E 15/1859
Register summary
- Holder
- One Eight Two Capital Investments Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 1 Nov 2021
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A129323 | 2022 | Evolution Mining (Mungari) Pty Ltd | Mungari West | 100% | Final Surrender Report - E15/1268 Mungari West for the period 31 October 2011 to 30 October 2021 |
| A133191 | 2022 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | <1% | Final Surrender Report - P15/6187 Kunanalling for the period ending 21/10/2022 |
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | 1.4% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A123398 | 2020 | Outback Minerals Pty Ltd | 12 Mile Tank | <1% | Annual Report 12 Mile Tank, E15/1534, for the period ending 14/02/2020 |
109 more reports
| A124510 | 2020 | Evolution Mining (Mungari) Pty Ltd | Roger Springs | <1% | Final Surrender Report - E15/960 Roger Springs project for the period 29 April 2008 to 28 April 2020 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | 1.3% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A119876 | 2019 | Mandurah Development Company Pty Ltd | 12 Mile Tank | <1% | Annual Report 12 Mile Tank Project E15/1534 for the period 15 February 2018 to 14 February 2019 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | 1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A116889 | 2018 | Mandurah Development Company Pty Ltd | 12 Mile Tank | <1% | Annual Report 12 Mile Tank E15/1534 for the period 15 February 2017 to 14 February 2018 |
| A117296 | 2018 | Evolution Mining (Mungari) Pty Ltd | Cutters Ridge | 88% | Final Surrender Report P15/5267 Cutters Ridge Project for the period 17/06/2010 - 16/06/2018 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | 1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A108735 | 2016 | Evolution Mining (Mungari) Pty Ltd | Mungari | 1.1% | Mungari Project C145/2013 Annual Report to the Department of Mines and Petroleum for the period 01/01/2015 to |
| A110144 | 2016 | Evolution Mining (Mungari) Pty Ltd | Cutters Ridge | 16% | Cutters Ridge C6/2009 Annual Report for the year ending 27/07/2016, M15/00692, P15/04863, P15/04864, P15/04865 |
| A110225 | 2016 | Pegasus Commodities Pty Ltd | Bonnie Vale Northeast | <1% | Final Surrender Report for the period 4 July 2011 to 24 June 2016 Bonnie Vale Northeast Project E15/1235 |
| A105026 | 2015 | La Mancha Resources Australia Pty Ltd | Mungari | 1.1% | MUNGARI PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 01/01/2014 to 31/12/2014 |
| A106567 | 2015 | Pegasus Commodities Pty Ltd | Bonnie Vale Northeast | <1% | Bonnie Vale Northeast Project E15/1235 Annual Report for the period 4 July 2014 to 3 July 2015 |
| A106792 | 2015 | Evolution Mining Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Project C6/2009 Annual Report to the Department of Mines and Petroleum for the period 28/07/2014 |
| A101174 | 2014 | La Mancha Resources Australia Pty Ltd | Mungari | 1.3% | Mungari Project C145/2013 Annual Report for the period 01/01/2013 to 31/12/2013, E15/960......P15/5265-5267 |
| A103099 | 2014 | Pegasus Commodities Pty Ltd | Bonnie Vale Northeast | <1% | Annual Report, 4 July 2013 to 3 July 2014 Bonnie Vale Northeast Project E15/1235 |
| A103181 | 2014 | La Mancha Resources Australia Pty Ltd | Cutters | 16% | CUTTERS RIDGE PROJECT ANNUAL REPORT to the Department of Mines and Petroleum FOR THE PERIOD 28/07/2013 TO 27/0 |
| A98972 | 2013 | Pegasus Commodities Pty Ltd | Bonnie Vale Northeast | <1% | Annual Report, 4 July 2012 to 3 July 2013 Bonnie Vale Northeast Project E15/1235 |
| A98985 | 2013 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleum for the period 28/07/2012 TO 27/ |
| A100149 | 2013 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | 1.4% | Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 |
| A94095 | 2012 | La Mancha Resources Australia Pty Ltd | Mungari West - Kurrawang | 1.4% | Mungari West-Kurrawang Project Annual Report to the Department of Mines and Petroleum for the period 15/03/11 |
| A94731 | 2012 | Aurelia Resources Ltd | Bonnie Vale Northeast | <1% | Annual Report, 4 July 2011 to 3 July 2012 Bonnie Vale Northeast Project E15/1235 |
| A95532 | 2012 | La Mancha Resources Australia Pty Ltd | Cutter's Ridge | 16% | Cutter's Ridge Project M15/692 & P15/4863-6 Annual Report to the DMP for the period 28/07/2011 to 27/07/2012 ( |
| A90700 | 2011 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | 1.2% | Mungari West Kurrawang Project, Annual Report to the Department of Mines and Petroleum for the period 15/03/10 |
| A90859 | 2011 | La Mancha Resources Australia Pty Ltd | West Kal | <1% | West Kal JV C8/2009, Annual Report to the Department of Mines and Petroleum for the period 29/04/10 to 28/04/1 |
| A91504 | 2011 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleumfor the period 28/07/2010 to 27/07 |
| A86384 | 2010 | Cazaly Resources Ltd | Kunanalling | <1% | Partial Surrender Report, KUNANALLING PROJECT E15/820, For the Period 29 November 2005 to 28 November 2009 |
| A86386 | 2010 | Cazaly Resources Ltd | Kunanalling | <1% | Combined Annual Report, KUNANALLING PROJECT, For the Period 1 January 2009 to 31 December 2009, C153/2006 |
| A87884 | 2010 | La Mancha Resources Australia Pty Ltd | CUTTERS RIDGE | 16% | CUTTERS RIDGE ANNUAL REPORT FOR THE PERIOD 28 July 2008 TO 27 July 2009, M15/692 & P15/4863-6 |
| A81250 | 2009 | Cazaly Resources Ltd | KUNANALLING | <1% | Annual Report E 15/0820 KUNANALLING PROJECT Roger Spring, For the Period 29 November 2007 to 28 November 2008 |
| A81510 | 2009 | Cazaly Resources Ltd | KUNANALLING | <1% | Partial Surrender Report KUNANALLING PROJECT E15/0820, For the Period 29 November 2005 to 28 November 2008, C1 |
| A82594 | 2009 | La Mancha Resources Australia Pty Ltd | WEST KALGOORLIE | <1% | ANNUAL REPORT FOR WEST KALGOORLIE PROJECT FOR THE PERIOD 29th APRIL 2008 TO 28th APRIL 2009. Tenement: M15/140 |
| A84626 | 2009 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Annual Report for the period 28 July 2008 to 27 July 2009, M15/692, P15/4863-6, and PLA 15/5266 |
| A74324 | 2007 | Cazaly Resources Ltd | Kunanalling | <1% | Annual Report, E15/820 Kunanalling Project Roger Spring, For the Period 29 November 2005 to 28 November 2006, |
| A73040 | 2006 | Stericorp Ltd | Cutters Ridge | 16% | Cutters Ridge Annual Report for the Period 1 January 2005 to 31 December 2005, M15/692,P15/3109-3111,3303, Com |
| A70331 | 2005 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Annual report for the period 28/02/04 - 27/02/05 Mungari West joint venture project, C70/1994, E15/197, E15/33 |
| A68129 | 2004 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | 16% | Cutter's Ridge Project, Annual Report P15/3109-3111, P15/3303, M15/692 for the period 01/01/2003-31/12/2003. ( |
| A68476 | 2004 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Annual report for the period 28/02/2003-27/02/2004 Mungari West Joint Venture Project (C70/1994), E15/197, E15 |
| A66146 | 2003 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutter's Ridge, Annual Report for the period 1 January 2002 to 31 December 2002, P15/3109-3111, P15/3303, M15/ |
| A66511 | 2003 | Mines & Resources Australia Pty Ltd | Mungari West - White Foil | <1% | Annual Report for the period 28th February 2002 to 27th February 2003 Mungari West Joint Venture Project C70/1 |
| A64542 | 2002 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | 16% | Cutter's Ridge Annual Report For The Period 1 January 2001 to 31 December 2001 PE02/04. Tenements: P15/3109-31 |
| A64736 | 2002 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | MUNGARI WEST JOINT VENTURE PROJECT ANNUAL REPORT FOR THE PERIOD 28th FEBRUARY 2001 TO 27th FEBRUARY 2002 Tenem |
| A62263 | 2001 | Goldfields Exploration Pty Ltd | Roger Spring | <1% | Annual Report, Bonnievale (JV) Project, for the period 11/2/2000 to 10/2/2001, E15/284. |
| A62327 | 2001 | Mines & Resources Australia Pty Ltd | Mungari West Joint Venture | <1% | Annual Report for the period 28th February 2000 to 27th February 2001 Mungari West Joint Venture Project tenem |
| A63319 | 2001 | Gilt-Edged Mining Nl | Roger Springs | <1% | Roger Springs Project Annual Report For The Period 25 July 2000 to 24 July 2001 PE01/11 Tenement: P15/2956, P1 |
| A61924 | 2001 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Joint Venture Project Annual Report 1 January 2000 to 31 December 2000, tenements P15/3109 - 311 |
| A59781 | 2000 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Joint Venture Project Annual Report for the period 01 January 1998 to 31 December 1999 PE00/02 P |
| A60309 | 2000 | Mines & Resources Australia Pty Ltd | Mungari West (White Foil) gold explorati | <1% | Mungari West Project Annual Report for the period 28/02/1999 to 27/02/2000 PE00/15 Tenements E15/197,E15/339,M |
| A60339 | 2000 | Goldfields Exploration Pty Ltd | Bonnievale | <1% | Tenement E15/284, Bonnievale JV Project, Annual Report, Reporting Period : 11/02/1999 to 10/02/2000. |
| A61043 | 2000 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.3% | Roger Springs Project Annual Report for the Period 25 July 1999 to 24 July 2000. E15/244, P15/2956, P15/2957, |
| A57698 | 1999 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Joint Venture Project PE 99/6 Annual Report 01/01/98 - 31/12/98 P15/3109-3111, 3303, M15/692 |
| A58042 | 1999 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project Annual Report For the Per iod For the Period 28/02/1998 to 27/02/1999, E15/ |
| A58256 | 1999 | Goldfields Exploration Pty Ltd | Roger Spring - Bonnievale | <1% | Roger Spring -Bonnie Vale Project, Annual Report for the period 11/02/1998 - 10/02/ 1999, E15/284. |
| A59083 | 1999 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.3% | Roger Springs Project ,Annual Report for the Period 24/07/1998 to 23/07/1999 E15/244, P15/2956-2957 |
| A54434 | 1998 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project E15/197 E15/339 and MLA 15/829 to MLA15/830 Annual report for the Twelve mo |
| A54837 | 1998 | Reefton Mining Nl | Roger Spring | <1% | Annual report E15/284,11 February 1996 - 10 February 1997 Roger Spring Project. |
| A54843 | 1998 | Reefton Mining Nl | Roger Spring | <1% | Annual Report E15/284 11th February 1997 - 10th February 1998, Roger Spring Project . |
| A56105 | 1998 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.3% | Roger Springs project. Annual report for the period 24/07/97-23/07/98. E15/244. P15/2956,2957. |
| A54023 | 1998 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Joint Venture Project (PE 98/6) Annual Report, 01/01/1997 - 31/12/1997 P15/3109-3111, 3303, M15 |
| A50356 | 1997 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licences P15/3109 to P15/3111, P15/3303 |
| A50954 | 1997 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Ventue Project E15/197 E15/339 MLA15/829 MLA15/830 MLA15/927 Annual report for the 12 month |
| A52612 | 1997 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.3% | Roger Springs Project. E15/244. P15/2956,2957. Annual report for the period 25/07/96-24/07/97. |
| A47099 | 1996 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licence P15/3109 to P15/3111, P15/3303 a |
| A47689 | 1996 | Mines & Resources Australia Pty Ltd | Mungari West Joint Venture | <1% | Mungari West Joint Venture Project E15/197 E15/339 Annual report for the 12 Month period to 27 February 1996 |
| A48869 | 1996 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.3% | Roger Springs Project Combined Annual Technical Report on E15/244 P15/2956 and P15/2957 for the period 25 July |
| A45558 | 1995 | Mines & Resources Australia Pty Ltd | Roger Springs | 4.4% | Roger Springs Project, Partial surrender report for E15/244 for the period 25/7/91 to 13/2/95. |
| A43746 | 1995 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 16% | Cutters Ridge Joint Venture Project Combined Annual report on Prospecting Licences P15/3109 to P15/3111 P15/33 |
| A44278 | 1995 | Mines & Resources Australia Pty Ltd | Mungari West | <1% | Mungari West Joint Venture Project E15/197 And E15/339 Annual Report for the 12 month period to 27 February 19 |
| A45417 | 1995 | Resource Service Group Pty Ltd | Roger Springs | 4.3% | ROGER SPRINGS PROJECT.COMBINED ANNUAL TECHNICAL REPORT ON E1 5/244, P15/2956 & P15/2957 FOR THE PERIOD 25 JULY |
| A41834 | 1994 | Keela Wee Exploration Ltd | Bonnievale- Roger Spring | <1% | Bonnievale- Roger Spring Project, Annual Report for E15/284 for the period 9th February 1993 to 10 February 19 |
| A42240 | 1994 | Afmeco Pty Ltd | Roger Springs | 4.3% | Annual report for the period 25/07/93-24/07/94 Roger Springs Project E15/244 P15/2956 P15/2957 |
| A40684 | 1994 | Afmeco Pty Ltd | Mungari West | 1.2% | Annual report for the period 28/02/93-27/02/94 Mungari West Project E15/197 |
| A37984 | 1993 | Resource Service Group Pty Ltd | Cutters Ridge | 20% | Annual Report for the period 01/01/92-31/12/92 Cutters Ridge JV Project P15/3109-3111,2754 M15/628 |
| A39315 | 1993 | Afmeco Pty Ltd | Roger Springs | 4.3% | Roger Springs Project Combined Annual Technical Report on exploration within E15/244, P15/2956 and P15/2957 25 |
| A37842 | 1993 | Afmeco Pty Ltd | Mungari West | 1.2% | Mungari West (JV() Project, Annual Report for the period 28/02/1993 to 27/02/1993, E15/197. |
| A37879 | 1993 | Afmeco Pty Ltd | Mungari West | 1.2% | Mungari West Joint Venture Project. E15/197. Partial surrender report to 8/12/92 and 27/2/93. |
| A94572 | 1992 | Afmeco Pty Ltd | Mungari | <1% | PROPOSED MUNGARI INDUSTRIAL SITE - STERILIZATION PROGRAMME |
| A35034 | 1992 | Afmeco Pty Ltd | Cutters Ridge | 10% | Annual Report for the Period 01/01/91- 31/12/91 Cutters Ridge Project |
| A35712 | 1992 | Afmeco Pty Ltd | Cutters Ridge | 22% | Surrender Report for the Period of 1992 Cutters Ridge Project GML15/6464; M15/281,343 |
| A36858 | 1992 | Afmeco Pty Ltd | Roger Springs | 4.3% | Roger Springs Project Combined Annual Technical Report on Exploration within E15/244 P15/2956 and P15/2957, 25 |
| A35344 | 1992 | Afmeco Pty Ltd | Mungari West | 1.2% | Mungari West Joint Venture Project E15/197 Annual Report for the 12 month period to 27 February 1992 |
| A33312 | 1991 | Afmeco Pty Ltd | Mungari West | 1.2% | Mungari West Annual report on Exploration Licence 15/197 (1991) |
| A32266 | 1990 | City Resources Ltd | Roger Spring | <1% | Roger Spring Project Summary Report |
| A32267 | 1990 | City Resources Ltd | Roger Spring | <1% | Roger Spring Project, Non-statutory Report: Report on the Roger Spring Project 1990 Field Programme, April 199 |
| A26809 | 1989 | City Resources Ltd | Roger Spring | 1.3% | Annual report , Roger Spring E15/22 for period 13/10/87 to 12/10/88 , Report no W89-15 |
| A27166 | 1989 | Lyco Resources Nl | Northlander | 78% | Annual report on Operations for period ending 23/02/89 Northlander Prospect ML15/281 |
| A27837 | 1989 | Lyco Resources Nl | Cutters Ridge | <1% | Cutters Ridge Prospect. ML 15/343, PL 15/2319 14/07/1989 |
| A32265 | 1989 | City Resources Ltd | Roger Spring | <1% | Report on trench sampling at Roger Spring |
| A21504 | 1987 | Cesium International Pty Ltd | Lady Grace | <1% | Lady Grace Project, Non-statutory Report: Exploration Review, May 1987. |
| A6607 | 1976 | Western Mining Corporation Ltd | Ora Banda- Kunanalling- Broad Arrow | <1% | Ora Banda- Kunanalling- Broad Arrow Project, Annual Report for the period 01/05/1973 to 29/06/1976, TR70/5012 |
| A2860 | 1972 | Western Mining Corporation Ltd | Black Cat | 4.9% | Black Cat Project, Annual Report for the year ending 30th June 1972, MC15/1631-1635, 1640-1646 & 1995-2021. |
| A2810 | 1971 | Carpentaria Exp Co Pty Ltd | Bonnie Vale | 1.6% | Bonnie Vale Project, Final Surrender Report, July 1971, MC15/1493-1503. |
| A20084 | 1971 | Carpentaria Exp Co Pty Ltd | Roper | <1% | Final Surrender Report, Roper, June 1971, MC15/326 - 349. |
| A2206 | 1971 | Carpentaria Exp Co Pty Ltd | Bonnie Vale | 1.6% | Bonnie Vale Project, Non-statutory Report: Report on Rotary Drilling at Bonnie Vale for the period ending 6th |
| A105 | 1970 | Western Mining Corporation Ltd | Ora Banda- Kunanalling | <1% | Ora Banda- Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Reports Data File, |
| A106 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Kalgoorlie Regional & Geological Plans (8), circa July |
| A107 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report ,Data File |
| A112 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report:Annual Report, Folder 11, Sample Data Sheets for Kunanal |
| A108 | 1970 | Western Mining Corporation Ltd | Ora Banda/Kunanalling | <1% | Annual Tenements and Temporary Reserve Report Data File, Ora Banda - Kunanalling Area. |
| A109 | 1970 | Western Mining Corporation Ltd | Ora Banda - Kunanalling | <1% | Ora Banda - Kunanalling Project, Non-statutory Report: Annual Tenements & Temporary Reserve Report,Folder 8,In |
| A110 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenement & Temporary Reserve Report, Folder 9, Vac |
| A111 | 1970 | Western Mining Corporation Ltd | Ora Banda -Kunanalling | <1% | Ora Banda -Kunanalling Project, Non-statutory Report:Annual Tenements & Temporary Reserve Report Folder 10,Sam |
| A2791 | 1969 | Carpentaria Exp Co Pty Ltd | Bonnie Vale | 1.6% | Bonnie Vale Project, Non-statutory Report: Exploration Report, November 1969, MC15/1493-1503. |
| A2793 | 1969 | Carpentaria Exp Co Pty Ltd | Bonnie Vale | 1.6% | Bonnie Vale Project, Non-statutory Report: Progress Report: Magnometer & Induced Polarization Survey, Final Re |
| A47864 | 1753 | Reefton Mining Nl | Roger Spring | <1% | Annual Report, E15/284, for the period 11 February 1995 - 10 February 1996, Roger Spring Project. |
| A33561 | 1753 | Lyco Resources Nl | Cutters Ridge | <1% | Annual report on operations for period ending 14/07/90 Cutters Ridge Prospect M15/343 P15/2319 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A44730 | 1753 | Reefton Mining Nl | Bonnievale - Roger Spring | <1% | Bonnievale - Roger Spring Project, Annual Report , E15/284 ,for period 9th February 1994 to 10th February 19 |
| A1612 | 1753 | New Consolidated Gold Fields Aust Ltd | Three Mile Hill | <1% | Three Mile Hill Project, Non-statutory Report: |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 15/1859 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 15/1859 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 15/1859? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.