NextMaps›WA Tenements›E 39/1297

E 39/1297

LiveExploration LicenceShire of LeonoraMt. Morgans District
Area
930ha
Expires
Oct 2026
in 25 days
WAMEX reports
100
WA median is 53
Report drilling
54
of 100 reports
Leonora Explore on the live map

Register summary

Holder
Northern Star (Carosue Dam) Pty Ltd
Part of
Northern Star Resources Ltd (ASX:NST) as at 2026-06-30
Local government
Shire of Leonora, Shire of Menzies
Application received
31 Jan 2007
Commenced
24 Oct 2008
Expiry
23 Oct 2026
Term
5 Years (Extended)

Exploration history on this ground

100 historical WAMEX exploration reports intersect E 39/1297: 53 report geochemistry or sampling, 61 include a digital data package.
When this ground was worked · 94 of 100 reports dated
61960s
61970s
1980s
251990s
252000s
272010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A132369 2022 Northern Star (Carosue Dam) Pty Ltd Mount Celia <1% Final Surrender Report on E39/1674, Mount Celia Project, for the period 7 August 2012 to 6 August 2022
A126462 2021 Saracen Gold Mines Pty Limited Yundamindera <1% Exploration Licence 39/1810 Partial Surrender Report for the Period 23 January 2015 to 22 January 2021
A122389 2020 Saracen Gold Mines Pty Limited Yundamindera 4.8% Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2018 to 31 October 2019
A123330 2020 Alibaba Resources Pty Ltd Larkin Find <1% Larkin Find Nickel Deposit E39/01799 for the period ending 22/04/2020
A125696 2020 Saracen Gold Mines Pty Limited Yundamindera 5.9% Yundamindera Project (C96/2016) Annual Report for the Period 1 November 2019 to 31 October 2020
95 more reports
A119280 2019 Hawthorn Resources Limited; Westgold Resources Limited Yundamindera 4.8% C96/2016 Yundamondera Project Annual Report for the period 1 November 2017 to 31 October 2018
A115738 2018 Hawthorn Resources Limited Yundamindera 4.8% C96/2016 Combined Group Report 2017 - Yundamindera Project For the Period 1 November 2016 to 31 October 2017,
A112186 2017 Hawthorn Resources Limited; Metals X Limited Yundamindera 4.8% Yundamindera Project C96/2016 Annual Report For the Period 1 November 2015 to 31 October 2016, E39/01292, E39/
A107895 2016 Hawthorn Resources Limited Yundamindera 100% Yundamindera Project E39/1297 Coffey Bore South Annual Report for the period 24 October 2014 - 23 October 2015
A108827 2016 Hawthorn Resources Limited Yundamindera <1% Exploration Licence E39/1810 YUNDAMINDERA Mt Howe – Coffey Bore East Annual Report for the period 23 January 2
A107160 2015 Hawthorn Resources Limited Yundamindera - Mt Howe <1% Annual Report for E39/1674 Yundamindera - Mt Howe Project from 7 August 2014 to 6 August 2015
A107495 2015 Hawthorn Resources Limited Yundamindera - Middle Box Bore <1% Annual Mineral Exploration Report E39/1295 Yundamindera - Middle Box Bore Project For the Period 22 August 201
A104559 2015 Hawthorn Resources Limited Yundamindera - Coffey Bore South 100% Yundamindera Project E39/1297 – Coffey Bore South Annual Report for the period 24 October 2013 to 23 October 2
A105467 2015 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I
A103981 2014 Hawthorn Resources Limited Yundamindera – Middle Box Bore <1% Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2013 to 21 August 2014
A104328 2014 Hawthorn Resources Limited Yundamindera <1% Yundamindera – Mt Howe E39/1674 ANNUAL REPORT FOR THE PERIOD 7 August 2013 to 6 August 2014
A101326 2014 Hawthorn Resources Limited Yundamindera - Coffey Bore South 100% Yundamindera Project E39/1297 – Coffey Bore South, Annual Report for the period 24 October 2012 - 23 October 2
A101784 2014 Saracen Gold Mines Pty Ltd Mount Howe <1% Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I
A97466 2013 Saracen Gold Mines Pty Ltd Mount Howe <1% MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007.
A97692 2013 Hawthorn Resources Limited Yundamindera <1% Yundamindera P39/4701 Annual Report for the period 24 October 2011 to 23 October 2012
A96685 2013 Hawthorn Resources Limited Yundamindera - Coffey Bore South 100% Yundamindera Project E39/1297 - Coffey Bore South Annual Report for the period 24 October 2011 TO 23 October 2
A100284 2013 Hawthorn Resources Limited Yundamindera – Mt Howe <1% Yundamindera – Mt Howe E39/1674 Annual Report for the period 7 August 2012 to 6 August 2013
A100285 2013 Hawthorn Resources Limited Yundamindera – Middle Box Bore <1% Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2012 to 21 August 2013
A95805 2012 Hawthorn Resources Limited Yundamindera – Middle Box Bore <1% Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2011 to 21 August 2012
A92683 2012 Hawthorn Resources Limited Yundamindera 100% YUNDAMINDERA PROJECT, E39/1297 – Coffey Bore South, ANNUAL REPORT FOR THE PERIOD 24 October 2010 TO 23 October
A93045 2012 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011
A91995 2011 Hawthorn Resources Limited Yundamindera – Middle Box Bore <1% Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2010 to 21 August 2011
A89114 2011 Hawthorn Resources Limited Yundamindera 100% Yundamindera Project, Annual Report for the period 24th October 2009 to 23rd October 2010, E39/1297.
A89379 2011 Rubicon Resources Ltd Mount Howe <1% Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010
A87441 2010 Hawthorn Resources Limited Yundamindera <1% E39/1138 The Box Soak Project, Partial Surrender Report for the period 2 May 2006 to 1 May 2010
A87442 2010 Hawthorn Resources Limited Yundamindera <1% E39/1138 Annual Report for the Period 2 May 2009 to 1 May 2010
A88518 2010 Hawthorn Resources Limited Yundamindera – Middle Box Bore <1% Yundamindera – Middle Box Bore E39/1295 Annual Report for the period 22 August 2009 to 21 August 2010
A86118 2009 Rubicon Resources Ltd Mount Howe <1% Combined Annual Technical Report Mt Howe Project, 1st January 2009 – 31 December 2009, E39/1132, 1182, 1317, 1
A86473 2009 Hawthorn Resources Limited Yundamindera / Middle Box Bore <1% Tenement E39/1295 Annual Report for the Period 22 August 2008 to 21 August 2009
A78307 2008 Saracen Gold Mines Pty Ltd Mount Celia 1.4% E39/833 Mount Celia Project Partial surrender Report 18 AUGUST 2003 TO 17 AUGUST 2007 C139/2002
A80517 2008 Saracen Gold Mines Pty Ltd Mount Celia 2.4% SURRENDER REPORT 16 MAY 2000 TO 15 MAY 2008
A81158 2008 Rubicon Resources Ltd MT HOWE <1% Mt Howe Project Combined Report, 1st January 2008 – 31 December 2008
A76535 2007 Saracen Gold Mines Pty Ltd Mount Celia <1% MT CELIA PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007. CR GROUP: C139/2002
A73243 2006 Saracen Gold Mines Pty Ltd Mount Celia <1% Mt Celia Project, Annual Report, 01 July 2005 to 30 June 2006, C139/2002 (Edjudina).
A69777 2005 Great Gold Mines Nl Pinjin 2.6% EXPLORATION LICENCE: E39/728, SURRENDER REPORT FOR PERIOD 23 MAY 2000 TO 29 DECEMBER 2004 (Pi
A71276 2005 Great Gold Mines Nl Savannah 5.8% Savannah C66/2002, Combined Group Reporting Annual Report, For the period 31 December 2003 to 30 December 2004
A71178 2005 St Barbara Mines Ltd Mount Celia <1% Mount Celia Project, Annual report for the period 1 July 2004 - 30 June 2005, (C139/2002, Report no 0522-2005-
A68860 2004 Gutnick Resources Nl Savannah 4.2% Exploration Licences:E31/313, E31/315, E31/352 E31/353, E31/433, E31/434, E31/453, E39/714, E39/728, E39/743,
A69059 2004 Sons Of Gwalia Ltd Mount Celia <1% Annual report for the period 01/07/2003-30/06/2004 Mount Celia Project (C139/2002), M39/307-309, M39/639, M39/
A69370 2004 Great Gold Mines Nl Savannah 9.4% Savannah Project, Partial Surrender Report for the period 31st March 2000 to 11th August 2004, E31/433-434; E3
A69146 2004 Great Gold Mines Nl Savannah <1% Exploration licences E31/453, E39/743,and E39/7812 C66/2002 Savannah Project, Joint surrender report for the p
A66972 2003 Gutnick Resources Nl Savannah 4.2% Joint Annual Report for the period 31 December 2001 to 30 December 2002 Savannah Project C66/2002: E31/313,315
A67068 2003 Sons Of Gwalia Ltd Butcher Well 2.4% Partial Surrender Report for E39/827 for the period 16 May 2000 to 16 May 2003 C345/1993:E39/827 Report No.029
A66524 2003 Sons Of Gwalia Ltd Butcher Well <1% Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423,
A64386 2002 Gutnick Resources Nl Pinjin 2.6% Annual Report For The Period 23 May 2000 To 22 May 2001. Exploration Licences: E39/728
A64070 2002 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344,
A64894 2002 Anaconda Nickel Ltd Abador <1% Technical Report TR 1266 Abador Project E39/392 Eighth Annual Technical Report For the period 21 February 2001
A64387 2002 Gutnick Resources Nl Pinjin <1% Annual Report For The Period 2 June 2000 To 1 June 2001. Exploration Licences: E39/781.
A64388 2002 Gutnick Resources Nl Pinjin 47% Annual Report For The Period 2 June 2000 To 1 June 2001 Exploration Licences: E39/810.
A62805 2001 Anaconda Nickel Ltd Abador <1% Technical Reort TR 1157 Abador Project E39/392 . Seventh Annual Technical Report June 2001. Edjudina (SH51-6)
A62854 2001 Sons Of Gwalia Ltd Camelback / Butcher Well / Linden <1% Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3
A61162 2000 Anaconda Nickel Ltd Larkins Find <1% Technical Report TR 862. Larkins Find Project E39/392. Sixth Annual technical Report for the period 21st Febru
A58322 1999 Acacia Resources Ltd Camelback 47% Coffey Bore E39/596 Surrender Report 06/1999 Mt Morgan District, Mt Margaret Mineral Field Yilgarn W.A.
A58244 1999 Anaconda Nickel Ltd Larkin Find <1% LARKIN FIND PROJECT E39/392 FIFTH ANNUAL TECHNICAL REPORT FOR THE PERIOD 21st FEBRUARY 1998 TO 20th FEBRUARY
A54584 1998 Mount Burgess Mining Nl Butcher Well 1.6% Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1
A57000 1998 Delta Gold Ltd Mount Howe - Puddle - Millicent 6.9% Mt Howe- Puddle- Millicent Project, Annual Report for the period 15/01/1998 to 14/01/1999, E38/290, E39/353, E
A53902 1998 Acacia Resources Ltd Camelback 13% Camelback Project P39/3458-3462,E39/491,E39/502, E39/503 E39/596 Annual report for the period 01/01/97-31/12/
A54421 1998 Abador Gold Nl Larkin Find <1% Larkin Find Project, Annual Report Exploration Licence:39/392 Mt Margaret Mineal Field, 21/02/97 - 20/02/98
A54577 1998 Sons Of Gwalia Ltd Mount Hornet 15% Butcher Well Joint Venture, Mount Hornet Project E39/405, Final Report for the Period 16/11/97 - 30/04/98.
A54383 1998 Resource Exploration Nl Mount Howe 6.9% Annual Report for the Mt Howe Prospect E31/186, E38/290, E39/353, near Laverton W.A. (Period January - Decembe
A55110 1998 Delta Gold Ltd Puddle 2.5% Puddle Project, Partial Surrender Report 15/01/93 - 13/03/98 E39/353
A49910 1997 Mount Burgess Mining Nl Mount Hornet 15% Mount Hornet Project Partial Relinquishment Report for Period Ending 15th November 1996 Tenement E39/405
A51028 1997 Abador Gold Nl Larkin Find <1% Exploration Licence E39/392 Larkin Find Edjudina Region Western Australia Annual report for the period 21 Febr
A51742 1997 Abador Gold Nl Larkin Find <1% Larkin Find Project, Partial Surrender Report E39/392, February 1997.
A51461 1997 Resource Exploration Nl Mount Howe - Puddle 9.8% Annual Report on Exploration 1 January 1995 to 31 December 1996 Mt Howe - Puddle Project, E39/290, E39/353.
A47243 1996 Mpi Gold Pty Ltd Mount Hornet 15% Mount Hornet Project, Annual Technical Report, For the Period 16 November 1994 to 15 November 1995, E39/405.
A49770 1996 Sons Of Gwalia Ltd Mount Hornet 15% Butcher Well Joint Venture Mount Hornet Project E39/405 Annual Technical Report for the Period 16 November 199
A47823 1996 Abador Gold Nl Larkin Find <1% Exploration Licence E39/392 Larkin Find Western Australia Annual report for the period 21 February 1995 to 20
A44163 1995 Delta Gold Ltd Mount Howe 9.8% Mt Howe-Puddle Project, Annual Report November 1993 to December 1994 (E39/290, E39/353)
A44297 1995 Abador Gold Nl Larkin Find <1% Exploration licence E39/392 Larkin Find W.A Annual report for the period 21st February 1994 to 20th February 1
A46310 1995 Delta Gold Ltd Mount Howe Puddle Millicent 6.9% Annual Technical Report on Mt Howe/Puddle/Millicent for the period 15 January, 1995 to 14 January, 1996. Repor
A41741 1994 Delta Gold Ltd Mount Howe - Puddle 9.8% Annual Report for the period 11/92-12/93 Mt Howe - Puddle Project E39/290,353
A43316 1994 Mining Project Investors Pty Ltd Mount Hornet 15% Mt Hornet Project, Summary of Open File Data and Annual Technical Report on MPI Exploration for period ending
A42461 1994 Delta Gold Ltd Mount Howe 15% Mt Howe Project, Partial Surrender Report for period ending 17th October 1994, E39/290.
A38823 1993 Delta Gold Ltd Mount Howe - Choirboy 15% Annual Report for the period 01/92-12/92 Mt Howe/ChoirBoy Project E39/290
A33992 1991 Delta Gold Ltd Mount Howe 15% Mount Howe Project, Partial Surrender Report, April 1991, E39/290.
A35195 1991 Delta Gold Ltd Mount Howe 15% Mount Howe E39/290 Annual Report for 1991 (Gap Bore Project)
A3932 1973 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37
A2782 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H.
A2829 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H.
A3618 1972 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3
A941 1971 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H.
A271 1970 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H.
A1121 1969 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on
A1122 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the
A1123 1969 International Nickel Southern Exp Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re
A269 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H.
A270 1968 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep
A268 1967 International Nickel Aust Ltd Lake Carey <1% Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H.
A79710 1753 Saracen Gold Mines Pty Ltd Mount Celia <1% MT CELIA PROJECT, ANNUAL REPORT, 01 JULY 2007 TO 30 JUNE 2008. CR GROUP: C139/2002, TENEMENTS: E39/315, E39/
A81390 1753 Saracen Gold Mines Pty Ltd MT CELIA 1.4% E39/833 - MT CELIA PROJECT, SURRENDER REPORT – 18 AUGUST 2003 TO 14 DECEMBER 2008
A85720 1753 Hawthorn Resources Limited Yundamindera 100% YUNDAMINDERA PROJECT E39/1297 – Coffey Bore South ANNUAL REPORT FOR THE PERIOD 24 October 2008 TO 23 October 2
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A82961 1753 Hawthorn Resources Limited Yundamindera <1% Exploration Licence E39/1138 YUNDAMINDERA PARTIAL SURRENDER REPORT FOR THE PERIOD 2 MAY 2006 TO 1 MAY 2009
A84475 1753 Saracen Gold Mines Pty Ltd Mount Celia <1% Mount Celia Project, ANNUAL REPORT, 01 JULY 2008 TO 30 JUNE 2009. C139/2002, E39/350, E39/371, E39/409, E39/83
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
25 days · 23 Oct 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 39/1297 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 39/1297? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.