E 45/5834
Register summary
- Holder
- Haoma Mining Nl
- Local government
- Shire of East Pilbara
- Application received
- 9 Nov 2020
- Commenced
- 11 May 2023
- Expiry
- 10 May 2028
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A138816 | 2024 | Valorem Resources Pty Ltd | SPEAR HILL | <1% | Partial Surrender Report E 45/4713 Spear Hill For the period ending 23/10/2023 |
| A126154 | 2021 | Atlas Iron Pty Ltd | Mount Webber | <1% | Final Surrender Report for Tenement E45/4595 for the period 24 February 2016 to 19 January 2021 |
| A122720 | 2020 | Haoma Mining Nl; Elazac Mining Pty Ltd | Hillside - Soansville | <1% | Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019 |
| A124033 | 2020 | Atlas Iron Pty Ltd | Mount Webber | <1% | Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2020 |
| A125521 | 2020 | Atlas Iron Pty Ltd | Mount Webber | 17% | Final Surrender Report for Tenement E45/4540 Mount Webber for the period ending 20/10/2020 |
132 more reports
| A122392 | 2020 | Sayona Lithium Pty Ltd | Cooglegong | 50% | Annual Report, Cooglegong Project E45/4738 for the period 30 October 2018 to 29 October 2019 |
| A122711 | 2020 | Rear M | Smith Bore | <1% | Annual Report for Smith Bore Project E45/04713 for the period 24 October 2018 to 23 October 2019 |
| A124034 | 2020 | Atlas Iron Pty Ltd | Mount Webber | 9.5% | Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2020 |
| A124257 | 2020 | Cttr Gold Pty Ltd | Marshall Creek | 11% | Final Surrender Report Marshall Creek Project E45/2020 for the period ending 06/01/2020 |
| A125088 | 2020 | Haoma Mining Nl | Spear Hill | 12% | C145/2016 Spear Hill Annual Report for the period ending 21/09/2020 |
| A125698 | 2020 | Rear M | Smith Bore | <1% | Annual Report for Smith Bore Project E 45/04713 for the period 24 October 2019 to 23 October 2020 |
| A119040 | 2019 | Sayona Mining Limited | Cooglegong | 50% | Cooglegong Lithium Project E45/04738 Annual Technical Report for the period 30 October 2017 to 29 October 2018 |
| A119187 | 2019 | Haoma Mining Nl; Elazac Mining Pty Ltd | Soansville | <1% | Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018 |
| A120318 | 2019 | Atlas Iron Pty Ltd | Mount Webber | <1% | Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2019, E 45/02922, M45/01197, E45/04 |
| A121649 | 2019 | Haoma Mining Nl | Spear Hill | 12% | Annual Report For C145/2016 (Spear Hill) for the period 22 September 2018 to 21 September 2019, P45/02973, E45 |
| A120321 | 2019 | Atlas Iron Pty Ltd | Mount Webber | 9.5% | Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2019, M45/01209, P45/02822, E45/04 |
| A120960 | 2019 | Wodgina Lithium Pty Ltd | Shaw River | <1% | Final Surrender Report Shaw River E45/4762 for the period 13/7/2018 to 20/5/2019 |
| A120962 | 2019 | Wodgina Lithium Pty Ltd | Shaw River | <1% | Final Surrender Report Shaw River E45/4763 for the period 13/7/2018 to 20/5/2019 |
| A116690 | 2018 | Haoma Mining Nl | Soansville | <1% | C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/ |
| A117091 | 2018 | Atlas Iron Limited | Mount Webber | 9.3% | Mt Webber Combined Annual Report (C187/2012) for the Period 30 March 2017 to 29 March 2018, E45/04269, E45/045 |
| A117094 | 2018 | Atlas Iron Limited | Mount Webber | <1% | Mt Webber Combined Annual Report (C71/2003) for the Period 30 March 2017 to 29 March 2018, E45/02922, M45/0119 |
| A118150 | 2018 | Haoma Mining Nl | Speak Hill | 12% | C145/2016 Speak Hill Project Annual Report for the period 22 September 2017 to 21 September 2018, P45/02973, P |
| A112091 | 2017 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | <1% | North Pole Project C282/1997 Annual Report For the Period 1 December 2015 to 30 November 2016, E45/02532.....P |
| A114400 | 2017 | Atlas Iron Limited | Mount Webber | 9.3% | Annual Technical Report to the Department of Mines and Petroleum for Combined Reporting Group C187/2012 (Mt We |
| A112488 | 2017 | Haoma Mining Nl | Tambourah - Soansville - Mercury Hill - | <1% | C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/ |
| A114409 | 2017 | Atlas Iron Limited | Mount Webber | <1% | C71/2003 Annual Tenement Report for the Period 30th March 2016 to 29th March 2017, E45/02922, M45/01197, P45/0 |
| A115237 | 2017 | Haoma Mining Nl | Spear Hill | 12% | C145/2016 Spear Hill Project Annual Report for the period 22 September 2016 to 21 September 2017, E45/04586, E |
| A108265 | 2016 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | <1% | North Pole Project C282/1997 Annual Report 1 December 2014 to 30 November 2015, E 45/02532, E45/03930, E45/039 |
| A110280 | 2016 | Haoma Mining Nl | Spear Hill | 100% | Spear Hill Project P45/02973, P45/02974, P45/02975 Annual Report For the Period 22 September 2015 to 21 Septem |
| A108317 | 2016 | Haoma Mining Nl | Tambourah/Soansville/Mercury Hill/Tank H | <1% | Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015 |
| A109218 | 2016 | Atlas Iron Limited | Mount Webber | <1% | MT WEBBER PROJECT E45/2922, E45/3822, E45/4029, M45/1197, P45/2739, P45/2901, P45/2902, P45/2903, P45/2904, P4 |
| A104665 | 2015 | Haoma Mining Nl | Soansville - Tambourah - Jeff’s Hill - T | <1% | Soansville / Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual report for the period 1st December 20 |
| A107121 | 2015 | Fortescue Metals Group Ltd | Hillside | 21% | C129/2011 Hillside Final Surrender Report For the Period 1 March 2011 to 17 July 2015, E45/03445, E45/02861, E |
| A104877 | 2015 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | <1% | North Pole Project C282/1997 Group 3 Annual Report for the Period 1 December 2013 to 30 November 2014, E45/253 |
| A105489 | 2015 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project E45/2922‐I P45/2702‐I 2705‐I 2706‐I 2739‐I P45/2901‐I to P45/ 2904‐I & M45/1197‐I Annual Tec |
| A105490 | 2015 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project E45/2312‐I E45/2268‐I E45/3437‐I E45/4269‐I M45/1209‐I P45/2822 Annual Technical Report To t |
| A101203 | 2014 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1st December 2012 – 30th November 2013, M45/302 M45/328, M4 |
| A101206 | 2014 | Haoma Mining Nl | Soansville - Tambourah - Jeff’s | <1% | Soansville / Tambourah / Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2012 to 30th Nov |
| A101797 | 2014 | Lithex Resources Ltd | Shaw River | 14% | Shaw River Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/3354. |
| A102085 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I |
| A102086 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project E45/2312-I E45/2268-I E45/3437-I M45/1209-I P45/2822 to the Department of Mines and Petro |
| A103943 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014 |
| A104367 | 2014 | Fortescue Metals Group Ltd | Hillside | 12% | Hillside Project, Annual Report for the period 01/11/2013 to 31/10/2014, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A97299 | 2013 | Lithex Resources Ltd | Shaw River | 7.4% | Shaw River Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/3439 & 3354. [C33 |
| A97510 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2312 & 2268; M45/1209. [C187/20 |
| A100051 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29 |
| A100572 | 2013 | Fortescue Metals Group Ltd | Hillside | 12% | Annual Report for the Period 1 November 2012 to 31 October 2013, C129/2011 Hillside Project E45/2861, E45/2862 |
| A97509 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298 |
| A97703 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2 |
| A93517 | 2012 | Atlas Iron Ltd | Mount Webber | <1% | MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/ |
| A94689 | 2012 | Haoma Mining Nl | North Shaw | <1% | E45/2784 North Shaw Project Surrender Report 11th April 2007 - 10th April 2012 |
| A92895 | 2012 | Atlas Iron Ltd | Mount Webber | 2.2% | Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2012 |
| A95672 | 2012 | Haoma Mining Nl | North Shaw - Hillside | <1% | C71/2004 North Shaw/Hillside Project Annual Report E45/2955, E45/2784 for the period 1 August 2011 to 31 July |
| A96143 | 2012 | Fortescue Metals Group Ltd | Hillside | 12% | Hillside Project, Annual Report for the period 01/11/2011 to 31/10/2012, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A89779 | 2011 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011 |
| A89929 | 2011 | Atlas Iron Ltd | Mount Webber | 2.2% | Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2011 |
| A90433 | 2011 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project, Partial Surrender Report for the period 11th April 2007 to 28th March 2011, E45.2784. (C71 |
| A92137 | 2011 | Lithex Resources Ltd | E45/3354 | 14% | Annual Report E 45/3439 Shaw River for the Period 1 December 2010 – 30 November 2011 |
| A91705 | 2011 | Haoma Mining Nl | North Shaw | <1% | Annual report for the period 1st August 2010 to 31st July 2011, Combined Reporting Group C71/2004, North Shaw |
| A88569 | 2010 | Haoma Mining Nl | North Shaw | 1% | Annual report for the period 1st August 2009 to 31st July 2010, Combined Reporting Group C70/2000, North Shaw |
| A86431 | 2010 | Atlas Iron Ltd | Mount Webber | 2.2% | Mount Webber E45/2268, Annual Report for the period 30/01/2009 – 29/01/2010 |
| A86548 | 2010 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010 |
| A87562 | 2010 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2784 Surrender Report, From 11 April 2007 to 10 April 2010 |
| A81669 | 2009 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009 |
| A80143 | 2008 | Haoma Mining Nl | North Shaw | 1% | ANNUAL REPORT FOR THE PERIOD 29 JULY 2007 1 AUGUST 2008 |
| A80593 | 2008 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003 |
| A76646 | 2007 | Haoma Mining Nl | North Shaw | 1.3% | NORTH SHAW PROJECT ANNUAL REPORT FOR THE PERIOD 31 JULY 2006 - 1 AUGUST 2007 |
| A75860 | 2007 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29 |
| A72610 | 2006 | Giralia Resources Nl | Daltons | <1% | E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20 |
| A73912 | 2006 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2188-2189, Annual Report for the Period 31 July 2005 to 1 August 2006, Combined Reporti |
| A70820 | 2005 | Haoma Mining Nl | North Shaw | 1.3% | North Shaw Project, E45/2188, Annual report for the period ending July 2005 (Report No. 05-02-2005-03, Marble |
| A71128 | 2005 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin |
| A68997 | 2004 | Giralia Resources Nl | Daltons | <1% | Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187 |
| A69093 | 2004 | Haoma Mining Nl | North Shaw Gold Mining Centre | 1.3% | Annual Report for the Period 05/04/2003 to 05/04/2004 North Shaw Gold Mining Centre E45/2188 |
| A68392 | 2004 | Haoma Mining Nl | Marble Bar | <1% | Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/ |
| A68393 | 2004 | Haoma Mining Nl | Marble Bar | 1.5% | E45/1615 - Surrender report Marble Bar - East Pilbara District (14/04/2004) |
| A66205 | 2003 | Haoma Mining Nl | North Shaw | 45% | Tenement E45/2062, North Shaw , East Pilbara Region, Surrender Report February 2003. |
| A66209 | 2003 | Haoma Mining Nl | North Shaw | 15% | TENEMENT E45/2063 -North Shaw- East Pilbara Region Surrender Report - February 2003 |
| A66284 | 2003 | Haoma Mining Nl | Marble Bar | <1% | Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2 |
| A66961 | 2003 | Giralia Resources Nl | Daltons | <1% | E45/2186, Daltons Project, Annual Technical Report for 12 months ending 4 March 2003. |
| A67027 | 2003 | Haoma Mining Nl | North Shaw | 1.3% | Annual Report for the period ending 05/06/2003 E45/2188 North Shaw East Pilbara District |
| A67049 | 2003 | Giralia Resources Nl | Daltons | <1% | Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187 |
| A66632 | 2003 | Geotech International Pty Ltd | Hillside | <1% | E45/2255, Hillside, Annual Report to 3 January 2003 and Final and urrender Report to 7 April 2003. |
| A64172 | 2002 | Haoma Mining Nl | Marble Bar | 5.7% | Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4 |
| A65028 | 2002 | De Beers Australia Exploration Ltd | North Shaw | 1.3% | Annual Report for Exploration Licence 45/2188 May 2002. |
| A61722 | 2001 | Stockdale Prospecting Ltd | Hillside | 1.9% | 2000 Final Report for Exploration Licence 45/2137 February 2001 |
| A62138 | 2001 | Haoma Mining Nl | Marble Bar | 5.7% | Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606, |
| A59703 | 2000 | Haoma Mining Nl | Lalla Rookh - North Pole | 1.4% | Group 3, Lalla Rookh -North Pole, Tenements E45/1453 and E45/1513, Partial Surrender Report for the period end |
| A60049 | 2000 | Haoma Mining Nl | Marble Bar | 7.8% | Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607, |
| A60184 | 2000 | Haoma Mining Nl | North Shaw | <1% | Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1 |
| A60185 | 2000 | Haoma Mining Nl | North Pole,Lalla Rookh,Callina Creek,Nor | <1% | North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M |
| A57391 | 1999 | Mr Johnston Lg | North Pole | 2.2% | North Pole - Surrender Report 1998 Exploration Licence: E45/1882 |
| A57524 | 1999 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08 |
| A58642 | 1999 | Haoma Mining Nl | North Shaw | 1.4% | Surrender Report E45/1453,1513 for period ending July 1999 ( North Shaw Project). |
| A58651 | 1999 | Stockdale Prospecting Ltd | Marble Bar | <1% | Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998 |
| A59335 | 1999 | Haoma Mining Nl | Marble Bar | <1% | Group 2 Marble Bar, Tenements E45/1606, 1607, 1608, 1614, 1615, Partial Surrender Report for the Period Ending |
| A54110 | 1998 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8. |
| A54804 | 1998 | Gold Partners Nl | Market Creek/ North Shaw | <1% | North Shaw Project, Market Creek,Partial Surrender Report for the period 15th September 1994 to 27th March1998 |
| A55536 | 1998 | Valdrew Nominees Pty Ltd | Spear Hill | <1% | Surrender Report M45/690 Spear Hill Tin Prospect, July 1998. |
| A54106 | 1998 | Haoma Mining Nl | North Pole, Lala Rookh, Callina Creek, N | <1% | Group3 - North Pole, Lala Rookh, Callina Creek, Normay, & Mickeys Find. Annual report for the period ending 11 |
| A52601 | 1997 | Reynard Australia Pty Ltd | Shaw River | <1% | Shaw River Project, Non -statutory Report for period 22nd July 1996 to 22nd July 1997, M45/690(Spear Hill), & |
| A53072 | 1997 | Geographe Resources Ltd | North Shaw | 1% | North Shaw Project, Annual Report for year ending 18th August 1997, E45/1453, 1513, & 1600. |
| A52156 | 1997 | Haoma Mining Nl | Marble Bar (Group 2) | <1% | Annual report for period ending 30/11/96 Group 2:Marble Bar |
| A49396 | 1996 | Gold Partners Nl | North Shaw | <1% | Market Creek Project Annual Report E45/1513 for Period 15/09/1995 to 14/09/1996, Soil Sampling, Geological Map |
| A49398 | 1996 | Gold Partners Nl | North Shaw | 1.5% | North Shaw Project, Annual Report E45/1453, 1600, 2130 and 2131for the year ending August 30th 1996. |
| A52157 | 1996 | Bhp Minerals Pty Ltd | Bamboo Creek | <1% | Bamboo Creek Project Final Report CR8769 September 1996 |
| A47858 | 1996 | Valdrew Nominees Pty Ltd | Spear Hill | 52% | Spear Hill Project, Partial Surrender Report,May 1996, E45/1475. |
| A46198 | 1995 | Gold Partners Nl | Market Creek | <1% | Market Creek Project, Annual Report E45/1513 for the year ending September 14th 1995. |
| A46082 | 1995 | Gold Partners Nl | North Shaw | 2.3% | North Shaw Project, Annual Report Exploration Licences E45/1037&1453 ; Prospecting Licences P45/2130 & 2131 fo |
| A40371 | 1994 | Mt Edon Gold Mines Nl | Shaw River | 7% | Shaw River Project, Annual Report for the period 01/09/1993 to 01/09/1994, E45/1219 -1221. |
| A41760 | 1994 | Gold Partners Nl | North Shaw | 2.3% | North Shaw Project, Annual Report for the year ending 30th August 1994, E45/1037, 1453, 2130 & 2131. |
| A43234 | 1994 | Mt Edon Gold Mines Nl | Shaw River | 7% | Annual report for the period 09/93-09/94 Shaw River Project E45/1219 E45/1220 E45/1221 |
| A28619 | 1989 | Hooker Mining Pty Ltd | White Quartz Hill | <1% | White Quartz Hill Project, Non-statutory Report: Mineralogical Analysis of Beryllium Rich Permatite Samples f |
| A28379 | 1989 | Greenex Ltd | Shaw River | 10% | Shaw River Project, Non-statutory Report: Thin Sections & Sample Data, July 1987, M45/20, 44, 46, 81, 260-261, |
| A28385 | 1989 | Greenex Ltd | Pilbara | 13% | Pilbara, 1989, Feasibility Study, E45/327. |
| A28378 | 1989 | Greenex Ltd | Shaw River | 10% | Shaw River Project, Non-statutory Report: Exploration Report , February 1989, M45/20, 44, 46, 81, 260-261, 287 |
| A29227 | 1989 | Lynas Gold Nl | Daltons | 4.4% | Report on rock chip sampling program, Daltons Creek area, 1989, P45/1755-1764, P45/1768-1770, P45/1772-1773, P |
| A22310 | 1988 | Greenex Ltd | Pilbara | 15% | Pilbara Tin - Tantalum - Rare Earth Project, Annual report January 1988 |
| A25218 | 1988 | Greenbushes Ltd | Hartigans, Spear Hill | 10% | [ Shaw River tin-tantalum - rare earth exploration, Hartigans and Spear Hill, Non-statutory report, E45/327 ] |
| A28387 | 1988 | Greenex Ltd | Pilbara | 10% | Pilbara, Mining Feasibility Study and Cost Analysis, December 1988. |
| A32422 | 1988 | Greenbushes Ltd | Pilbara | 15% | Pilbara Project,1987 Annual Report, January 1988, E45/327, P500-510,513-519,615-617,621-626, 863,1504-1507,151 |
| A24569 | 1988 | Greenbushes Ltd | Shaw River - Pilbara | 16% | Pilbara Tin Tantalum Rare Earth Project, Pre feasibility study, April 1988, E45/327; P45/864-865, 1041-1042, 1 |
| A19220 | 1987 | Greenex Ltd | Shaw River - Pilbara | 17% | Pilbara Tin, Tantalum, Rare Earth Project, Progress [annual] report, December 1986, E45/327, M45/20...45/81, P |
| A16921 | 1985 | Greenex Ltd | Pilbara | 3.2% | Pilbara Project, Annual Report for the period ending 31/12/1985, M45/81;P45/500-510, 513-519, P45/615-618,621- |
| A16386 | 1985 | Greenex Ltd | Spear Hill, Pilbara | 28% | Pilbara Project, Annual Report for the period 25/07/1984 to 25/07/1985, E45/327. |
| A15930 | 1984 | Kincora Pty Ltd | Shaw River | 13% | Shaw River Project, Annual Report for the period ending 31/12/1984, P45/618, 621-626. |
| A11222 | 1982 | Greenex Ltd | Pilbara | 19% | Pilbara Project, Non-statutory Report: Progress Report, February 1982, ( Tenement Schedule , see page 61). |
| A10398 | 1981 | Greenex Ltd | Spear Hill | 53% | Spear Hill Project, Non-statutory Report: Spear Hill Exploration Programme,for the period July-December 1979, |
| A8135 | 1977 | Straits Trading Co Ltd | Spear Hill | 27% | Spear Hill Project, Non-statutory Report: Exploration Report , September to November 1977, DC45/202........... |
| A4796 | 1974 | Cooglegong Tin Pty Ltd | Spear Hill | 53% | Spear Hill Project, Non-statutory Report: Assessment Report, February 1967, MC45/615-616, 827-828, 930-935, 98 |
| A4797 | 1974 | Cooglegong Tin Pty Ltd | Spear Hill | 53% | Spear Hill Project, Non-statutory Report: Investigations of Alluvial Tin Deposits for the period ending 12th D |
| A2976 | 1972 | Placer Prospecting ( Australia) Pty Ltd | Spear Hill | 53% | Spear Hill Project, Non-statutory Report: Brief Exploration Report for the period ending 31/12/1970, DC45/378- |
| A60803 | 1970 | Placer Prospecting Pty Ltd | Spear Hill | 30% | Report of Investigation Cooglegong Tin Ltd. Claims Spear Hill, Pilbara Goldfield. 1970 |
| A2975 | 1970 | Placer Prospecting ( Australia) Pty Ltd | Hillside | 12% | Hillside Project, Non-statutory Report: Report of Investigation , February 1970, DC45/295-296, 298-299, 300, 3 |
| A4795 | 1968 | Placer Prospecting Pty Ltd | Hillside | 60% | Hillside Project, Non-statutory Report:Brief Exploration Report, June 1968, MC45/445-447; DC45/202-203. |
| A79126 | 1753 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH |
| A84776 | 1753 | Haoma Mining Nl | NORTH SHAW - HILLSIDE | 1% | NORTH SHAW/ HILLSIDE PROJECT, ANNUAL REPORT FOR THE PERIOD 31 JULY 2008 – 1 AUGUST 2009, E45/2188, E45/2784, E |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 19 months · 10 May 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 45/5834 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 45/5834? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.