E 39/1812
Register summary
- Holder
- Matsa Gold Pty Ltd
- Part of
- Matsa Resources Limited (ASX:MAT) as at 2025-06-30
- Local government
- Shire of Menzies, Shire of Laverton
- Application received
- 21 May 2014
- Commenced
- 8 May 2015
- Expiry
- 7 May 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146236 | 2025 | Matsa Gold Pty Ltd | Fortitude North | <1% | Final Report R29DAG0033#2024-25 (R29) |
| A138106 | 2024 | Fmg Resources Pty Ltd | E39/2206 | <1% | E39/2206 Annual Mineral Exploration Report for the period ending 14/11/2023. |
| A143715 | 2024 | Fortescue Ltd | Sunrise Bore | <1% | E39/2206 Sunrise Bore Final Surrender Report for the period 15 November 2022 to 30 May 2024 |
| A130028 | 2022 | Salt Lake Potash Limited | Lake Mingwal Potash | <1% | Combined Annual Technical Report C68 /2016, Lake Minigwal Potash Project, reporting period 1 January 2021 to 3 |
| A126769 | 2021 | So4 Fertiliser Developments Pty Ltd | Lake Minigwal | <1% | Annual Technical Report [C68/2016] Lake Minigwal Potash Project for the period ending 31/12/2020 |
131 more reports
| A128110 | 2021 | Matsa Gold Pty Ltd | Lake Carey | <1% | E39/1834 Partial Surrender Report, Lake Carey Project, for the period 17 June 2025 to 16 June 2021 |
| A123153 | 2020 | Matsa Gold Pty Ltd | Lake Carey | 20% | Combined Annual Report C5/2003, Lake Carey Project, 1 January 2019 to 31 December 2019 |
| A124660 | 2020 | Legacy Iron Ore Ltd | Sunrise Bore | <1% | Annual Mineral Exploration Report for the Sunrise Bore Project E39/01748 for the period ending 30/06/2020 |
| A125069 | 2020 | Legacy Iron Ore Ltd | Sunrise Bore | <1% | Partial Surrender Report for the Sunrise Bore Project E39/01748 for the period ending 30 June 2020 |
| A119612 | 2019 | Salt Lake Potash Limited | Lake Minigwal | <1% | Annual Technical Report Lake Minigwal Potash Project C68/2016 For the Period 1 January 2018 to 31 December 201 |
| A119197 | 2019 | Matsa Gold Pty Ltd | Lake Carey | 20% | Lake Carey Project C5/2003 Annual Report for the period 1 January 2018 to 31 December 2018 |
| A120813 | 2019 | Legacy Iron Ore Ltd | Sunrise Bore | <1% | Annual Mineral Exploration Report for the Sunrise Bore Project For the Period 1 July 2018 to 30 July 2019 |
| A121536 | 2019 | Matsa Gold Pty Ltd | Lake Carey | 47% | Voluntary Partial Surrender Report Lake Carey Project E39/1812 For the Period 8 May 2015 to 4 September 2019 |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | 15% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A117492 | 2018 | Legacy Iron Ore Ltd | Sunrise Bore | <1% | Sunrise Bore Annual Report 2018, E39/1748, 01 July 2017 - 30 June 2018 |
| A112275 | 2017 | Matsa Resources Limited | Lake Carey | 20% | Lake Carey Project C05/2003 Annual Report for the period 1 January 2015 to 31 December 2016, E39/01287.....E39 |
| A114521 | 2017 | Legacy Iron Ore Ltd | Sunrise Bore | <1% | Annual Mineral Exploration Report for the Sunrise Bore Project E39/01748 For the Period 1 July 2016 to 30 June |
| A109482 | 2016 | Matsa Resources Limited | Mount Weld | 37% | E39/01812, E39/01834 Mount Weld C80/2016 Annual Mineral Exploration Report For the Period 8 May 2015 to 7 May |
| A108809 | 2016 | Fortitude Gold Pty Ltd | Wilga | <1% | Wilga Project – E39/1803 First Annual Report to the DMP for the period 30th January 2015 to 29th January 2016 |
| A108808 | 2016 | Fortitude Gold Pty Ltd | Lake Carey | <1% | LAKE CAREY PROJECT Annual Report To The WA Department of Mines & Petroleum For The Period 1st January 2015 to |
| A109254 | 2016 | Matsa Resources Limited | Mount Weld | 47% | Mt Weld Project E39/1812 Annual Mineral Exploration Report for the period 08/05/2015 to 07/05/2016 |
| A109715 | 2016 | Legacy Iron Ore Ltd | South Laverton - Sunrise Bore | <1% | Annual Mineral Exploration Report – Sunrise Bore Project E 39/1748 for the period 1st July 2015 – 30th June 20 |
| A105191 | 2015 | Fortitude Gold Pty Ltd | Lake Carey | <1% | Annual Technical and Geological Report for Department of Mines and Petroleum in relation to the Lake Carey Pro |
| A106458 | 2015 | Fortitude Gold Pty Ltd | Lake Carey Project | 24% | Final Surrender Report E39/348 Lake Carey Project for the reporting period 28/10/1992 - 27/02/2015 |
| A106687 | 2015 | Legacy Iron Ore Ltd | South Laverton - Sunrise Bore | <1% | Combined Annual Mineral Exploration Report South Laverton Area Sunrise Bore Project E39/1748 For the Period 1s |
| A101298 | 2014 | Midas Resources Ltd | Lake Carey | 19% | Lake Carey Project C5/2003Annual Report to the Department of Mines and Petroleum for the period 01/01/13 to 31 |
| A103496 | 2014 | Midas Resources Ltd | Lake Carey | 75% | Lake Carey Project E39/1286 Final Surrender Report For the period 12th November 2008 to 17th April 2014. [C5/2 |
| A97172 | 2013 | Midas Resources Ltd | Lake Carey | 19% | Lake Carey Project Annual Report To the Department of Mines and Petroleum For the period 01/01/2012 to 31/12/2 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 12% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97893 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 58% | Sunrise Dam Project, Final Surrender Report for the period 01/04/2010 to 03/05/2013, E39/1507; P39/5046 & 5076 |
| A99208 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Surrender Report for E39/1433 for the period 23/09/2009 to 24/07/2013 |
| A100204 | 2013 | Goldphyre Wa Pty Ltd | Mount Weld | <1% | Annual Report Mount Weld Project E39/1355 for the period 16/10/12 – 15/10/13 |
| A100658 | 2013 | Midas Resources Ltd | Lake Carey | 75% | Lake Carey E39/1286 Partial Surrender to the Department of Mines and Petroleum for the period 12/11/2008 to 27 |
| A93207 | 2012 | Midas Resources Ltd | Lake Carey | 19% | Lake Carey C5/2003 Annual Report to the Department of Mines and Petroleum for the period 01/01/11 to 31/12/11, |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 2.3% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A94200 | 2012 | Goldphyre Wa Pty Ltd | Mount Weld | 100% | Annual Report Mount Weld Project P39/5085 for the period 21/05/11 – 20/05/12 |
| A95571 | 2012 | Anglogold Ashanti Australia | Sunrise Dam | 3.7% | Final Surrender Report for the period 01/01/2012 to 17/10/2012, E38/2348, E38/2349, E38/2477, E38/2478,2487, 2 |
| A95591 | 2012 | Anglogold Ashanti Australia Ltd | Wilga | 43% | WILGA, Final Surrender Report for E39/1003, E39/1458, P39/4890 and P39/5089 for the Period 23 September 2011 t |
| A95972 | 2012 | Anglogold Ashanti Australia Ltd | Goldphyre | <1% | Goldphyre Project, Annual Report for the period 16th October 2011 to 15th October 2012, E39/1355. |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 12% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A89696 | 2011 | Midas Resources Ltd | Lake Carey | 19% | Lake Carey Project, Annual Report for the period 01/01/10 to 31/12/10. (C5/2003) |
| A90765 | 2011 | Goldphyre Resources Pty Ltd | Mount Weld | 100% | Annual Report Mount Weld Project Prospecting Licence 39/5085 For the period: 21/05/10 – 20/05/11 |
| A91885 | 2011 | Anglogold Ashanti Australia Ltd | Wilga | 43% | Wilga Project, Annual Mineral Exploration Report for E39/1003, E39/1458, P39/4890 and P39/5089 for the Period |
| A92076 | 2011 | Anglogold Ashanti Australia Ltd | Goldphyre Farm | <1% | Mineral Exploration Report for E39/1355 for the period 16 October 2010 to 15 October 2011 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 3.5% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A86132 | 2010 | Midas Resources Ltd | Lake Carey | 7% | LAKE CAREY PROJECT Western Australia, Combined Annual Technical Report - C 5 / 2003 E39/348, M39/1, M39/198, M |
| A88405 | 2010 | Anglogold Ashanti Australia Ltd | Wilga | 43% | Annual Mineral Exploration Report for E39/1003, E39/1458, P39/4890 and P39/5089 for the Period 23 September 20 |
| A88623 | 2010 | Anglogold Ashanti Australia | Goldphyre Farm In | <1% | Goldphyre Farm-In Project Mineral Exploration Report for E39/1355 for the period 16 October 2009 to 15 October |
| A81017 | 2009 | Midas Resources Ltd | LAKE CAREY | 58% | LAKE CAREY PROJECT Western Australia Surrender Report P39/4643, For the Period 20 June 2008 to 14 January 2009 |
| A81018 | 2009 | Midas Resources Ltd | LAKE CAREY | <1% | LAKE CAREY PROJECT Western Australia, Surrender Report P39/4642 For the Period 20 June 2008 to 14 January 2009 |
| A81022 | 2009 | Midas Resources Ltd | LAKE CAREY | <1% | LAKE CAREY PROJECT, Western Australia Surrender Report E39/959, For the Period 06 September 2006 to 16 January |
| A81392 | 2009 | Anglogold Ashanti Australia | WILGA | 43% | WILGA PROJECT PARTIAL SURRENDER TECHNICAL REPORT FOR E39/1003 Blocks:- Kalgoorlie 967 y & Kalgoorlie 1039 d,e |
| A81454 | 2009 | Midas Resources Ltd | LAKE CAREY | 7% | LAKE CAREY PROJECT Western Australia, Combined Annual Technical Report C5/2003, For the Period 01 January 2008 |
| A84915 | 2009 | Anglogold Ashanti Australia | Wilga | 43% | Annual Technical Report for E39/1003 & P39/4890 for the period 23 Sep 2008 to 22 Sep 2009 (Wilga). |
| A85195 | 2009 | Goldphyre Resources Pty Ltd | Mount Weld | <1% | ANNUAL REPORT MT WELD PROJECT, EXPLORATION LICENCE 39/1355 FOR THE PERIOD: 16/10/08 – 15/10/09 |
| A76863 | 2008 | Mr Whitfield Gb | Wilga Hills | 22% | SURRENDER REPORT 23 JULY 2006 to 22 JULY 2007 WILGA HILLS PROJECT TENEMENT - E39/1131 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A77606 | 2008 | Metex Resources Ltd | William Bore | <1% | Annual Technical Report for the period 21/01/2007 to 20/01/2008, William Bore Project, E38/1451, E38/1928, E39 |
| A77724 | 2008 | Midas Resources Ltd | Lake Carey | 7.2% | Annual Technical Report on the Lake Carey Project for the period 01/01/2007 to 31/12/2007 E39/348, E39/462, E3 |
| A79020 | 2008 | Metex Resources Ltd | William Bore | <1% | William Bore Project, E39/1005 (block 967j) Partial Surrender Report for the period 17/05/2005 to 16/05/2008. |
| A80025 | 2008 | Carbon Energy Ltd | William Bore | <1% | SURRENDER REPORT for the period 22/01/2004 to 30/09/2008 |
| A80136 | 2008 | Anglogold Ashanti Australia Ltd | Wilga | 43% | WILGA PROJECT ANNUAL TECHNICAL REPORT FOR E39/1003 FOR THE PERIOD 23 SEPTEMBER 2007 – 22 SEPTEMBER 2008 |
| A76333 | 2007 | Metex Resources Ltd | Linden | <1% | Linden Project, Surrender Report E39/1102, for the period 09/08/2005 - 31/08/2007. Mount Margaret Mineral Fie |
| A74534 | 2007 | Metex Resources Ltd | William Bore | <1% | William Bore Project Area E38/1451, E39/1004-5, P39/4277-79-8, Annual Technical Report for the Period 21/01/20 |
| A74685 | 2007 | Midas Resources Ltd | Lake Carey / Fortitude | 11% | Lake Carey Project, Western Australia, Combined Annual Technical Report (C5/2003), E39/348, E39/462, M39/1, M3 |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A76601 | 2007 | Chalice Gold Mines Ltd | Wilga Well | 43% | Wilga Well Project Annual Technical Report for E39/1003 For the Period 23/09/06 to 22/09/07 |
| A72534 | 2006 | Metex Resources Ltd | William Bore | <1% | William Bore Project Area E39/1004-1005,4277-4278, Annual Technical Report for the Period 21/01/2005 to 20/01/ |
| A73484 | 2006 | Metex Resources Ltd | Linden | <1% | Linden Project Area E39/1102, Annual Report for the Period 09/08/2005 to 08/08/2006, (Edjudina). |
| A73695 | 2006 | Chalice Gold Mines Ltd | Wilga Well | 43% | Wilga Well Project E59/1003, Annual Technical Report for the Period 23/09/05 to 22/09/06, (Edjudina). |
| A71990 | 2006 | Midas Resources Ltd | Lake Carey / Fortitude | 5.6% | Lake Carey Project, Western Australia, Annual Technical Report, (E39/348, E39/462, E39/535, E39/865, E39/866, |
| A69950 | 2005 | Midas Resources Ltd | Lake Carey / Fortitude | 5.6% | Annual technical report for the period 01/01/04 - 31/12/04 Lake Carey Project, C05/2003, E39/348, E39/462, E39 |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | <1% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A68398 | 2004 | Midas Resources Ltd | Lake Carey | 5.6% | Annual Report for the period 01/01/2003-31/12/2003 Lake Carey Project E39/348, E39/462, E39/535, E39/865, E39 |
| A69006 | 2004 | Placer Dome Asia Pacific Ltd | Lands End | 34% | Lands End Project, E39/358, Mount Margaret Mineral Field Western Australia, Annual Exploration Report for the |
| A65868 | 2003 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Annual Report for the period 25/11/01-24/11/02 Wilga Well Tenement: E39/327 Report No: 0450-2003-01 |
| A66442 | 2003 | Placer (Granny Smith) Pty Ltd | Lands End | 34% | Lands End Project (M39/653, 654, 655, 667, 668, 669, 670 & 849), Mount Margaret Mineral Field Western Australi |
| A66552 | 2003 | Anglogold Australia Ltd | Relief Well and Sunrise Bore | <1% | Relief Well JV & Sunrise Bore JV, E39/329, M38/427, 429, 358-59, 260, Annual Report for the period 1 February |
| A66660 | 2003 | Placer (Granny Smith) Pty Ltd | Lands End | 34% | Lands End Project, Partial Surrender Report for the period 11th February 1993 to 10th February 2002, E39/358. |
| A64631 | 2002 | Aurora Gold (Wa) Pty Ltd | Lake Carey | 24% | H508 Lake Carey Project. Annual Technical Report for the period 1 January to 31 December 2001. Exploration Lic |
| A65757 | 2002 | Aurora Gold (Wa) Pty Ltd | Lake Carey | 24% | Lake Carey Project Annual Report For The Period 1 January 2002 To 31 December 2002. Exploration Licence 39/348 |
| A64619 | 2002 | Placer (Granny Smith) Pty Ltd | Lands End | 34% | Annual Report On Exploration Lands End E39/358 Mt Margaret Mineral Field, WA For The Period 11 February, 2001 |
| A62474 | 2001 | Placer (Granny Smith) Pty Ltd | Lands End | 23% | Annual Report On Exploration Lands End E39/358 and 636 ,for the period 11th February 2000 to 10th February, 20 |
| A63454 | 2001 | Anglogold Australia Ltd | The Counties | <1% | The Counties E39/834 & E39/836 Verification Report Annual Re port for the period 20 July to 19 July 2001. |
| A63759 | 2001 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Wilga Well Annual Report for the period 25/11/00 - 24/11/01 tenement: E39/327. Report No: 0450-14. |
| A64334 | 2001 | Anglogold Australia Ltd | Sunrise Well/Sunrise Bore/Relief Well | <1% | Annual Report for the period 1 February 2001 to 31 January 2002 Relief Well JV & Sunrise Bore JV E39/329, M38/ |
| A61788 | 2001 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Wilga Well Annual Report for the period 25/11/99-24/11/00 tenement E39/327. |
| A62096 | 2001 | Aurora Gold Ltd | Lake Carey | 24% | Annual Technical Report Lake Carey Project Western Australia exploration licence 39/348, mining leases 39/1, 3 |
| A62813 | 2001 | Anglogold Australasia Ltd | Sunrise Well-Sunrise Bore | <1% | Relief Well Sunrise Bore Project E39/329, M38/427, M38/429 M39/358, M39/359 & M38/260 Annual Report for the pe |
| A59772 | 2000 | Aurora Gold Ltd | Lake Carey | 24% | Annual Technical Report Lake Carey Project Western Australia Exploration Licence 39/348 for the period 28 Oct |
| A60247 | 2000 | Anglogold Australasia Ltd | Relief Well | <1% | Relief Well JV & Sunrise Bore JV E39/329, M38/427-429, M39/358-360, M38/260 Annual report for the Period 1/2/1 |
| A60643 | 2000 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Wilga Well, Annual Report for the Period 25/11/98 to 24/11/1999, E39/327. |
| A60915 | 2000 | Placer (Granny Smith) Pty Ltd | Lands End | 23% | Annual Report on Exploration, Lands End E39/358 and 636, Mt Margaret Mineral Field WA, for the period 11 Febru |
| A57336 | 1999 | Aurora Gold Ltd | Lake Carey | 24% | H508 Larry Carey Project W.A. 28/10/97 - 27/10/98 Exploration Licence: 39/348 |
| A57542 | 1999 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Wilga Well - Annual Report For the Period 25/11/97-24/11/98 E29/327 |
| A57891 | 1999 | Placer (Granny Smith) Pty Ltd | Lands End | 34% | Lands End Project, E39/358 ,for the year ending 10/02/1999. |
| A58149 | 1999 | Acacia Resources Ltd | Relief Well | <1% | Relief Well JV And Sunrise Bore JV E39/329 M38/427,428,429, 260 M39/358,359,360 Annual Report For the Period 0 |
| A53599 | 1998 | Aurora Gold Ltd | Lake Carey | 24% | Lake Carey Project,Partial Surrender Report for the period 28th October 1992 to 2nd April 1998, E39/348. |
| A53598 | 1998 | Aurora Gold Ltd | Lake Carey | 24% | Annual Technical Report Lake Carey Project Western Australia Exploration Licence 39/348 for the period 28/10/9 |
| A54294 | 1998 | Placer (Granny Smith) Pty Ltd | Lands End | 34% | Lands End Project, E39/358, Year Ending 10/02/98 |
| A50300 | 1997 | Acacia Resources Ltd | Mount Lucky | 54% | Mount Lucky East Project, Final Report E39/365 February 1997. |
| A51299 | 1997 | Placer (Granny Smith) Pty Ltd | Black Swan | 10% | Combined Mineral Exploration Report Black Swan Project E38/421 E38/427 E38/428 E39/358 P38/2381 P38/2476 P38/2 |
| A53600 | 1997 | Acacia Resources Ltd | Relief Well | <1% | Relief Well JV and Sunrise Bore JV E39/329 M38/427-429 M39/358 M39/359 M39/360 M38/260 1997 Annual Report for |
| A50043 | 1997 | Sons Of Gwalia Ltd | Wilga Well | 2.1% | Wilga Well Joint Venture Annual report for the year ending 24th November 1996 Tenement E39/327 |
| A50570 | 1997 | Acacia Resources Ltd | Relief Well | <1% | Relief Well Joint Venture and Sunrise Bore E39/329 M38/427 M38/428 M38/429 M39/358 M39/359 M39/360 and M38/260 |
| A49663 | 1996 | Aurora Gold Ltd | Lake Carey | 24% | Annual Technical Report Lake Carey Project Western Australia Exploration Licence E39/348 for the period 28 Oct |
| A46873 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well | 2.1% | Wilga Well E39/327 Annual report for the year to 24 November 1995 |
| A46975 | 1996 | Acacia Resources Ltd | Relief Well | <1% | Relief Well E39/329 1995 annual report for the period January 1995 to December 1995 Report NO. 08.7642 |
| A48007 | 1996 | Placer (Granny Smith) Pty Ltd | Black Swan | 9.9% | Project No. 591 Combined Mineral Exploration Report Black Swan Project E38/359 E38/371 (MLA's38/461 MLA38/462) |
| A44007 | 1995 | Acacia Resources Ltd | Relief Well | <1% | Relief Well Joint Venture E39/329, P39/2520 1994 Annual Report for the period January 1994 to 31 December 1994 |
| A44570 | 1995 | Placer Exploration Ltd | Black Swan | 9.8% | Combined Mineral Exploration Report Black Swan Project E38/359,371,420,421,427,428, E39/358,M38/370,378,379 P3 |
| A45379 | 1995 | Acacia Resources Ltd | Sunrise Bore | <1% | Sunrise Bore M38/260 And A Portion Of E39/329 ANNUAL REPORT for the period 31/1/94 to 31/1/95 |
| A46675 | 1995 | Aurora Gold Ltd | Lake Carey | 24% | Annual Technical Report Lake Carey Project Western Australia Exploration Licence E39/348 for the period 28 Oct |
| A43371 | 1995 | Aurora Gold Ltd | Lake Carey | 24% | Annual technical report Lake Carey project W.A exploration Licence E39/348 For the period 28th October 1993 to |
| A43703 | 1995 | Gasgoyne Gold Mines Nl | Wilga Well | 2.1% | Wilga Well project. Wilga Well- E39/327 Annual report for year to 24th November 1994 |
| A46637 | 1995 | Acacia Resources Ltd | Mount Lucky | 21% | Dominion Mining Mt Lucky Project E39/364 E39/365 Annual report for the period January 1st 1995 to December 31s |
| A40378 | 1994 | Dominion Mining Ltd | Edjudina | 21% | Annual report for the period 01/93-01/94 Edjudina/Wilga Project E39/364 E39/365 |
| A40687 | 1994 | Aurora Gold Ltd | Lake Carey | 24% | Annual report for the period 01/01/93-31/10/93 Lake Carey Project E39/348 |
| A40377 | 1994 | Dominion Mining Ltd | Sunrise Well | <1% | Annual report for the period 01/93-01/94 Sunrise Well Prospect E39/329 |
| A41274 | 1994 | Placer Exploration Ltd | Black Swan | 9.9% | Annual Report for the Period 31/03/93 - 31/03/93 Black Swan Project E38/359,371,420,421,427,428,E39/358,M38/3 |
| A38402 | 1993 | Ashton Gold Wa Ltd | Lake Carey | 24% | Annual report for the period 01/01/92-31/12/92 Lake Carey Project E39/348 SC17/05 |
| A38516 | 1993 | Dominion Mining Ltd | Sunrise Well | <1% | Annual Report for the period 08/92-01/93 Sunrise Well(Edjudina) Project E39/329 |
| A40536 | 1993 | Gasgoyne Gold Mines Nl | Wilga Well | 2.1% | Annual report for the period 25/11/92-24/11/93 Wilga Well Project E39/327 |
| A37704 | 1992 | Gasgoyne Gold Mines Nl | Wilga Well | 2.1% | Annual report for the period ending November 1992 Wilga Well Project E39/327 |
| A34983 | 1991 | Mr Mckeaig Ls | Sunrise Well | <1% | Sunrise Well Prospect Summary Report to 10/12/91 (R Report for 1991; E39/329; M38/260) |
| A9273 | 1973 | Us Steel International Inc | Ghost Rock | 8.9% | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A3742 | 1973 | Pacminex Pty Ltd | Wilga | 1.4% | Wilga Project, Annual Report for the period ending 31/10/1972, MC39/64-70, 73-79, 82-88, 91-97, 100-104, 109-1 |
| A2691 | 1972 | Australian Selection Pty Ltd | Wilga | 4.2% | Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9 |
| A1366 | 1970 | Australian Selection Pty Ltd | Wilga | 6.8% | Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 & |
| A1365 | 1968 | Australian Selection Pty Ltd | Wilga | 2.1% | Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747, |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | <1% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 7 months · 7 May 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 39/1812 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 39/1812? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.