NextMaps›WA Tenements›E 39/2516

E 39/2516

PendingExploration LicenceShire of LeonoraMt. Morgans District
Area
930ha
Applied
July 2024
2 years ago
WAMEX reports
107
WA median is 53
Report drilling
76
of 107 reports
Leonora Explore on the live map

Register summary

Holder
Gold Alpha Investments Pty Ltd
Local government
Shire of Leonora
Application received
8 July 2024

Exploration history on this ground

107 historical WAMEX exploration reports intersect E 39/2516: 61 report geochemistry or sampling, 73 include a digital data package.
When this ground was worked · 101 of 107 reports dated
71960s
61970s
41980s
231990s
232000s
312010s
72020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A135977 2023 Anglogold Ashanti Australia Limited Butcher Well 29% Butcher Well JV (E39/1410) Partial Surrender Report for the period 23/07/2009 to 22/07/2023
A136222 2023 Anglogold Ashanti Australia Limited Otway Project (E39/1697) 20% Otway Project (E39/1697) Final Surrender Report to the Department of Mines, Industry Regulation and Safety for
A137997 2023 Solstice Minerals Limited Butcher Dam <1% Combined Annual Report C303/2022 (Butcher Dam) for the period ending 3/10/2023
A128442 2021 Anglogold Ashanti Australia Limited; Northern Star Resources Butcher Well 29% Butcher Well JV (E39/1410) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety
A128444 2021 Anglogold Ashanti Australia Otway <1% Otway Project (E39/1912) Final Surrender Report to the Department of Mines, Industry Regulation and Safety for
102 more reports
A122817 2020 Anglogold Ashanti Australia Limited Otway <1% Otway (C145/2018) Annual Group Report for the period ending 31/12/2019
A122816 2020 Anglogold Ashanti Australia Limited Butcher Well 2.1% Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019
A119199 2019 Anglogold Ashanti Australia Limited Butcher Well 2.1% Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018
A119201 2019 Anglogold Ashanti Australia Limited Otway <1% Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A115966 2018 Anglogold Ashanti Australia Limited Butcher Well 2.1% Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A112355 2017 Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi Butcher Well 2.2% Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A108161 2016 Saracen Gold Mines Pty Ltd Butcher Well - Mount Minnie- Mount Flore 1.6% VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015,
A108266 2016 Saracen Gold Mines Pty Ltd Mount Howe <1% Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A105466 2015 Saracen Gold Mines Pty Ltd Butcher Well 1.5% Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063
A105467 2015 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I
A107019 2015 Saracen Gold Mines Pty Ltd Mount Howe <1% Exploration License 39/1504 (Mount Howe) Surrender Report for the Period 27 July 2010 to 26 July 2015
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A101784 2014 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I
A101830 2014 Saracen Gold Mines Pty Ltd Butcher Well 1.4% Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39
A97466 2013 Saracen Gold Mines Pty Ltd Mount Howe <1% MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007.
A97624 2013 Saracen Gold Mines Pty Ltd Butcher Well 1.4% Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279;
A100359 2013 Hawthorn Resources Limited Yundamindera - Mount Florence <1% Exploration Licence E39/1350 , Yundamindera - Mount Florence Project, Annual Report for the period 29 July 20
A93583 2012 Saracen Gold Mines Pty Ltd Butcher Well 1.3% Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011
A93045 2012 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011
A94245 2012 Midas Resources Ltd Butcher Well 17% Butcher Well E39/1499 Relinquishment Report to the Department of Mines and Petroleum for E39/1499 for the peri
A95857 2012 Hawthorn Resources Limited Yundamindera - Mount Florence <1% E39/1350, Yundamindera - Mt Florence Project, Annual Report for the period 29th July 2011 to 28th July 2012.
A89855 2011 Saracen Gold Mines Pty Ltd Butcher Well 1.3% Butcher Well Project Annual Report for the period 01 January 2010 to December 2010
A91996 2011 Hawthorn Resources Limited Yundamindera - Mount Florence <1% E39/1350 Yundamindera - Mount Florence Project, Annual Report for the period 29 July 2010 to 28 July 2011.
A89379 2011 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010
A90591 2011 Hawthorn Resources Limited Yundamindera – Bore Well <1% Yundamindera – Bore Well E39/1047 Final Surrender Report for the period 14 March 2006 to 12 March 2011
A91060 2011 Midas Resources Ltd Butcher Well 17% Butcher Well E39/1499 Annual Report to the Department of Mines and Petroleum for the period 22/06/10 to 21/06/
A86442 2010 Saracen Gold Mines Pty Ltd Butcher Well 1.1% BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993)
A87167 2010 Hawthorn Resources Limited Yundamindera - Bore Well <1% Yundamindera – Bore Well E39/1047 Annual Report for the period 14 March 2009 to 13 March 2010
A87168 2010 Hawthorn Resources Limited Yundamindera - Bore Well <1% Yundamindera – Bore Well E39/1047 Partial Surrender Report for the period 14 March 2006 to 13 March 2010
A86118 2009 Rubicon Resources Ltd Mount Howe 2.2% Combined Annual Technical Report Mt Howe Project, 1st January 2009 – 31 December 2009, E39/1132, 1182, 1317, 1
A78034 2008 Saracen Gold Mines Pty Ltd Butcher Well <1% BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678
A78141 2008 Minara Resources Ltd Murrin Murrin East 3.4% TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997
A78782 2008 Hawthorn Resources Limited Yundamindera <1% Yundamindera E39/1047 ANNUAL REPORT FOR THE PERIOD 14 March 2007 TO 13 March 2008
A74902 2007 Minara Resources Ltd Murrin Murrin East 3.4% Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2
A75083 2007 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993)
A72256 2006 Minara Resources Ltd Eucalyptus / Murrin Murrin East 3.4% Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar
A71147 2005 Minara Resources Ltd Camelback 6.9% TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August
A69663 2005 Sons Of Gwalia Ltd Butcher Well <1% Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449
A68603 2004 Gutnick Resources Nl Yundamindera <1% Joint Surrender Report for the Period 23 May 2002 to 1 Augus t 2003 C76/2000 - Yundamindera, E39/776, E39/780,
A68195 2004 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39
A69079 2004 Gutnick Resources Nl Yundermindera <1% Joint Annual Report for the Period 1 June 2003 to 31 May 200 4 C76/2000 - Yundamindera E39/708...P39/3860
A66524 2003 Sons Of Gwalia Ltd Butcher Well <1% Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423,
A67427 2003 Anaconda Operations Pty Ltd Camelback 6.9% Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312
A67291 2003 Gutnick Resources Nl Yundamindera <1% Joint annual Report for the period 1 June 2002 - 31 May 2003 Yundamindera Project C76/2000: E39/708,719,721,72
A64070 2002 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344,
A64638 2002 Anaconda Nickel Ltd Camelback 6.9% Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p
A64890 2002 Gutnick Resources Nl Yundamindera <1% C76/2000 - Yundamindera Joint Annual Report for the period 1 June 2001 to 31 May 2002
A65603 2002 Anaconda Nickel Ltd Camelback 6.9% Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For
A62854 2001 Sons Of Gwalia Ltd Camelback / Butcher Well / Linden 1.3% Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3
A63889 2001 Gutnick Resources Nl Yundamindera <1% Joint Annual Report for the period 1 June 2000 to 31 May 2001 C76/2000 - Yundamindera exploration licences: E3
A61790 2000 Sons Of Gwalia Ltd Butcher Well 1.4% Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1
A61380 2000 Anaconda Nickel Ltd Camelback 6.9% Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999
A58272 1999 Acacia Resources Ltd Bore Well <1% Acacia Resources Ltd, Bore Well E39/491 Surrender Report (01/03/99)
A58497 1999 Sons Of Gwalia Ltd Butcher Well 1.4% Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475
A59148 1999 Anaconda Nickel Ltd Camelback 6.9% Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999
A54584 1998 Mount Burgess Mining Nl Butcher Well 1.2% Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1
A56201 1998 Homestake Gold Of Australia Ltd Camelback Bore 6.9% Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374
A53902 1998 Acacia Resources Ltd Camelback <1% Camelback Project P39/3458-3462,E39/491,E39/502, E39/503 E39/596 Annual report for the period 01/01/97-31/12/
A52508 1997 Plutonic Operations Ltd Camelback Bore 6.9% Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647,
A53120 1997 Plutonic Operations Ltd Camelback Bore 6.9% Camelback Bore Project, Partial Surrender Report, December 1997, E39/374
A50237 1997 Acacia Resources Ltd Camelback <1% Camelback Project P39/3458 to P39/3462 E39/491 E39/502 E39/503 1996 Annual report for the period 1 January 199
A50531 1997 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme
A49565 1996 Sons Of Gwalia Ltd Mount Florence 18% Partial Surrender Mount Florence Project E39/384 Relinquishment Report for the Period Ending 11 October 1996
A46564 1996 Mount Burgess Mining Nl Mount Florence 18% Mount Florence Gold Project Annual Technical Report for period ending October 11, 1995 Tenement E39/384
A47727 1996 Sons Of Gwalia Ltd Camelback-Butcher Well <1% Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R
A49566 1996 Sons Of Gwalia Ltd Mount Florence 18% Mount Florence Project Annual Technical Report for the period ending 11 October 1996 Tenements E39/384 Report
A45800 1995 Dominion Mining Ltd Camelback Bore 6.9% Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995
A43925 1995 Mount Burgess Mining Nl Butcher Well <1% Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232
A40601 1994 Mount Burgess Mining Nl Camelback, Butcher Well, Linden <1% Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93
A43162 1994 Mount Burgess Mining Nl Mount Florence 18% Mount Florence Gold Project Annual Technical Report, For the period ending October 11,1994 Tenement E39/384.
A42793 1994 Dominion Mining Ltd Camelback Bore 6.9% Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994
A38219 1993 Mount Burgess Mining Nl Camelback - Butcher Well North 7.3% Annual report for the period ending 30/09/92 Butcher Well/Camelback Gold Project M39/118-120 M39/230 M39/232
A39628 1993 Mount Burgess Mining Nl Camelback - Butcher Well North 7.3% Camelback - Butcher Well North Project, Annual Report for the period 30th September 1993, M39/118-120, 230 & 2
A33077 1991 Western Mining Corporation Ltd Camelback 7.3% Annual report on Camelback Project M39/118 to M39/120, M39/232 for the period 05/10/89 to 04/10/90 WMC
A34829 1991 Mim Exploration Pty Ltd Camelback 7.3% Annual report for the period ending 30/09/91 Camelback Project M39/118 to M39/120 M39/230 M39/232 MIM Explorat
A28980 1989 Western Mining Corporation Ltd Camelback 17% Annual report on Camelback M39/118, M39/119, M39/120, E39/64, and P39/2187. 5 October 1988 to 4 October 1989.
A25868 1988 Western Mining Corporation Ltd Camelback 17% Annual report on Camelback. E39/64. M39/118 to M39/120 Period 05 October 1987 to 4 October 1988
A11227 1982 Esso Exploration Aust Inc Mount Morgans 10% Mt Morgans Project, Annual Report , June 1982, MC39/5311-5366 & 5698-5700.
A9551 1980 Swan Resources Ltd Camel Back Range 4.4% Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H.
A3932 1973 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37
A2782 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H.
A2829 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H.
A3618 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3
A941 1971 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H.
A271 1970 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H.
A1121 1969 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on
A1122 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the
A1123 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re
A269 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H.
A270 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep
A268 1967 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H.
A1590 1965 Mount Margaret Prospecting Syndicate Yundamindera <1% Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2
A81890 1753 Saracen Gold Mines Pty Ltd BUTCHER WELL <1% BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/
A82519 1753 Hawthorn Resources Limited YUNDAMINDERA <1% Exploration Licence E39/1047 YUNDAMINDERA ANNUAL REPORT FOR THE PERIOD 15 MARCH 2008 TO 14 MARCH 2009
A82541 1753 Hawthorn Resources Limited YUNDAMINDERA <1% Exploration Licence E39/1047 YUNDAMINDERA PARTIAL SURRENDER REPORT FOR THE PERIOD 15 MARCH 2006 TO 16 MARCH 20
A84840 1753 Hawthorn Resources Limited YUNDAMINDERA <1% Exploration Licence E39/1350 YUNDAMINDERA ANNUAL REPORT FOR THE PERIOD 29 JULY 2008 TO 28 JULY 2009.
A88235 1753 Hawthorn Resources Limited Yundamindera - Mount Florence <1% E39/1350 ,Yundamindera - Mt Florence Project, Annual Report for the period 29th July 2009 to 28th July 2010.
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 39/2516 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 39/2516 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 39/2516? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.