E 38/4061
Register summary
- Holder
- Mining Equities Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 12 Dec 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153368 | 2026 | Rincon Resources Limited | Garden Well | 20% | Final Surrender Report C116/2020 Garden Well Project for the period ending 16/12/2025. E 38/3063,E 38/3064,E 3 |
| A135654 | 2023 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Partial Surrender Report Central Laverton -E38/3052 for the period ending 25/04/2023. |
| A134696 | 2023 | Magnetic Resources Nl | Hawks Nest | <1% | Partial Surrender Report, E38/3127 Hawks Nest, Western Australia, Reporting Period 16 February 2017 to 15 Feb |
| A136356 | 2023 | Seatommy Pty Ltd | PETER DAM | 62% | Peter Dam Partial Surrender Report P38/4160 for the period ending 15/06/2023 |
| A130268 | 2022 | Pursuit Exploration Pty Ltd | Gladiator | 25% | Gladiator Project Annual Report C67/2021 for the period ending 31/12/2021. |
94 more reports
| A133248 | 2022 | Mining Equities Pty Ltd | Marabou | 100% | Annual Report for the Marabou Project (E38/3064) from 07/01/2022 to 07/01/2023 |
| A126718 | 2021 | Pursuit Minerals Ltd | Gladiator | 100% | Annual Technical Report for E 38/3064 Gladiator project for the period 7 January 2020 to 6 January 2021 |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124529 | 2020 | Seatommy Pty Ltd | Peter Dam | 62% | Peter Dam Annual Report P38/4160 for the period 16 June 2019 to 15 June 2020 |
| A124221 | 2020 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period ending 28/02/2020 |
| A125553 | 2020 | Magnetic Resources Nl | Hawks Nest | <1% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, M38/1041, P38/4201, P38/4317–4324 |
| A122259 | 2020 | Mining Equities Pty Ltd | Marabou | 100% | Annual Report for the Marabou Project, E38/3064, 7 January 2019 to 6 January 2020 |
| A121910 | 2019 | Magnetic Resources Nl | Hawks Nest | <1% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, P38/4201, P38/4317–4324), Western |
| A119009 | 2019 | Mining Equities Pty Ltd | Marabou | 100% | Annual Repot for the Marabou Project (E38/3064) from 7/1/2018 to 6/1/2019 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120411 | 2019 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
| A120715 | 2019 | Seatommy Pty Ltd | PETER DAM | 62% | Peter Dam Annual Report P38/4160 for the period 16 June 2018 to 15 June 2019 |
| A118435 | 2018 | Magnetic Resources Nl | Hawks Nest | <1% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, P38/4201, P38/4317–4324), Western |
| A116239 | 2018 | Matador Mining Pty Ltd | Marabou | 100% | Marabou E38/3064 Annual Tenement Report for the period 7 January 2017 to 6 January 2018 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A116824 | 2018 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report For the Period 1 March 2017 to 28 February 2018 |
| A117348 | 2018 | Seatommy Pty Ltd | Peter Dam | 62% | P38/04160 Peter Dam Annual Report For the Period 16 June 2017 to 15 June 2018 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A114491 | 2017 | Seatommy Pty Ltd | Peter Dam | 62% | Peter Dam P38/04160 Annual Report For the Period 16 June 2016 to 15 June 2017 |
| A112029 | 2017 | Poseidon Nickel Limited | Laverton West | 3.1% | Laverton West E38/1930 Surrender Report for the period 13/04/2007 to 11/05/2016 |
| A112328 | 2017 | Matador Mining Pty Ltd | Marabou | 100% | Annual Tenement Report E30/3064 Marabou Project for the period 7 January 2016 to 6 January 2017 |
| A113931 | 2017 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119/2014 Central Laverton Project for the period 1 March 2016 to 28 February 2017, E38 |
| A108204 | 2016 | Poseidon Nickel Limited | Laverton West | 3% | West Laverton (C85/2014) Annual Technical Report 01/01/2015 - 31/12/2015, E 38/01930, M 38/00372, M 38/00694, |
| A108862 | 2016 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119_2014 Central Laverton Project for the period 1 March 2015 to 28 February 2016 |
| A109824 | 2016 | Seatommy Pty Ltd | Peter Dam | 62% | Annual Report PETER DAM PROJECT P38/4160 For the period: 16/06/15 – 15/06/16 |
| A104754 | 2015 | Poseidon Nickel Limited | Laverton West | 3% | C85/2014 LavertonWest Project - Annual Report for the period 1 January 2014 to 31 December 2014, E38/1930, M38 |
| A105958 | 2015 | Focus Minerals Ltd | Central Laverton | <1% | Combined Annual Report Central Laverton Project - C119/2014 Western Australia For the Period 1 March 2014 to 2 |
| A102352 | 2014 | Poseidon Nickel Limited | Laverton West | 3.1% | Laverton West Project E38/1930 for the period 13 April 2013 to 12 April 2014 |
| A101668 | 2014 | Poseidon Nickel Limited | Laverton West | 2.6% | P38/3717 Laverton West Project Annual Report for the period 6 February 2013 to 5 February 2014 |
| A102282 | 2014 | Focus Minerals Ltd | Central Laverton | <1% | Central Laverton Project, C310/2011, Combined Annual Report, 01/03/2013 to 28/02/2014, E38/1349, E38/2203, M38 |
| A102944 | 2014 | Poseidon Nickel Ltd | Windarra | <1% | Windarra Project, Final Surrender Report for the period 14/09/2005 to 11/04/2014, E38/1752. |
| A104222 | 2014 | Poseidon Nickel Limited | East Laverton | <1% | East Laverton Project E38/2706 – Surrender Report for the period 25/10/2012 to 05/09/2014 |
| A104223 | 2014 | Poseidon Nickel Ltd | East Laverton | <1% | East Laverton Project E38/2705 – Surrender Report for the period 25 October 2012 to September 5 2014 |
| A98404 | 2013 | Focus Minerals (Laverton) Pty Ltd | Central Laverton | <1% | Central Laverton Project, Annual Report for the period 01/03/2012 to 28/02/2013, E38/1349........E38/2321;M38/ |
| A99043 | 2013 | Poseidon Nickel Limited | Windarra | <1% | Windarra Nickel Project - Combined Annual Report For the Period 22 April 2012 to 21 April 2013, C79/2006, E38/ |
| A97205 | 2013 | Focus Minerals (Laverton) Pty Ltd; Panoramic Resources Ltd; | West Laverton | 2.6% | West Laverton Project, Annual Report for the period 30/11/2011 to 29/11/2012, E38/1930; E39/1296; M38/46, 372, |
| A98016 | 2013 | Focus Minerals (Laverton) Pty Ltd | West Laverton | 3.1% | PARTIAL SURRENDER REPORT ON EXPLORATION FOR THE PERIOD 13 APRIL 2007 to 12 APRIL 2013 Tenement: E38/1930 [West |
| A92556 | 2012 | Poseidon Nickel Limited | Windarra | 14% | Windarra Project, Final Surrender Report for the period 3rd October 2006 to 2nd October 2011, E38/1622. (C79/2 |
| A92554 | 2012 | Poseidon Nickel Limited | Windarra | <1% | Windarra Project, Final Surrender Report for the period 9th January 2007 to 8th January 2012, E38/1587. ( C79/ |
| A92841 | 2012 | Crescent Gold Ltd; Magma Metals Ltd; Poseidon Nickel Ltd | West Laverton | 2.6% | West Laverton Project, Annual Report for the period 30/11/2010 to 29/11/2011, E38/1930; E39/1296; M38/46, 372, |
| A93988 | 2012 | Crescent Gold Ltd | Central Laverton | <1% | Combined Annual Report on Exploration for the period 01/03/2011 to 28/02/2012; Central Laverton Project; C310/ |
| A94461 | 2012 | Poseidon Nickel Limited | Windarra | 1.6% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2011 to 21 April 2012, C79/2006, E38/ |
| A94667 | 2012 | Poseidon Nickel Ltd | Windarra | <1% | Windarra Nickel Project Final Surrender Report E38/1450 for the period 22nd April 2004 to 29th May 2012 |
| A89112 | 2011 | Poseidon Nickel Limited | Windarra | 14% | Windarra Project, Partial Surrender Report for the period 3rd October 2006 to 28th September 2010, E38/1622. |
| A89308 | 2011 | Poseidon Nickel Limited | Windarra | <1% | E38-1587 - Partial Surrender Report, As at 8th January, 2011 |
| A89806 | 2011 | Crescent Gold Ltd | West Laverton | 2.6% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; West Laverton Project; C5/2011 |
| A90143 | 2011 | Crescent Gold Ltd | Central Laverton | <1% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Central Laverton Project; C6/20 |
| A91181 | 2011 | Poseidon Nickel Limited | Windarra | 1.3% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2010 to 21 April 2011, C79/2006, E38/ |
| A91289 | 2011 | Triton Gold Ltd | Windarra | 17% | Annual report for the Windarra Regional Project 6 August 2010 to 5 August 2011, E38/2347 |
| A85529 | 2010 | Poseidon Nickel Ltd | Windarra | 14% | Windarra Nickel Project C79/2006, E38-1622 - Partial Surrender Report, Period: 3rd October 2006 to 10th Septem |
| A85530 | 2010 | Poseidon Nickel Ltd | Windarra Nickel | <1% | Windarra Nickel Project C79/2006, E38-1752 - Partial Surrender Report, Period: 14th September 2005 to 10th Sep |
| A86461 | 2010 | Poseidon Nickel Ltd | Windarra | <1% | Windarra Nickel Project E38-1587 - Partial Surrender Report, Period: 9th January 2007 to 8th January 2010 |
| A86798 | 2010 | Barrick (Australia Pacific) Ltd | Laverton | 2% | Project 8871 Laverton Joint Venture Annual Report period 1 January 2009 – 31 December 2009, Technical Report N |
| A87137 | 2010 | Poseidon Nickel Limited | Windarra | 1.3% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2009 to 21 April 2010, CR# C79/2006, |
| A80997 | 2009 | Poseidon Nickel Limited | Windarra | <1% | Windarra Nickel Project C79/2006, E38-1752 - Partial Surrender Report, 14th September 2005 to 10th December 20 |
| A82038 | 2009 | Barrick Gold Of Australia Ltd | Laverton Exploration JV | 1.9% | LAVERTON EXPLORATION JOINT VENTURE ANNUAL, REPORT Period 1 January 2008 – 31 December 2008 TECHNICAL REPORT No |
| A82530 | 2009 | Poseidon Nickel Ltd | Windarra | 1.3% | Windarra Project - Combined Annual Report for the Period 22 April 2008 to 21 April 2009, C79/2006 |
| A78114 | 2008 | Barrick (Granny Smith) Pty Ltd | Laverton | 1.9% | PROJECT 8871, LAVERTON Project, (ALL TENEMENTS), ANNUAL REPORT, Period 1 January 2007 31 December 2007, TECH |
| A78633 | 2008 | Poseidon Nickel Ltd | Windarra | 1.3% | Windarra Nickel Project - Combined Annual Report for the period 22 April 2007 to 21 April 2008, CR79/2006 |
| A75073 | 2007 | Barrick Gold Of Australia Ltd | Laverton | <1% | Project 8871, Laverton Project, Annual Report, Period 1 January 2006 - 31 December 2006, Technical Report No.1 |
| A75758 | 2007 | Dynasty Metals Australia Ltd | Laverton | <1% | Laverton Project, EL38/1450 Partial Surrender Report for the Period Ended 21/06/2007 (E381450_200706_00_prr) |
| A75957 | 2007 | Dynasty Metals Australia Ltd | Laverton | 1% | LAVERTON PROJECT COMBINED REPORT E38/1450/1586/1587/1622/ 1752, E39/929/930/1325/1326/3272-3274 Annual Technic |
| A72558 | 2006 | Dynasty Metals Australia Ltd | Laverton | <1% | Laverton Project E38/1450, Annual Technical Report Period Ending 21 April 2006. |
| A72705 | 2006 | Barrick Gold Of Australia Ltd | Laverton | <1% | Laverton Exploration JV, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, Combined |
| A73096 | 2006 | Metex Resources Ltd | Laverton | 1.2% | Laverton Exploration Joint Venture, M38/45, M38/47, E38/556, E38/658, E38/837, Final Surrender Report & M38/46 |
| A69813 | 2005 | Metex Resources Ltd | Laverton | <1% | Annual report for the period 01/02/04 - 31/12/04 Laverton Exploration Project, C5/2002, E38/411, E38/556, E38/ |
| A70791 | 2005 | Target Minerals Australia Pty Ltd | Laverton | <1% | Laverton (Four Mile Well) Project E38/1450, Annual technical report for the period ending 21st April 2005. |
| A68953 | 2004 | Metex Resources Ltd | Laverton | <1% | Laverton JV Project (C5/2002),Annual Report for the period 01/02/2003-31/12/2003 Laverton JV Project (C5/2002) |
| A66477 | 2003 | Metex Resources Ltd | Laverton | <1% | 2002 Annual Report for period 01/02/02 to 31/12/02 Laverton Exploration Joint Venture C5/2002: E38/389, 406, 4 |
| A66565 | 2003 | Metex Resources Ltd | Windarra East | 10% | 2002 Partial Relinquishment Report for period 03/06/98 to 10/10/02 Windarra East Project E38/1037 Group C5/200 |
| A67631 | 2003 | Metex Resources Ltd | Laverton | 1.8% | Final Report for the period 13 December 1996-30 July 2003 Laverton Project C5/2002, E38/389,E38/406,E38/625,E3 |
| A65027 | 2002 | Metex Resources Ltd | Laverton | 1.6% | Combined Annual Technical Report, Laverton Project, Lancefield Tenement Group (DME Ref: C382/1995) Laverton, W |
| A62445 | 2001 | Metex Resources Nl | Laverton | 1.6% | Combined Annual Technical Report Period 1 February 2000 To 31 January 2001. Laverton Project Lancefield Teneme |
| A63587 | 2001 | Metex Resources Nl | Windarra East | 10% | Partial Surrender Report Windarra East, Laverton, Western Australia, Exploration Licence E38/1037. |
| A63779 | 2001 | Metex Resources Ltd | Danny Bore | <1% | Partial Surrender Report Danny Bore Project Laverton, Western Australia exploration lease E38/822. |
| A61886 | 2001 | Metex Resources Ltd | Hawk Nest North | <1% | Partial Surrender Report at 4 April 2000 E38/822. Laverton (SH51-02) 1:250,000, Laverton (3340) 1:100,000 map |
| A60731 | 2000 | Metex Resources Nl | Laverton/Lancefield | 1.6% | Combined Annual Technical Report Period 01/02/1999 to 31/01/2000 Laverton Project, Lancefield Tenement Group E |
| A57921 | 1999 | Metex Resources Nl | Laverton | 1.6% | Laverton Project, Laverton Exploration J.V. Beasley Creek Oxide J.V. 01/02/1998 - 31/01/1999 E38/658, 822 |
| A54899 | 1998 | Metex Resources Nl | Laverton | 1.1% | Laverton Project - Lancefield Tenement Group E38/365, 822, 835, M38/37, 38, 39, 40, 45 etc. 01/02/97 - 31/12/9 |
| A50315 | 1997 | Metex Resources Nl | Danny Bore | <1% | Interim Technical Report W112 Danny Bore Project Exploraiton Licence E38/822 for the period 10 April 1996 to 3 |
| A51243 | 1997 | Metex Resources Nl | Lancefield | <1% | Annual Technical Report Period 1 Febuary 1996 to 31 January 1997 Laverton Develpment Project Lancefield Teneme |
| A48547 | 1996 | Metex Resources Nl | Lancefield | 2.3% | Annual Technical Report Period 1 Febuary 1995 to 31 January 1996 Laverton Development Project Lancefield Tenem |
| A43233 | 1995 | Western Mining Corporation Ltd | Windarra | 1.8% | Technical Report Windarra Leases for the period 01/07/93 to 31/12/94 (AML70/261, M38/38 to M38/43, M38/45 to M |
| A43145 | 1994 | Western Mining Corporation Ltd | Windarra | 3.2% | Technical Report Windarra Leases for the period 01/07/92 to 30/06/93 Windarra Nickel Project (M38/38 to M38/43 |
| A38501 | 1993 | Western Mining Corporation Ltd | Windarra | 6% | Annual Report for the Period 01/07/91 - 30/06/92 Windarra Project 18042005sn s/c |
| A35126 | 1992 | Western Mining Corporation Ltd | Mount Windarra | 3.2% | Mount Windarra Project, Annual Report for the period 01/07/1989 to 30/06/1991, SA261;M38/38-43, 45-49, 52-53, |
| A31396 | 1989 | Western Mining Corporation Ltd | Windarra | 3.2% | Technical Report; Windarra Leases For The Period 1 July 1988 to 30 June 1989. (Annual Report M38/38 to 43, M38 |
| A22647 | 1988 | Western Mining Corporation Ltd | Windarra | 3.4% | Annual Report, Windara Mining Leases, SA261,M38/38, M38/39, M38/40, M38/41, M38/42, M38/43, M38/45, M38/46, M3 |
| A26696 | 1988 | Western Mining Corporation Ltd | Windarra | 3.4% | Windarra Mining leases SA261, M38/38-43, 45-49, 52-53, 60. M39/25 1/7/87 to 30/6/88 Windarra Nickel Project 1 |
| A19838 | 1986 | Western Mining Corporation Ltd | Windarra | 3% | Annual report Windarra Nickel Project Mining Leases SA261 M38/33 M38/34 M38/38 to M38/43 M38/45 to M38/49 M38/ |
| A17197 | 1985 | Western Mining Corporation Ltd | Mount Windarra | 2.8% | Mount Windarra Project, Annual Report for the period 20th June 1984 to 18th June 1985, ML38/27-29; M38/33-34, |
| A5659 | 1975 | Asarco Australia Ltd | Thompson Well | 11% | Final report [non-statutory], Thompson Well Mineral Claims, March 1975, MC38/6631-6642 ... 38/6933 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 38/4061 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/4061 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/4061? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-24. Compiled by NextMaps. Verify against primary sources before reliance.