NextMaps›WA Tenements›E 45/5834

E 45/5834

LiveExploration LicenceShire of East PilbaraMarble Bar District
Area
13,330ha
Expires
May 2028
in 19 months
WAMEX reports
137
WA median is 53
Report drilling
44
of 137 reports
East Pilbara Explore on the live map

Register summary

Holder
Haoma Mining Nl
Local government
Shire of East Pilbara
Application received
9 Nov 2020
Commenced
11 May 2023
Expiry
10 May 2028
Term
5 Years

Exploration history on this ground

137 historical WAMEX exploration reports intersect E 45/5834: 83 report geochemistry or sampling, 74 include a digital data package.
When this ground was worked · 135 of 137 reports dated
11960s
61970s
161980s
211990s
282000s
522010s
112020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A138816 2024 Valorem Resources Pty Ltd SPEAR HILL <1% Partial Surrender Report E 45/4713 Spear Hill For the period ending 23/10/2023
A126154 2021 Atlas Iron Pty Ltd Mount Webber <1% Final Surrender Report for Tenement E45/4595 for the period 24 February 2016 to 19 January 2021
A122720 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Hillside - Soansville <1% Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019
A124033 2020 Atlas Iron Pty Ltd Mount Webber <1% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2020
A125521 2020 Atlas Iron Pty Ltd Mount Webber 17% Final Surrender Report for Tenement E45/4540 Mount Webber for the period ending 20/10/2020
132 more reports
A122392 2020 Sayona Lithium Pty Ltd Cooglegong 50% Annual Report, Cooglegong Project E45/4738 for the period 30 October 2018 to 29 October 2019
A122711 2020 Rear M Smith Bore <1% Annual Report for Smith Bore Project E45/04713 for the period 24 October 2018 to 23 October 2019
A124034 2020 Atlas Iron Pty Ltd Mount Webber 9.5% Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2020
A124257 2020 Cttr Gold Pty Ltd Marshall Creek 11% Final Surrender Report Marshall Creek Project E45/2020 for the period ending 06/01/2020
A125088 2020 Haoma Mining Nl Spear Hill 12% C145/2016 Spear Hill Annual Report for the period ending 21/09/2020
A125698 2020 Rear M Smith Bore <1% Annual Report for Smith Bore Project E 45/04713 for the period 24 October 2019 to 23 October 2020
A119040 2019 Sayona Mining Limited Cooglegong 50% Cooglegong Lithium Project E45/04738 Annual Technical Report for the period 30 October 2017 to 29 October 2018
A119187 2019 Haoma Mining Nl; Elazac Mining Pty Ltd Soansville <1% Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018
A120318 2019 Atlas Iron Pty Ltd Mount Webber <1% Mt Webber Combined Annual Report (C71/2003) for the period ending 29 March 2019, E 45/02922, M45/01197, E45/04
A121649 2019 Haoma Mining Nl Spear Hill 12% Annual Report For C145/2016 (Spear Hill) for the period 22 September 2018 to 21 September 2019, P45/02973, E45
A120321 2019 Atlas Iron Pty Ltd Mount Webber 9.5% Mt Webber Combined Annual Report (C187/2012) for the period ending 29 March 2019, M45/01209, P45/02822, E45/04
A120960 2019 Wodgina Lithium Pty Ltd Shaw River <1% Final Surrender Report Shaw River E45/4762 for the period 13/7/2018 to 20/5/2019
A120962 2019 Wodgina Lithium Pty Ltd Shaw River <1% Final Surrender Report Shaw River E45/4763 for the period 13/7/2018 to 20/5/2019
A116690 2018 Haoma Mining Nl Soansville <1% C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/
A117091 2018 Atlas Iron Limited Mount Webber 9.3% Mt Webber Combined Annual Report (C187/2012) for the Period 30 March 2017 to 29 March 2018, E45/04269, E45/045
A117094 2018 Atlas Iron Limited Mount Webber <1% Mt Webber Combined Annual Report (C71/2003) for the Period 30 March 2017 to 29 March 2018, E45/02922, M45/0119
A118150 2018 Haoma Mining Nl Speak Hill 12% C145/2016 Speak Hill Project Annual Report for the period 22 September 2017 to 21 September 2018, P45/02973, P
A112091 2017 Haoma Mining Nl North Pole - Lalla Rookh - Callina Creek <1% North Pole Project C282/1997 Annual Report For the Period 1 December 2015 to 30 November 2016, E45/02532.....P
A114400 2017 Atlas Iron Limited Mount Webber 9.3% Annual Technical Report to the Department of Mines and Petroleum for Combined Reporting Group C187/2012 (Mt We
A112488 2017 Haoma Mining Nl Tambourah - Soansville - Mercury Hill - <1% C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/
A114409 2017 Atlas Iron Limited Mount Webber <1% C71/2003 Annual Tenement Report for the Period 30th March 2016 to 29th March 2017, E45/02922, M45/01197, P45/0
A115237 2017 Haoma Mining Nl Spear Hill 12% C145/2016 Spear Hill Project Annual Report for the period 22 September 2016 to 21 September 2017, E45/04586, E
A108265 2016 Haoma Mining Nl North Pole - Lalla Rookh - Callina Creek <1% North Pole Project C282/1997 Annual Report 1 December 2014 to 30 November 2015, E 45/02532, E45/03930, E45/039
A110280 2016 Haoma Mining Nl Spear Hill 100% Spear Hill Project P45/02973, P45/02974, P45/02975 Annual Report For the Period 22 September 2015 to 21 Septem
A108317 2016 Haoma Mining Nl Tambourah/Soansville/Mercury Hill/Tank H <1% Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015
A109218 2016 Atlas Iron Limited Mount Webber <1% MT WEBBER PROJECT E45/2922, E45/3822, E45/4029, M45/1197, P45/2739, P45/2901, P45/2902, P45/2903, P45/2904, P4
A104665 2015 Haoma Mining Nl Soansville - Tambourah - Jeff’s Hill - T <1% Soansville / Tambourah /Jeff’s Hill / Tank Hill Project C283/1997 Annual report for the period 1st December 20
A107121 2015 Fortescue Metals Group Ltd Hillside 21% C129/2011 Hillside Final Surrender Report For the Period 1 March 2011 to 17 July 2015, E45/03445, E45/02861, E
A104877 2015 Haoma Mining Nl North Pole - Lalla Rookh - Callina Creek <1% North Pole Project C282/1997 Group 3 Annual Report for the Period 1 December 2013 to 30 November 2014, E45/253
A105489 2015 Atlas Iron Ltd Mount Webber <1% Mt Webber Project E45/2922‐I P45/2702‐I 2705‐I 2706‐I 2739‐I P45/2901‐I to P45/ 2904‐I & M45/1197‐I Annual Tec
A105490 2015 Atlas Iron Ltd Mount Webber <1% Mt Webber Project E45/2312‐I E45/2268‐I E45/3437‐I E45/4269‐I M45/1209‐I P45/2822 Annual Technical Report To t
A101203 2014 Haoma Mining Nl North Pole <1% North Pole (Group 3), Annual Report for the Period 1st December 2012 – 30th November 2013, M45/302 M45/328, M4
A101206 2014 Haoma Mining Nl Soansville - Tambourah - Jeff’s <1% Soansville / Tambourah / Jeff’s Hill / Tank Hill Project C283/1997 Annual Report 1st December 2012 to 30th Nov
A101797 2014 Lithex Resources Ltd Shaw River 14% Shaw River Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/3354.
A102085 2014 Atlas Iron Ltd Mount Webber <1% Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I
A102086 2014 Atlas Iron Ltd Mount Webber <1% Mount Webber Project E45/2312-I E45/2268-I E45/3437-I M45/1209-I P45/2822 to the Department of Mines and Petro
A103943 2014 Atlas Iron Ltd Mount Webber <1% Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014
A104367 2014 Fortescue Metals Group Ltd Hillside 12% Hillside Project, Annual Report for the period 01/11/2013 to 31/10/2014, E45/2860-2862, 2867, 2946, 3328, 3412
A97299 2013 Lithex Resources Ltd Shaw River 7.4% Shaw River Project, Annual Report for the period 1st January 2012 to 31st December 2012, E45/3439 & 3354. [C33
A97510 2013 Atlas Iron Ltd Mount Webber <1% Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2312 & 2268; M45/1209. [C187/20
A100051 2013 Atlas Iron Ltd Mount Webber <1% Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29
A100572 2013 Fortescue Metals Group Ltd Hillside 12% Annual Report for the Period 1 November 2012 to 31 October 2013, C129/2011 Hillside Project E45/2861, E45/2862
A97509 2013 Atlas Iron Ltd Mount Webber <1% Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298
A97703 2013 Atlas Iron Ltd Mount Webber <1% Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2
A93517 2012 Atlas Iron Ltd Mount Webber <1% MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/
A94689 2012 Haoma Mining Nl North Shaw <1% E45/2784 North Shaw Project Surrender Report 11th April 2007 - 10th April 2012
A92895 2012 Atlas Iron Ltd Mount Webber 2.2% Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2012
A95672 2012 Haoma Mining Nl North Shaw - Hillside <1% C71/2004 North Shaw/Hillside Project Annual Report E45/2955, E45/2784 for the period 1 August 2011 to 31 July
A96143 2012 Fortescue Metals Group Ltd Hillside 12% Hillside Project, Annual Report for the period 01/11/2011 to 31/10/2012, E45/2860-2862, 2867, 2946, 3328, 3412
A89779 2011 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011
A89929 2011 Atlas Iron Ltd Mount Webber 2.2% Mt Webber Project E45/2268 Annual Technical Report to DMP Period Ending 29 January 2011
A90433 2011 Haoma Mining Nl North Shaw <1% North Shaw Project, Partial Surrender Report for the period 11th April 2007 to 28th March 2011, E45.2784. (C71
A92137 2011 Lithex Resources Ltd E45/3354 14% Annual Report E 45/3439 Shaw River for the Period 1 December 2010 – 30 November 2011
A91705 2011 Haoma Mining Nl North Shaw <1% Annual report for the period 1st August 2010 to 31st July 2011, Combined Reporting Group C71/2004, North Shaw
A88569 2010 Haoma Mining Nl North Shaw 1% Annual report for the period 1st August 2009 to 31st July 2010, Combined Reporting Group C70/2000, North Shaw
A86431 2010 Atlas Iron Ltd Mount Webber 2.2% Mount Webber E45/2268, Annual Report for the period 30/01/2009 – 29/01/2010
A86548 2010 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010
A87562 2010 Haoma Mining Nl North Shaw <1% North Shaw Project E45/2784 Surrender Report, From 11 April 2007 to 10 April 2010
A81669 2009 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009
A80143 2008 Haoma Mining Nl North Shaw 1% ANNUAL REPORT FOR THE PERIOD 29 JULY 2007 1 AUGUST 2008
A80593 2008 Giralia Resources Nl Daltons <1% Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003
A76646 2007 Haoma Mining Nl North Shaw 1.3% NORTH SHAW PROJECT ANNUAL REPORT FOR THE PERIOD 31 JULY 2006 - 1 AUGUST 2007
A75860 2007 Giralia Resources Nl Daltons <1% E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29
A72610 2006 Giralia Resources Nl Daltons <1% E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20
A73912 2006 Haoma Mining Nl North Shaw <1% North Shaw Project E45/2188-2189, Annual Report for the Period 31 July 2005 to 1 August 2006, Combined Reporti
A70820 2005 Haoma Mining Nl North Shaw 1.3% North Shaw Project, E45/2188, Annual report for the period ending July 2005 (Report No. 05-02-2005-03, Marble
A71128 2005 Giralia Resources Nl Daltons <1% E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin
A68997 2004 Giralia Resources Nl Daltons <1% Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187
A69093 2004 Haoma Mining Nl North Shaw Gold Mining Centre 1.3% Annual Report for the Period 05/04/2003 to 05/04/2004 North Shaw Gold Mining Centre E45/2188
A68392 2004 Haoma Mining Nl Marble Bar <1% Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/
A68393 2004 Haoma Mining Nl Marble Bar 1.5% E45/1615 - Surrender report Marble Bar - East Pilbara District (14/04/2004)
A66205 2003 Haoma Mining Nl North Shaw 45% Tenement E45/2062, North Shaw , East Pilbara Region, Surrender Report February 2003.
A66209 2003 Haoma Mining Nl North Shaw 15% TENEMENT E45/2063 -North Shaw- East Pilbara Region Surrender Report - February 2003
A66284 2003 Haoma Mining Nl Marble Bar <1% Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2
A66961 2003 Giralia Resources Nl Daltons <1% E45/2186, Daltons Project, Annual Technical Report for 12 months ending 4 March 2003.
A67027 2003 Haoma Mining Nl North Shaw 1.3% Annual Report for the period ending 05/06/2003 E45/2188 North Shaw East Pilbara District
A67049 2003 Giralia Resources Nl Daltons <1% Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187
A66632 2003 Geotech International Pty Ltd Hillside <1% E45/2255, Hillside, Annual Report to 3 January 2003 and Final and urrender Report to 7 April 2003.
A64172 2002 Haoma Mining Nl Marble Bar 5.7% Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4
A65028 2002 De Beers Australia Exploration Ltd North Shaw 1.3% Annual Report for Exploration Licence 45/2188 May 2002.
A61722 2001 Stockdale Prospecting Ltd Hillside 1.9% 2000 Final Report for Exploration Licence 45/2137 February 2001
A62138 2001 Haoma Mining Nl Marble Bar 5.7% Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606,
A59703 2000 Haoma Mining Nl Lalla Rookh - North Pole 1.4% Group 3, Lalla Rookh -North Pole, Tenements E45/1453 and E45/1513, Partial Surrender Report for the period end
A60049 2000 Haoma Mining Nl Marble Bar 7.8% Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607,
A60184 2000 Haoma Mining Nl North Shaw <1% Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1
A60185 2000 Haoma Mining Nl North Pole,Lalla Rookh,Callina Creek,Nor <1% North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M
A57391 1999 Mr Johnston Lg North Pole 2.2% North Pole - Surrender Report 1998 Exploration Licence: E45/1882
A57524 1999 Haoma Mining Nl Marble Bar (Group 2) <1% Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08
A58642 1999 Haoma Mining Nl North Shaw 1.4% Surrender Report E45/1453,1513 for period ending July 1999 ( North Shaw Project).
A58651 1999 Stockdale Prospecting Ltd Marble Bar <1% Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998
A59335 1999 Haoma Mining Nl Marble Bar <1% Group 2 Marble Bar, Tenements E45/1606, 1607, 1608, 1614, 1615, Partial Surrender Report for the Period Ending
A54110 1998 Haoma Mining Nl Marble Bar (Group 2) <1% Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8.
A54804 1998 Gold Partners Nl Market Creek/ North Shaw <1% North Shaw Project, Market Creek,Partial Surrender Report for the period 15th September 1994 to 27th March1998
A55536 1998 Valdrew Nominees Pty Ltd Spear Hill <1% Surrender Report M45/690 Spear Hill Tin Prospect, July 1998.
A54106 1998 Haoma Mining Nl North Pole, Lala Rookh, Callina Creek, N <1% Group3 - North Pole, Lala Rookh, Callina Creek, Normay, & Mickeys Find. Annual report for the period ending 11
A52601 1997 Reynard Australia Pty Ltd Shaw River <1% Shaw River Project, Non -statutory Report for period 22nd July 1996 to 22nd July 1997, M45/690(Spear Hill), &
A53072 1997 Geographe Resources Ltd North Shaw 1% North Shaw Project, Annual Report for year ending 18th August 1997, E45/1453, 1513, & 1600.
A52156 1997 Haoma Mining Nl Marble Bar (Group 2) <1% Annual report for period ending 30/11/96 Group 2:Marble Bar
A49396 1996 Gold Partners Nl North Shaw <1% Market Creek Project Annual Report E45/1513 for Period 15/09/1995 to 14/09/1996, Soil Sampling, Geological Map
A49398 1996 Gold Partners Nl North Shaw 1.5% North Shaw Project, Annual Report E45/1453, 1600, 2130 and 2131for the year ending August 30th 1996.
A52157 1996 Bhp Minerals Pty Ltd Bamboo Creek <1% Bamboo Creek Project Final Report CR8769 September 1996
A47858 1996 Valdrew Nominees Pty Ltd Spear Hill 52% Spear Hill Project, Partial Surrender Report,May 1996, E45/1475.
A46198 1995 Gold Partners Nl Market Creek <1% Market Creek Project, Annual Report E45/1513 for the year ending September 14th 1995.
A46082 1995 Gold Partners Nl North Shaw 2.3% North Shaw Project, Annual Report Exploration Licences E45/1037&1453 ; Prospecting Licences P45/2130 & 2131 fo
A40371 1994 Mt Edon Gold Mines Nl Shaw River 7% Shaw River Project, Annual Report for the period 01/09/1993 to 01/09/1994, E45/1219 -1221.
A41760 1994 Gold Partners Nl North Shaw 2.3% North Shaw Project, Annual Report for the year ending 30th August 1994, E45/1037, 1453, 2130 & 2131.
A43234 1994 Mt Edon Gold Mines Nl Shaw River 7% Annual report for the period 09/93-09/94 Shaw River Project E45/1219 E45/1220 E45/1221
A28619 1989 Hooker Mining Pty Ltd White Quartz Hill <1% White Quartz Hill Project, Non-statutory Report: Mineralogical Analysis of Beryllium Rich Permatite Samples f
A28379 1989 Greenex Ltd Shaw River 10% Shaw River Project, Non-statutory Report: Thin Sections & Sample Data, July 1987, M45/20, 44, 46, 81, 260-261,
A28385 1989 Greenex Ltd Pilbara 13% Pilbara, 1989, Feasibility Study, E45/327.
A28378 1989 Greenex Ltd Shaw River 10% Shaw River Project, Non-statutory Report: Exploration Report , February 1989, M45/20, 44, 46, 81, 260-261, 287
A29227 1989 Lynas Gold Nl Daltons 4.4% Report on rock chip sampling program, Daltons Creek area, 1989, P45/1755-1764, P45/1768-1770, P45/1772-1773, P
A22310 1988 Greenex Ltd Pilbara 15% Pilbara Tin - Tantalum - Rare Earth Project, Annual report January 1988
A25218 1988 Greenbushes Ltd Hartigans, Spear Hill 10% [ Shaw River tin-tantalum - rare earth exploration, Hartigans and Spear Hill, Non-statutory report, E45/327 ]
A28387 1988 Greenex Ltd Pilbara 10% Pilbara, Mining Feasibility Study and Cost Analysis, December 1988.
A32422 1988 Greenbushes Ltd Pilbara 15% Pilbara Project,1987 Annual Report, January 1988, E45/327, P500-510,513-519,615-617,621-626, 863,1504-1507,151
A24569 1988 Greenbushes Ltd Shaw River - Pilbara 16% Pilbara Tin Tantalum Rare Earth Project, Pre feasibility study, April 1988, E45/327; P45/864-865, 1041-1042, 1
A19220 1987 Greenex Ltd Shaw River - Pilbara 17% Pilbara Tin, Tantalum, Rare Earth Project, Progress [annual] report, December 1986, E45/327, M45/20...45/81, P
A16921 1985 Greenex Ltd Pilbara 3.2% Pilbara Project, Annual Report for the period ending 31/12/1985, M45/81;P45/500-510, 513-519, P45/615-618,621-
A16386 1985 Greenex Ltd Spear Hill, Pilbara 28% Pilbara Project, Annual Report for the period 25/07/1984 to 25/07/1985, E45/327.
A15930 1984 Kincora Pty Ltd Shaw River 13% Shaw River Project, Annual Report for the period ending 31/12/1984, P45/618, 621-626.
A11222 1982 Greenex Ltd Pilbara 19% Pilbara Project, Non-statutory Report: Progress Report, February 1982, ( Tenement Schedule , see page 61).
A10398 1981 Greenex Ltd Spear Hill 53% Spear Hill Project, Non-statutory Report: Spear Hill Exploration Programme,for the period July-December 1979,
A8135 1977 Straits Trading Co Ltd Spear Hill 27% Spear Hill Project, Non-statutory Report: Exploration Report , September to November 1977, DC45/202...........
A4796 1974 Cooglegong Tin Pty Ltd Spear Hill 53% Spear Hill Project, Non-statutory Report: Assessment Report, February 1967, MC45/615-616, 827-828, 930-935, 98
A4797 1974 Cooglegong Tin Pty Ltd Spear Hill 53% Spear Hill Project, Non-statutory Report: Investigations of Alluvial Tin Deposits for the period ending 12th D
A2976 1972 Placer Prospecting ( Australia) Pty Ltd Spear Hill 53% Spear Hill Project, Non-statutory Report: Brief Exploration Report for the period ending 31/12/1970, DC45/378-
A60803 1970 Placer Prospecting Pty Ltd Spear Hill 30% Report of Investigation Cooglegong Tin Ltd. Claims Spear Hill, Pilbara Goldfield. 1970
A2975 1970 Placer Prospecting ( Australia) Pty Ltd Hillside 12% Hillside Project, Non-statutory Report: Report of Investigation , February 1970, DC45/295-296, 298-299, 300, 3
A4795 1968 Placer Prospecting Pty Ltd Hillside 60% Hillside Project, Non-statutory Report:Brief Exploration Report, June 1968, MC45/445-447; DC45/202-203.
A79126 1753 Giralia Resources Nl Daltons <1% E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH
A84776 1753 Haoma Mining Nl NORTH SHAW - HILLSIDE 1% NORTH SHAW/ HILLSIDE PROJECT, ANNUAL REPORT FOR THE PERIOD 31 JULY 2008 – 1 AUGUST 2009, E45/2188, E45/2784, E
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
19 months · 10 May 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 45/5834 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 45/5834? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.