E 31/1327
Register summary
- Holder
- Ozaurum Mines Pty Ltd
- Part of
- Ozaurum Resources Limited (ASX:OZM) as at 2025-06-30
- Local government
- Shire of Menzies
- Application received
- 23 June 2022
- Commenced
- 30 Mar 2023
- Expiry
- 29 Mar 2028
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134119 | 2023 | Ozaurum Mines Pty Ltd | Mulgabbie North | <1% | Partial Surrender Report, Mulgabbie North Project, Exploration License E28/2477 (part of Combined Reporting Gr |
| A131803 | 2022 | Nexus Minerals Limited | Wallbrook | 32% | Tenement E31/1107 Partial Surrender Report Wallbrook Project for the period ending 23/06/2022. |
| A122550 | 2020 | Ardea Resources Limited | Lake Rebecca | <1% | Annual Report for the Lake Rebecca Project C66/2014 Annual Report for the period 5 December 2018 to 4 Decembe |
| A123409 | 2020 | Nexus Minerals Limited | Wallbrook | 10% | Annual Report for Wallbrook Project C73/2018 for the period ending 24/02/2020 |
| A124728 | 2020 | Saracen Gold Mines Pty Limited | Carouse Dam | 4.9% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020 |
180 more reports
| A125643 | 2020 | Andrew Pumphrey | Mulgabbie East | <1% | Annual Report Mulgabbie East Project E28/2477 for the period 17 October 2019 to 18 October 2020 |
| A125646 | 2020 | Andrew Pumphrey | MULGABBIE NORTH PROJECT | <1% | 2019/2020 ANNUAL REPORT MULGABBIE NORTH PROJECT E31/1085 |
| A120911 | 2019 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.9% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019 |
| A118810 | 2019 | Ardea Resources Limited | Lake Rebecca | <1% | C66/2014 Lake Rebecca Annual Report for the period 5 December 2017 to 4 December 2018, P31/02038, P31/02039, P |
| A119999 | 2019 | Nexus Minerals Limited | Wallbrook | 10% | Annual Report for Wallbrook Project – Combined Reporting Group C73/2018 For the Period 25 February 2018 to 24 |
| A122118 | 2019 | Andrew Pumphrey | Mulgabbie East | <1% | 2018/2019 ANNUAL REPORT, MULGABBIE EAST PROJECT, For the Period 17 October 2019 to 18 October 2019 |
| A122117 | 2019 | Andrew Pumphrey | Mulgabbie North | <1% | 2018/2019 Annual Report Mulgabbie North Project E 31/01085 for the period 17 October 2019 to 18 October 2019 |
| A118573 | 2018 | Andrew Pumphrey | Mulgabbie East | <1% | Annual Report Mulgabbie East Project E28/2477 for the period 17/10/2017 - 18/10/2018 |
| A117528 | 2018 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.7% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018 |
| A115782 | 2018 | Ardea Resources Limited | Lake Rebecca | <1% | Lake Rebecca C66/2014 Combined Annual Report for the period 5 December 2016 to 4 December 2017, P31/2038, P31/ |
| A117278 | 2018 | Saracen Gold Mines Pty Limited | Carosue Dam | <1% | Exploration Licence 31/741 Carosue Dam Final Surrender Report for the Period 22 July 2008 to the 21 June 2018 |
| A117873 | 2018 | Newmont Exploration Pty Ltd | Mulgabbie North | 13% | Combined Annual Report for C23/2018 (Mulgabbie North Project) for the period 5th July 2017 to 4th July 2018, E |
| A118574 | 2018 | Andrew Pumphrey | Mulgabbie North | <1% | Mulgabbie North Project E31/1085 Annual Report for the period 17 October 2017 to 17 October 2018 |
| A114606 | 2017 | Newmont Exploration Pty Ltd | Mulgabbie North | 32% | Mulgabbie North Project E31/01107 for the period 5th July 2016 to 4th July 2017 |
| A110828 | 2017 | Heron Resources Limited | Lake Rebecca | <1% | Lake Rebecca Combined Annual Report C66/2014 5 December 2015 to 4 December 2016 |
| A114597 | 2017 | Saracen Gold Mines Pty Limited | Carosue Dam | 4.7% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202 |
| A107828 | 2016 | Heron Resources Ltd | Lake Rebecca | <1% | Lake Rebecca Project C66/2014, P31/2038, P31/2039, P31/2040 Combined Annual Report for the period 5 December 2 |
| A109933 | 2016 | Saracen Gold Mines Pty Ltd | Carosue Dam | 4.8% | Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A104607 | 2015 | Heron Resources Ltd | Lake Rebecca | <1% | Combined annual report for the period 5 December 2013 to 4 December 2014, Lake Rebecca Project, C66/2014, P31/ |
| A106872 | 2015 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project (C064/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E28/1747, M28/166, M |
| A106912 | 2015 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 2.5% | Old Plough Dam (C065/2001) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/586, E31/741, E31/105 |
| A103242 | 2014 | Cazaly Resources Ltd | Carosue Dam | <1% | E28/2049 (Carosue Dam Project) Final Surrender Report for the period 15 March 2011 to 20 May 2014 |
| A103536 | 2014 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project C64/2001 Annual Report for the period 01/07/2013 to 30 June 2014, E28/1747, M28/166, M28/1 |
| A103734 | 2014 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | CAROSUE DAM PROJECT EXPLORATION LICENCE E28/1747 PARTIAL SURRENDER REPORT 04 JULY 2008 TO 03 JULY 2014 |
| A103510 | 2014 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 2.5% | Old Plough Dam Project, Annual Report, 1 July 2013 to 30 June 2014, C65/2001, E31/586, E31/741, M31/156, M31/2 |
| A100737 | 2014 | Cazaly Resources Ltd | Carosue Dam | 14% | E31/0924 Final Surrender Report for the period ended 12/09/2013 |
| A97182 | 2013 | Legacy Iron Ore Ltd | Kingsley | <1% | Final Surrender Report, Kingsley Project (Deenya Hill) E31/717, For the Period 7th February 2008 to 6th Februa |
| A97218 | 2013 | Renaissance Minerals Ltd | Rebecca | 3.5% | Rebecca Project, Annual Report for the period 26/10/2011 to 25/10/2012, E28/1756-1757, 1850, 1852, 1992, 2037- |
| A99441 | 2013 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project C64/2001Annual Report for the period 1 July 2012 to 30 June 2013 E28/828, E28/1747, M28/16 |
| A99470 | 2013 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 5.9% | Old Plough Dam Project Annual Report for the period 1 July 2012 to 30 June 2013, C65/2001, E31/586, E31/741, M |
| A98165 | 2013 | Sammy Resources Pty Ltd | Mulgabbie East | <1% | MULGABBIE EAST E28/2049 ANNUAL REPORT For the Period 15th March 2012 to the 14th March 2013 |
| A99687 | 2013 | Renaissance Minerals Ltd | Rebecca | 55% | E31/920 (Rebecca) Surrender Report for the period 21 January 2011 to 07 June 2013 |
| A100147 | 2013 | Cazaly Resources Ltd | Carosue Dam | <1% | E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013 |
| A93461 | 2012 | Cove Resources Limited | Mulgabbie East | <1% | Mulgabbie East E28/2049 First Annual Report period ending 14 March 2012 |
| A92878 | 2012 | Renaissance Minerals Ltd | Rebecca | 3.5% | Rebecca Project, Annual Report for the period 26/10/2010 to 25/10/2011, E31/920; E28/1756-1757, 1850,1852, 199 |
| A93586 | 2012 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report – Wallbrook Project E31/716, 1st February 2011 – 31st January 2012 |
| A93738 | 2012 | Legacy Iron Ore Ltd | Kingsley | <1% | Annual Mineral Exploration Report – Kingsley Project E31/717, Report Period: 7th February 2011 – 6th February |
| A94585 | 2012 | Saracen Gold Mines Pty Ltd | Carosue Dam | 25% | E31/365 Carosue Dam Project Final Report 1 February 2007 to 15 May 2012 |
| A95050 | 2012 | Cove Resources Limited | Carosue Dam | 1.1% | Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/ |
| A95128 | 2012 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 5.9% | Old Plough Dam Project Annual Report for the period 1 July 2011 to 30 June 2012, C65/2001, E31/586, 741, M31/1 |
| A95372 | 2012 | Saracen Gold Mines Pty Ltd | Carosue Dam Prroject | 7.6% | CAROSUE DAM PROJECT, ANNUAL REPORT, C064/2001 01 JULY 2011 TO 30 JUNE 2012 |
| A89864 | 2011 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report Wallbrook Project E 31/716 For the Period 1st February 2010 to 31st January |
| A90118 | 2011 | Saracen Gold Mines Pty Ltd | Mulgabbie | 25% | Mulgabbie Project, Partial Surrender Report for the period 01/02/2007 to 31/01/2011, E31/365. (C64/2001) |
| A91511 | 2011 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 5.9% | Old Plough Dam Project C065/2001 Annual Report 01 July 2010 to 30 June 2011, E31/586, 741, M31/156, 208, 209, |
| A91960 | 2011 | Cove Resources Limited | Carosue Dam | 1.1% | Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31 |
| A89963 | 2011 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report, Wallbrook Project, E 31/717, For the Period 7th February 2010 to 6th Februa |
| A91632 | 2011 | Saracen Gold Mines Pty Ltd | Carosue Dam | 7.6% | Carosue Dam Project C64/2001 annual report for the period 1 July 2010 to 30 June 2011, E28/828, E28/1747, E31/ |
| A86310 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Mineral Exploration Report Wallbrook Project E 31/717 For the Period 7th February 2009 to 6th February |
| A86915 | 2010 | Saracen Gold Mines Pty Ltd | E31/365 | 25% | E31/365 – Partial Surrender Report 01 February 2007 to 31 January 2010 |
| A87741 | 2010 | Heron Resources Ltd | Binti Binti South | <1% | Binti Binti South Project, M31/318, Annual Report for the period 16 June 2009 to 15 June 2010 |
| A86231 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Annual Exploration Report Wallbrook Project E31/716 for the period 1st February 2009 to 31st January 2010 |
| A86247 | 2010 | Legacy Iron Ore Ltd | Wallbrook | <1% | Surrender Report Wallbrook Project E 31/719 For the Period 7th February 2008 to 11th December 2009 |
| A80799 | 2009 | Jackson Minerals Ltd | Wallbrook | <1% | E31/717 Partial Surrender Report, 7 February 2008 – 21 November 2008 |
| A80605 | 2009 | Jackson Minerals Ltd | Galvalley | <1% | Galvalley Project – E31/677 Surrender Report, 28 July 2005– 21 November 2008 |
| A81777 | 2009 | Legacy Iron Ore Ltd | Wallbrook | <1% | E31/719 Annual Report, 7 February 2008 – 6 February 2009 |
| A81798 | 2009 | Legacy Iron Ore Ltd | Wallbrook | <1% | Wallbrook Project E31/717 Annual Report, 7 February 2008 – 6 February 2009 |
| A82244 | 2009 | Saracen Gold Mines Pty Ltd | E31/365 | 25% | E31/365 ANNUAL REPORT 01 FEBRUARY 2008 TO 31 JANUARY 2009 |
| A82485 | 2009 | Jackson Minerals Ltd | Wallbrook | <1% | E31/716 Annual Report 01 February 2008 – 31 January 2009 |
| A79781 | 2008 | Saracen Gold Mines Pty Ltd | Relief Well | <1% | RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2007 TO 02 JULY 2008, E28/898, 981, 1120, Combined reporting C254/1 |
| A80434 | 2008 | Jackson Minerals Ltd | Wallbrook | <1% | E31/719 Partial Surrender Report, Report Period: 7 February 2008 – 25 November 2008 |
| A76905 | 2008 | Jindalee Resources Ltd | Menangina | 100% | Menangina Project E31/686 ANNUAL REPORT FOR THE PERIOD ENDING 30th of October 2007 |
| A77066 | 2008 | Jackson Gold Ltd | Wallbrook Hill 2 | 1.8% | Wallbrook Hill 2 Project 2007 Annual Report 1 January 2007 - 31 December 2007 E31/174, E31/478, E31/496, E31/6 |
| A77128 | 2008 | Pioneer Nickel Ltd | Mulgabbie | <1% | Mulgabbie Project, Exploration Licence 31/679 , Annual Report for the period 21st November 2006 to 22nd Novem |
| A78376 | 2008 | Saracen Gold Mines Pty Ltd | E31/365 | 25% | E31/365 - ANNUAL REPORT 01 FEBRUARY 2007 TO 31 JANUARY 2008 |
| A79782 | 2008 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | 3.7% | OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3 |
| A79893 | 2008 | Jackson Minerals Ltd | Galvalley | <1% | Galvalley Project – E31/677 Partial Surrender Report, Report Period: 28 July 2005– 27 July 2008 |
| A80058 | 2008 | Jindalee Resources Ltd | Menangina | 100% | ANNUAL AND SURRENDER REPORT FOR THE PERIOD ENDING 30th of October 2008 |
| A76639 | 2007 | Saracen Gold Mines Pty Ltd | Relief Well (Mulgabbie) | <1% | RELIEF WELL PROJECT ANNUAL REPORT 03 JULY 2006 TO 02 JULY 2007 C254/1993 E28/898, 981, 1120 (Kurnalpi) |
| A75995 | 2007 | Jackson Gold Ltd | Galvalley | <1% | Galvalley Project E31/677 Project 2006-2007 Annual Report 28 July 2006 - 27 July 2007 |
| A76575 | 2007 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project Annual Report 01 July 2006 to 30 June 2007 CR GROUP: C064/2001 M28/166, M28/167, M28/168, |
| A76674 | 2007 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 3.7% | Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1 |
| A72119 | 2006 | Jackson Gold Ltd | Wallbrook Hill | <1% | E31/89,117,174,477,P31/1406,1407, Wallbrook Project 2005 Annual Report, Period 1 January 2005 to 31 December 2 |
| A73244 | 2006 | Saracen Gold Mines Pty Ltd | Old Plough Dam | 3.7% | Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21 |
| A73245 | 2006 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | Carosue Dam Project M28/166-168,M31/219-220, Annual Report, 01 July 2005 to 30 June 2006, Combined Reporting N |
| A73922 | 2006 | Jackson Gold Ltd | Wallbrook | 1.7% | Wallbrook Project 2006 Annual Report, Reporting Period: 1st January 2006 to 31st December 2006, Tenements: E3 |
| A72064 | 2006 | Jackson Gold Ltd | South Kingsley | 15% | E31/496 South Kingsley Project 2005 Annual Report, 18 December 2004 to 17 December 2005, (Kurnalpi). |
| A72361 | 2006 | Jackson Gold Ltd | Wallbrook | 6% | Wallbrook Project - E31/478, 2005 Annual Report, 17 February 2005 to 16 February 2006, (Edjudina). |
| A73219 | 2006 | Jackson Gold Ltd | Galvalley | <1% | Gal Valley Project - E31/677, 2005 - 2006 Annual Report, 28 July 2005 to 27 July 2006, (Edjudina). |
| A73457 | 2006 | Jackson Gold Ltd | Relief Well (Mulgabbie) | <1% | E28/898,981,1120 Relief Well Project, 2006 Annual Report, 3 July 2005 to 2 July 2006, Combined Reporting No. C |
| A70518 | 2005 | Jackson Gold Ltd | South Kingsley | 15% | Annual report for the period 18/12/03 - 17/12/04 South Kingsley Project, E31/496, Kurnalpi |
| A71306 | 2005 | Jackson Gold Ltd | Mulgabbie | <1% | E28/898 - Mulgabbie Project 2005 Annual Report, 19 October 2004 to 2 July 2005, (Kurnalpi). |
| A70136 | 2005 | Jackson Gold Ltd | Wallbrook Hill | <1% | Annual report for the period 01/01/04 - 31/12/04 Wallbrook Project, C305/1992, E31/89, E31/117, E31/174, E31/4 |
| A70540 | 2005 | Jackson Gold Ltd | Wallbrook | 6% | Wallbrook Project, E31/478, Annual report, reporting period107/02/04 - 16/02/05 Kurnalpi |
| A70893 | 2005 | St Barbara Mines Ltd | Carosue Dam | <1% | Carosue Dam Project, Annual report for the period 01 July 2004 - 30 June 2005 (C64/2001, M28/166-168, M31/219- |
| A70985 | 2005 | St Barbara Mines Ltd | Old Plough Dam | 3.6% | Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10 |
| A68499 | 2004 | Jackson Gold Ltd | Wallbrook | <1% | Annual report for the period 01/01/2003-31/12/2003 Wallbrook Project (C305/1992), E31/117, E31/174, E31/89, P3 |
| A68669 | 2004 | Vulcan Resources Ltd | Mulgabbie | <1% | Mulgabbie Project, E28/989, Annual Report 31 March 2003 to 30 March 2004 |
| A68975 | 2004 | Sons Of Gwalia Ltd | Old Plough Dam | 3.6% | Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E |
| A69009 | 2004 | Sons Of Gwalia Ltd | Carosue Dam | <1% | Carosue Dam Project, Annual report for the period 1 July 2003 to 30 June 2004 (C64/2001), M28/166-168, M31/219 |
| A69196 | 2004 | Vulcan Resources Ltd | Mulgabbie | <1% | Mulgabbie Project,Partial Surrender Report for the period 31st March 2000 to 30th March 2004, E28/989. |
| A69537 | 2004 | Sons Of Gwalia Ltd | Yerilla JV | 65% | Yerilla JV Project, Annual report for the period 21/10/03 - 20/10/04, ( E31/479), report number 0626-2004-09 |
| A69625 | 2004 | Jackson Gold Ltd | Mulgabbie | <1% | E28/898 - Mulgabbie Project 2004 Annual Report, Reporting period: 18th October 2003 to 19th October 2004. (Kur |
| A66214 | 2003 | Jackson Gold Ltd | Wallbrook Hill | <1% | Wallbrook Project, 2002 Annual Report, Reporting period 1st January 2002 to 31st December 2002 C305/1992, E31/ |
| A67009 | 2003 | Sons Of Gwalia Ltd | Carosue Dam | <1% | Carusoe Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003, C64/2001: M28/166-168, M31/219- |
| A67021 | 2003 | Sons Of Gwalia Ltd | Yerilla | 90% | Yerilla JV Project, Annual Report for the period 28 April 2002 to 27 April 2003, E31/465 SOG Report No. 0626-2 |
| A67105 | 2003 | Sons Of Gwalia Ltd | Jessie Dam | 95% | Partial Surrender Report for the period 3 July 2000 - 2 July 2003 Report No. 0587-2003-01 |
| A67254 | 2003 | Sons Of Gwalia Ltd | Old Plough Dam | 6.1% | Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208 |
| A65810 | 2003 | Gutnick Resources Nl | Mulgabbie [ Relief Well ] | <1% | E28/898 & P28/784-787, Mulgabbie [Relief Well Project], Annual Report for the period 3 July 2001 To 2 July 200 |
| A65818 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 2.6% | Mulgabbie JV Annual Report For The Period 1 October 2001 - 30 September 2002. Tenements: E28/474, E28/476, E28 |
| A67112 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 4.7% | Surrender Report 18 October 1993 to 3 July 2003 C114/2002: E28/474,476 Report No. 0579-2003-01 |
| A67469 | 2003 | Sons Of Gwalia Ltd | Mulgabbie | 2.6% | Annual Report for the period 1 October 2002 - 30 September 2003 Mulgabbie JV E28/474,476,478 Report No. 0579-2 |
| A66451 | 2003 | Vulcan Resources Ltd | Mulgabbie | <1% | Annual Verification Report, 31st March 2002 to 30th March 2003, Mulgabbie Project, tenement E28/989. |
| A66902 | 2003 | Vulcan Resources Ltd | Mulgabbie | <1% | Mulgabbie Project, Tenement E28/989, Partial Surrender Report 31 March 2000 to 30th March 2003. |
| A64173 | 2002 | Croesus Mining Nl | Wallbrook | 1% | Annual Report 1st January 2001 to 31st December 2001 Wallbrook Joint Venture Project E31/117, C305/1992. |
| A65165 | 2002 | Croesus Mining Nl | Edjudina | 90% | Edjudina JV Project Tenement E31/465 Annual Report 28th April, 2001 to 27th April, 2002 |
| A65429 | 2002 | Sons Of Gwalia Ltd | Carosue Dam | <1% | Carosue Dam Project Area M28/166-168, M31/219, M31/220 2001/02 Annual Report For Period 01/07/01 To 30/06/02 G |
| A65553 | 2002 | Sons Of Gwalia Ltd | Old Plough Dam | 6.1% | Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001 |
| A65083 | 2002 | Croesus Mining Nl | Mulgabbie | <1% | Mulgabbie Project Tenement E28/989 Annual Report 31st March 2001 to 30th March, 2002 |
| A62597 | 2001 | Croesus Mining Nl | Edjudina | 90% | Edjudina JV Project Tenement 31/465 Annual Report 28th April 2000 to 27th April, 2001. |
| A63381 | 2001 | Pacmin Mining Corporation Ltd | Carosue Dam | <1% | 2000/01 Annual Report Carosue Dam Minesite M28/166 - 168, M31/219, M31/220 Combined Report For Period 01/07/00 |
| A63386 | 2001 | Pacmin Mining Corporation Ltd | Old Plough Dam | 95% | 2000/01 Annual Report E31/390 Report For Period 03/07/00 to 02/07/01 North Coolgardie Mineral Field Western Au |
| A63387 | 2001 | Pacmin Mining Corporation Ltd | Old Plough Dam | 84% | 2000/01 Annual Report E31/391 Report For Period 03/07/00 to 02/07/01 North Coolgardie Mineral Field Western Au |
| A63652 | 2001 | Sons Of Gwalia Ltd | Old Plough Dam | 6.1% | 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report |
| A63201 | 2001 | Gutnick Resources Nl | Mulgabbie [Relief Well ] | <1% | Exploration Licence E28/898 and Prospecting Licences P28/784-787 'C254/1993 - Mulgabbie [Relief Well ] Joint A |
| A63202 | 2001 | Gutnick Resources Nl | Mulgabbie (Relief Well) | <1% | Exploration Licence E28/898 and Prospecting Licence P28/784-787 'C254/1993 - Mulgabbie (Relief Well) Annual Re |
| A63874 | 2001 | Sons Of Gwalia Ltd | Mulgabbie | 6.4% | 2000/01 Annual Report E28/476 Mulgabbie JV report for period 18/10/00 to 17/10/01 North East Coolgardie Minera |
| A62412 | 2001 | Croesus Mining Nl | Mulgabbie | <1% | Mulgabbie Project Tenement E28/989 Annual Report 31st March 2000 to 30th March 2001. |
| A60970 | 2000 | Paddington Gold Pty Ltd | Keith Kilkenny - Old Plough Dam | 4.2% | Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul |
| A59724 | 2000 | Newcrest Mining Ltd | Mulgabbie | 3% | Interim Report, Mulgabbie Joint Venture, E28/476 and 478, for the period 01/01/1998 to 23/09/1998. |
| A60190 | 2000 | Troy Resources Nl | Mulgabbie | 2.3% | Annual Reprot Exploration Licences E28/474,E28/476,E28/478, E28/574 Mulgabbie Project Western Australia 02/01/ |
| A60050 | 2000 | Croesus Mining Nl | Wallbrook Hill | 1% | Annual Report, Wallbrook Joint Venture Project, 01/01/1999 to 31/12/1999, Combined Reporting No. C305/1992, Te |
| A61062 | 2000 | Pacmin Mining Corporation Ltd | Carosue Dam | <1% | 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482, |
| A58869 | 1999 | Goldfields Exploration Pty Ltd | Keith Kilkenny | 4.2% | Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153, |
| A57299 | 1999 | Talon Resources Nl | Kingsley | 1.2% | Kingsley Project E31/174 Annual Exploration Report for the year ending 10/02/99 Report No:ST010802R1 |
| A57164 | 1999 | Talon Resources Nl | Kingsley | 1.2% | Kingsley Project, Partial Surrender Report for the period ending 01/01/1999, E31/174. |
| A54208 | 1998 | Talon Resources Nl | Kingsley | 1.2% | Kingsley Project. E31/174. Annual report for the year ending 10/02/98. |
| A56952 | 1998 | Troy Resources Nl | Mulgabbie | 2.6% | Mulgabbie Project - North East Coolgardie Mineral Field W.A. Partial Surrender Report Exploration Licence:28/4 |
| A53498 | 1998 | Newcrest Mining Ltd | Mulgabbie | 1.8% | Combined Annual Report Mulgabbie Joint Venture E28/474,476,478,492 and 574 for the period 01/01/97-31/12/97 Re |
| A54100 | 1998 | Goldfields Exploration Pty Ltd | Old Plough Dam/ Relief Well | <1% | Final Report Keith Kilkenny Joint Venture, Old Plough Dam Project, E28/444 Relief Well, March 1998 |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | <1% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A53548 | 1998 | Goldfields Exploration Pty Ltd | Lake Rebecca | 21% | Lake Rebecca Project, Partial Surrender Report for the period 02/04/1993 to 23/12/1997, E31/152.(Keith Kilkenn |
| A55071 | 1998 | Talon Resources Nl | Kingsley | 1.2% | Kingsley Project, Partial Surrender Report E31/174, Edjudina, North Coolgardie Mineral Field 06/1998 |
| A55388 | 1998 | Goldfields Exploration Pty Ltd | Keith Kilkenny | 3.9% | Keith Kilkenny(JV) Project, Annual Report for the period 01/07/1997 to 30/06/1998, E28/444; E31/101, 107, 150, |
| A56747 | 1998 | Heron Resources Ltd | Lake Rebecca | <1% | Lake Rebecca Project - Report C52/1996 North East Coolgardie Mineral Field 05/10/97 - 04/10/98 M31/80-81, 1 |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | <1% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | <1% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A50181 | 1997 | Western Mining Corporation Ltd | Kingsley | 1.2% | Annual report for the period 11 February 1996 to 10 February 1997 The Kingsley Project Exploration Licence E31 |
| A51944 | 1997 | Goldfields Exploration Pty Ltd | Keith Kilkenny- Old Plough Dam | 3.9% | Keith Kilkenny (JV)- Plough Dam Project,Annual Report for the period 1 July 1996 to 30 June 1994, E28/444, E |
| A53058 | 1997 | Voyager Gold Nl | Lake Rebecca | <1% | Annual Report Lake Rebecca Project M31/80 M31/81 M31/118 for the year ending 01/10/97 |
| A50351 | 1997 | Newcrest Mining Ltd | Mulgabbie | 1.8% | Combined Annual Exploration Report Mulgabbie Joint Venture for E28/474, E28/476, E28/478, E28/574 for the peri |
| A53325 | 1997 | Newcrest Mining Ltd | Mulgabbie | 1.8% | Combined Partial Relinquishment Report Mulgabbie Joint Venture for E28/474,476, 478 & 492 (September 1997). |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A47683 | 1996 | Western Mining Corporation Ltd | Kingsley | 1.2% | Annual report for the period 1 February 1995 to 31 January 1996 The Kingsley Project Exploration Licence E31/1 |
| A48713 | 1996 | Goldfields Exploration Pty Ltd | Keith Kilkenny JV | 3.9% | Annual Report Keith Kilkenny Joint Venture Old Plough Dam E28/444, E28/101, E28/107, E28/150, E28/152, E28/153 |
| A49406 | 1996 | Mining Corporation Of Australia Ltd | Lake Rebecca | <1% | Annual report Lake Rebicca Project M31/80 M31/81 M31/118 for the Year ending 04/10/96 |
| A44207 | 1995 | Western Mining Corporation Ltd | Kingsley | 1.2% | Annual report for the period 1 February 1994 to 31 January 1995, The Kingsley Project,Exploration Licence 31/1 |
| A45752 | 1995 | Goldfields Exploration Pty Ltd | Old Plough Dam | 3.9% | Annual Report Old Plough Dam Project E31/101,E31/107,E28/444 ,E31/150,E31/152,E31/153,P31/1471-72,E31/184 |
| A46428 | 1995 | Maverick Exploration Pty Ltd | Mulgabbie | 2% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report October 1994 to 9 Octob |
| A46501 | 1995 | Mining Corporation Of Australia Ltd | Lake Rebecca | <1% | Annual report Lake Rebecca Project M31/80 M31/81 M31/118 for the year ending 04/10/95 |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A42910 | 1994 | Troy Resources Nl | Mulgabbie | 2% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report 10 October 1993 to 9 Oct |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A42513 | 1994 | Pancontinental Mining Ltd | Keith Kilkenny | 4.9% | Keith Kilkenny Project, Annual Report for the period 29th June 1993 to 30th June 1994, C/R65/2001: Old Plough |
| A39118 | 1993 | Pancontinental Mining Ltd | Keith Kilkenny | 4.9% | Keith Kilkenny (JV) Project, Annual Report for the period 29th June 1992 to 30th June 1993, E31/101, 107,150,1 |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A39432 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Final report to 28th February 1993 on E28/370-371/373/398/419/432/437/443, E31/92, P31/1396-97 Kurnalpi East P |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36819 | 1992 | Pancontinental Mining Ltd | Keith Kilkenny | 3.3% | Annual Report for the period 17 June 1991 to 16 June 1992, Keith Kilkenny JV Project, E31/101 (Old Plough Dam) |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | <1% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A24912 | 1988 | Auralia Resources Nl | Ellis Dam | 3.1% | Ellis Dam project. North East Coolgardie Mineral Field. Annual report on E28/49 for the year ended 12/7/88 |
| A21421 | 1987 | Freeport Of Australia Inc | Ellis Dam | 3.1% | Ellis Dam - Annual report for 1987 12-7-86 to 11-7-87 Exploration Licence 28/49 Vol 1 |
| A18735 | 1986 | Freeport Of Australia Inc | Ellis Dam | 3.1% | Ellis Dam- Annual Report for 1986, 12/7/85 to 12/7/86; Exploration Licence 28/49. |
| A16042 | 1985 | Freeport Of Australia Inc | Ellis Dam | 3.1% | Ellis Dam- Annual Report for 1985 (12/7/84 - 11/7/85). Exploration Licence 28/49. |
| A14349 | 1984 | Freeport Of Australia Inc | Ellis Dam | 3.1% | Ellis Dam - Annual report for 1984 12/7/83 - 11/7/84 Exploration Licence 28/49 |
| A5839 | 1975 | International Nickel Aust Ltd | Bent Stem Dam | 13% | Annual report, MC31/1702 - 31/1709, Bent Stem Dam Claim Group, For the period 20th November 1973 - 31st Decemb |
| A6311 | 1975 | International Nickel Australia Ltd | Bent Stem Dam | 13% | Bent Stem Dam Project, Non-statutory Report: Relinquishment Report for the period 1st January 1975 to 11th Aug |
| A1993 | 1970 | New Broken Hill Consolidated Ltd | Lake Rebecca | 3.6% | Lake Rebecca [JV] Project, Final Surrender Report for the period ending 01/11/1970,TR70/3811; MC28/1448-1452 & |
| A1143 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | 3.6% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st March 1968, TR70/3811H |
| A1144 | 1968 | New Broken Hill Consolidated Ltd | Lake Rebecca | 3.6% | Lake Rebecca Project, Annual Report for the period 18th July 1967 to 30th June 1968, TR70/3811H. |
| A1141 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | 3.6% | Lake Rebecca Project, Non-statutory Report: Quarterly Report for the period ending 31st October 1967, TR70/381 |
| A1142 | 1967 | New Consolidated Gold Fields Aust Ltd | Lake Rebecca | 3.6% | Lake Rebecca Project, Non-statutory Report: Report on Investigations for the period 18th July 1967 to 31st Dec |
| A61689 | 1753 | Croesus Mining Nl | Wallbrook JV | 1% | Annual Report 1st January 2000 to 31st December 2000 Wallbrook Joint Venture Project tenements E31/117, E31/17 |
| A79580 | 1753 | Saracen Gold Mines Pty Ltd | Carosue Dam | <1% | CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C064/2001, TENEMENTS: M28/166, M28/1 |
| A97183 | 1753 | Legacy Iron Ore Ltd | Wallbrook | <1% | Wallbrook Project, Final Surrender Report for the period 1st February 2008 to 31st January 2013, E31/716. |
| A84243 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | 4.9% | OLD PLOUGH DAM PROJECT, ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C065/2001, E31/152, E31/388, E31/390, E31/ |
| A84640 | 1753 | Saracen Gold Mines Pty Ltd | Carosue Dam | 7.6% | CAROSUE DAM PROJECT ANNUAL REPORT 01 JULY 2008 TO 30 JUNE 2009, C064/2001, E28/828, E28/1747, E31/365, M28/166 |
| A87937 | 1753 | Saracen Gold Mines Pty Ltd | CAROSUE DAM/ Whirling Dervish | 7.6% | CAROSUE DAM PROJECT (C064/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E28/828, E28/1747, E31/365, M28 |
| A87936 | 1753 | Saracen Gold Mines Pty Ltd | OLD PLOUGH DAM | 5.6% | OLD PLOUGH DAM PROJECT (C065/2001) ANNUAL REPORT – 01 JULY 2009 TO 30 JUNE 2010, E31/586, E31/620, E31/741, E3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 18 months · 29 Mar 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 31/1327 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 31/1327? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.