Register summary
- Holder
- Green Metals Group Pty Ltd
- Local government
- Shire of East Pilbara
- Application received
- 9 May 2023
- Commenced
- 30 Mar 2026
- Expiry
- 29 Mar 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A133559 | 2023 | Calidus Resources Limited | Warrawoona | <1% | Partial Surrender Report for E45/4666 Warrawoona for the period ending 23/12/2022 |
| A136936 | 2023 | Peregrine Gold Ltd | Comet East | <1% | Annual Report Comet East Project E45/3956 for the period ending 06/08/2023. |
| A135219 | 2023 | Keras (Pilbara) Gold Pty Ltd | Warrawoona | 100% | Final Surrender Report for E45/5706 Warrawoona for the period ending 19/04/2023. |
| A135319 | 2023 | Keras (Pilbara) Gold Pty Ltd | Warrawoona | <1% | Partial Surrender Report for Warrawoona E45/4555 for the period ending 10/05/2023 |
| A132521 | 2022 | Peregrine Gold Ltd | Comet East | <1% | Annual Report for Comet East Project E45/3956 for the period ending 06/08/2022. |
80 more reports
| A128525 | 2021 | Peregrine Gold Ltd | Comet East | <1% | Annual Report for Comet East Project E45/3956 for the period ending 06/08/2021 |
| A128051 | 2021 | Atlas Iron Pty Ltd | Corunna Downs | <1% | Final Surrender Report for Corunna Downs E45/4774 for the period 2/05/2018 to 1/07/2021 |
| A122546 | 2020 | Keras (Pilbara) Gold Pty Ltd | Warrawoona | 100% | Final surrender report for E45/4194 Warrawoona project for the period 15 July 2014 to 14 July 2019 |
| A122837 | 2020 | Calidus Resources Limited | Warrawoona | <1% | Annual Report C30/2007 Warrawoona Project for the period ending 31/12/2019 |
| A123125 | 2020 | Nullagine Gold Pty Ltd; Conglomerate Gold Pty Ltd | Marble Bar | <1% | Annual Mineral Exploration Report - C121/2012 Marble Bar Project, 1 January 2019 to 31 December 2019 |
| A125055 | 2020 | Lmtd Comet East Pty Ltd | Comet East | <1% | Annual Report for Comet East Project E 45/03956 for the period ending 6 August 2020 |
| A122722 | 2020 | Haoma Mining Nl; Elazac Mining Pty Ltd | Marble Bar | <1% | Annual Report For C281/1997 (Marble Bar) for the period 1 December 2018 to 30 November 2019 |
| A119134 | 2019 | Haoma Mining Nl; Elazac Mining Pty Ltd | Marble Bar | <1% | Marble Bar C281/1997 Annual Report for the period 1 December 2017 to 30 November 2018 |
| A119350 | 2019 | Nullagine Gold Pty Ltd; Conglomerate Gold Pty Ltd | Marble Bar | <1% | Combined Annual Mineral Exploration Report - C121/2012 Marble Bar Project for the period 1 January 2018 to 31 |
| A119726 | 2019 | Calidus Resources Limited | Warrawoona | 3.6% | Annual Report C30/2007 Warrawoona Project For the Period 1 January 2018 to 31 December 2018 |
| A120990 | 2019 | Haoma Mining Nl | E45/3655 | <1% | Annual Report E45/3655 for the period 4 July 2018 to 3 July 2019 |
| A121676 | 2019 | Lmtd Comet East Pty Ltd | Comet East | <1% | Comet East Annual Report E45/03956 for the period 7 August 2018 to 6 August 2019 |
| A116463 | 2018 | Calidus Resources Limited | Warrawoona | 4.8% | Annual Report C30/2007 Warrawoona Project for the period 1 January 2017 to 31 December 2017, M45/00552, M45/00 |
| A116267 | 2018 | Nullagine Gold Pty Ltd | Marble Bar | <1% | Combined Annual Mineral Exploration Report for Combined Reporting Group C121/2012 of the Marble Bar Project Fo |
| A116692 | 2018 | Haoma Mining Nl | Marble Bar | <1% | Marble Bar Project C281/1997 Annual Report for the period 1 December 2016 to 30 November 2017 |
| A117623 | 2018 | Haoma Mining Nl | E45/3655 | <1% | Annual Report on E45/3655, 04 July 2017 - 03 July 2018 |
| A117883 | 2018 | Lmtd Comet East Pty Ltd | Comet East | <1% | Annual Report for E45/3956 Comet East Project for the period 7 August 2017 to 6 August 2018 |
| A112524 | 2017 | Haoma Mining Nl | Marble Bar | <1% | Marble Bar Project C281/1997 Annual Report for the period 01/12/2015 to 30/11/2016, E45/03940....P45/02958 |
| A113889 | 2017 | Nullagine Gold Pty Ltd | Marble Bar | <1% | Final Surrender Report for Exploration Licence E45/3678 For the Period 15 November 2011 to 24 February 2017 |
| A113998 | 2017 | Beatons Creek Gold Pty Ltd | Warrawoona | <1% | Combined Annual Mineral Exploration Report: Warrawoona Project C237/2011 for the period 17 March 2016 to 16 Ma |
| A114623 | 2017 | Haoma Mining Nl | Fieldings Ridge | <1% | Fieldings Ridge E45/3655 Annual Report For the Period 4 July 2016 to 3 July 2017 |
| A112629 | 2017 | Nullagine Gold Pty Ltd | Marble Bar | 1.5% | Combined Annual Mineral Exploration Report Marble Bar Project For Combined Reporting Group C121/2012 For the P |
| A108308 | 2016 | Haoma Mining Nl | Marble Bar Group 2 | 3.4% | Marble Bar Project Annual Report C281/1997 for the period 1 December 2014 to 30 November 2015 |
| A108029 | 2016 | Haoma Mining Nl | Warrawoona | 9.6% | E45/1249 Final Surrender Report |
| A108297 | 2016 | Nullagine Gold Pty Ltd | Marble Bar | 1% | Combined Annual Mineral Exploration Report Marble Bar Project For Combined Reporting Group C121/2012 Report Pe |
| A110003 | 2016 | Haoma Mining Nl | Fieldings Ridge | <1% | FIELDINGS RIDGE E45/3655 Annual Report for the period 4 July 2015 to 3 July 2016 |
| A104755 | 2015 | Haoma Mining Nl | Marble Bar | 3.4% | C281/1997 Marble Bar Project, Group 2, Annual Report for the Period 1 December 2013 – 30 November 2014, E45/12 |
| A105373 | 2015 | Nullagine Gold Pty Ltd | Marble Bar | 1% | Combined Annual Mineral Exploration Report Marble Bar Project For combined reporting group C121/2012 During th |
| A106500 | 2015 | Haoma Mining Nl | Fieldings Ridge | <1% | ANNUAL REPORT For the Period 4 July 2014 to 3 July 2015 FIELDINGS RIDGE E45/3655 |
| A101205 | 2014 | Haoma Mining Nl | Marble Bar | 4.5% | Marble Bar Project C281/1997 Group 2 Annual Report for the period 1 December 2012 to 30 November 2013, E45/124 |
| A101801 | 2014 | Nullagine Gold Pty Ltd | Marble Bar | <1% | Marble Bar Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/3674-3676, 3678, 3717 & 4169; P |
| A102152 | 2014 | Interquip Pty Ltd | Sandy Well | 10% | Final Surrender Report, Sandy Well Project, E45/2755,for the period 30 March 2007 to 29 March 2014. |
| A103213 | 2014 | Haoma Mining Nl | Fieldings Ridge | <1% | E45/3655 Fieldings Ridge Project Annual Report for the period 4 July 2013 to 3 July 2014 |
| A96316 | 2013 | Haoma Mining Nl | Marble Bar | 3% | Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14...... |
| A98024 | 2013 | Interquip Pty Ltd | Sandy Well | 10% | Annual Report Sandy Well E45/2755 East Pilbara Shire Western Australia For the period 30 March 2012 to 29 Marc |
| A96834 | 2013 | Mithril Resources Ltd | Cutting Creek 1 - Cutting Creek 2 | 14% | E45/3470 and E45/3471 Cutting Creek 1 and 2, Combined Annual Report, year ending 30 November 2012 |
| A97366 | 2013 | Nullagine Gold Pty Ltd | Marble Bar | <1% | Marble Bar Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3674-3676, E45/3678 & E45/3717; |
| A98903 | 2013 | Haoma Mining Nl | Fieldings Ridge | <1% | E45/3655 Fieldings Ridge Annual Report for the period 4 July 2012 to 3 July 2013 |
| A92772 | 2012 | Mithril Resources Ltd | Cutting Creek 1 - Cutting Creek 2 | 14% | E45/3470 and E45/3471 Cutting Creek 1 and Cutting Creek 2 Year 1 Combined Annual Report for the period 27 Octo |
| A93903 | 2012 | Haoma Mining Nl | Marble Bar | 3% | C281/1997 Marble Bar Project (Group 2) Annual Report for the Period 1December 2010 – 30 November 2011, Marble |
| A95318 | 2012 | Haoma Mining Nl | Fieldings Ridge | <1% | Exploration Licence E45/3655 Fieldings Ridge Annual Report for the period 4 July 2011 to 3 July 2012 |
| A94558 | 2012 | Interquip Pty Ltd | Sandy Well | 10% | Annual Report Sandy Well E45/2755 For the period 30th March 2011 to 29th March 2012 |
| A89862 | 2011 | Haoma Mining Nl | Marble Bar | 3% | Marble Bar (Group 2), Annual Report for the Period 1 December 2009 – 30 November 2010, C281/1997 |
| A90446 | 2011 | Interquip Pty Ltd | Sandy Well | 10% | Sandy Well Project, Annual Report for the period ending 29th March 2011, E45/2755. |
| A90448 | 2011 | Interquip Pty Ltd | Sandy Well | 10% | Sandy Well Project, Partial Surrender Report for the period 30th March 2007 to 26th March 2011, E45/2755. |
| A86464 | 2010 | Haoma Mining Nl | Marble Bar (Group 2) | 2.9% | Marble Bar (Group 2) Annual Report for the Period 1 December 2007 – 30 November 2008 |
| A87105 | 2010 | Interquip Pty Ltd | Sandy Well | 10% | Annual Report, Sandy Well, E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 29/03/2010 |
| A87106 | 2010 | Interquip Pty Ltd | Sandy Well | 10% | Partial Surrender Report,Sandy Well E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 2 |
| A87347 | 2010 | Gondwana Resources Ltd | Comet East | 50% | Final Surrender Report Comet East Project, Tenement E45/2480, Period covered to 1st May 2010 |
| A83045 | 2009 | Gondwana Resources Ltd | Comet East | 50% | Annual and Partial Surrender report for the Comet East Project Period ending 1st of May 2009 |
| A83099 | 2009 | Interquip Pty Ltd | Sandy Well | 10% | Annual Report E45/2755 For Period Ending 16 June 2009 |
| A79135 | 2008 | Gondwana Resources Ltd | Comet East | 50% | ANNUAL REPORT Comet East Project Tenement E45/2480 East Pilbara Region Period covered 1 May 2007 to 30 April 2 |
| A78048 | 2008 | Haoma Mining Nl | Marble Bar | 2.5% | MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2006 - 30 NOVEMBER 2007, GROUP: CMER281/1997 TENE |
| A74735 | 2007 | Haoma Mining Nl | Marble Bar (Group 2) | 4.3% | Marble Bar (Group 2) Project C281/1997 Annual Report for the Period 1 Dec 2006 - 30 Nov 2006 Report No.03-02-2 |
| A72192 | 2006 | Haoma Mining Nl | Fortuna/Salgash | 18% | Fortuna/Salgash Project E45/2145, Surrender Report 2005, Combined Reporting No. C281/1997, (Haoma Report No. 0 |
| A72844 | 2006 | Haoma Mining Nl | Marble Bar (Group 2) | 6.2% | Marble Bar(Group 2), Annual Report for the Period 1 December 2004 to 30 November 2005, Combined Reporting No. |
| A69739 | 2005 | Haoma Mining Nl | Fortuna- Salgash | 9.6% | E45/1249, Fortuna- Salgash Project, Partial Surrender Report for the period 15/09/1992 to 10/08/2004. |
| A70559 | 2005 | Haoma Mining Nl | Marble Bar (Group 2) | 4.3% | Annual report for the period 01/12/03 - 30/11/04 Marble Bar (Group 2) Project, C281/1997, E45/1249, 1273, E45/ |
| A68392 | 2004 | Haoma Mining Nl | Marble Bar | 2.2% | Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/ |
| A68837 | 2004 | Haoma Mining Nl | Fortuna - Salgash | 18% | Tenement E45/2145 - Fortuna/ Salgash - Pilbara region Marble Bar 1:250 000 sheet, partial surrender report (15 |
| A66284 | 2003 | Haoma Mining Nl | Marble Bar | 2.3% | Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2 |
| A67148 | 2003 | Elazac Mining Pty Ltd | Fortuna Salgash | 18% | Partial Surrender of E45/2145 Fortuna/ Salgash Project |
| A64172 | 2002 | Haoma Mining Nl | Marble Bar | <1% | Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4 |
| A62138 | 2001 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606, |
| A60049 | 2000 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607, |
| A57524 | 1999 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08 |
| A58651 | 1999 | Stockdale Prospecting Ltd | Marble Bar | 1.5% | Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998 |
| A54110 | 1998 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8. |
| A52156 | 1997 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Annual report for period ending 30/11/96 Group 2:Marble Bar |
| A48896 | 1996 | Cra Exploration Pty Ltd | Marble Bar | <1% | Annual Exploration Report for E45/1559 Marble Bar 2 Year Ending 13/08/1996 Marble Bar SF50-08 Western Australi |
| A52158 | 1995 | Wmc Resources Ltd | Marble Bar | <1% | Technical Report 14/05/95-21/09/95 Marble Bar Project Report No:3 Mickey's Find/Normay E45/1556 E45/1903 M45/6 |
| A52159 | 1995 | Wmc Resources Ltd | Marble Bar | <1% | Technical Report 14/05/95-21/09/95 Marble Bar Project Mickey's Find/Normay E45/1556 E45/1903 M45/665 M45/650 E |
| A42266 | 1994 | Fortuna Nl | Wymans Well | 9.6% | Annual Report for the period 15/09/93-14/09/94 Wymans Well Project E45/1249 |
| A39412 | 1993 | Fortuna Nl | Wymans Well | 9.6% | Annual Report for the period 09/92-09/93 Wymans Well Project E45/1249 |
| A35765 | 1992 | Mim Exploration Pty Ltd | Nardoo | 1.8% | Nardoo Project,1990/1991 Annual & Final Surrender Report, March 1992, E45/950. |
| A14134 | 1984 | Bp Minerals Aust Pty Ltd | Coronation Ridge | 3.2% | Coronation Ridge Project, Annual Report for the period ending 31st March 1984, GML45/1717-1724; MC45/9809-9809 |
| A15559 | 1984 | Callina Nl | Just In Time | 4.3% | The Just In Time Gold Prospect, Pilbara Goldfield. P.Ls 45/107 to 45/126. November 1983 - September 1984 |
| A4189 | 1970 | Bamboo Creek Gold Mines Nl | Fielding's Gully - Split Rock | <1% | Fielding Gully - Split Rock Project, Non-statutory Report: Prospectus Report : The Geology of the Fielding's G |
| A81837 | 1753 | Haoma Mining Nl | MARBLE BAR (Group 2) | 2.9% | MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2007 – 30 NOVEMBER 2008 |
| A105966 | Archean Biosphere Drilling Project | 6.3% | Archean Biosphere Drilling Project 2003 and 2004. Drillhole locations and Drill Logs ABDP1-ABDP6 inclusive. AB |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 29 Mar 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 45/6547 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 45/6547? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.