A12464 1983 Pancontinental Mining Ltd Soanesville 2.5% Soanesville Project, Final Surrender Report for the period ending 26/07/1983, TR70/8811H & 8812H
A531 1970 Project Development Corp Shaw River 25% Shaw River Project, Non-statutory Report: Completion Report , November 1970, TR70/4221H.
A13076 1968 Us Steel International Inc Pilbara <1% Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4
A79126 1753 Giralia Resources Nl Daltons <1% E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH
A84776 1753 Haoma Mining Nl NORTH SHAW - HILLSIDE 12% NORTH SHAW/ HILLSIDE PROJECT, ANNUAL REPORT FOR THE PERIOD 31 JULY 2008 – 1 AUGUST 2009, E45/2188, E45/2784, E
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 45/6885 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 45/6885 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 45/6885? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.