E 39/2442
Register summary
- Holder
- Gold Alpha Investments Pty Ltd
- Local government
- Shire of Leonora, Shire of Laverton
- Application received
- 14 Dec 2023
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A148374 | 2025 | Anglogold Ashanti Australia Limited | Butcher Well JV | <1% | Butcher Well JV (E39/1875) Partial Surrender Report for the period ending 21/02/2025. |
| A143701 | 2024 | Anglogold Ashanti Australia Limited | Kraken | 39% | Kraken E38/2345 Partial Surrender Report for the period 26 February 2010 to 17 May 2024 |
| A136334 | 2023 | Dacian Gold Limited | Lake Carey | 100% | E38/3576 Final Surrender Report Lake Carey for the period ending 22/06/2023 |
| A137208 | 2023 | Anglogold Ashanti Australia Limited | Kraken | 54% | Kraken Project (E39/1416) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A129296 | 2022 | Anglogold Ashanti Australia Limited | Butcher Well JV Group | <1% | Butcher Well JV (E39/1875) Compulsory Partial Surrender Report to the Department of Mines, Industry Regulation |
149 more reports
| A129252 | 2022 | Anglogold Ashanti Australia Limited | Butcher Well | 100% | Butcher Well JV (E38/3129) Final Surrender Report to the Department of Mines, Industry Regulation and Safety f |
| A129254 | 2022 | Anglogold Ashanti Australia Limited | Butcher Well JV Group | 100% | Butcher Well JV (E38/3130) Final Surrender Report to the Department of Mines, Industry Regulation and Safety f |
| A129255 | 2022 | Anglogold Ashanti Australia Limited | Butcher Well | 100% | Butcher Well JV (E38/3128) Final Surrender Report to the Department of Mines, Industry Regulation and Safety f |
| A127843 | 2021 | Gsm Mining Company Pty Ltd | Laverton - West Lake - Wallaby Hinterlan | 11% | Compulsory Partial Surrender (40%) of Exploration Licence E38/3025 for the period 17 June 2015 to 16 June 2021 |
| A126296 | 2021 | Anglogold Ashanti Australia Limited | Kraken | 39% | Kraken Project (C146/2018) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | 3.7% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | 2.9% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A122822 | 2020 | Anglogold Ashanti Australia Limited | Kraken | 40% | Kraken C146/2018 Annual Report to the Department of Mines, Industry Regulation and Safety for the period 01/01 |
| A119207 | 2019 | Anglogold Ashanti Australia Limited | Kraken | 40% | Kraken (C146/2018) Annual Report for the period 1 January 2018 to 31 December 2018, E39/01416, E39/01738, E39/ |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | 2.9% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | 3.7% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 15% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | 2.9% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | 4% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 20% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | 4% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | 3% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 23% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | 4% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | 1.4% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A108266 | 2016 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E |
| A109127 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam | 39% | Partial Surrender Report for E38/2345, Sunrise Dam Project C144/1995, for the period 19/05/2010 to 27/04/2016 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | 25% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.3% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | 3.3% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A106102 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project Exploration Licence 39/1403 Surrender Report for the Period 23 July 2009 to the 9 April 201 |
| A107019 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Exploration License 39/1504 (Mount Howe) Surrender Report for the Period 27 July 2010 to 26 July 2015 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 26% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 3.8% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.3% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 3.3% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.3% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A99225 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 54% | Sunrise Dam Group Partial Surrender Report for E39/1416 for the period 12/08/2009 to 24/07/2013 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | 3.3% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A100647 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 39% | Partial Surrender Report for Sunrise Dam E38/2345 for the period 19/05/2010 to 28/11/2013 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 14% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.2% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | 3.3% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 13% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.2% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 19% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | 3.3% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | 3.8% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | 6.3% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A86118 | 2009 | Rubicon Resources Ltd | Mount Howe | <1% | Combined Annual Technical Report Mt Howe Project, 1st January 2009 – 31 December 2009, E39/1132, 1182, 1317, 1 |
| A82634 | 2009 | Crescent Gold Ltd | South Laverton | 43% | Final Surrender Report South Laverton For Lease E38/1887 5th June 2008 to 10th June 2009 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 3.8% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A84279 | 2009 | Jindalee Resources Limited | Pyke Hill | 47% | Pyke Hill Project E38/2119, SURRENDER REPORT Covering the period ended 2nd September 2009 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | 9.8% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A78141 | 2008 | Minara Resources Ltd | Murrin Murrin East | <1% | TR1415 MURRIN MURRIN EAST PROJECT, ELEVENTH COMBINED ANNUAL TECHNICAL REPORT C354/1997 |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 9.1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A80314 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | 29% | PARTIAL SURRENDER AND SURRENDER REPORT 10 MAY 2000 TO 22 AUGUST 2008 |
| A74902 | 2007 | Minara Resources Ltd | Murrin Murrin East | <1% | Murrin Murrin East Project Tenth, Combined Annual Technical Report C354/1997, for the Period 1 March 2006 TO 2 |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | 9.8% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A76087 | 2007 | Barrick Gold Of Australia Ltd | Lake Carey | 18% | Lake Carey Project E38/448, M38/675 & M38/677 Annual Report Period 1 July 2006 - 30 June 2007 TECHNICAL REPORT |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 7% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A72256 | 2006 | Minara Resources Ltd | Eucalyptus / Murrin Murrin East | <1% | Eucalyptus /Murrin Murrin East Project, Ninth Combined Annual Technical Report C354/1997, For the Period 1 Mar |
| A71147 | 2005 | Minara Resources Ltd | Camelback | 1.4% | TR1386 Camelback Project, Twelth Annual Technical Report (E39/374), for the period 20 August 2004 to 19 August |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | 7% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | 9.5% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A70845 | 2005 | Jindalee Resources Ltd | Lake Carey | 64% | Lake Carey Project E38/1212, Report for the period ending 23 March 2005, Mt Margaret mineral field (Laverton). |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | 7% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | 9% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68999 | 2004 | Jindalee Resources Ltd | Lake Carey | 64% | Annual report for the period ending 23/03/2004 Lake Carey Project |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | 14% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A67298 | 2003 | Sons Of Gwalia Ltd | Mount Minnie | 3.3% | Annual Report for the period 17 August 2002 - 16 August 2003 Mount Minnie Project C88/2002: E39/173 M39/231 Re |
| A67427 | 2003 | Anaconda Operations Pty Ltd | Camelback | 1.4% | Tenth Annual Report for the period 20 August 2002 to 19 August 2003 Camelback Project E39/374 TR1312 |
| A65832 | 2003 | Sons Of Gwalia Ltd | Pikes Hollow | <1% | Annual Report for the period 1 December 2001 to 30 November 2002 Pikes Hollow E39/463 Report No: 0368-2003-01 |
| A66082 | 2003 | Jindalee Resources Ltd | Crimson Belle | 4.3% | Annual Report for the period ending 9 October 2002 Crimson Belle Project E39/879 |
| A66522 | 2003 | Sons Of Gwalia Ltd | Mount Minnie | 3.3% | Annual Report for the period 17 August 2001 - 16 August 2002 Mount Minnie Project C88/2002: E39/173, M39/231 R |
| A66956 | 2003 | Jindalee Resources Ltd | Lake Carey | 64% | Annual Report for the period ending 23 March 2003 E38/1212 Lake Carey Project Mt Margaret Mineral Field |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.6% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.6% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | 14% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A64638 | 2002 | Anaconda Nickel Ltd | Camelback | 1.4% | Technical Report 1251 E39/374, M39/720, M39/800, M39/801 Camelback Project Eight Annual Technical Report For p |
| A65603 | 2002 | Anaconda Nickel Ltd | Camelback | 1.4% | Technical Report 1280 E39/374, M39/720, M39/800, M39/801. Camelback Project. Ninth Annual Technical Report For |
| A65765 | 2002 | Jindalee Resources Ltd | Lake Carey | 64% | Lake Carey Project E38/1212. Annual Report For The Period Ending 23 March 2002. |
| A62683 | 2001 | Horizon Mining Nl | Lake Carey | 64% | Lake Carey Project E38/1212 Annual Report For The Period Ending 23rd March 2001 Mt Margaret Mineral Field Geol |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A62666 | 2001 | Metex Resources Ltd | Lake Carey | 6.2% | Annual Technical Report 16 May 2000 to 15 May 2001 Lake Carey Project E39/817. |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | 13% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | 12% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A61114 | 2000 | Sons Of Gwalia Ltd | Pikes Hollow | <1% | Pikes Hollow Project, Partial Surrender Report for the Period 01/12/1995 to 03/04/2000. E39/463. |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A61380 | 2000 | Anaconda Nickel Ltd | Camelback | 1.4% | Technical Report 905 E39/374 Camelback Project Seventh Annual Technical Report for the period 20th August 1999 |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A58422 | 1999 | Sons Of Gwalia Ltd | Pikes Hollow | <1% | Pikes Hollow Project, Annual Report For the Period 1/12/1997 to 30/11/1998, E39/463 |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | 12% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A59148 | 1999 | Anaconda Nickel Ltd | Camelback | 1.4% | Camelback Project, E39/374, Sixth Annual Technical Report for the Period 20th August 1998 to 19th August 1999 |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | 11% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A56201 | 1998 | Homestake Gold Of Australia Ltd | Camelback Bore | 1.4% | Camelback Bore - Project 460 Annual Report 20/08/97 - 19/08/98 Technical Report No:759, E39/374 |
| A56808 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | 20% | Lake Carey Project, Partial Surrender Report for theperiod 09/08/1992 to 11/11/1998, E38/448. |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A50019 | 1997 | Normandy Exploration Ltd | Mount Minnie | 31% | Mt Minnie E39/403 Annual Report for the Period 26 October 1995-25 October 1996 |
| A52508 | 1997 | Plutonic Operations Ltd | Camelback Bore | 1.4% | Project 460 - Camelback Bore, E39/374 Annual Report. 20/08/1996 - 19/08/1997 Technical Report No: 647, |
| A53120 | 1997 | Plutonic Operations Ltd | Camelback Bore | 1.4% | Camelback Bore Project, Partial Surrender Report, December 1997, E39/374 |
| A51270 | 1997 | Sons Of Gwalia Ltd | Pikes Hollow | <1% | North Eastern Goldfields Pikes Hollow Project Annual report for the period 01/12/95 to 30/11/96 Tenement E39/4 |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | 16% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | 6.3% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A49565 | 1996 | Sons Of Gwalia Ltd | Mount Florence | <1% | Partial Surrender Mount Florence Project E39/384 Relinquishment Report for the Period Ending 11 October 1996 |
| A51779 | 1996 | Mount Burgess Mining Nl | Mount Minnie | 3.5% | Mount Minnie Project, Partial Surrender Report for period ending 17th February 1997, E39/173. |
| A46564 | 1996 | Mount Burgess Mining Nl | Mount Florence | <1% | Mount Florence Gold Project Annual Technical Report for period ending October 11, 1995 Tenement E39/384 |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | 15% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A49566 | 1996 | Sons Of Gwalia Ltd | Mount Florence | <1% | Mount Florence Project Annual Technical Report for the period ending 11 October 1996 Tenements E39/384 Report |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | 6.6% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A45800 | 1995 | Dominion Mining Ltd | Camelback Bore | 1.4% | Annual Report 'Camel Back Bore' E39/374 From 20 August 1994 to 19 August 1995 |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | 15% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A44232 | 1995 | Normandy Exploration Ltd | Mount Minnie | 31% | Mount Minnie Project, Annual Report E39/403 for the period 26th October 1993 to 25th October 1994. |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | 14% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | 6.6% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A43162 | 1994 | Mount Burgess Mining Nl | Mount Florence | <1% | Mount Florence Gold Project Annual Technical Report, For the period ending October 11,1994 Tenement E39/384. |
| A42793 | 1994 | Dominion Mining Ltd | Camelback Bore | 1.4% | Annual report 'Camelback' E39/374 from 20 August 1993 to August 1994 |
| A39256 | 1993 | Placer Exploration Ltd | Island | 9.9% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A38219 | 1993 | Mount Burgess Mining Nl | Camelback - Butcher Well North | 4.6% | Annual report for the period ending 30/09/92 Butcher Well/Camelback Gold Project M39/118-120 M39/230 M39/232 |
| A39628 | 1993 | Mount Burgess Mining Nl | Camelback - Butcher Well North | 4.6% | Camelback - Butcher Well North Project, Annual Report for the period 30th September 1993, M39/118-120, 230 & 2 |
| A36956 | 1992 | Billiton Australia Pty Ltd | Mount Minnie | 3.5% | Partial Surrender Report- Mt. Minnie E 39/173 |
| A37886 | 1992 | Mount Burgess Mining Nl | Mount Minnie | 3.5% | Annual Report for the period 17/08/92-16/08/92 Mt Minnie Project E39/173 |
| A33077 | 1991 | Western Mining Corporation Ltd | Camelback | 4.6% | Annual report on Camelback Project M39/118 to M39/120, M39/232 for the period 05/10/89 to 04/10/90 WMC |
| A34829 | 1991 | Mim Exploration Pty Ltd | Camelback | 4.6% | Annual report for the period ending 30/09/91 Camelback Project M39/118 to M39/120 M39/230 M39/232 MIM Explorat |
| A32987 | 1991 | Billiton Australia Pty Ltd | Mount Minnie | 3.5% | Annual Report 1990 Mt Minnie E39/173 Report No.08.5349 |
| A28432 | 1989 | Billiton Australia Pty Ltd | Mount Minnie | 3.5% | Mt Minnie E39/173. Annual Report 1988-1989. Report No. 08.4186 |
| A22846 | 1987 | Billiton Australia Pty Ltd | Tin Dog Flat | 3.5% | Tin Dog Joint Venture Annual report 1987 Report No. 08.3993 (E39/72 E39/106 E39/173 M39/38 M39/147, M39/148, P |
| A9551 | 1980 | Swan Resources Ltd | Camel Back Range | 3.8% | Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H. |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | 2% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A1590 | 1965 | Mount Margaret Prospecting Syndicate | Yundamindera | <1% | Yundamindera Project, Non-statutory Report: Report on 78 Gold Products received 13th August 1964, TR70/2685, 2 |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | 11% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A85883 | 1753 | Saracen Gold Mines Pty Ltd | Butcher Well | 13% | M39/232 – BUTCHER WELL PROJECT PARTIAL SURRENDER REPORT – 11 SEPTEMBER 1990 TO 23 SEPTEMBER 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 39/2442 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 39/2442 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 39/2442? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.