E 28/2494
Register summary
- Holder
- Lamboo Operations Pty Ltd
- Part of
- Bulletin Resources Limited (ASX:BNR) as at 2025-06-30
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 9 Sept 2014
- Commenced
- 19 Mar 2015
- Expiry
- 18 Mar 2027
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153917 | 2026 | Kalgoorlie Gold Mining Limited | Kirgella Project | <1% | Final Report on Diamond Drilling at the Kirgella Gift & Providence Gold Deposits (R30) |
| A146405 | 2025 | Ramelius Resources Ltd | Rebecca | <1% | Partial Surrender Report for E28/2733 — Rebecca Project for the period ending 12 December 2024 |
| A127066 | 2021 | St Barbara Limited | South Pinjin | 59% | E28/2494 - Partial Surrender Report for the Period 19 March 2015 to 18 March 2021 |
| A127268 | 2021 | Fin Resources Limited | Sentinel | <1% | Sentinel Project E28/2652 Annual Report for the period ending 18/4/2021 |
| A122248 | 2020 | William Richmond | Lake Rebecca | <1% | Lake Rebecca Annual Technical Report, E28/2741, 13 December 2018 to 12 December 2019 |
192 more reports
| A122252 | 2020 | Ac Minerals Pty Ltd | Rebecca | <1% | Group Annual Technical Report for the Rebecca Project, C302/2011, 1 October 2018 to 30 September 2019 |
| A123311 | 2020 | Breaker Resources Nl | Pinjin | <1% | E28/2629 Surrender Report Pinjin project for the period 18 January 2017 to 13 January 2020. |
| A123983 | 2020 | Fin Resources Limited | Sentinel | <1% | Sentinel Project E28/02652 Annual Report for the period ending 18/04/2020 |
| A124585 | 2020 | St Barbara Limited | Pinjin South | <1% | E28/2264 - Partial Surrender Report for the Period 2 April 2013 to 24 June 2020, Pinjin South project. |
| A124596 | 2020 | St Barbara Limited | Pinjin East | 59% | E28/2494 - Partial Surrender Report for the Period 19 March 2015 to 24 June 2020 |
| A124697 | 2020 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2019 to 30 June |
| A124701 | 2020 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2019 to 30 Jun |
| A125101 | 2020 | St Barbara Limited | South Pinjin | <1% | E28/2264 - Partial Surrender Report for the Period 2 April 2013 to 14 August 2020, South Pinjin project. |
| A125661 | 2020 | Ac Minerals Pty Ltd | Rebecca | <1% | Rebecca Project C302/2011 Group Annual Technical Report for the period 1 October 2019 to 30 September 2020 |
| A124492 | 2020 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central E28/2445 - Final Surrender Report for the Period 10 July 2014 to 24 June 2020 |
| A124603 | 2020 | St Barbara Limited | Pinjin East | <1% | Pinjin East E28/2375 - Partial Surrender Report for the Period 1 July 2014 to 30 June 2020 |
| A124698 | 2020 | St Barbara Limited | Pinjin East | 13% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2019 to 30 June 2 |
| A118745 | 2019 | St Barbara Limited | Pinjin East | <1% | E28/2234 – Partial Surrender Report for the Period 5 December 2012 to 4 December 2018 |
| A118826 | 2019 | Ac Minerals Pty Ltd | Rebecca | <1% | Combined Annual Technical Report - Rebecca Project C302/2011 for the period 1 October 2017 to 30 September 201 |
| A119708 | 2019 | Breaker Resources Nl | Pinjin | <1% | Pinjin E28/2629 Annual Report for the period 18 January 2018 to 17 January 2019 |
| A120269 | 2019 | Fin Resources Limited | Sentinel | <1% | Annual Report for E28/2652 Sentinel Project for the period 19/04/2018 to 18/04/2019 |
| A120891 | 2019 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2018 to 30 Jun |
| A120894 | 2019 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 Annual Report for the Period 1 July 2018 to 30 June 20 |
| A120892 | 2019 | St Barbara Limited | Pinjin East | 13% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2018 to 30 June 2 |
| A115831 | 2018 | Ac Minerals Pty Ltd | Rebecca | <1% | Combined Annual Technical Report C302/2011 Rebecca Project For the Period 1 October 2016 to 30 September 2017, |
| A116108 | 2018 | Breaker Resources Nl | Pinjin | <1% | Pinjin Project E28/2629 Annual Report for the period 18 January 2017 to 17 January 2018 |
| A117250 | 2018 | Crosspick Resources Pty Ltd | Sentinel | <1% | Annual Mineral Exploration Report E28/2652 Sentinel Project for the period 19 April 2017 to 18 April 2018 |
| A117529 | 2018 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2017 to 30 Jun |
| A117533 | 2018 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2017 to 30 June |
| A117530 | 2018 | St Barbara Limited | Pinjin East | 13% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2017 to 30 June 2 |
| A110810 | 2017 | Ac Minerals Pty Ltd | Rebecca | <1% | Combined Annual Technical Report C302/2011 Rebecca Project 1 October 2015 to 30 September 2016 |
| A114571 | 2017 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2016 to 30 Jun |
| A114577 | 2017 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2016 to 30 June |
| A114574 | 2017 | St Barbara Limited | Pinjin East | 13% | Pinjin East Project Combined Reporting Group C123/2015 - Annual Report for the Period 1 July 2016 to 30 June 2 |
| A107804 | 2016 | Ac Minerals Pty Ltd | Rebecca | 2.6% | Combined Annual Technical Report C302/2011 Rebecca Project E28/1610, E28/2146, E28/2233, E28/2243, E28/2275, E |
| A109186 | 2016 | Naturaliste Holdings Pty Ltd | Lake Rebecca | <1% | E28/2498 Annual Technical Report for the period 24 April 2015 to 23 April 2016 |
| A109203 | 2016 | Ac Minerals Pty Ltd | Rebecca | 3.4% | Final Surrender Report E28/2233 & E28/2306 Rebecca Project C302/2011 for the period 30/05/2013 - 07/06/2016 |
| A109692 | 2016 | St Barbara Limited | Pinjin South | <1% | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2015 to 30 June |
| A109693 | 2016 | St Barbara Limited | Pinjin Central | <1% | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2015 to 30 Jun |
| A109706 | 2016 | St Barbara Limited | Pinjin East | 13% | Pinjin East Project Combined Reporting Group C123/2015 Annual Report for the Period 1 July 2015 to 30 June 201 |
| A106387 | 2015 | St Barbara Limited | Away from it all Dam | <1% | Annual Report for the Period 1 July 2014 to 30 June 2015 |
| A105183 | 2015 | Renaissance Minerals Ltd | Pinjin | <1% | Annual Report for E28/1634, Pinjin Project, for the period 1st January 2014 to 18st October 2014 |
| A105978 | 2015 | St Barbara Limited | Pinjin | <1% | Annual Mineral Exploration Report - Combined Reporting Group C138/2012 (Pinjin) for the period 28 June 2014 to |
| A107247 | 2015 | Renaissance Minerals Ltd | Pinjin | <1% | Annual Report for E28/1634 for the Period 19th October 2014 to 18th October 2015. |
| A100679 | 2014 | Renaissance Minerals Ltd | Pinjin | <1% | Combined Annual Report for the Pinjin Project (C146/2005) for the Period January 2012 to 31st December 2013, E |
| A103130 | 2014 | St Barbara Ltd | Away From It All Dam | <1% | Annual Report for the Period 1 July 2013 to 30 June 2014, Away From It All Dam Project C73/2013 E28/2218, E28/ |
| A103683 | 2014 | Independence Group Nl | Rebecca | 2.6% | Combined Annual Report Rebecca JV Project C302/2011, E28/2233, 2275, 2306, 2146, 1610, 2243 for the period 1st |
| A102819 | 2014 | St Barbara Ltd | Pinjin | <1% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C138/2012 Pinjin Reporting Period: 28 June 2 |
| A98583 | 2013 | St Barbara Mines Ltd | Pinjin | <1% | Annual Mineral Exploration Report- DMP, Combined Reporting Group: C138/2012 Pinjin, Reporting Period: 28 June |
| A96875 | 2013 | Renaissance Minerals Ltd | Pinjin | <1% | Pinjin Project, Final Surrender Report for the period 13th December 2007 to 12th December 2012, E28/1562. [C14 |
| A97218 | 2013 | Renaissance Minerals Ltd | Rebecca | <1% | Rebecca Project, Annual Report for the period 26/10/2011 to 25/10/2012, E28/1756-1757, 1850, 1852, 1992, 2037- |
| A99065 | 2013 | St Barbara Mines Ltd | Away from It All Dam | <1% | Annual Mineral Exploration Report – Combined Reporting Group C73/2013 (AWAY FROM IT ALL DAM) for the period 30 |
| A96874 | 2013 | Renaissance Minerals Ltd | Pinjin | <1% | Pinjin Project, Final Surrender Report for the period 5th August 2005 to 20th January 2012, E28/1506. [C146/2 |
| A97152 | 2013 | Renaissance Minerals Ltd | Pinjin | <1% | Combined Annual Report for the Pinjin Project (C146/2005) for the Period 1st January 2012 to 31st December 201 |
| A93735 | 2012 | Renaissance Minerals Ltd | Pinjin | 4.3% | C146/2005 - Combined Annual Report on Exploration for the Period 1st January 2011 to 31st December 2011, E28/1 |
| A92878 | 2012 | Renaissance Minerals Ltd | Rebecca | <1% | Rebecca Project, Annual Report for the period 26/10/2010 to 25/10/2011, E31/920; E28/1756-1757, 1850,1852, 199 |
| A94168 | 2012 | Renaissance Minerals Ltd | Pinjin | <1% | Pinjin Project E28/2045 Surrender Report 2012 |
| A95563 | 2012 | Legacy Iron Ore Ltd | Yindi - South Laverton | <1% | Final Surrender Mineral Exploration Report South Laverton Area Yindi Project E28/1319 For the Period 2nd May 2 |
| A93948 | 2012 | Richmond W R | Lake Rebecca | <1% | LAKE REBECCA PROJECT ANNUAL MINERAL EXPLORATION REPORT TENEMENT: E28/2085 For The Period: 4th APRIL 2011 to 3r |
| A94062 | 2012 | Legacy Iron Ore Ltd | South Laverton - Yindi | <1% | Annual Mineral Exploration Report South Laverton Area Yindi Project E 28/1319 For the Period 2nd May 2011 to 1 |
| A94063 | 2012 | Legacy Iron Ore Ltd | South Laverton - Yindi | <1% | Partial Surrender Mineral Exploration Report South Laverton Area Yindi Project E28/1319 For the Period 2nd May |
| A92540 | 2012 | Legacy Iron Ore Ltd | Yindi | 8.3% | Yindi Project, Final Surrender Report for the period 7th November 2006 to 4th November 2011, E28/1609. |
| A92646 | 2012 | Renaissance Minerals Ltd | Pinjin | 100% | E28/1626 Surrender Report 19th October 2006 to 18th October 2011 |
| A92647 | 2012 | Renaissance Minerals Ltd | Pinjin | <1% | E28/1634 Partial Surrender Report, 19th October 2006 to 18th October 2011 |
| A92648 | 2012 | Renaissance Minerals Ltd | Pinjin | <1% | E28/1635 Surrender Report 19th October 2006 to 18th October 2011 |
| A92649 | 2012 | Renaissance Minerals Ltd | Pinjin | 50% | E28/1633 Surrender Report, 19th October 2006 to 18th October 2011 |
| A89989 | 2011 | Renaissance Minerals Ltd | Pinjin | 6.7% | Pinjin Project, Annual Report for the period 1st January 2010 to 31st December 2010, P28/1055, 1057-1061, 1073 |
| A88865 | 2011 | Legacy Iron Ore Ltd | Yindi | 8.3% | Annual Technical Report - Yindi Project E28/1609, 7th November 2009 - 6th November 2010 |
| A91628 | 2011 | Renaissance Minerals Ltd | Pinjin | <1% | E28/1560 “Pinjin” Final Surrender Report for the period 21 July 2006 to 20 July 2011 |
| A92014 | 2011 | Renaissance Minerals Ltd | Mulgabbie | <1% | E28/1757 Annual Report, 30 July 2010 to 29 July 2011 |
| A92154 | 2011 | Renaissance Minerals Ltd | Eastern Goldfields | 50% | E28/2061 2011 Surrender Report Report Period: 2 December 2010 to 1 December 2011 |
| A91142 | 2011 | Legacy Iron Ore Ltd | Yindi | 1.5% | Final Mineral Exploration Report Yindi Project E28/1536 For the Period 9th June 2006 to 8th June 2011 |
| A89561 | 2011 | Renaissance Minerals Ltd | Crab Hill | <1% | E28/1562 “Crab Hill” Partial Surrender Report March 2010. Report Period: 13 December 2007 to 09 December 2010 |
| A90502 | 2011 | Legacy Iron Ore Ltd | Yindi | <1% | Annual Mineral Exploration Report, Yindi Project, E28/1319, for the period 2nd May 2010 to 1st May 2011. |
| A90503 | 2011 | Legacy Iron Ore Ltd | Yindi | <1% | Partial Surrender Mineral Exploration Report, Yindi Project, E28/1319, for the period 2nd May 2008 to 1st Ma |
| A85409 | 2010 | Legacy Iron Ore Ltd | Yindi | 8.3% | Annual Technical Report - Yindi Project E28/1609, Report Period: 7th November 2008 - 6th November 2009 |
| A85613 | 2010 | Newmont Exploration Pty Ltd | Pinjin | <1% | Partial Relinquishment Report for E28/1506 for the period 22 December 2005 to 21 December 2009 |
| A86130 | 2010 | Newmont Asia Pacific | Pinjin | 7.2% | Combined Annual Report On Exploration For The Period 1st January 2009 to 31st January 2009 for E28/1143, 1506, |
| A87095 | 2010 | Legacy Iron Ore Ltd | Yindi | <1% | Annual Mineral Exploration Report Yindi Project E28/1319 For the Period 2nd May 2009 to 1st May 2010 |
| A87887 | 2010 | Gryphon Minerals Ltd | Mulgabbie | <1% | Mulgabbie, E28/1757 Annual Report for the period 30 July 2009 to 29 July 2010 |
| A85500 | 2010 | Newmont Exploration Pty Ltd | Pinjin | 28% | Final Report On Exploration For The Period 8th December 2005 to 7th December 2009 for P28/1047, Pinjin |
| A87501 | 2010 | Legacy Iron Ore Ltd | Yindi | 1.5% | Annual Mineral Exploration Report Yindi Project E28/1536 For the Period 9th June 2009 to 8th June 2010 |
| A87886 | 2010 | Legacy Iron Ore Ltd | Argument Dam - Yangan | 6.7% | Combined Annual Mineral Exploration Report Argument Dam (Yangan) Project C18/2006 For the Period 18th July 200 |
| A80603 | 2009 | Jackson Minerals Ltd | Yindi | 8.3% | Yindi North – E28/1609 Partial Surrender Report, 7 November 2006 – 21 November 2008 |
| A80705 | 2009 | Newmont Asia Pacific | Pinjin | <1% | E28/1506 PARTIAL RELINQUISHMENT REPORT ON EXPLORATION, for the period 22 December 2005 to 21 December 2008 Pin |
| A80801 | 2009 | Jackson Minerals Ltd | Yindi | 6.7% | Yindi Project E28/1417 Partial Surrender Report, 11 April 2006 – 21 November 2008 |
| A82163 | 2009 | Newmont Asia Pacific | Pinjin | 4.5% | Final Report On Exploration For The Period 10/04/2007 to 01/04/2009, E28/1652, Pinjin Project. |
| A82892 | 2009 | Legacy Iron Ore Ltd | BARRICK-YINDI | 1.5% | ANNUAL TECHNICAL REPORT BARRICK-YINDI PROJECT E28/1536 BETWEEN 9TH JUNE 2008 AND 8TH JUNE 2009 JULY 2009 |
| A82921 | 2009 | Newmont Exploration Pty Ltd | Pinjin | <1% | Final Report On Exploration For The Period 15/06/2008 to 14/06/2009 for P28/1038 (Pinjin) |
| A84364 | 2009 | Legacy Iron Ore Ltd | Yangan Hill | 3.4% | Yangan Hill – E28/1417, 1493 Project 2007 - 2009 Annual Report, C18/2006. Report Period: 18th July 2008 to 17 |
| A84707 | 2009 | Gryphon Minerals Ltd | Mulgabbie | <1% | Mulgabbie E28/1757 Annual Report for the period 30 July 2008 to 29 July 2009 |
| A81567 | 2009 | Newmont Asia Pacific | Pinjin | 5.4% | COMBINED ANNUAL REPORT ON EXPLORATION for the period 01/01/2008 to 31/12/2008, Project C146/2005 Pinjin, WESTE |
| A82527 | 2009 | Legacy Iron Ore Ltd | Yindi | <1% | Yindi – E28/1319 2008 Annual Report, 2 May 2008 – 1 May 2009 |
| A84031 | 2009 | Newmont Exploration Pty Ltd | Pinjin | <1% | PARTIAL RELINQUISHMENT REPORT for E28/1560 for the period 21 July 2006 to 20 July 2009, Pinjin Project, Wester |
| A78298 | 2008 | Newmont Exploration Pty Ltd | Pinjin | 8.8% | Combined Annual Report On Exploration For The Period 01/01/2007 To 31/12/2007. Project C146/2005 Pinjin. E28/1 |
| A78680 | 2008 | Jackson Minerals Ltd | Yindi | 1.5% | Yindi - E28/1536 Project 2007 - 2008 Annual Report Report Period: 9 June 2007 - 8 June 2008 |
| A79556 | 2008 | Newmont Exploration Pty Ltd | Pinjin | 42% | E28/1143 PARTIAL RELINQUISHMENT REPORT ON EXPLORATION for the period 5 August 2005 to 4 August 2008 Pinjin Pro |
| A79568 | 2008 | Jackson Minerals Ltd | Argument Dam | 3.2% | Argument Dam Project C18/2006 2007 - 2008 Annual Report, Report Period: 18 July 2007 – 17 July 2008 |
| A80358 | 2008 | Jackson Minerals Ltd | Yindi | 8.3% | Yindi North – E28/1609 Project 2008 Annual Report, Period: 7 November 2007 – 6 November 2008 |
| A80602 | 2008 | Jackson Minerals Ltd | Yindi | 1.5% | Yindi – E28/1536 Project Partial surrender Report, 9 June 2006 – 21 November 2008 |
| A74938 | 2007 | Newmont Exploration Pty Ltd | Pinjin | 9.7% | Combined Annual Report On Exploration For The Period 01/01/2006 to 31/12/2006. Project C146/2005 Pinjin. Repor |
| A75358 | 2007 | Jackson Gold Ltd | Yindi | 6.7% | Yindi – E28/1417 Project 2006 - 2007 Annual Report, 11th April 2006 to 10th April 2007. |
| A75470 | 2007 | Great Gold Mines Nl | Wild Dog Dam | 67% | Wild Dog Dam Project, Annual Report for the period 18th April 2006 to 17th April 2007, E28/1565. |
| A75603 | 2007 | Jackson Gold Ltd | Yindi | 1.5% | Yindi Project (E28/1536) Annual Report Reporting Period 9 June 2006 - 8 June 2007 |
| A76820 | 2007 | Jackson Gold Ltd | Yindi | 8.3% | Yindi North - E28/1609 Project 2007 Annual Report Report Period: 7 November 2006 - 6 November 2007 |
| A75994 | 2007 | Jackson Gold Ltd | Argument Dam | 3.2% | Argument Dam Project C18/2006 2006 - 2007 Annual Report E28/1417, E28/1318, E28/1493 18 July 2006 - 17 July 20 |
| A71844 | 2006 | Great Gold Mines Nl | Wild Dog Dam | 5.5% | Exploration Licences 28/872, 28/930, 28/978, 28/1006, 28/1084, 28/1168 and Prospecting Licence P28/838, C181/1 |
| A73265 | 2006 | Barrick Gold Of Australia Ltd | Argument Dam JV | 3.2% | Argument Dam JV Project E28/1493, Annual Report, Period 18 July 2005 to 17 July 2006, (Barrick Report No. 1193 |
| A71867 | 2006 | Newmont Australia Ltd | Pinjin | 36% | Combined Annual Report on exploration for the period 01/01/2005 to 31/12/2005, Project C146/2005 Pinjin, (Newm |
| A69778 | 2005 | Great Gold Mines Nl | Wild Dog Dam | 30% | Exploration Licence:E28/891 and Prospecting Licences P28/923 to P28/927, C181/1995-Wild Dog Dam, Joint Surrend |
| A70742 | 2005 | Avoca Resources Ltd | Pinjin | 100% | Pinjin Project, Exploration licence 28/1242, Technical report for the period 2 March 2004 to 1 March 2005 (Kur |
| A70930 | 2005 | Gel Resources Pty Ltd | Pinjin | <1% | Pinjin Project E28/558 - Kirgella South (For the period 24/04/2003 - 23/04/2005 (Kurnalpi). |
| A71123 | 2005 | Gel Resources Pty Ltd | Pinjin | <1% | Pinjin Project, E28/588 - Kirgella South (Annual report for the period 24/04/04 - 23/04/05, Kurnalpi). |
| A69225 | 2004 | Sons Of Gwalia Ltd | Lake Rebecca | 8.4% | Surrender Report for the period 20/09/2002-19/07/2004 Lake Rebecca Project E28/888 |
| A69288 | 2004 | Metex Resources Ltd | Roe | 1.3% | Surrender report for the period 15/12/1998-12/12/2003 Roe Project E28/810 |
| A69426 | 2004 | Great Gold Mines Nl | Wild Dog Dam | 4.4% | Exploration licences E28/872, E28/891, E28/925, E28/930 E28/977, E28/1006, C181/1995, Wild Dog Dam, Joint par |
| A68651 | 2004 | Metex Resources Ltd | Roe | <1% | 2003 Annual Report for Period 01/01/2003 to 31/12/2003 Roe Project (C408/1996), E28/620, E28/672, E28/720, E28 |
| A69024 | 2004 | Gutnick Resources Nl | Wild Dog Dam | 3% | Exploration Licences: E28/557,558,872,891,925,930, 977,978,1006, Prospecting Licences: P28/838,923-927,950-952 |
| A69025 | 2004 | Gutnick Resources Nl | Wild Dog Dam | 37% | Prospecting licences P28/950 - 952 C181/1995 - Wild Dog Dam Joint surrender report for the period 10 December |
| A66142 | 2003 | Placer Dome Asia Pacific Ltd | Roe Metex | <1% | Annual Report 01/01/2002 - 31/12/2002 Roe Metex JV Project C408/1996: E28/620, 672, 720, 803-04, 810, 833, 836 |
| A66624 | 2003 | Placer Dome Asia Pacific Ltd | Roe | <1% | Roe (JV) Project, Partial Surrender Report for the period 15/12/1998 to 14/12/2002 E28/803 & 804, E28/810. [C |
| A67446 | 2003 | Sons Of Gwalia Ltd | Lake Rebecca | 8.4% | Annual Report for the period 20 September 2002 to 19 September 2003 Lake Rebecca Project E28/888 Report No. 05 |
| A67583 | 2003 | Gutnick Resources Nl | Wild Dog Dam | 3% | Exploration Licences: E28/557,558,872,891,925,930, 977,978,1006, Prospecting Licences: P28/838,923-927,950-952 |
| A64192 | 2002 | Delta Gold Ltd | Roe Joint Venture | <1% | Roe Joint Venture Project C408/1996 Annual Report 01/01/2001 to 31/12/2001 tenements E28/620, 672, 720, 803, 8 |
| A64526 | 2002 | Newcrest Operations Ltd | Pinjin/Lake Rebecca | 4.4% | Interim Report To November 15, 2001. Pinjin/Lake Rebecca Option E28/635, E28/636 & E28/617 |
| A61625 | 2001 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 7.7% | Crab Hill E28/617 Partial Surrender Report for period 26/02/2000 to 3/07/2000. |
| A62853 | 2001 | Croesus Mining Nl | Yindi | <1% | Yindi Project Combined Annual Report For The Period 31st July 2000 To 30th July 2001 On Tenements E28/1023, E2 |
| A62882 | 2001 | Metex Resources Ltd | Roe | <1% | Combined Biannual Technical Report W503 Roe Project E28/620, E28/672, E28/720, E28/803-804, E28/810, E28/833, |
| A63087 | 2001 | Ashburton Mining Co Pty Ltd | Pinjin | 43% | E28/559 Annual Report For The Period 16/12/98 to 15/12/01 |
| A63317 | 2001 | Gutnick Resources Nl | Wild Dog Dam | 3.1% | Exploration Licences E28/526, E28/557-558, E28/925, E28/930, E28/977, E28/1006, Prospecting Licences P28/923-9 |
| A61896 | 2001 | Central Kalgoorlie Gold Mines Nl | Round Hill | <1% | Round Hill (North and South) E28/635 & 636 Annual Report for the period 30 November 1999 to 29 November 2000. |
| A62251 | 2001 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 7.7% | 2000/2001 Annual Report for period 26/02/2000 to 25/02/2001 Crab Hill E28/617. |
| A60451 | 2000 | Central Kalgoorlie Gold Mines Nl | Pinjin | <1% | Pinjin E28/592,635 & 636 Annual Report for the period 30/11/1998 to 29/11/1999 |
| A60453 | 2000 | Central Kalgoorlie Gold Mines Nl | Lake Rebecca | 7.7% | 1999 to 2000 Annual Report Crab Hill E28/617 for period 26/02/1999 to 25/02/2000 |
| A60848 | 2000 | Pacmin Mining Corporation Ltd | Kurnalpi East | 16% | Kurnalpi East Project, 2000 Final Surrender Report for the period 07/02/1991 to 02/02/2000, E28/374. |
| A60849 | 2000 | Pacmin Mining Corporation Ltd | Kurnalpi East | <1% | 2000 Final Report, E28/453, Report for Period 11/06/1992 to 02/02/2000. |
| A63110 | 2000 | Gutnick Resources Nl | Wild Dog Dam | 3.4% | Exploration Licences: E28/526, 557-558, 925 Prospecting Licences: P28/923-927, 950-952. 'C181/1995 - Wild Dog |
| A57853 | 1999 | Pacific Mining Corporation Ltd | Lake Rebecca | 7.7% | Annual Report for the period 26 February 1998 to 25 February 1999 Lake Rebecca JV E28/617 Crab Hill. |
| A58706 | 1999 | Burdekin Resources Nl | Kirgella South | <1% | Kirgella South Project - E28/558 - Eastern Goldfields, W.A. Annual Report for the period ended 23/04/99. |
| A58893 | 1999 | Mt Kersey Mining Nl | Wild Dog Dam | 2.5% | Wild Dog Dam Project, Partial Surrender Report for the period 04/05/1994 to 04/03/1999, E28/526. |
| A58967 | 1999 | Gutnick Resources Nl | Wild Dog Dam | 2.5% | Exploration licence E28/526, Prospecting licences P28/950-952, 'C181/1995 - Wild Dog Dam', Joint annual report |
| A57169 | 1999 | Heron Resources Ltd | Mulgabbie | 8.5% | Mulgabbie Project, Rough Gap Prospect, Prospecting Licences 28/883-888 Surrender Report. |
| A54145 | 1998 | Aberfoyle Resources Ltd | Lake Rebecca | 7.7% | Annual Report for the period 26 February 1997 to 25 February 1998 Lake Rebecca JV E28/617 Crab Hill. ARL Repo |
| A53375 | 1998 | Aberfoyle Resources Ltd | Pinjin | <1% | Annual Report for the period 30 November 1996 to 29 November 1997 Pinjin E28/592, 596, 597, 635, 636, P28/908. |
| A53377 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 16% | E28/374 Rebecca, Partial Surrender Report to 24/12/1997 |
| A53444 | 1998 | Troy Resources Nl | Mulgabbie | 7.6% | Mulgabbie Project Exploration Licence 28/479 Partial Surrender Report 1997. |
| A53777 | 1998 | Aberfoyle Resources Ltd | Wild Dog | 14% | Rough Gap JV E28/503 Wild Dog Partial Surrender Report to 17 February 1998. |
| A54832 | 1998 | Aberfoyle Resources Ltd | Rough Gap | 6.8% | Rough Gap JV Project, E28/503,E28/517,M28/88 , Annual Report for the Period 16/04/1997 to 15/04/1998. |
| A55511 | 1998 | Mt Kersey Mining Nl | Wild Dog Dam | 2.5% | Wild Dog Dam Project, Partial Surrender Report for the period ending 23/03/1998, E28/526. |
| A55924 | 1998 | Burdekin Resources Nl | Kirgella South | <1% | Kirgella South Project, E28/558, Eastern Goldfields W.A. Annual Report Period End: 23/04/98 |
| A55980 | 1998 | Mt Kersey Mining Nl | Wild Dog Dam | 2.5% | C181/1995 - Wild Dog Dam, Joint Annual Report for the period 05/05/97 - 04/05/98, Exploration Licence: E28/52 |
| A56805 | 1998 | Aberfoyle Resources Ltd | Pinjin | <1% | Annual Report for the period 30 November 1997 to 29 November 1998 Pinjin E28/592, 635 & 636. ARL Report No: W |
| A53474 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 4.1% | E28/372, Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam, E31/94 Anglo Saxon. Annual Report |
| A56807 | 1998 | Aberfoyle Resources Ltd | Kurnalpi East | 5.3% | E28/372 Khartoum, E28/374 Rebecca, E28/453 Round Hill, E31/93 Jungle Dam Annual Report 07/12/97 - 06/12/98 |
| A50042 | 1997 | Aberfoyle Resources Ltd | Kurnalpi | 4.1% | Kurnalpi (JV) Project, E28/372 E28/374 E28/453 E31/93 E31/94 Annual report for the period 7th December 1995 t |
| A50487 | 1997 | Aberfoyle Resources Ltd | Lake Rebecca | 7.7% | Annual Report for the period 26 February 1996 to 25 February 1997 Lake Rebecca JV E28/617 'Crab Hill'. ARL R |
| A51257 | 1997 | Aberfoyle Resources Ltd | Rough Gap | 6.7% | Rough Gap JV Project, E28/503,E28/517,P28/847,M28/88 Annual Report for the period 16/04/1996 to 15/04/1997 |
| A51545 | 1997 | Mt Kersey Mining Nl | Wild Dog Dam | 2.5% | Exploration Licence E28/526 'Wild Dog Dam' C181/1995 Joint Annual Report for the period 05 May 1996 to 04 May |
| A51679 | 1997 | Great Southern Mines Nl | Round Hill | 1% | Round Hill Project, Annual Report E28/634 for the period 09/05/1996 to 08/05/1997. |
| A51901 | 1997 | Aberfoyle Resources Ltd | Rough Gap | 14% | Rough Gap (JV) Project, Partial Surrender Report to 17th February 1997, E28/503. |
| A52128 | 1997 | Burdekin Resources Nl | Kirgella South | <1% | Kirgella South Project E28/558 Eastern Goldfields Western Australia Annual report for the period ended 23rd Ap |
| A52799 | 1997 | Yardarino Mining Nl | Yindi | <1% | Yindi Project, Annual Report for period ending 27th October 1997, E28/448,P28/878-879. |
| A51139 | 1997 | Aberfoyle Resources Ltd | Round Hill | <1% | Round Hill Project,(Kurnalpi JV), Partial Surrender Report E28/453 to 5th February 1997. |
| A53445 | 1997 | Troy Resources Nl | Mulgabbie | 7.6% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Licence E28/479 Annual Report October |
| A48406 | 1996 | Preston Resources Nl | Lake Rebecca | <1% | Lake Rebecca Project, Annual Report for the period 14th March 1995 to 13th March 1996, E28/538. |
| A49646 | 1996 | Troy Resources Nl | Mulgabbie | 7.6% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Exploration Licence 28/479 Annual Repo |
| A46680 | 1996 | Cra Exploration Pty Ltd | Kurnalpi East | 3.6% | Annual Report to 7 December 1995 on E31/93 E31/94 E28/372 E28/372 E28/374 E28/433 E28/453 E28/572 Kurnalpi Eas |
| A48181 | 1996 | Western Mining Corporation Ltd | Rebecca | 6.7% | Annual Report for the period 16/04/1995 to 15/04/1996 The Rebecca Project Exploration Licences 28/503,517 Mini |
| A49428 | 1996 | Yardarino Mining Nl | Yindi | <1% | Yindi Project E28/448 P28/878-879 Annual Report for Period Ending 27 October 1996 |
| A44815 | 1995 | Mt Kersey Mining Nl | Wild Dog Dam | 2.5% | Annual Report for the period 4 May 1994 to 3 May 1995 Exploration Licence E28/526 'Wild Dog Dam' |
| A45054 | 1995 | Western Mining Corporation Ltd | Rebecca | 6.7% | Annual Report for the period 05/11/1993 to 15/04/1995, Rebecca Project, M 28/88, P 28/847; E28/503& 517. |
| A46428 | 1995 | Maverick Exploration Pty Ltd | Mulgabbie | 2.5% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report October 1994 to 9 Octob |
| A46430 | 1995 | Yardarino Mining Nl | Yindi / Yardarino | <1% | Yindi / Yardarino Project, Annual Report Exploration Licence E28/448 for the period 28th October 1994 to 27th |
| A46788 | 1995 | Cra Exploration Pty Ltd | Kurnalpi East | 3.2% | Partial Surrender for the period 1995 Kurnalpi East Project E28/372 E28/374 E28/433 E28/453 E31/93 E31/94 |
| A41598 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 3.7% | First partial relinquishment report to April 1994 on E28/372, 374, 431, 433, E31/93, 94 Kurnalpi East Project |
| A42910 | 1994 | Troy Resources Nl | Mulgabbie | 2.5% | Mulgabbie Project North East Coolgardie Mineral Field Western Australia Annual Report 10 October 1993 to 9 Oct |
| A43058 | 1994 | Troy Resources Nl | Yindi Yardarino | <1% | Yindi Yardarino Project, Annual Report for the period 28th October 1993 to 27th October 1994, E28/448. |
| A43302 | 1994 | Cra Exploration Pty Ltd | Kurnalpi East | 3.2% | Annual Report to 7 December 1994 on E31/93-94, E28/372, 374, 433, 442, 453, Kurnalpi East Project. |
| A38589 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.1% | Kurnalpi East Project, Annual Report for the period 08/12/1991 to 07/12/1992, E28/372 ,374, 431, 433, 442 & 45 |
| A39675 | 1993 | Yardarino Mining Nl | Yindi | <1% | Yindi Project, Annual Report for period ending March 1993, E28/448. |
| A39676 | 1993 | Yardarino Mining Nl | Yindi | <1% | Yind Project, Non-statutory Report: Progress Report -December 1993, E28/448. |
| A41041 | 1993 | Cra Exploration Pty Ltd | Kurnalpi East | 3.1% | Annual report for the period 08/12/92-07/12/93 Kurnalpi East Project E28/372 E28/374 E28/431 E28/433 E28/442 E |
| A36333 | 1991 | Cra Exploration Pty Ltd | Kurnalpi East | 2.7% | Annual Report for the period 08/12/90-07/12/91 Kurnalpi East Project, E31/92-94 E28/370-374,398,419,431-433,4 |
| A26795 | 1989 | Bhp Minerals Pty Ltd | Pinjin | 10% | CR 6391 PINJIN PROJECT E31/38 RUTTER$ DAM E28/158 KIRGELLA E28/87 MAGPIES FIND FINAL REPORT TO 31st JANUARY. 1 |
| A22865 | 1988 | Bhp Minerals Pty Ltd | Magpies Find | 10% | Partial relinquishment to 24/1/88 for E28/87, Magpie's Find, WA |
| A22463 | 1987 | Bhp Minerals Pty Ltd | Magpie's Find | 10% | Magpie's Find Project, Annual Report for the period ending 25/01/1987, E28/87. |
| A19316 | 1986 | Bhp Minerals Pty Ltd | Magpies Find | 10% | Magpies Find Project, Annual Report for the period ending 25th January 1986, E28/87. |
| A17458 | 1985 | Bhp Minerals Ltd | Magpies Find | 10% | Magpies Find Project, Non-statutory Report: Proposed Field Test Work - Yilgarn Block Tertiary Channels - Plac |
| A15685 | 1985 | Uranerz Australia Pty Ltd | Lake Rebecca | 10% | Lake Rebecca Project, Annual Report for the period 25/01/1984 to 24/01/1985, E28/87. |
| A22866 | 1985 | Bhp Minerals Pty Ltd | Magpies Find | 10% | Magpies Find Project, Annual Report for the period ending 25/01/1988, E28/87 |
| A7472 | 1978 | Aquitaine Aust Minerals Pty Ltd | Binti- South Crab | <1% | Binti- South Crab Project, Non-statutory Report: Geophysical Investigations at South Crab Claims (Binti), W.A, |
| A7471 | 1977 | Aquitaine Aust Minerals Pty Ltd | Binti - South Crab | <1% | Binti - South Crab Project, Non-statutory Report: Progress Report, September 1977, MC28/480-488, 517, 1182, 1 |
| A4372 | 1973 | Noranda Australia Ltd | Pinjin - Kirgella Rocks | <1% | Pinjin and Kirgella Rocks (JV) Project, Final Surrender Report, May 1973, MC28/495-500, 544-547, 593,595-603, |
| A1888 | 1970 | Endeavour Minerals Nl | Pinjin | <1% | Pinjin Project, Non-statutory Report: Work Programme Summary for the year ending 30th June 1970, MC28/495-500, |
| A82931 | 1753 | Hawthorn Resources Limited | WILD DOG DAM | 67% | E28/1565 WILD DOG DAM PARTIAL SURRENDER REPORT FOR THE PERIOD 18 APRIL 2006 TO 17 APRIL 2009 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A92781 | 1753 | Renaissance Minerals Ltd | Pinjin | 42% | Pinjin Project, E28/1143 Surrender Report. Report Period: 5th August 2005 to 14th November 2011 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 6 months · 18 Mar 2027
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 28/2494 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 28/2494? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.