NextMaps›WA Tenements›E 28/3620

E 28/3620

PendingExploration LicenceCity of Kalgoorlie-BoulderKurnalpi District
Area
4,960ha
Applied
Sept 2026
12 days ago
WAMEX reports
422
WA median is 53
Report drilling
288
of 422 reports
Kalgoorlie-Boulder Explore on the live map

Register summary

Holder
Nex Wongatha Jv Pty Ltd
Local government
City of Kalgoorlie-Boulder, Shire of Menzies
Application received
16 Sept 2026

Exploration history on this ground

422 historical WAMEX exploration reports intersect E 28/3620: 183 report geochemistry or sampling, 304 include a digital data package.
When this ground was worked · 98 of 422 reports dated
41960s
11970s
61980s
311990s
262000s
212010s
92020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A138719 2024 Native Mineral Resources Pty Ltd 21% ARCOONA E31/1203 Annual Report for the period ending 18/11/2023.
A138719 2024 Native Mineral Resources Pty Ltd 21% ARCOONA E31/1203 Annual Report for the period ending 18/11/2023.
A138719 2024 Native Mineral Resources Pty Ltd 21% ARCOONA E31/1203 Annual Report for the period ending 18/11/2023.
A138719 2024 Native Mineral Resources Pty Ltd 21% ARCOONA E31/1203 Annual Report for the period ending 18/11/2023.
A145208 2024 Dynamic Metals Limited 2.5% Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024
245 more reports
A145208 2024 Dynamic Metals Limited 2.5% Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024
A145208 2024 Dynamic Metals Limited 2.5% Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024
A145208 2024 Dynamic Metals Limited 2.5% Partial Surrender Report for E 28/3138 - Pinnacles West for the period 13 October 2023 to 11 September 2024
A133554 2023 Native Metals Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2021 to 18 November 2022
A133554 2023 Native Metals Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2021 to 18 November 2022
A133554 2023 Native Metals Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2021 to 18 November 2022
A133554 2023 Native Metals Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2021 to 18 November 2022
A130040 2022 Nexus Minerals Australia Pty Ltd <1% E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021.
A130040 2022 Nexus Minerals Australia Pty Ltd <1% E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021.
A130040 2022 Nexus Minerals Australia Pty Ltd <1% E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021.
A130040 2022 Nexus Minerals Australia Pty Ltd <1% E28/2526 Partial Surrender Report Pinnacles Project for the period ending 21/12/2021.
A126380 2021 Element 25 Limited 7.4% Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021
A126380 2021 Element 25 Limited 7.4% Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021
A126380 2021 Element 25 Limited 7.4% Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021
A126380 2021 Element 25 Limited 7.4% Annual Report - C210/2017 - Pinnacles Project for the period ending 04/01/2021
A129122 2021 Native Mineral Resources Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2020 to 18 November 2021
A129122 2021 Native Mineral Resources Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2020 to 18 November 2021
A129122 2021 Native Mineral Resources Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2020 to 18 November 2021
A129122 2021 Native Mineral Resources Pty Ltd 21% Arcoona E 31/1203 Annual Report for the period 19th November 2020 to 18 November 2021
A122911 2020 Element 25 Limited 4.5% Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701
A122911 2020 Element 25 Limited 4.5% Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701
A122911 2020 Element 25 Limited 4.5% Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701
A122911 2020 Element 25 Limited 4.5% Annual Report - C210/2017 Pinnacles for the period ending 04/01/2020, E 28/02577, E 28/02701
A124728 2020 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020
A124728 2020 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020
A124728 2020 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020
A124728 2020 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2019 to 30 June 2020
A124921 2020 Nexus Minerals Limited <1% Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020
A124921 2020 Nexus Minerals Limited <1% Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020
A124921 2020 Nexus Minerals Limited <1% Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020
A124921 2020 Nexus Minerals Limited <1% Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 for the period ending 30/06/2020
A119504 2019 Element 25 Limited 4.5% Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701
A119504 2019 Element 25 Limited 4.5% Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701
A119504 2019 Element 25 Limited 4.5% Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701
A119504 2019 Element 25 Limited 4.5% Annual Report C210/2017 Pinnacles for the period 5 January 2018 to 4 January 2019, E28/02577, E28/02701
A120696 2019 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526,
A120696 2019 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526,
A120696 2019 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526,
A120696 2019 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016 for the period 1 July 2018 to 30 June 2019, E 28/02526,
A120911 2019 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019
A120911 2019 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019
A120911 2019 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019
A120911 2019 Saracen Gold Mines Pty Limited 1.3% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2018 to 30 June 2019
A116288 2018 Montezuma Mining Company Ltd 4.5% Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701
A116288 2018 Montezuma Mining Company Ltd 4.5% Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701
A116288 2018 Montezuma Mining Company Ltd 4.5% Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701
A116288 2018 Montezuma Mining Company Ltd 4.5% Annual Report C210/2017 Pinnacles For the Period 5 January 2017 to 4 January 2018, E28/02577, E28/02701
A117528 2018 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018
A117528 2018 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018
A117528 2018 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018
A117528 2018 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2017 to 30 June 2018
A117596 2018 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018
A117596 2018 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018
A117596 2018 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018
A117596 2018 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project, C45/2016, 01 July 2017 - 30 June 2018
A114597 2017 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202
A114597 2017 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202
A114597 2017 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202
A114597 2017 Saracen Gold Mines Pty Limited 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2016 to 30 June 2017, E28/01747.....P31/0202
A114725 2017 Nexus Gold Pty Ltd <1% Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526,
A114725 2017 Nexus Gold Pty Ltd <1% Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526,
A114725 2017 Nexus Gold Pty Ltd <1% Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526,
A114725 2017 Nexus Gold Pty Ltd <1% Combined Annual Report for Pinnacles Project, C45/2016 For the Period 1 July 2016 to 30 June 2017, E28/02526,
A109789 2016 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to
A109789 2016 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to
A109789 2016 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to
A109789 2016 Nexus Minerals Limited <1% Combined Annual Report for Pinnacles Project – Combined Reporting Group C45/2016 For the Period 1 July 2015 to
A109933 2016 Saracen Gold Mines Pty Ltd 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016
A109933 2016 Saracen Gold Mines Pty Ltd 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016
A109933 2016 Saracen Gold Mines Pty Ltd 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016
A109933 2016 Saracen Gold Mines Pty Ltd 1.1% Carosue Dam Project (C9/2016) Annual Report for the Period 1 July 2015 to 30 June 2016
A106812 2015 Saracen Gold Mines Pty Ltd 13% Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241
A106812 2015 Saracen Gold Mines Pty Ltd 13% Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241
A106812 2015 Saracen Gold Mines Pty Ltd 13% Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241
A106812 2015 Saracen Gold Mines Pty Ltd 13% Mulgabbie West Project (C117/1999) Annual Report for the Period 1 July 2014 to 30 June 2015, E31/1009, M28/241
A103198 2014 Cazaly Resources Ltd 2.6% E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014
A103198 2014 Cazaly Resources Ltd 2.6% E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014
A103198 2014 Cazaly Resources Ltd 2.6% E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014
A103198 2014 Cazaly Resources Ltd 2.6% E31/886, E28/2273 Combined Annual Report C50/2011 for the period 01/07/2013 to 30/06/2014
A103508 2014 Saracen Gold Mines Pty Ltd 27% Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28
A103508 2014 Saracen Gold Mines Pty Ltd 27% Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28
A103508 2014 Saracen Gold Mines Pty Ltd 27% Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28
A103508 2014 Saracen Gold Mines Pty Ltd 27% Mulgabbie West Project Annual Report, 1 July 2013 to 30 June 2014, C117/1999; E31/796, E31/1009, M28/241, M28
A99440 2013 Saracen Gold Mines Pty Ltd 29% Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009
A99440 2013 Saracen Gold Mines Pty Ltd 29% Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009
A99440 2013 Saracen Gold Mines Pty Ltd 29% Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009
A99440 2013 Saracen Gold Mines Pty Ltd 29% Mulgabbie West Project (C117/1999) Annual Report for the period 1 July 2012 to 30 June 2013, E31/796, E31/1009
A100147 2013 Cazaly Resources Ltd 5.3% E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013
A100147 2013 Cazaly Resources Ltd 5.3% E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013
A100147 2013 Cazaly Resources Ltd 5.3% E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013
A100147 2013 Cazaly Resources Ltd 5.3% E31/886, E28/2049 Combined Annual Report C50/2011 for the period ended 30 June 2013
A95050 2012 Cove Resources Limited 3.8% Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/
A95050 2012 Cove Resources Limited 3.8% Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/
A95050 2012 Cove Resources Limited 3.8% Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/
A95050 2012 Cove Resources Limited 3.8% Carosue Dam Project Combined Annual Exploration Report For The Year to 30th June 2012, C50/2011, E31/886, P31/
A95130 2012 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269,
A95130 2012 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269,
A95130 2012 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269,
A95130 2012 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project Annual Report 1 July 2011 to 30 June 2012, C117/1999, E31/796, M28/241, 243, 266, 269,
A91293 2011 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2
A91293 2011 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2
A91293 2011 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2
A91293 2011 Saracen Gold Mines Pty Ltd 28% Mulgabbie West Project C117/1999 Annual Report for the period 1 July 2010 to 30 June 2011 E31/796, M28/241, M2
A91960 2011 Cove Resources Limited 3.8% Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31
A91960 2011 Cove Resources Limited 3.8% Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31
A91960 2011 Cove Resources Limited 3.8% Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31
A91960 2011 Cove Resources Limited 3.8% Carosue Dam Project C50/2011 Combined First Annual Report period ending 30 June 2011 for E31/886, E31/889, E31
A85447 2010 Saracen Gold Mines Pty Ltd 83% M31/301 Mulgabbie West Project Final Report 2 May 2008 to 16 April 2009
A85447 2010 Saracen Gold Mines Pty Ltd 83% M31/301 Mulgabbie West Project Final Report 2 May 2008 to 16 April 2009
A85447 2010 Saracen Gold Mines Pty Ltd 83% M31/301 Mulgabbie West Project Final Report 2 May 2008 to 16 April 2009
A85447 2010 Saracen Gold Mines Pty Ltd 83% M31/301 Mulgabbie West Project Final Report 2 May 2008 to 16 April 2009
A87089 2010 Saracen Gold Mines Pty Ltd 45% E31/796 PARTIAL SURRENDER REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2010
A87089 2010 Saracen Gold Mines Pty Ltd 45% E31/796 PARTIAL SURRENDER REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2010
A87089 2010 Saracen Gold Mines Pty Ltd 45% E31/796 PARTIAL SURRENDER REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2010
A87089 2010 Saracen Gold Mines Pty Ltd 45% E31/796 PARTIAL SURRENDER REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2010
A78705 2008 Saracen Gold Mines Pty Ltd 45% E31/796 ANNUAL REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2008
A78705 2008 Saracen Gold Mines Pty Ltd 45% E31/796 ANNUAL REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2008
A78705 2008 Saracen Gold Mines Pty Ltd 45% E31/796 ANNUAL REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2008
A78705 2008 Saracen Gold Mines Pty Ltd 45% E31/796 ANNUAL REPORT 23 FEBRUARY 2007 TO 22 FEBRUARY 2008
A79749 2008 Saracen Gold Mines Pty Ltd 6.6% ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999
A79749 2008 Saracen Gold Mines Pty Ltd 6.6% ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999
A79749 2008 Saracen Gold Mines Pty Ltd 6.6% ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999
A79749 2008 Saracen Gold Mines Pty Ltd 6.6% ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR Group C117/1999
A79782 2008 Saracen Gold Mines Pty Ltd <1% OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3
A79782 2008 Saracen Gold Mines Pty Ltd <1% OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3
A79782 2008 Saracen Gold Mines Pty Ltd <1% OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3
A79782 2008 Saracen Gold Mines Pty Ltd <1% OLD PLOUGH DAM PROJECT ANNUAL REPORT 01 JULY 2007 TO 30 JUNE 2008, CR GROUP: C065/2001, TENEMENTS: E31/101, E3
A76674 2007 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1
A76674 2007 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1
A76674 2007 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1
A76674 2007 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project Annual Report 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C065/2001, E31/101, E31/107, E31/1
A76717 2007 Saracen Gold Mines Pty Ltd 8.4% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999
A76717 2007 Saracen Gold Mines Pty Ltd 8.4% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999
A76717 2007 Saracen Gold Mines Pty Ltd 8.4% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999
A76717 2007 Saracen Gold Mines Pty Ltd 8.4% MULGABBIE WEST PROJECT ANNUAL REPORT 01 JULY 2006 TO 30 JUNE 2007 CR GROUP: C117/1999
A73244 2006 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21
A73244 2006 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21
A73244 2006 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21
A73244 2006 Saracen Gold Mines Pty Ltd <1% Old Plough Dam Project, Annual Report, 01 July 2005 to 30 June 2006, C065/2001, E31/101....E31/620, M31/208-21
A73246 2006 Saracen Gold Mines Pty Ltd 8.4% Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2
A73246 2006 Saracen Gold Mines Pty Ltd 8.4% Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2
A73246 2006 Saracen Gold Mines Pty Ltd 8.4% Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2
A73246 2006 Saracen Gold Mines Pty Ltd 8.4% Mulgabbie West Project Annual Report, 01 July 2005 to 30 June 2006, E28/553,605-606, CR Group: C117/1999, P2
A70985 2005 St Barbara Mines Ltd <1% Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10
A70985 2005 St Barbara Mines Ltd <1% Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10
A70985 2005 St Barbara Mines Ltd <1% Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10
A70985 2005 St Barbara Mines Ltd <1% Old Plough Dam Project, Annual report for the period 1 July 2004 - 30 June 2005 (C65/2001, M31/208-210, E31/10
A68963 2004 Sons Of Gwalia Ltd 7.7% Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E
A68963 2004 Sons Of Gwalia Ltd 7.7% Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E
A68963 2004 Sons Of Gwalia Ltd 7.7% Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E
A68963 2004 Sons Of Gwalia Ltd 7.7% Annual report for the period 01/07/2003-30/06/2004 Mulgabbie West Project (C117/1999), E28/553, E28/605-607 E
A68975 2004 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E
A68975 2004 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E
A68975 2004 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E
A68975 2004 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual report for the period 01/07/2003-30/06/2004, (C65/2001, M31/208-210, M31/101, E
A66653 2003 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553.
A66653 2003 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553.
A66653 2003 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553.
A66653 2003 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project, Annual Report for the period 21 February 2002 - 20 February 2003, E28/553.
A67103 2003 Sons Of Gwalia Ltd 7.2% Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93
A67103 2003 Sons Of Gwalia Ltd 7.2% Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93
A67103 2003 Sons Of Gwalia Ltd 7.2% Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93
A67103 2003 Sons Of Gwalia Ltd 7.2% Annual Report for the period 1 July 2002 to 30 June 2003 Mulgabbie West Project C117/1999: E28/605-606, P28/93
A67254 2003 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208
A67254 2003 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208
A67254 2003 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208
A67254 2003 Sons Of Gwalia Ltd <1% Old Plough Dam Project, Annual Report for the period 1 July 2002 to 30 June 2003 C65/2001: Tenements: M31/208
A65074 2002 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi
A65074 2002 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi
A65074 2002 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi
A65074 2002 Sons Of Gwalia Ltd 8.9% Mulgabbie West Project Area E28/553 2001/02 Annual Report For Period 21/02/01 to 20/02/02 North East Coolgardi
A65553 2002 Sons Of Gwalia Ltd <1% Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001
A65553 2002 Sons Of Gwalia Ltd <1% Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001
A65553 2002 Sons Of Gwalia Ltd <1% Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001
A65553 2002 Sons Of Gwalia Ltd <1% Old Plough Dam Project Area 2001/02 Annual Report For Period 01/07/01 To 30/06/02 Group Reporting No. C65/2001
A65554 2002 Sons Of Gwalia Ltd 7.2% Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann
A65554 2002 Sons Of Gwalia Ltd 7.2% Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann
A65554 2002 Sons Of Gwalia Ltd 7.2% Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann
A65554 2002 Sons Of Gwalia Ltd 7.2% Mulgabbie West Project Area E28/605, E28/606, E28/930-939, P31/1482, P31/1541, P31/1542, P31/1545. 2001/02 Ann
A62394 2001 Kanowna Lights Nl 28% The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001
A62394 2001 Kanowna Lights Nl 28% The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001
A62394 2001 Kanowna Lights Nl 28% The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001
A62394 2001 Kanowna Lights Nl 28% The Pinnacles Nickel Project Annual Exploration Progress Report For The Year 1st May, 2000 to 30th April, 2001
A62606 2001 Pacmin Mining Corporation Ltd 8.9% Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01.
A62606 2001 Pacmin Mining Corporation Ltd 8.9% Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01.
A62606 2001 Pacmin Mining Corporation Ltd 8.9% Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01.
A62606 2001 Pacmin Mining Corporation Ltd 8.9% Mulgabbie Project, 2000/01 Annual Report E28/553 Report For Period 21/02/00 to 20/02/01.
A63382 2001 Pacmin Mining Corporation Ltd 7.2% 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/
A63382 2001 Pacmin Mining Corporation Ltd 7.2% 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/
A63382 2001 Pacmin Mining Corporation Ltd 7.2% 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/
A63382 2001 Pacmin Mining Corporation Ltd 7.2% 2000/2001 Annual Report, Carosue Dam Project Area, E28/605, E28/606, P28/930-P28/939, P31/1482, P31/1541, P31/
A63652 2001 Sons Of Gwalia Ltd <1% 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report
A63652 2001 Sons Of Gwalia Ltd <1% 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report
A63652 2001 Sons Of Gwalia Ltd <1% 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report
A63652 2001 Sons Of Gwalia Ltd <1% 2000/01 Annual Report Old Plough Dam Project Area E31/101, E31/107, E31/150, E31/152, E31/153 combined report
A60052 2000 Pacmin Mining Corporation Ltd 8.9% 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi
A60052 2000 Pacmin Mining Corporation Ltd 8.9% 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi
A60052 2000 Pacmin Mining Corporation Ltd 8.9% 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi
A60052 2000 Pacmin Mining Corporation Ltd 8.9% 1999/2000 Annual Report, E28/553, Report for Period 21/02/1999 to 20/02/2000, North East Coolgardie Mineral Fi
A60505 2000 Pacmin Mining Corporation Ltd 84% 1999/2000 Annual Report P28/1542 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Fiel
A60505 2000 Pacmin Mining Corporation Ltd 84% 1999/2000 Annual Report P28/1542 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Fiel
A60505 2000 Pacmin Mining Corporation Ltd 84% 1999/2000 Annual Report P28/1542 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Fiel
A60505 2000 Pacmin Mining Corporation Ltd 84% 1999/2000 Annual Report P28/1542 Report for Period 10/04/1999 to 09/04/2000 North East Coolgardie Mineral Fiel
A60513 2000 Pacmin Mining Corporation Ltd 74% 1999/2000 Annual Report P31/1541 Report for Period 10/03/1999 to 09/03/2000 North Coolgardie Mineral Field Wes
A60513 2000 Pacmin Mining Corporation Ltd 74% 1999/2000 Annual Report P31/1541 Report for Period 10/03/1999 to 09/03/2000 North Coolgardie Mineral Field Wes
A60513 2000 Pacmin Mining Corporation Ltd 74% 1999/2000 Annual Report P31/1541 Report for Period 10/03/1999 to 09/03/2000 North Coolgardie Mineral Field Wes
A60513 2000 Pacmin Mining Corporation Ltd 74% 1999/2000 Annual Report P31/1541 Report for Period 10/03/1999 to 09/03/2000 North Coolgardie Mineral Field Wes
A60970 2000 Paddington Gold Pty Ltd <1% Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul
A60970 2000 Paddington Gold Pty Ltd <1% Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul
A60970 2000 Paddington Gold Pty Ltd <1% Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul
A60970 2000 Paddington Gold Pty Ltd <1% Annual Report, Keith Kilkenny (JV)- Old Plough Dam Project, E31/107,152,150,101,153,184 for the Period 1st Jul
A60974 2000 Goldfields Exploration Pty Ltd <1% Wandinnie Well - Old Dam Plough Project, Partial Surrender Report for the period ending 09/06/2000, E31/153. [
A60974 2000 Goldfields Exploration Pty Ltd <1% Wandinnie Well - Old Dam Plough Project, Partial Surrender Report for the period ending 09/06/2000, E31/153. [
A60974 2000 Goldfields Exploration Pty Ltd <1% Wandinnie Well - Old Dam Plough Project, Partial Surrender Report for the period ending 09/06/2000, E31/153. [
A60974 2000 Goldfields Exploration Pty Ltd <1% Wandinnie Well - Old Dam Plough Project, Partial Surrender Report for the period ending 09/06/2000, E31/153. [
A61062 2000 Pacmin Mining Corporation Ltd 3.6% 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482,
A61062 2000 Pacmin Mining Corporation Ltd 3.6% 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482,
A61062 2000 Pacmin Mining Corporation Ltd 3.6% 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482,
A61062 2000 Pacmin Mining Corporation Ltd 3.6% 1999/2000 Annual Report Carosue Dam Project Area E28/605-606 M28/166-168, M31/219-220, P28/930-939, P31/1482,
A57525 1999 Mt Kersey Mining Nl <1% Beowulf Project, Partial Surrender Report for the period 7th February 1994 to 10th August 1998, E28/514.
A57525 1999 Mt Kersey Mining Nl <1% Beowulf Project, Partial Surrender Report for the period 7th February 1994 to 10th August 1998, E28/514.
A57525 1999 Mt Kersey Mining Nl <1% Beowulf Project, Partial Surrender Report for the period 7th February 1994 to 10th August 1998, E28/514.
A57525 1999 Mt Kersey Mining Nl <1% Beowulf Project, Partial Surrender Report for the period 7th February 1994 to 10th August 1998, E28/514.
A57854 1999 Pacific Mining Corporation Ltd 8.9% Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553.
A57854 1999 Pacific Mining Corporation Ltd 8.9% Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553.
A57854 1999 Pacific Mining Corporation Ltd 8.9% Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553.
A57854 1999 Pacific Mining Corporation Ltd 8.9% Mulgabbie West (JV)Project, Annual Report for the period 21/02/98 - 20/02/99, E28/553.
A58869 1999 Goldfields Exploration Pty Ltd <1% Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153,
A58869 1999 Goldfields Exploration Pty Ltd <1% Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153,
A58869 1999 Goldfields Exploration Pty Ltd <1% Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153,
A58869 1999 Goldfields Exploration Pty Ltd <1% Annual report, Keith Kilkenny Joint Venture Old Plough Dam, Tenements E31/101,E31/107,E31/150,E31/152,E31/153,
A59021 1999 Gutnick Resources Nl <1% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 8th March 1999, E28/548.
A59021 1999 Gutnick Resources Nl <1% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 8th March 1999, E28/548.
A59021 1999 Gutnick Resources Nl <1% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 8th March 1999, E28/548.
A59021 1999 Gutnick Resources Nl <1% Solawulf Project, Partial Surrender Report for the period 26th August 1994 to 8th March 1999, E28/548.
A53474 1998 Aberfoyle Resources Ltd <1% E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report
A53474 1998 Aberfoyle Resources Ltd <1% E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report
A53474 1998 Aberfoyle Resources Ltd <1% E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report
A53474 1998 Aberfoyle Resources Ltd <1% E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report
A54118 1998 Aberfoyle Resources Ltd 8.9% Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98.
A54118 1998 Aberfoyle Resources Ltd 8.9% Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98.
A54118 1998 Aberfoyle Resources Ltd 8.9% Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98.
A54118 1998 Aberfoyle Resources Ltd 8.9% Mulgabbie West (JV) Project, , E28/553 , Annual Report for the period 20/02/97 - 19/02/98.
A55388 1998 Goldfields Exploration Pty Ltd <1% Keith Kilkenny(JV) Project, Annual Report for the period 01/07/1997 to 30/06/1998, E28/444; E31/101, 107, 150,
A55388 1998 Goldfields Exploration Pty Ltd <1% Keith Kilkenny(JV) Project, Annual Report for the period 01/07/1997 to 30/06/1998, E28/444; E31/101, 107, 150,
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 28/3620 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 28/3620 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 28/3620? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.