NextMaps›WA Tenements›E 45/4982

E 45/4982

LiveExploration LicenceShire of East PilbaraMarble Bar District
Area
1,550ha
Expires
July 2028
in 21 months
WAMEX reports
77
WA median is 53
Report drilling
19
of 77 reports
East Pilbara Explore on the live map

Register summary

Holder
Hedland Exploration Pty Ltd
Local government
Shire of East Pilbara
Application received
22 Aug 2017
Commenced
3 July 2018
Expiry
2 July 2028
Term
5 Years (Extended)

Exploration history on this ground

77 historical WAMEX exploration reports intersect E 45/4982: 40 report geochemistry or sampling, 42 include a digital data package.
When this ground was worked
21960s
101970s
81980s
81990s
132000s
302010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A136260 2023 Octava Minerals Limited Eginbah <1% Eginbah _ E45/5022, Final Surrender Report for the period ending 02/07/2023.
A132329 2022 Octava Minerals Ltd Talga East <1% Annual Technical Report Talga East Gold and Lithium Project E45/2055 for the period ending 2/7/2022
A128362 2021 8 Au Ltd Talga East <1% Talga East E45/5022 Annual Technical Report for the period ending 02/07/2021
A125800 2021 First Au Limited Talga <1% Annual Mineral Exploration Report for Combined Reporting Group C92/2015 — Talga Project for the period ending
A124120 2020 Moly Metals Australia Pty Ltd Spinifex Ridge 15% Annual report for the period 15th March 2019 to 14th March 2020, Spinifex Ridge Project, M45/1095, M45/1096 an
72 more reports
A124907 2020 Great Sandy Pty Ltd Gorge Creek <1% E45/5022 Gorge Creek project Annual Report for the period 3 July 2019 to 2 July 2020
A119052 2019 First Au Limited Talga <1% Talga E45/4136 Final Surrender for the period 16/09/2013 to 07/01/2019
A120167 2019 Moly Metals Australia Pty Ltd Spinifex Ridge 15% C51/2019 Annual Report for the period 15th March 2018 to 14th March 2019, Spinifex Ridge Project, M45/1095, M4
A120975 2019 Great Sandy Pty Ltd; Mineral Edge Pty Ltd Gorge Creek <1% Gorge Creek E45/5022 Annual Report for the period ending 02/07/2019
A122141 2019 First Au Limited Talga <1% Talga C92/2015 Annual Report for the period ending 15/09/2019, E45/03679, E45/03857, E45/04137, E45/04615
A118549 2018 First Au Limited Talga <1% Talga Project C92/2015 Annual Report for the period ending 15/09/2018, E45/03679, E45/04615, E45/03857, E45/04
A116173 2018 Moly Metals Australia Pty Ltd Spinifex Ridge 15% Annual Report for the period 15th March 2017 to 14th March 2018, Spinifex Ridge Project, M45/1095, M45/1096 an
A117365 2018 Great Sandy Pty Ltd; First Au Limited Talga <1% Talga E45/3679 Partial Surrender Report for the period 12/06/2012 to 06/6/2018
A112489 2017 Moly Metals Australia Pty Ltd Spinifex Ridge 15% Annual Report for the period 15th March 2016 to 14th March 2017, Spinifex Ridge Project, M45/1095, M45/1096 an
A114045 2017 Moly Metals Australia Pty Ltd Spinifex Ridge 43% Partial Surrender Report for the Period 15th March 2007 to 14th March 2017 Spinifex Ridge Project M45/1095
A115511 2017 Great Sandy Pty Ltd Talga <1% Talga C92/2015 Combined Annual Report for the period ending 15/09/2017, E45/03679, E45/03857, E45/04136, E45/0
A107832 2016 Great Sandy Pty Ltd Talga <1% Talga Project C92/2015 Combined Annual Report to the Department of Mines and Petroleum for the Period 16/09/20
A107997 2016 Fortescue Metals Group Ltd Talga 1.4% C25/2015 Talga Final Surrender Report for the period 26/08/2013 to 05/10/2015, E 45/03845, P 45/02922
A109326 2016 Moly Mines Limited Spinifex Ridge 15% C51/2007 Combined Annual Mineral Exploration Report for the period 15 March 2015 to 14 March 2016, M45/1095, M
A110535 2016 Great Sandy Pty Ltd Talga <1% Talga C92/2015 Combined Annual Report for the period ending 15/09/2016, E45/03679, E45/03857, E45/04136, E45/0
A106165 2015 Fortescue Metals Group Ltd Talga 1.4% C28/2015 Talga Project E45/03845, E45/04330, P45/02922 Annual Report for the period 1 July 2014 to 30 June 201
A105779 2015 Moly Metals Australia Pty Ltd Spinifex Ridge 16% Annual Report for the period 15th March 2013 to 14th March 20134, Spinifex Ridge Project, M45/1095, M45/1096,
A106380 2015 Great Sandy Pty Ltd Talga Peak <1% Talga Peak Project E45/3679 Annual Report for the period 12/06/2014 to 11/06/2015
A103938 2014 Richardson B Talga Peak <1% Talga Peak Project E45/4136 Annual Report for the period 16 September 2013 15 September 2014
A102489 2014 Moly Metals Australia Pty Ltd Spinifex Ridge 6.2% Annual report for the period 15th March 2013 to 14th March 20134, Spinifex Ridge Project, M45/1095, M45/1096,
A103008 2014 Great Sandy Pty Ltd Talga Peak <1% TALGA PEAK PROJECT E45/3679WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 12 JUNE 2013 to 11 JUNE 2014
A97414 2013 Mining Projects Group Talga Peak <1% Talga Peak Project, Final Surrender Report for the period 23rd December 2005 to 17th December 2012, E45/2650.
A98819 2013 Great Sandy Pty Ltd Talga Peak <1% Talga Peak Project E45/3679 Western Australia Annual Report for the period 12 June 2012 to 11 June 2013
A98131 2013 Moly Metals Australia Pty Ltd Spinifex Ridge 10% Spinifex Ridge Project, Annual Report for the period 15th March 2012 to 14th March 2013, M45/1095-1097 & 1164;
A93952 2012 Moly Metals Australia Pty Ltd Spinifex Ridge 16% Annual report for the period 15th March 2011 to 14th March 2012, Spinifex Ridge Project, M45/1095, M45/1096, M
A89254 2011 Oakover Gold Ltd Talga Peak <1% TALGA PEAK PROJECT E45/2650-I WESTERN AUSTRALIA ANNUAL REPORT FOR THE PERIOD 23 DECEMBER 2009 to 22 DECEMBER 2
A90722 2011 Moly Metals Australia Pty Ltd Spinifex Ridge 16% Annual report for the period 15th March 2010 to 14th March 2011, Spinifex Ridge Project, M45/1095, M45/1096, M
A92752 2011 Mining Projects Group Talga Peak <1% Annual Report Talga Peak Project E45/2650 for the period 23rd December 2010 to 22nd December 2011
A85644 2010 Mining Projects Group Talga Peak <1% ANNUAL REPORT TALGA PEAK PROJECT E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2009 (4th Year Anniversary)
A87031 2010 Moly Mines Ltd Spinifex Ridge 16% Spinifex Ridge Project M45/1095, M45/1096, M45/1097, M45/1164, Pilbara Mineral Field, Combined Annual Technica
A85643 2010 Mining Projects Group Talga Peak <1% PARTIAL SURRENDER TALGA PEAK PROJECT E45/2650 FOR THE FOUR YEAR PERIOD ENDING 17/12/2009 (4th Year Anniversary
A81167 2009 Mining Projects Group; Oakover Gold Ltd TALGA PEAK <1% ANNUAL REPORT TALGA PEAK PROJECT E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2008
A81168 2009 Mining Projects Group; Oakover Gold Ltd TALGA PEAK <1% PARTIAL SURRENDER TALGA PEAK PROJECT E45/2650 FOR THE THREE YEAR PERIOD ENDING 22/12/2008 (3rd Year Anniversar
A82409 2009 Moly Mines Ltd SPINIFEX RIDGE 16% SPINIFEX RIDGE PROJECT M45/1095, M45/1096, M45/1097, M45/1164, COMBINED ANNUAL TECHNICAL REPORT C51/2007 15th
A78529 2008 Moly Mines Ltd Spinifex Ridge 16% Spinifex Ridge Project M45/1095, M45/1096 ,M45/1097, M45/1164 Combined Annual Technical Report C51/2007 15th M
A77775 2008 Oakover Gold Ltd Talga Peak <1% Annual Report Talga Peak Project E45/2650 FOR THE 12 MONTH PERIOD ENDING 22/12/2007
A77951 2008 Mr Creasy Mg Yarrie 4.3% Project Name: Yarrie C182/2006 Nature of Report: Anuual Period Covered: 16.12.2006 to 15.12.2007 Tenements: ex
A74310 2007 Mining Projects Group Talga Peak <1% Annual Report, Talga Peak Project E45/2650, For the 12 Month Period Ending 22/12/2006, (Port Hedland).
A75664 2007 Moly Mines Ltd Spinifex Ridge 21% Spinifex Ridge Projec Annual Report for the period 23rd April 2006 to 14 March 2007, E45/2226.
A74614 2006 Muccan Minerals Pty Ltd Bamboo Creek 4.3% Annual Report for the period 16.12.2005 to 15.12.2006 Yarrie Project (C182/2006) E45/2385, M45/202
A72555 2006 Moly Mines Ltd Spinifex Ridge 21% Spinifex Ridge Project E45/2226, Annual Technical Report, 23 April 2005 to 22 April 2006, (Yarrie).
A70761 2005 Moly Mines Ltd Spinifex Ridge 21% Spinifex Ridge Project, Annual Report for the period 23rd April 2004 to 22nd April 2005, E45/2226.
A68784 2004 Hibernia Gold Ltd Spinifex Ridge 21% Spinifex Ridge Project E45/2226 Annual Technical Report 23r d April 2003 to 22nd April 2004
A63518 2001 De Beers Australia Exploration Ltd Carlindi <1% Annual Report for Exploration Licences 45/2195 - 45/2200.
A57034 1999 Sipa Resources Ltd Panorama / Kittys Gap 12% 1998 Annual and Final Report on E45/1294 Kittys Gap Panorama Project, Covering the Period 9 November 1992 to 3
A53457 1998 Outokumpu Exp Aust Pty Ltd Panorama / Kittys Gap 12% E45/1294 Kittys Gap Annual Report Panorama Project covering the period 1January to 31 December 1997.
A50543 1997 Sipa Resources Ltd Kitty's Gap/ Panorama 12% Kitty's Gap/ Panorama Project, Annual Report E45/1294 for period 9th November 1995 to 31st December 1996.
A46574 1995 Cra Exploration Pty Ltd Panorama 12% Panorama Project, Annual Report for year ending 8th November 1995, E45/1294.
A44976 1995 Sipa Resources Ltd Panorama / Kittys Gap 12% Panorama / Kittys Gap Project,1994 Annual Report E45/1294 covering period 1st January 1994 to 31st December 19
A44977 1995 Sipa Resources Ltd Panorama 12% E45/1294 voluntary partial surrender report. Kitty's Gap, Panorama Project. Covering the period 9/11/92 to 26/
A40985 1994 Sipa Resources Ltd Panorama 12% Panorama Project, Annual Report for the period 9th November 1992 to 31st December 1993, E45/1294
A40863 1993 Sipa Resources Ltd Coppins Gap 87% Coppins Gap Project, Annual Report for the period 8th February 1992 to 7th February 1993, P45/2115.
A26664 1989 City Resources Ltd Nuggetty Gully 6.5% Annual Report Nuggetty Gully EL 45/319 for period 28/11/87 - 27/11/88
A29864 1989 City Resources Ltd Nuggetty Gully 6.4% Annual Report, Nuggetty Gully EL45/319, for the period 28/11/88 - 27/11/89
A22215 1987 City Resources Ltd Nuggetty Gully 6.4% Annual report for Nuggety Gully Exploration Licence (E45/319, Coppin Gap area), East Pilbara, WA.
A19211 1986 Esso Australia Ltd Nuggetty Gully 6.4% Nuggetty Gully (5649) EL 45/319, Annual Report for Period 27th November 1985 to 26 November 1986.
A14736 1984 Esso Australia Ltd Nuggetty Gully 6.2% Nuggetty Gully Annual Report for Period 1 January 1984 - 31 December 1984. ML's 45/518 and 45/519 (now part of
A13447 1984 Esso Australia Ltd Nuggetty Gully 2.9% Nuggetty Gully Project 649 Annual Report 1983 Mineral claims 45/7876, 7877, 9207-17, 9347 and Minerl leases 45
A10789 1983 Esso Australia Ltd Nuggetty Gully 2.9% Annual Report 1981 Nuggetty Gully Project 649
A10101 1981 Amax Iron Ore Corporation Coppins Gap <1% Copping Gap Project, Non-statutory Report: Final Exploration Report, July 1981, TR7508H & 7509H.
A8604 1979 Esso Australia Ltd Nuggetty Gully 3.7% Nuggetty Gully Project, Annual [Final] Report, October 1979, TR70/5948H.
A7961 1978 Esso Australia Ltd Nuggetty Gully 3.7% Nuggetty Gully Project, Annual Report for the period 26/07/1977 to 25/07/1978, TR70/5948H.
A7169 1977 Esso Australia Ltd Nuggetty Gully 3.7% Nuggetty Gully Project, Annual Report for the period July 26th 1976 to July 25th 1977, TR70/5948H.
A6526 1976 Esso Australia Ltd Nuggetty Gully 3.7% Nuggetty Gully Project, Annual Report for the year ending 26/07/1976, TR70/5948H.
A5593 1975 Esso Exploration Aust Inc Murphy Well 20% Murphy Well Annual Report for Period Ending March 1975
A6080 1975 Esso Australia Ltd Nuggetty Gully 3.7% Annual Report for Temporary Reserve No. 5948H Nuggetty Gully
A3074 1972 Woodsreef Mines Ltd Coppins Gap - Bamboo Creek <1% Coppins Gap - Bamboo Creek Project, Non-statutory Report: Report on Final Field Examination TR70/ 4770 & 487
A2635 1971 Australian Anglo American Ltd Yarrie <1% Yarrie Project, Annual Report for the period 01/01/1971 to 31/12/1971, TR70/4875H & 4770H.
A530 1971 Woodsreef Mines Ltd Marble Bar 1.4% Report on Exploration Temporary Reserve 4875H, Marble Bar, W.A. Year Ended Feb 24, 1971 With Proposed Programm
A339 1970 Woodsreef Mines Ltd Marble Bar <1% Report on Phase I Exploration Southern Part T.R 4875H and Western Part T.R. 4770H, Marble Bar, Western Austral
A1452 1963 Mt Goldsworthy Mining Assoc Roebourne 10% Roebourne Project, Non-statutory Report: Final Examination Report, June 1963, TR70/2064H. (Kitty's Gap & Coppi
A1440 1961 Consolidated Gold Fields Aust Ltd Port Hedland 1.1% Port Hedland Project, Non-statutory Report: Report for the year ending 31st December 1961, TR70/2059, 2061-207
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
21 months · 2 July 2028
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 45/4982 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 45/4982? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.