E 29/1347
Register summary
- Holder
- Ashrock Nominees Pty Ltd
- Local government
- Shire of Menzies
- Application received
- 24 July 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149606 | 2025 | Redscope Enterprises Pty Ltd | Henderson North | 22% | Final Surrender Report for Tenement E29/1112 Henderson North Project for the period ending 1/7/2025 |
| A144354 | 2024 | Redscope Mining Pty Ltd; Venus Metals Corporation Limited | Henderson | 22% | Henderson Lithium Project Annual Report E29/1112 for the period ending 1/7/2024 |
| A142964 | 2024 | Javelin Minerals Limited | Mt Ida - Ida Valley | 21% | Mt Ida - Ida Valley E29/1095 Annual Report for the period ending 02/03/2024 |
| A143586 | 2024 | Javelin Minerals Limited | Mount Ida - Ida Valley | 21% | Mt Ida - Ida Valley E 29/1095 Final Surrender Report for the period 3 March 2023 to 2 March 2024 |
| A143964 | 2024 | Javelin Minerals Limited | Mount Ida - Ida Valley | 8.7% | Mt Ida - Ida Valley Final Report E29/01135 for the period ending 24/04/2024 |
129 more reports
| A144020 | 2024 | Javelin Minerals Limited | Mount Ida - Ida Valley | <1% | Mount Ida - Ida Valley Final Report E29/1185 for the period ending 08/08/2024. |
| A135029 | 2023 | Javelin Minerals Limited | Mount Ida - Ida Valley | 21% | Mount Ida - Ida Valley E29/1095 Annual Report for the period ending 02/03/2023 |
| A135158 | 2023 | Javelin Minerals Limited | Mount Ida - Ida Valley | 8.7% | Annual Report E 29/1135 Mt Ida - Ida Valley for the period ending 17/03/2023. |
| A136511 | 2023 | Igo Ltd | Henderson | 22% | Henderson Project, E29/1112, Annual Report for the Period 02/07/2022 to 01/07/2023 |
| A130469 | 2022 | Fleet Street Holdings Pty Ltd | Mount Ida | 21% | Annual Report E29/1095 Mount Ida Project for the period ending 2/3/2022 |
| A132133 | 2022 | Venus Metals Corporation Limited | Henderson North | 22% | Annual Report for Tenement E29/1112 Henderson North Project for the period ending 01/07/2022. |
| A124712 | 2020 | Alt Resources Limited | Quin Hills | <1% | C143/2005 Quinn Hills Project Combined Annual Report for the period ending 30/06/2020 |
| A122770 | 2020 | Ora Banda Mining | Mount Ida | <1% | Mt Ida Project C112/2001 Annual Report for the period ending 31/12/2019 |
| A118654 | 2019 | Alt Resources Limited | Mount Ida South | <1% | E29/1016 Mount Ida South Annual Report Period 08/11/2017 - 07/11/2018 |
| A119089 | 2019 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 1 January 2018 to 31 December 2018, E29/00640, E29/006 |
| A121025 | 2019 | Alt Resources Limited | Quinns | <1% | Combined Annual Technical Report Quinns Project C143/2005 for the period 1 July 2018 to 30 June 2019, E 29/649 |
| A121635 | 2019 | Bruce Legendre | Ballard | <1% | E30/00472, E29/00991 Ballard Project C 5/2018 Annual Technical Report for the period 5 July 2018 to 4 July 201 |
| A115798 | 2018 | Eastern Goldfields Limited | Mount Ida | <1% | Mt Ida Project - C112/2001 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A116111 | 2018 | Eastern Goldfields Limited | Mount Ida | 2% | Mt Ida Project P29/2310 to P29/2318 Final Surrender For the Period 7 October 2013 to 26 February 2018 |
| A117534 | 2018 | Mgk Resources Pty Ltd | QUINNS | <1% | C143/2005 QUINNS PROJECT COMBINED REPORT, 01 JULY 2017 - 30 JUNE 2018 |
| A118047 | 2018 | Enterprise Metals Limited | Ballard | <1% | Ballard Project E30/472 & E29/991 Combined Annual Report for the period 05/07/2017 - 04/07/2018 |
| A114985 | 2017 | Mgk Resources Pty Ltd | Quinn Hills | <1% | Combined Annual Technical Report Quinns Project C143/2005 for the period 1 July 2016 to 30 June 2017, E29/0064 |
| A112032 | 2017 | Eastern Goldfields Limited | Mount Ida | <1% | Mineral Exploration Report Mount Ida C112/2001 for the period 1 January 2016 to 31 December 2016, E29/00640... |
| A108022 | 2016 | Eastern Goldfields Limited | Mount Ida | <1% | MT IDA PROJECT Mineral Exploration Report Combined Report C112/2001 For the Period 1/01/2015 – 31/12/2015, E29 |
| A110160 | 2016 | Fe Limited | Mount Ida | 10% | Mt Ida E29/818 Final Surrender Report For the Period 26 October 2011 to 31 August 2016 |
| A110206 | 2016 | Mgk Resources Pty Ltd | Quinns | <1% | Combined Annual Technical Report (C143/2005), Quinns Project, for the period 01 July 2015 to 30 June 2016, E29 |
| A104852 | 2015 | Swan Gold Mining Ltd | Mount Ida | <1% | Combined C112/2001 Mineral Exploration Report Mt Ida Project for the period 1/01/2014 – 31/12/2014, E29/640.. |
| A106903 | 2015 | Wild Acre Metals Limited | Quinns | <1% | Annual Technical Report (C143/2005), M29/36, M29/37, M29/65, E29/649, E29/707 (dead), E29/716 (dead), E29/724 |
| A107146 | 2015 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 - Mt Ida South Project for the Period 1st September 2014 to 31st August 2015 |
| A107422 | 2015 | Fe Limited | Mount Ida | 10% | Mount Ida E29/818 Annual Technical Report for the period ended 25/10/2015 |
| A103494 | 2014 | Wild Acre Metals Limited | Quinns | <1% | Annual Technical Report Quinns Project C143/2005 for the period 01/07/2013 to 30/06/2014 "* |
| A101107 | 2014 | Swan Gold Mining Ltd | Mount Ida | <1% | Mineral Exploration Report Mt Ida Project Combined Report C112/2001 For the Period 1/01/2013 – 31/12/2013, E29 |
| A101881 | 2014 | Fe Limited; Swan Gold Mining Ltd | Mount Ida | <1% | Mount Ida Project, Final Surrender Report for the period 23/09/2008 to 22/01/2014, E29/642. |
| A104047 | 2014 | Fe Limited | Mount Ida | 10% | Mt Ida Project E29/818 Annual Report for the period 26/10/2013 to 25/10/2014 |
| A105117 | 2014 | Wild Acre Metals Limited | Mount Ida | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st September 2013 to 31st August 2014, |
| A97708 | 2013 | Swan Gold Mining Ltd | Mount Ida | <1% | Mt Ida Project, Annual Report for the period 01/01/2012 to 31/12/2012, E29/561, 660, 640- 644, 647 & E29/659; |
| A98715 | 2013 | Wild Acre Metals Ltd | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2012 to 31st July 2013, E29/7 |
| A99269 | 2013 | Wild Acre Metals Limited | Quinns | <1% | Annual Technical Report Quinns Project C143/2005 for the period 01/07/2012 to 30/06/2013 |
| A99824 | 2013 | Fe Limited | Mount Ida | 10% | Mt Ida Project E29/818 Annual Report for the period 26/10/2012 to 25/10/2013 |
| A100112 | 2013 | Wild Acre Metals Ltd | Quinns | <1% | Partial Surrender Report to the period 31/07/2013 Quinns Project C143/2005 E29/649, E29/699, E29/707, E29/716, |
| A94745 | 2012 | Wild Acre Metals Limited | Quinns | <1% | Annual Technical Report Quinns Project C143/2005 Report Period: 01/07/2011 to 30/06/2012 |
| A95369 | 2012 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010 Mt Ida South Project for the Period 1st August 2011 to 31st July 2012, E29/7 |
| A95398 | 2012 | Fe Limited | Mount Ida | 10% | Mt Ida Project E29/818 Annual Report for the period 26/10/2011 to 25/10/2012 |
| A90617 | 2011 | Swan Gold Mining Ltd | Mount Ida | <1% | Annual Mineral Exploration Report E29/642, 23rd September 2009 – 22nd September 2010 |
| A91197 | 2011 | Wild Acre Metals Limited | Quinns | <1% | Quinns Project,Annual Report for the period 01/07/2010 to 30/06/2011, E29/648.............748; M29/36-37 & 65 |
| A91684 | 2011 | Wild Acre Metals Limited | Mount Ida South | <1% | Annual Technical Report C175/2010- Mt Ida South Project 1st August 2010 to 31st July 2011, E29/744, 749, 750, |
| A87836 | 2010 | Wild Acre Metals Limited | Quinns | <1% | Annual Technical Report Quinns Project C143/2005, 01/07/2009 to 30/06/2010 |
| A85594 | 2010 | Heron Resources Ltd | Snake Hill | <1% | Snake Hill Project, C67/2006, E29/527, E29/544, Partial Surrender Report, 24 November 2005 to 23 November 2009 |
| A85967 | 2010 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2009 TO 31/12/2009 Tenements: E29/526, 539, 559, 56 |
| A86288 | 2010 | Heron Resources Ltd | Snake Hill | <1% | Snake Hill Project, C67/2006 E29/527, E29/544, Final SurrenderReport, 24 November 2005 to 3 February 2010, |
| A81393 | 2009 | La Mancha Resources Australia Pty Ltd | MT IDA | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2008 TO 31/12/2008, Tenements: E29/481, 506, 526, 5 |
| A84996 | 2009 | Wild Acre Metals Ltd | Quinns | <1% | Annual Technical Report E29/649 - Quinns, Report Period: 07/10/2008 to 06/10/2009 |
| A85346 | 2009 | Heron Resources Ltd | Snake Hill | <1% | Annual report for the period 1 November 2008 to 31 October 2009, Snake Hill Nickel Project, C67/2006, E29/527, |
| A77445 | 2008 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | MT IDA PROJECT COMBINED ANNUAL REPORT FOR THE PERIOD 01/01/2007 TO 31/12/2007 C112/2001 |
| A79562 | 2008 | Barra Resources Ltd | Quinn Hills | <1% | Combined Annual Technical Report (C143/2005) (E29/329, E29/331, E29/489, E29/492, E29/493, E29/494, M29/36, M2 |
| A80187 | 2008 | Vale Inco Australia Limited Partnership | Snake Hill | <1% | SNAKE HILL PROJECT C67/2006, TENEMENTS: E29/527 and E29/544M PARTIAL SURRENDER REPORT 24 NOVEMBER 2005 – 17 NO |
| A79686 | 2008 | Barra Resources Ltd | Quinn Hills | <1% | Partial Surrender Report E29/329 For the Period Jan 1997 - Jun 2008 |
| A80186 | 2008 | Vale Inco Australia Limited Partnership | Snake Hill | <1% | Snake Hill Project, Annual Report for the period 1st November 2007 to 31st October 2008, E29/527 & 544. |
| A81775 | 2008 | Barra Resources Ltd | Quinn Hills | <1% | Surrender Report E29/329 For the period 24 January 1997 – 07 October 2008 |
| A74160 | 2007 | Inco Australia Ltd | Snake Hill | <1% | Snake Hill Project E29/527, E29/544, E29/575, E29/586, Combined Annual Report C67/2006, 01 November 2005 to 31 |
| A76730 | 2007 | Inco Australia Ltd | Snake Hill | <1% | SNAKE HILL PROJECT, C67/2006, TENEMENTS: E29/527 AND E29/544, COMBINED ANNUAL REPORT - C67/2006, 01 NOVEMB |
| A76802 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 6.9% | Mount Ida Project Combined Annual Report for the period 16/06/2006 to 15/06/2007, Tenements: E29/133, E29/134. |
| A74385 | 2007 | La Mancha Resources Australia Pty Ltd | Mount Ida | <1% | Mount Ida Project, C112/2001, Combined Annual Report for the Period 01/01/2007 to 31/12/2007 (Menzies) |
| A76187 | 2007 | Barra Resources Ltd | Forrest Belle/Quinn Hills | <1% | Combined annual Technical Report (C143/2005) for the period 01 July 2006 - 30 June 2007 Quinn Hills Project. |
| A76808 | 2007 | La Mancha Resources Australia Pty Ltd | Snake Hill | 6.9% | MT IDA PROJECT E29/133, E29/134 COMBINED ANNUAL REPORT FOR THE PERIOD 16/06/2006 TO 15/06/2007 |
| A71621 | 2006 | International Goldfields Ltd | Four Corners | 6.9% | Annual Report period ending 16/06/2005 for the Four Corners Project, Tenements E29/133 and E29/134, Combined R |
| A72271 | 2006 | Mines & Resources Australia Pty Ltd | Mount Ida | <1% | Mt Ida Project, Combined Annual Report for the Period 01/01/2005 to 31/12/2005, C112/2001, (Leonora). |
| A72673 | 2006 | Bhp Billiton Minerals Pty Ltd | Ida Valley | 1.8% | Ida Valley Project, Partial Surrender Report for the period 24th October 2001 to 3rd July 2006, E29/483. |
| A73395 | 2006 | Bhp Billiton Iron Ore Pty Ltd | Ida Valley | 15% | Combined Annual Report C126/2002, For the Period 1 July 2005 to 30 June 2006, Ida Valley Project E29/483, E29/ |
| A73635 | 2006 | International Goldfields Ltd | Snake Hill | 6.9% | 2006 Combined Annual Report for the Four Corners Project Exploration Licences E29/133, E29/134. (C351/1997) Fo |
| A73917 | 2006 | Bhp Billiton Nickel West Pty Ltd | Ida Valley | 1.8% | Relinquishment Report for the Period 15 January 2002 to 23 November 2006, Ida Valley Project E29/483, (Leonora |
| A72905 | 2006 | Sipa Exploration Nl | Forrest Belle/Quinn Hills | <1% | Annual Technical Report for Quinn Hills Project E29/329,331, 489,492-494,521,M29/36-37,65,P29/1716-1717, Combi |
| A73919 | 2006 | Bhp Billiton Minerals Pty Ltd | Ida Valley | 29% | Relinquishment Report for the Period 27 August 2002 to 2 November 2006, Ida Valley Project E29/484, (Leonora). |
| A70987 | 2005 | Wmc Resources Ltd | Ida Valley | 15% | Combined annual report: C126/2002, For the period 1 July 2004 to 30 June 2005, Due:31st August 2005. Ida Valle |
| A71015 | 2005 | Sipa Exploration Nl | KCGM/ Quinn Hills | <1% | Annual technical report for Quinn Hills Project - KCGM JV - Combined report C31/2001, Western Australia, Tenem |
| A70249 | 2005 | International Goldfields Ltd | Mount Ida | <1% | Annual report for the period 01/01/04 - 31/12/04 Mount Ida Project, C112/2001, E29/120, 378, 385, 386, 388, E2 |
| A68318 | 2004 | International Goldfields Ltd | Four Corners | 6.9% | Annual Report for the period 17/06/2002-16/06/2003 Four Corners Project, E29/133, E29/134, Combined Report No |
| A69138 | 2004 | Sipa Exploration Nl | Quinn Hills | <1% | Annual report for the period 01/07/2003-30/06/2004 Quinn Hills JV Project (C31/2001), E29/329, E29/331 |
| A69174 | 2004 | Wmc Resources Ltd | Ida Valley | 15% | Ida Valley Project, Annual Report E29/483 & E29/484 for the period 01/07/2003-30/06/2004 (C126/2002). |
| A68646 | 2004 | International Goldfields Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2003-31/12/2003 Mount Ida Project (C112/2001), E29/120, E29/385, E29/386, E |
| A69531 | 2004 | International Goldfields Ltd | Four Corners | 6.9% | Annual report for the period ending 16/06/04 Four Corners Project, C351/1997, E29/133, E29/134 |
| A66710 | 2003 | Hamill Resources Ltd | Mount Ida | <1% | Annual Report for the period 01/01/2002 to 31/12/2002 Mount Ida Project C112/2001: E29/120, 385-6, 388, 413, 4 |
| A67227 | 2003 | Wmc Resources Ltd | Ida Valley | 15% | Annual Report for the period 1 July 2002 - 30 June 2003 Nickel Exploration, E29/483,E29/484, C126/2002: ( Ida |
| A67249 | 2003 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141,E29/150, C351/1997 - Four Corners, Surrender Report for the period 24 January 19 |
| A67642 | 2003 | Barra Resources Ltd | Quinn Hills | <1% | Combined Annual Technical Report for the period 1 July 2002- 30 June 2003, Quinn Hills/KCGM JV Gold Prospect E |
| A65446 | 2002 | Barra Resources Ltd | KCGM/ Quinn Hills | <1% | Quinn Hills Gold Project KCGM JV Gold Prospect Combined Annual Technical Report Reporting Period: 1st July 200 |
| A65676 | 2002 | Mt Kersey Mining Nl | Lake Ballard | <1% | Exploration Licence E29/141 'Lake Ballard JV' Annual Ministerial Submission For Extension Of Term For The Peri |
| A65677 | 2002 | Mt Kersey Mining Nl | Four Corners | <1% | Exploration Licences: E29/141 & 150. Four Corners. Annual Report For The Period 9 August 1997 To 8 August 1998 |
| A65678 | 2002 | Gutnick Resources Nl | Four Corners | <1% | Exploration Licences: E29/141, 150. Four Corners. Joint Annual Report For The Period 9 August 1999 To 8 August |
| A62986 | 2001 | Barra Resources Ltd | KCGM JV | <1% | KCGM JV Gold Project Combined Annual Technical Report Reporting Period: 30 December 1997 to 30 June 2001 Tenem |
| A63746 | 2001 | Gutnick Resources Nl | Four Corners | 5.1% | Exploration licences: E29/133-134, 141, 150 'C351/1997 - Four Corners' Joint Annual Report for the period 9 Au |
| A61368 | 2000 | Anglogold Australasia Ltd | Mount Ida | <1% | Mt Ida Project, E29/159. Annual Report for the Period 1st January 2000 to 31st December 2000. C403/95. Report |
| A59962 | 2000 | Acacia Resources Ltd | Mount Ida | <1% | Mt Ida Project E29/159,P29/1561 01/01/1999 to 31/12/1999 |
| A57405 | 1999 | Mt Kersey Mining Nl | Snake Hill | <1% | Exploration Licence E29/141 'Snake Hill' Partial Surrender Report for the Period 24th January 1992 to 18 Novem |
| A57522 | 1999 | Acacia Resources Ltd | Mount Ida | <1% | Mt Ida Project E29/159, P29/1561 Annual Repor for the Period 1st January 1998 to 31st December 1998 |
| A57918 | 1999 | Astro Mining Nl | West Leonora | <1% | Exploration Licences E29/225, 271, 272 (all tenements worked on ) Joint Annual Report for the Period 6th Decem |
| A53736 | 1998 | Astro Mining Nl | West Leonora | <1% | Exploration Licences : E29/211-226,271-272 ;E36/262-269 Joint Annual Report for the Period 06 December1996 to |
| A55874 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Partial Surrender Report E29/159 Copperfield Project, Mt Ida joint venture. Report No: G630/7. (Period August |
| A56011 | 1998 | Mt Kersey Mining Nl | Snake Hill | <1% | Snake Hill Project, Partial Surrender Report for the period 24th January 1992 to 24th April 1998, E29/141. |
| A53617 | 1998 | Stockdale Prospecting Ltd | Ida | 2.5% | Ida Project Combined Annual Report No M9200 E29/233-234, E29/240, E29/242, E29/249 & E29/251 (11/96-11/97) |
| A54161 | 1998 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report on Exploration carried out during 1st January 1997 to 31st December 1997, Copperfield Project, M |
| A56693 | 1998 | Gme Resources Nl | Mt Ida - Oberwyl | <1% | Partial Surrender Report E29/159 Mt Ida - Oberwyl Project report period 26/2/98 - 19/6/98. |
| A52288 | 1997 | Mt Kersey Mining Nl | Snake Hill | 19% | Exploration Licences E29/134 'Snake Hill' Ministerial submission for extension of term for the period 17/06/97 |
| A50122 | 1997 | Astro Mining Nl | West Leonora | <1% | West Leonora Project, Annual Report for the period 6th December 1995 to 5th December 1996, |
| A50766 | 1997 | Cra Exploration Pty Ltd | Lake Ballard | <1% | Annual Report to 31 January 1997 on E29/141 & 150 Lake Ballard Project. |
| A50771 | 1997 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report for the period ending 31/12/1996 Copperfield Project Mt Ida Joint Venture E29/159, E29/199 & M29 |
| A50810 | 1997 | Stockdale Prospecting Ltd | Ida | 3.9% | Ida Project Combined Annual Report E29/231 to E29/234 E29/240 E29/242 E29/249 and E29/251 (11/95 to 11/96) |
| A53624 | 1997 | Stockdale Prospecting Ltd | Ida | 2.5% | Ida Project, Combined Partial Relinquishment Report, E29/233, 234, 240, 242, 249, 251 December 1997. |
| A53623 | 1997 | Stockdale Prospecting Ltd | Ida | 8.7% | Ida Project, Final Combined Report, E29/231 & E29/232 December 1997. |
| A47369 | 1996 | Cra Exploration Pty Ltd | Dead Camel | <1% | Dead Camel Project, Surrender Report February 1996, E29/187. |
| A47810 | 1996 | Newcrest Mining Ltd | Copperfield | <1% | Annual Report for the period ending 31/12/1995 Copperfield Project Mt Ida Joint Venture E29/159, E29/199 & M29 |
| A49265 | 1996 | Cra Exploration Pty Ltd | Snake Hill | 6.9% | Annual report to 16 June 1996 on E29/133 and E29/134 Snake Hill Project,. |
| A46762 | 1996 | Astro Mining Nl | West Leonora | <1% | West Leonora Project, Reporting Period 6/12/1994 - 5/12/1995, Exploration Licences E29/211-233, E29/2226 and E |
| A47322 | 1996 | Stockdale Prospecting Ltd | Ida | 3.9% | Combined Annual report E29/231 E29/232 E29/233 E29/234 E29/240 E29/242 E29/249 E29/251 (11/94 to 11/95) |
| A43977 | 1995 | Gold & Mineral Exploration Nl | Mt Ida-Oberwyl | <1% | Annual report for period January 1, 1994 to December 31 1994 Mount Ida - Oberwyl Project E29/120 E29/151 E29/1 |
| A45920 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 6.9% | Partial Surrender Report for the period ending 16/06/95 Snake Hill Project E29/133 E29/134 |
| A45472 | 1995 | Cra Exploration Pty Ltd | Snake Hill | 6.9% | ANNUAL REPORT TO 16 JUNE 1995 ON E29/133, 134 SNAKE HILL MENZIES SH5105 W.A |
| A45532 | 1995 | Cra Exploration Pty Ltd | Dead Camel | <1% | Dead Camel Project, Annual Report E29/187 for period ending 16th June 1995. |
| A46308 | 1995 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project ,Annual Report for the Period March 1994 to August 1995, E29/141 & 150. |
| A41379 | 1994 | Delta Gold Ltd | Lake Ballard | <1% | Lake Ballard Project Annual Report for the Period February 1993 to March 1994 E29/141, 150. |
| A41673 | 1994 | Cra Exploration Pty Ltd | Snake Hill base | 6.9% | Partial Relinquishment Report to 16 June 1994 |
| A40480 | 1994 | Gold & Mineral Exploration Nl | Mount Ida | <1% | Annual Report for the period 01/01/93-31/12/93 Mt Ida Oberwyl Project E29/120,151,155,159 M29/02,158 P29/1206, |
| A41805 | 1994 | Cra Exploration Pty Ltd | Snake Hill | 6.9% | Annual Report for the period 17/06/93-16/06/94 Snake Hill Project E29/133,134 |
| A38576 | 1993 | Delta Gold Ltd | Lake Ballard | <1% | Non-statutory Report : Report on Previous Nickel and Gold Exploration in the Lake Ballard Area ,Exploration Li |
| A38133 | 1992 | Cra Exploration Pty Ltd | Snake Hill | 6.9% | Annual report for the period 17/06/91-16/06/92 Snake Hill Project E29/133 E29/134 |
| A6292 | 1975 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Annual Report for the year ending 31/12/1975, MC29/2546, 2546-2550, 2492-2495, 2537-2545, 2 |
| A5589 | 1974 | Cra Exploration Pty Ltd | Kurrajong | <1% | Annual report for 1974, Kurrajong Mineral Claims, MC29/2492 ... 29/2836 |
| A3847 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report; Progress Report for the period 1st January 1973 to 31st May 1973, TR7 |
| A3571 | 1973 | Cra Exploration Pty Ltd | Kurrajong - Mount Ida | <1% | Kurrajong - Mount Ida Project, Non-statutory Report: Progress Report for the period 01/02/1972 to 31/12/1972, |
| A4482 | 1973 | Cra Exploration Pty Ltd | Kurrajong | <1% | Kurrajong Project, Non-statutory Report:Exploratiom Report for the period 1st June 1973 to 30th November 1973, |
| A12559 | 1972 | Cra Exploration Pty Ltd | Kurrajong | <1% | Geophysical Survey at Kurrajong (W.A), November, 1962 |
| A51856 | 1753 | Mt Kersey Mining Nl | Snake Hill | 19% | Exploration Licence E29/134 'Snake Hill' Annual report for the period 17 June 1996 to 16 June 1997 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A52190 | 1753 | Mt Kersey Mining Nl | Snake Hill | 5.1% | Mt Kersey Mining NL Exploration licences E29/133, E29/134, E29/141, E29/150 Snake Hill C180/1994 Joint Annual |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 29/1347 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 29/1347 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 29/1347? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-28. Compiled by NextMaps. Verify against primary sources before reliance.