NextMaps›WA Tenements›E 38/3868

E 38/3868

PendingExploration LicenceShire of LavertonMt. Margaret District
Area
310ha
Applied
July 2023
3 years ago
WAMEX reports
126
WA median is 53
Report drilling
95
of 126 reports
Laverton Explore on the live map

Register summary

Holder
Saldaris, Jim
Local government
Shire of Laverton
Application received
4 July 2023

Exploration history on this ground

126 historical WAMEX exploration reports intersect E 38/3868: 57 report geochemistry or sampling, 89 include a digital data package.
When this ground was worked · 124 of 126 reports dated
31970s
31980s
321990s
412000s
362010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A129997 2022 Matsa Gold Pty Ltd Hacks Well <1% E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021
A132799 2022 Lodestar Minerals Ltd Jubilee Well <1% Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022
A126029 2021 Gsm Mining Company Pty Ltd E38/2888 5.9% Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar
A128857 2021 Lodestar Minerals Ltd Jubilee Well <1% Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam <1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
121 more reports
A122827 2020 Matsa Resources Limited Red October <1% Red October Group Annual Report C173/2017 for the period ending 31/12/2019
A123791 2020 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A118830 2019 Matsa Gold Pty Ltd Hack Well <1% Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A119510 2019 Matsa Resources Limited Red October <1% Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019
A119796 2019 Oro Del Sur Pty Ltd Laverton <1% E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018
A120095 2019 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
A115637 2018 Australian Potash Limited Hack Well <1% ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A116780 2018 Gsm Mining Company Pty Ltd Central Laverton <1% Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A114051 2017 Gsm Mining Company Pty Ltd Central Laverton <1% CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2
A112076 2017 Australian Potash Limited Hack Well <1% Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A108971 2016 Gsm Mining Company Pty Ltd Central Laverton <1% C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A105693 2015 Gsm Mining Company Pty Ltd Central Laverton 1% Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38
A104805 2015 Gsm Mining Company Pty Ltd Barnicoat <1% BARNICOAT PROJECT COMBINED ANNUAL TECHNICAL REPORT (C388/1993) FOR THE PERIOD 01 JANUARY 2014 – 31 DECEMBER 20
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A100990 2014 Gsm Mining Company Pty Ltd Barnicoat 3% Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203
A102477 2014 Focus Minerals Ltd Mount Weld <1% Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014
A102837 2014 Gsm Mining Company Pty Ltd Barnicoat 3.2% Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993
A99227 2013 Anglogold Ashanti Australia Ltd Sunrise Dam Group 100% Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A96870 2013 Barrick (Granny Smith) Pty Ltd Barnicoat 2.9% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe
A92879 2012 Barrick (Granny Smith) Pty Ltd Barnicoat 2.9% Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484;
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A95100 2012 Torridon Exploration Sunrise Dam <1% Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements:
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89375 2011 Barrick (Granny Smith) Pty Ltd Barnicoat 2.9% Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri
A90565 2011 Crescent Gold Ltd Childe Harold <1% Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200
A91983 2011 Cove Resources Limited Sunrise Dam <1% Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 &
A85813 2010 Barrick (Australia Pacific) Ltd Barnicoat 2.9% Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe
A87437 2010 Crescent Gold Ltd Childe Harold <1% Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010
A88423 2010 Cazaly Resources Ltd Sunrise Dam <1% Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010
A82441 2009 Carbon Energy Ltd CHILDE HAROLD <1% CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP <1% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A82274 2009 Carbon Energy Ltd CHILDE HAROLD <1% Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75
A78902 2008 Jindalee Resources Ltd Jubilee Well 8.3% Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam <1% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A78009 2008 Barrick Gold Of Australia Ltd Barnicoat <1% Project 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 Annual Report Period 1 January 2007 - 31 December 200
A78425 2008 Metex Resources Ltd Childe Harold <1% CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o
A81090 2008 Barrick (Granny Smith) Pty Ltd Barnicoat <1% PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483 ANNUAL REPORT Period 1 January 2008 – 31 December 200
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A74557 2007 Barrick Gold Of Australia Ltd Barnicoat <1% Barnicoat Project M38/361,362,483 C388/1993 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006 Report
A75232 2007 Metex Resources Ltd Childe Harold <1% Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157
A76156 2007 Jindalee Resources Ltd Burtville 8.3% Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730
A72825 2006 Metex Resources Ltd Childe Harold <1% W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to
A72164 2006 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati
A72416 2006 Placer (Granny Smith) Pty Ltd Mikado <1% Mikado Project, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, C463/1996, (PGS R
A72951 2006 Crescent Gold Ltd Jubilee Well <1% Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2
A70514 2005 Placer Dome Asia Pacific Ltd Mikado <1% Mikado Project, Annual Report for the period 01/01/2004 - 31/12/2004 , E38/422, 680, 772, 930, 1126, E38/1205,
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70566 2005 Anglogold Ashanti Australia Ltd Laverton <1% Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38
A70688 2005 Placer Dome Asia Pacific Ltd Barnicoat <1% Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret
A68271 2004 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the
A68436 2004 Placer Dome Asia Pacific Ltd Mikado <1% Annual report for the period 01/01/2003-31/12/2003 Mikado Project E38/0422, E38/0680, E38/0772, E38/0930, E38/
A68170 2004 Anglogold Australasia Ltd Sunrise Dam <1% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A68313 2004 Anglogold Australia Ltd Laverton <1% Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066,
A69921 2004 Placer Dome Asia Pacific Ltd Mikado 2.1% Mikado Project, E38/1205, Partial surrender report for the period 20th July, 2001 to 19th July 2004, C463/1996
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A65899 2003 Placer (Granny Smith) Pty Ltd Barnicoat <1% Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project
A66171 2003 Placer (Granny Smith) Pty Ltd Mt Lebanon <1% Annual Report on Exploration period ending 31st December 2002 Mt Lebanon Project C463/1996: M38/9, E38/422, E3
A66180 2003 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462,
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A67737 2003 Anglogold Australia Ltd Jubilee Well <1% Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003.
A64307 2002 Anglogold Australia Ltd Jubilee Well <1% Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524.
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A64064 2002 Placer (Granny Smith) Pty Ltd Mt Lebanon P <1% Mt Lebanon Project M38/0009, E38/0422, E38/0680, E38/0772 E38/0930, E38/1126, E38/1205, E38/1206, P38/2239 and
A64258 2002 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329
A62105 2001 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar
A60543 2000 Placer (Granny Smith) Pty Ltd Barnicoat <1% Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go
A60182 2000 Acacia Resources Ltd Jubilee Well <1% Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A62054 2000 Anglogold Australasia Ltd Jubilee Well <1% Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January
A57772 1999 Placer (Granny Smith) Pty Ltd Barnicoat <1% Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98
A57593 1999 Acacia Resources Ltd Jubilee Well <1% Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54524 1998 Placer (Granny Smith) Pty Ltd Barnicoat 1.4% Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437,
A56251 1998 Placer (Granny Smith) Pty Ltd Barnicoat/Keringal 3.1% Hack Well/ Ophir Bore (E38/437) Surrender Report October 1998.
A53166 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97
A50186 1997 Acacia Resources Ltd Brumby Well <1% Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A51588 1997 Placer (Granny Smith) Pty Ltd Barnicoat 1.3% Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361
A51717 1997 Placer (Granny Smith) Pty Ltd Ophir Bore/ Barnicoat 5.3% Ophir Bore/ Barnicoat Project,Surrender Report P38/2426, July 1997.
A47027 1996 Placer Exploration Ltd Barnicoat 1.3% Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A47216 1996 Aurora Gold Ltd Brumby Well <1% H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar
A44189 1995 Aurora Gold Ltd Brumby Well <1% Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A43702 1995 Placer Exploration Ltd Barnicoat 1% Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429
A45544 1995 Placer Exploration Ltd Barnicoat 3.1% Partial Surrender Report for the period 07/09/92-18/08/95 ,Barnicoat Project ,E38/437.
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A41746 1994 Placer Exploration Ltd Barnicoat 1.2% Annual Report for the period 11/02/93-10/02/94 Barnicoat Project E38/494
A40522 1994 Placer Exploration Ltd Mount Weld 1% Annual Report for the Period 01/01/93 - 31/12/93 Mt Weld/Keringal/Ophir Bore Project
A41227 1994 Aurora Gold Ltd Brumby Well <1% Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A40012 1993 Billiton Australia Pty Ltd Sunrise Central <1% Partial surrender report, Sunrise Central, E39/229.
A35400 1992 Poseidon Exploration Ltd Mount Weld 1% Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163.
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A32915 1991 Poseidon Ltd Mount Weld 1% Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163.
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A33396 1991 Poseidon Ltd Mount Weld 1% Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163.
A30632 1990 Poseidon Ltd Mount Weld 1% Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2
A30847 1990 Freeport Of Australia Inc Mount Weld 1% Mt Weld Project, Annual report, 1988. E38/163
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A14703 1985 Golconda Minerals Nl Hack Well 2% Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24.
A12968 1983 Golconda Minerals Nl Davis Well - Hack Well 1.5% Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72-
A6945 1973 Kennecott Exp Aust Pty Ltd Erlistoun <1% Aeromag- Raw Data
A2691 1972 Australian Selection Pty Ltd Wilga <1% Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9
A1366 1970 Australian Selection Pty Ltd Wilga <1% Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 &
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 38/3868 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 38/3868 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 38/3868? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.