E 45/4666

LiveExploration LicenceShire of East PilbaraMarble Bar District
Area
2,170ha
Expires
Nov 2026
in 2 months
WAMEX reports
109
WA median is 53
Report drilling
31
of 109 reports
East Pilbara Explore on the live map

Register summary

Holder
Keras (Pilbara) Gold Pty Ltd
Local government
Shire of East Pilbara
Application received
11 Dec 2015
Commenced
24 Nov 2016
Expiry
23 Nov 2026
Term
5 Years (Extended)

Exploration history on this ground

109 historical WAMEX exploration reports intersect E 45/4666: 84 report geochemistry or sampling, 59 include a digital data package.
When this ground was worked · 107 of 109 reports dated
11960s
41970s
171980s
141990s
182000s
472010s
62020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A133559 2023 Calidus Resources Limited Warrawoona 16% Partial Surrender Report for E45/4666 Warrawoona for the period ending 23/12/2022
A135310 2023 Keras (Pilbara) Gold Pty Ltd Warrawoona <1% Partial Surrender Report for E45/4622 Warrawoona for the period ending 04/05/2023.
A135219 2023 Keras (Pilbara) Gold Pty Ltd Warrawoona <1% Final Surrender Report for E45/5706 Warrawoona for the period ending 19/04/2023.
A122722 2020 Haoma Mining Nl; Elazac Mining Pty Ltd Marble Bar <1% Annual Report For C281/1997 (Marble Bar) for the period 1 December 2018 to 30 November 2019
A122546 2020 Keras (Pilbara) Gold Pty Ltd Warrawoona <1% Final surrender report for E45/4194 Warrawoona project for the period 15 July 2014 to 14 July 2019
104 more reports
A122837 2020 Calidus Resources Limited Warrawoona 3% Annual Report C30/2007 Warrawoona Project for the period ending 31/12/2019
A119726 2019 Calidus Resources Limited Warrawoona 1.7% Annual Report C30/2007 Warrawoona Project For the Period 1 January 2018 to 31 December 2018
A120990 2019 Haoma Mining Nl E45/3655 <1% Annual Report E45/3655 for the period 4 July 2018 to 3 July 2019
A116463 2018 Calidus Resources Limited Warrawoona 2.3% Annual Report C30/2007 Warrawoona Project for the period 1 January 2017 to 31 December 2017, M45/00552, M45/00
A117623 2018 Haoma Mining Nl E45/3655 <1% Annual Report on E45/3655, 04 July 2017 - 03 July 2018
A112524 2017 Haoma Mining Nl Marble Bar <1% Marble Bar Project C281/1997 Annual Report for the period 01/12/2015 to 30/11/2016, E45/03940....P45/02958
A113889 2017 Nullagine Gold Pty Ltd Marble Bar <1% Final Surrender Report for Exploration Licence E45/3678 For the Period 15 November 2011 to 24 February 2017
A113998 2017 Beatons Creek Gold Pty Ltd Warrawoona 2.8% Combined Annual Mineral Exploration Report: Warrawoona Project C237/2011 for the period 17 March 2016 to 16 Ma
A114623 2017 Haoma Mining Nl Fieldings Ridge <1% Fieldings Ridge E45/3655 Annual Report For the Period 4 July 2016 to 3 July 2017
A112629 2017 Nullagine Gold Pty Ltd Marble Bar <1% Combined Annual Mineral Exploration Report Marble Bar Project For Combined Reporting Group C121/2012 For the P
A108029 2016 Haoma Mining Nl Warrawoona 4.3% E45/1249 Final Surrender Report
A108308 2016 Haoma Mining Nl Marble Bar Group 2 1.5% Marble Bar Project Annual Report C281/1997 for the period 1 December 2014 to 30 November 2015
A107866 2016 Fortescue Metals Group Ltd Corunna <1% C119/2011 Corunna Tin Final Surrender Report for the period 17 July 2013 to 13 July 2015, E 45/03767, E 45/041
A108297 2016 Nullagine Gold Pty Ltd Marble Bar <1% Combined Annual Mineral Exploration Report Marble Bar Project For Combined Reporting Group C121/2012 Report Pe
A110003 2016 Haoma Mining Nl Fieldings Ridge <1% FIELDINGS RIDGE E45/3655 Annual Report for the period 4 July 2015 to 3 July 2016
A104755 2015 Haoma Mining Nl Marble Bar 1.5% C281/1997 Marble Bar Project, Group 2, Annual Report for the Period 1 December 2013 – 30 November 2014, E45/12
A105146 2015 Fortescue Metals Group Ltd Corunna Tin <1% Combined Annual Mineral Exploration Report for the Period 01 January 2014 to 31 December 2014, C119/2011, Coru
A106500 2015 Haoma Mining Nl Fieldings Ridge <1% ANNUAL REPORT For the Period 4 July 2014 to 3 July 2015 FIELDINGS RIDGE E45/3655
A105373 2015 Nullagine Gold Pty Ltd Marble Bar <1% Combined Annual Mineral Exploration Report Marble Bar Project For combined reporting group C121/2012 During th
A105484 2015 Talga Resources Ltd Warrawoona <1% Warrawoona Project 2015 Annual Report for the period 17th March 2014 to 16th March 2015 Combined Reporting Gro
A101205 2014 Haoma Mining Nl Marble Bar 2.1% Marble Bar Project C281/1997 Group 2 Annual Report for the period 1 December 2012 to 30 November 2013, E45/124
A101801 2014 Nullagine Gold Pty Ltd Marble Bar <1% Marble Bar Project, Annual Report for the period 01/01/2013 to 31/12/2013, E45/3674-3676, 3678, 3717 & 4169; P
A102152 2014 Interquip Pty Ltd Sandy Well <1% Final Surrender Report, Sandy Well Project, E45/2755,for the period 30 March 2007 to 29 March 2014.
A103213 2014 Haoma Mining Nl Fieldings Ridge <1% E45/3655 Fieldings Ridge Project Annual Report for the period 4 July 2013 to 3 July 2014
A96316 2013 Haoma Mining Nl Marble Bar 1.3% Marble Bar Project, Annual Report for the period 01/12/2011 to 30/11/2012, E45/1249, 1273 & 1869; M45/14......
A98024 2013 Interquip Pty Ltd Sandy Well <1% Annual Report Sandy Well E45/2755 East Pilbara Shire Western Australia For the period 30 March 2012 to 29 Marc
A99987 2013 Talga Resources Ltd Warrawoona 65% Warrawoona Project P45/2736 Final Surrender Report for the period 20th November 2009 to 1st November 2013 (C23
A96834 2013 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and 2, Combined Annual Report, year ending 30 November 2012
A97366 2013 Nullagine Gold Pty Ltd Marble Bar <1% Marble Bar Project, Annual Report for the period 01/01/2012 to 31/12/2012, E45/3674-3676, E45/3678 & E45/3717;
A98184 2013 Talga Resources Ltd Warrawoona <1% Warrawoona Project, Annual Report for the period 17/03/2012 to 16/03/2013, E45/3381; P45/2661-2662, 2736 & 278
A98903 2013 Haoma Mining Nl Fieldings Ridge <1% E45/3655 Fieldings Ridge Annual Report for the period 4 July 2012 to 3 July 2013
A92772 2012 Mithril Resources Ltd Cutting Creek 1 - Cutting Creek 2 <1% E45/3470 and E45/3471 Cutting Creek 1 and Cutting Creek 2 Year 1 Combined Annual Report for the period 27 Octo
A93698 2012 Talga Gold Ltd Warrawoona <1% Warrawoona Project 2012 Annual Report for the period 17th March 2011 to 16th March 2012 Combined Reporting Gro
A95318 2012 Haoma Mining Nl Fieldings Ridge <1% Exploration Licence E45/3655 Fieldings Ridge Annual Report for the period 4 July 2011 to 3 July 2012
A93903 2012 Haoma Mining Nl Marble Bar 1.3% C281/1997 Marble Bar Project (Group 2) Annual Report for the Period 1December 2010 – 30 November 2011, Marble
A94558 2012 Interquip Pty Ltd Sandy Well <1% Annual Report Sandy Well E45/2755 For the period 30th March 2011 to 29th March 2012
A89862 2011 Haoma Mining Nl Marble Bar 1.3% Marble Bar (Group 2), Annual Report for the Period 1 December 2009 – 30 November 2010, C281/1997
A90446 2011 Interquip Pty Ltd Sandy Well <1% Sandy Well Project, Annual Report for the period ending 29th March 2011, E45/2755.
A90448 2011 Interquip Pty Ltd Sandy Well <1% Sandy Well Project, Partial Surrender Report for the period 30th March 2007 to 26th March 2011, E45/2755.
A91094 2011 Arc Pty Ltd Corunna Downs <1% Final Surrender Report for the period 1 May 2006 to 30 April 2011 Corunna Downs Project E45/2560
A91096 2011 Arc Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2010 to 30 April 2011, Corunna Downs Project E45/2560
A89884 2011 Talga Gold Ltd Warrawoona 25% Warrawoona Project: Annual Report Report Period: 23/11/2009 to 22/11/2010, C95/2010, P45/2661, P45/2662, P45/2
A87106 2010 Interquip Pty Ltd Sandy Well <1% Partial Surrender Report,Sandy Well E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 2
A86464 2010 Haoma Mining Nl Marble Bar (Group 2) 1.3% Marble Bar (Group 2) Annual Report for the Period 1 December 2007 – 30 November 2008
A87105 2010 Interquip Pty Ltd Sandy Well <1% Annual Report, Sandy Well, E45/2755, East Pilbara Shire, Western Australia, Reporting Period ending 29/03/2010
A87347 2010 Gondwana Resources Ltd Comet East <1% Final Surrender Report Comet East Project, Tenement E45/2480, Period covered to 1st May 2010
A87398 2010 Arc Pty Ltd Corunna Downs <1% ANNUAL REPORT For the Period 1 May 2009 to 30 April 2010 CORUNNA DOWNS PROJECT EXPLORATION LICENCE 45/2560 PIL
A87843 2010 Arc Pty Ltd Corunna Downs <1% Partial Surrender Report For the Period 1 May 2006 to 13 May 2010 Corunna Downs Project Exploration Licence 45
A83045 2009 Gondwana Resources Ltd Comet East <1% Annual and Partial Surrender report for the Comet East Project Period ending 1st of May 2009
A83099 2009 Interquip Pty Ltd Sandy Well <1% Annual Report E45/2755 For Period Ending 16 June 2009
A84008 2009 Arc Pty Ltd CORUNNA DOWNS <1% Annual Report For the Period 1 May 2008 to 30 April 2009, Corunna Downs Project Exploration Licence 45/2560 Pi
A84085 2009 Arc Pty Ltd CORUNNA DOWNS <1% PARTIAL SURRENDER REPORT FOR THE PERIOD TO 30TH APR 2009, CORUNNA DOWNS PROJECT, EXPLORATION LICENCE 45/2560,
A78048 2008 Haoma Mining Nl Marble Bar 1.1% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2006 - 30 NOVEMBER 2007, GROUP: CMER281/1997 TENE
A79088 2008 Arc Pty Ltd Corunna <1% ANNUAL REPORT For the Period 1 May 2007 to 30 April 2008 CORUNNA DOWNS PROJECT Exploration Licence 45/2560 Pil
A79135 2008 Gondwana Resources Ltd Comet East <1% ANNUAL REPORT Comet East Project Tenement E45/2480 East Pilbara Region Period covered 1 May 2007 to 30 April 2
A74735 2007 Haoma Mining Nl Marble Bar (Group 2) 2% Marble Bar (Group 2) Project C281/1997 Annual Report for the Period 1 Dec 2006 - 30 Nov 2006 Report No.03-02-2
A75925 2007 Vgs Pty Ltd Corunna Downs <1% Annual Report for the period 1 May 2006 to 30 April 2007 Corunna Downs Project Exploration Licence 45/2560
A72844 2006 Haoma Mining Nl Marble Bar (Group 2) 2.8% Marble Bar(Group 2), Annual Report for the Period 1 December 2004 to 30 November 2005, Combined Reporting No.
A69739 2005 Haoma Mining Nl Fortuna- Salgash 4.3% E45/1249, Fortuna- Salgash Project, Partial Surrender Report for the period 15/09/1992 to 10/08/2004.
A70559 2005 Haoma Mining Nl Marble Bar (Group 2) 2% Annual report for the period 01/12/03 - 30/11/04 Marble Bar (Group 2) Project, C281/1997, E45/1249, 1273, E45/
A68392 2004 Haoma Mining Nl Marble Bar 1.1% Annual Report for the period 01/12/2002-30/11/2003 Marble Bar Project M45/235, M45/296, M45/655, M45/76, M45/
A66284 2003 Haoma Mining Nl Marble Bar 1% Annual Report for the period ending November 30th 2002 Marble Bar - Group 2 C281/1997: E45/1249, 1273, 1615, 2
A66385 2003 Haoma Mining Nl Marble Bar 3.9% TENEMENT E45/2045- PILBARA REGION SURRENDER REPORT - APRIL2003 [Warrawoona Prospect]
A64172 2002 Haoma Mining Nl Marble Bar <1% Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4
A62138 2001 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606,
A60049 2000 Haoma Mining Nl Marble Bar <1% Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607,
A57524 1999 Haoma Mining Nl Marble Bar (Group 2) <1% Marble Bar Group 2 Annual report for the period ending 11/98 Marble Bar SF50-08
A58651 1999 Stockdale Prospecting Ltd Marble Bar <1% Elazac Haoma Mining JV Project E45/1249, 1607-1608, 1615 10/1998
A54110 1998 Haoma Mining Nl Marble Bar (Group 2) <1% Group 2 Marble Bar Annual Report for the Period Ending November 1997 Marble Bar SF50-8.
A50399 1997 Mr Nowland Pj Butcher Well <1% Butcher Well Project, Surrender Report on Exploration Licence E45/1467 from 15/03/1996 to 30/10/1996.
A52156 1997 Haoma Mining Nl Marble Bar (Group 2) <1% Annual report for period ending 30/11/96 Group 2:Marble Bar
A43690 1995 Fortuna Nl Fieldings Gully <1% Report on M45/521 Fieldings Gully Gold Project Pilbara Goldfield Western Australia Tenement M45/521 Fortuna NL
A44145 1995 Mr Nowland Pj Butcher Well <1% Butcher Well Project, Annual Report E45/1467 for period March 1994 to March 1995.
A52158 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Report No:3 Mickey's Find/Normay E45/1556 E45/1903 M45/6
A52159 1995 Wmc Resources Ltd Marble Bar <1% Technical Report 14/05/95-21/09/95 Marble Bar Project Mickey's Find/Normay E45/1556 E45/1903 M45/665 M45/650 E
A40455 1994 Fortuna Nl Fieldings Gully 18% Annual report for the period 02/93-02/94 Fielding's Gully Projedt E45/954 M45/521
A42266 1994 Fortuna Nl Wymans Well 4.3% Annual Report for the period 15/09/93-14/09/94 Wymans Well Project E45/1249
A38016 1993 Fortuna Nl Fieldings Gully 18% Annual report for the period 02/92-02/93 Fielding's Gully Gold Project E45/954 E45/521
A39412 1993 Fortuna Nl Wymans Well 4.3% Annual Report for the period 09/92-09/93 Wymans Well Project E45/1249
A34667 1991 Fortuna Nl Fieldings Gully <1% Report on GML45/1334 and M45/495 Fielding's Gully, Wyman's Well Pilbara Goldfield, W. A. 1/1/91 to 31/12/91
A29424 1989 Aztec Exploration Ltd Warrawoona <1% Warrawoona (JV) Project, Annual Report for the period 1st January 1989 to 31st December 1989, E45/350 & 351;
A26466 1989 Aztec Exploration Ltd Warrawoona 1.2% Warrawoona, Relinquishment Report, P45/946-948, P45/951-956, P45/959, E45/350, E45/351.
A23636 1988 Aztec Exploration Ltd Warrawoona 1.1% Warrawoona Joint Venture, Annual report 1 January - 31 December 1987, E45/350-351, P45/945-959
A24742 1988 Randolph Holdings Pty Ltd Fielding's Ridge 46% Fielding's Ridge, Report on sampling, October 1987, P45/1174-1179
A24642 1988 Randolph Resources Pty Ltd Fieldings Gully 1.9% Annual Report GML45/1334 P45/1172. Fieldings Gully. (1988).
A25544 1988 Aztec Mining Co Ltd Warrawoona 1.1% Warrawoona Joint Venture, Annual report for period 1 January to 31 December 1988, E45/350-351, P45/945-959
A19724 1987 Aztec Exploration Ltd Warrawoona 1.3% Warrawoona Project, Drilling report [non-statutory], P45/945-959, January 1987
A20906 1987 Kennecott Exp Aust Pty Ltd Fieldings Ridge 46% Annual report, Fieldings Ridge Prospect, P45/1174 to 45/1179, July 1987
A21170 1987 Randolph Holdings Pty Ltd Fieldings Gully 1.9% Annual report on PL45/1172 Pilbara Mineral Field Western Australia to 19/06/87 (Fieldings Gully Project)
A17267 1986 Aztec Exploration Ltd Warrawoona 1.2% Progress Report Warrawoona Project Marble Bar Area, Western Australia 1986 (E45/350, E45/351, M45/4, P45/79, P
A20217 1986 Randolph Holdings Pty Ltd Fieldings Gully <1% Metallurgical Testwork Report Leach Testwork for Randolph Holdings DOC ID 00525T Job No. 8085 (GML45/1334, 198
A15870 1985 Great Victoria Gold Ltd Wyman 82% Wyman Project, Annual Report for the period ending 16/06/1985, P45/186.
A15874 1985 Great Victoria Gold Ltd Coronation West 69% Coronation West Project, Annual Report for the period ending 16/06/1985, P45/187.
A17233 1985 Alcoa Of Australia Ltd Fielding's Ridge 46% Fielding's Ridge Project, Non-statutory Report: Final Explorarion Report for period ending 31/12/1985, P45/44
A14134 1984 Bp Minerals Aust Pty Ltd Coronation Ridge 2.6% Coronation Ridge Project, Annual Report for the period ending 31st March 1984, GML45/1717-1724; MC45/9809-9809
A15551 1983 Mr Welsh Fh Fieldings Gully <1% Geological Examination of GML45/1334 June 1983 (Fieldings Ridge)
A13438 1983 Alcoa Of Australia Ltd Fieldings Gully 47% Fieldings Gully Project, Non-statutory Report: Exploration of Mineral Claims,July 1983, MC45/8773-8777;PA45/31
A7676 1978 Dampier Mining Co Ltd Copper Hills- Kelly Copper 7.4% Copper Hills - Kellys Copper Project, Non-statutory Report: Exploration Report, January 1978, MC45/8427-8439
A2471 1972 Hawkstone Minerals Ltd Warrawoona - Salgash 2.8% Warrawoona - Salgash Project, Final Surrender Report , April 1972, MC45/995-1002,1062-1063,1045-1051, 1071-107
A2610 1970 Hawkstone Minerals Ltd Warrawoona 2.5% Warrawoona (JV) Project, Non-statutory Report: Exploration Report for the period ending 31/12/1969, MC45/995-1
A4189 1970 Bamboo Creek Gold Mines Nl Fielding's Gully - Split Rock 6.3% Fielding Gully - Split Rock Project, Non-statutory Report: Prospectus Report : The Geology of the Fielding's G
A9721 1969 Bamboo Creek Gold Mines Nl Fielding's Gully 30% Fielding's Gully Project, Annual Report, May 1969, MC45/1004-1006, 1013-1018 & 1020.
A81837 1753 Haoma Mining Nl MARBLE BAR (Group 2) 1.3% MARBLE BAR (Group 2) ANNUAL REPORT FOR THE PERIOD 1 DECEMBER 2007 – 30 NOVEMBER 2008
A105966 Archean Biosphere Drilling Project 2.9% Archean Biosphere Drilling Project 2003 and 2004. Drillhole locations and Drill Logs ABDP1-ABDP6 inclusive. AB
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
2 months · 23 Nov 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 45/4666 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 45/4666? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.