NextMaps›WA Tenements›E 08/3894

E 08/3894

PendingExploration LicenceAshburton M.F. District
Area
9,610ha
Applied
Sept 2026
12 days ago
WAMEX reports
426
WA median is 53
Report drilling
258
of 426 reports
Ashburton M.F. Explore on the live map

Register summary

Holder
Arrow Minerals Ltd
Application received
16 Sept 2026

Exploration history on this ground

426 historical WAMEX exploration reports intersect E 08/3894: 140 report geochemistry or sampling, 238 include a digital data package.
When this ground was worked · 102 of 426 reports dated
61960s
71970s
31980s
181990s
232000s
412010s
42020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A130219 2022 Bci Minerals Limited <1% E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022
A130219 2022 Bci Minerals Limited <1% E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022
A130219 2022 Bci Minerals Limited <1% E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022
A130219 2022 Bci Minerals Limited <1% E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022
A122354 2020 Bci Minerals Limited <1% Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013
245 more reports
A122354 2020 Bci Minerals Limited <1% Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013
A122354 2020 Bci Minerals Limited <1% Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013
A122354 2020 Bci Minerals Limited <1% Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013
A124087 2020 Zanthus Resources Pty Ltd 7.2% Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020
A124087 2020 Zanthus Resources Pty Ltd 7.2% Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020
A124087 2020 Zanthus Resources Pty Ltd 7.2% Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020
A124087 2020 Zanthus Resources Pty Ltd 7.2% Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020
A124277 2020 Zanthus Resources Pty Ltd 6.2% Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686,
A124277 2020 Zanthus Resources Pty Ltd 6.2% Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686,
A124277 2020 Zanthus Resources Pty Ltd 6.2% Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686,
A124277 2020 Zanthus Resources Pty Ltd 6.2% Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686,
A118759 2019 Bci Minerals Limited <1% Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018,
A118759 2019 Bci Minerals Limited <1% Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018,
A118759 2019 Bci Minerals Limited <1% Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018,
A118759 2019 Bci Minerals Limited <1% Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018,
A120882 2019 Zanthus Resources Pty Ltd 2.4% C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060,
A120882 2019 Zanthus Resources Pty Ltd 2.4% C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060,
A120882 2019 Zanthus Resources Pty Ltd 2.4% C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060,
A120882 2019 Zanthus Resources Pty Ltd 2.4% C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060,
A115578 2018 Fortescue Metals Group Ltd <1% E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017
A115578 2018 Fortescue Metals Group Ltd <1% E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017
A115578 2018 Fortescue Metals Group Ltd <1% E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017
A115578 2018 Fortescue Metals Group Ltd <1% E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017
A117003 2018 Robe River Mining Co Pty Ltd 100% Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1
A117003 2018 Robe River Mining Co Pty Ltd 100% Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1
A117003 2018 Robe River Mining Co Pty Ltd 100% Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1
A117003 2018 Robe River Mining Co Pty Ltd 100% Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1
A117179 2018 Coziron Resources Ltd 2.4% C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0
A117179 2018 Coziron Resources Ltd 2.4% C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0
A117179 2018 Coziron Resources Ltd 2.4% C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0
A117179 2018 Coziron Resources Ltd 2.4% C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0
A114319 2017 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0
A114319 2017 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0
A114319 2017 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0
A114319 2017 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0
A114411 2017 Robe River Mining Co P/L 100% King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016
A114411 2017 Robe River Mining Co P/L 100% King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016
A114411 2017 Robe River Mining Co P/L 100% King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016
A114411 2017 Robe River Mining Co P/L 100% King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016
A114648 2017 Robe River Mining Co Pty Ltd <1% C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2
A114648 2017 Robe River Mining Co Pty Ltd <1% C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2
A114648 2017 Robe River Mining Co Pty Ltd <1% C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2
A114648 2017 Robe River Mining Co Pty Ltd <1% C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2
A108177 2016 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period
A108177 2016 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period
A108177 2016 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period
A108177 2016 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period
A108200 2016 Fortescue Metals Group Ltd 5.9% C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942,
A108200 2016 Fortescue Metals Group Ltd 5.9% C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942,
A108200 2016 Fortescue Metals Group Ltd 5.9% C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942,
A108200 2016 Fortescue Metals Group Ltd 5.9% C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942,
A108751 2016 Taylor A 33% E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015
A108751 2016 Taylor A 33% E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015
A108751 2016 Taylor A 33% E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015
A108751 2016 Taylor A 33% E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015
A108878 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0
A108878 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0
A108878 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0
A108878 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0
A109295 2016 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0
A109295 2016 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0
A109295 2016 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0
A109295 2016 Zanthus Resources Pty Ltd 2.4% Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0
A110065 2016 Fortescue Metals Group Ltd 5.1% C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E
A110065 2016 Fortescue Metals Group Ltd 5.1% C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E
A110065 2016 Fortescue Metals Group Ltd 5.1% C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E
A110065 2016 Fortescue Metals Group Ltd 5.1% C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E
A110563 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072
A110563 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072
A110563 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072
A110563 2016 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072
A104907 2015 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999]
A104907 2015 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999]
A104907 2015 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999]
A104907 2015 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999]
A105330 2015 Fortescue Metals Group Ltd 2.6% Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E
A105330 2015 Fortescue Metals Group Ltd 2.6% Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E
A105330 2015 Fortescue Metals Group Ltd 2.6% Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E
A105330 2015 Fortescue Metals Group Ltd 2.6% Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E
A105967 2015 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E
A105967 2015 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E
A105967 2015 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E
A105967 2015 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E
A105977 2015 Zanthus Resources Pty Ltd 7.2% Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015
A105977 2015 Zanthus Resources Pty Ltd 7.2% Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015
A105977 2015 Zanthus Resources Pty Ltd 7.2% Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015
A105977 2015 Zanthus Resources Pty Ltd 7.2% Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015
A107554 2015 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015
A107554 2015 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015
A107554 2015 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015
A107554 2015 Fortescue Metals Group Ltd <1% C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015
A107644 2015 Zanthus Resources Pty Ltd 6.2% Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e
A107644 2015 Zanthus Resources Pty Ltd 6.2% Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e
A107644 2015 Zanthus Resources Pty Ltd 6.2% Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e
A107644 2015 Zanthus Resources Pty Ltd 6.2% Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e
A101252 2014 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio
A101252 2014 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio
A101252 2014 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio
A101252 2014 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio
A101523 2014 Fortescue Metals Group Ltd 3% Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara
A101523 2014 Fortescue Metals Group Ltd 3% Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara
A101523 2014 Fortescue Metals Group Ltd 3% Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara
A101523 2014 Fortescue Metals Group Ltd 3% Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara
A103067 2014 Zanthus Resources Pty Ltd 2.4% YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/
A103067 2014 Zanthus Resources Pty Ltd 2.4% YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/
A103067 2014 Zanthus Resources Pty Ltd 2.4% YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/
A103067 2014 Zanthus Resources Pty Ltd 2.4% YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/
A104369 2014 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2
A104369 2014 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2
A104369 2014 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2
A104369 2014 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2
A96945 2013 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.
A96945 2013 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.
A96945 2013 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.
A96945 2013 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196.
A98890 2013 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16
A98890 2013 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16
A98890 2013 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16
A98890 2013 Zanthus Resources Pty Ltd 2.4% Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16
A100449 2013 Fortescue Metals Group Ltd <1% Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08
A100449 2013 Fortescue Metals Group Ltd <1% Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08
A100449 2013 Fortescue Metals Group Ltd <1% Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08
A100449 2013 Fortescue Metals Group Ltd <1% Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08
A92882 2012 Rio Tinto Iron Ore <1% Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. (
A92882 2012 Rio Tinto Iron Ore <1% Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. (
A92882 2012 Rio Tinto Iron Ore <1% Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. (
A92882 2012 Rio Tinto Iron Ore <1% Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. (
A93158 2012 Fortescue Metals Group Ltd <1% Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15
A93158 2012 Fortescue Metals Group Ltd <1% Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15
A93158 2012 Fortescue Metals Group Ltd <1% Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15
A93158 2012 Fortescue Metals Group Ltd <1% Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15
A94680 2012 Zanthus Resources Pty Ltd 2.4% C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08
A94680 2012 Zanthus Resources Pty Ltd 2.4% C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08
A94680 2012 Zanthus Resources Pty Ltd 2.4% C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08
A94680 2012 Zanthus Resources Pty Ltd 2.4% C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08
A94984 2012 Zanthus Resources Pty Ltd 15% Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012
A94984 2012 Zanthus Resources Pty Ltd 15% Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012
A94984 2012 Zanthus Resources Pty Ltd 15% Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012
A94984 2012 Zanthus Resources Pty Ltd 15% Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012
A95914 2012 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [
A95914 2012 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [
A95914 2012 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [
A95914 2012 Fortescue Metals Group Ltd <1% Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [
A97214 2012 Fortescue Metals Group Ltd 3.3% West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183
A97214 2012 Fortescue Metals Group Ltd 3.3% West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183
A97214 2012 Fortescue Metals Group Ltd 3.3% West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183
A97214 2012 Fortescue Metals Group Ltd 3.3% West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183
A89412 2011 Rio Tinto Iron Ore <1% Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196
A89412 2011 Rio Tinto Iron Ore <1% Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196
A89412 2011 Rio Tinto Iron Ore <1% Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196
A89412 2011 Rio Tinto Iron Ore <1% Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196
A91378 2011 Zanthus Resources Pty Ltd 2.4% Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western
A91378 2011 Zanthus Resources Pty Ltd 2.4% Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western
A91378 2011 Zanthus Resources Pty Ltd 2.4% Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western
A91378 2011 Zanthus Resources Pty Ltd 2.4% Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western
A102150 2011 Rio Tinto Exploration Pty Ltd <1% Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me
A102150 2011 Rio Tinto Exploration Pty Ltd <1% Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me
A102150 2011 Rio Tinto Exploration Pty Ltd <1% Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me
A102150 2011 Rio Tinto Exploration Pty Ltd <1% Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me
A85757 2010 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009
A85757 2010 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009
A85757 2010 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009
A85757 2010 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009
A85970 2010 Rio Tinto Iron Ore <1% Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196.
A85970 2010 Rio Tinto Iron Ore <1% Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196.
A85970 2010 Rio Tinto Iron Ore <1% Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196.
A85970 2010 Rio Tinto Iron Ore <1% Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196.
A86833 2010 Watson S 14% Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola
A86833 2010 Watson S 14% Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola
A86833 2010 Watson S 14% Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola
A86833 2010 Watson S 14% Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola
A88220 2010 Creasy M G 2.4% REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA
A88220 2010 Creasy M G 2.4% REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA
A88220 2010 Creasy M G 2.4% REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA
A88220 2010 Creasy M G 2.4% REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA
A81206 2009 Rio Tinto Iron Ore <1% Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1
A81206 2009 Rio Tinto Iron Ore <1% Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1
A81206 2009 Rio Tinto Iron Ore <1% Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1
A81206 2009 Rio Tinto Iron Ore <1% Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1
A81248 2009 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C
A81248 2009 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C
A81248 2009 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C
A81248 2009 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C
A81249 2009 Rio Tinto Exploration Pty Ltd 14% Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste
A81249 2009 Rio Tinto Exploration Pty Ltd 14% Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste
A81249 2009 Rio Tinto Exploration Pty Ltd 14% Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste
A81249 2009 Rio Tinto Exploration Pty Ltd 14% Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste
A81415 2009 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008
A81415 2009 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008
A81415 2009 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008
A81415 2009 Skryne Hill Pty Ltd <1% E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008
A81894 2009 Rio Tinto Iron Ore <1% Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/
A81894 2009 Rio Tinto Iron Ore <1% Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/
A81894 2009 Rio Tinto Iron Ore <1% Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/
A81894 2009 Rio Tinto Iron Ore <1% Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/
A77206 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya
A77206 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya
A77206 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya
A77206 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya
A77447 2008 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan
A77447 2008 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan
A77447 2008 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan
A77447 2008 Robe River Mining Co Pty Ltd <1% Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan
A77448 2008 Newexco Services Pty Ltd <1% E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336
A77448 2008 Newexco Services Pty Ltd <1% E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336
A77448 2008 Newexco Services Pty Ltd <1% E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336
A77448 2008 Newexco Services Pty Ltd <1% E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336
A77618 2008 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul
A77618 2008 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul
A77618 2008 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul
A77618 2008 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul
A80195 2008 Skryne Hill Pty Ltd <1% Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd
A80195 2008 Skryne Hill Pty Ltd <1% Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd
A80195 2008 Skryne Hill Pty Ltd <1% Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd
A80195 2008 Skryne Hill Pty Ltd <1% Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd
A80225 2008 Rio Tinto Exploration Pty Ltd 71% Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006
A80225 2008 Rio Tinto Exploration Pty Ltd 71% Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006
A80225 2008 Rio Tinto Exploration Pty Ltd 71% Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006
A80225 2008 Rio Tinto Exploration Pty Ltd 71% Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006
A85680 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project
A85680 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project
A85680 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project
A85680 2008 Rio Tinto Exploration Pty Ltd 14% Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project
A74197 2007 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo
A74197 2007 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo
A74197 2007 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo
A74197 2007 Rio Tinto Exploration Pty Ltd 14% Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo
A74436 2007 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P
A74436 2007 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P
A74436 2007 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P
A74436 2007 Rio Tinto Exploration Pty Ltd 3.7% Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P
A74452 2007 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola).
A74452 2007 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola).
A74452 2007 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola).
A74452 2007 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola).
A71869 2006 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined
A71869 2006 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined
A71869 2006 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined
A71869 2006 Robe River Mining Co Pty Ltd <1% Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined
A74328 2006 Skryne Hill Pty Ltd <1% E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006.
A74328 2006 Skryne Hill Pty Ltd <1% E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006.
A74328 2006 Skryne Hill Pty Ltd <1% E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006.
A74328 2006 Skryne Hill Pty Ltd <1% E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006.
A70191 2005 Robe River Mining Co Pty Ltd <1% Annual report for the period 01/01/04 - 31/12/04 Warramboo Project, C144/1999, E08/788, E08/789, E08/1196.
A70191 2005 Robe River Mining Co Pty Ltd <1% Annual report for the period 01/01/04 - 31/12/04 Warramboo Project, C144/1999, E08/788, E08/789, E08/1196.
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
No expenditure obligation until granted
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence

Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 08/3894 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 08/3894 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 08/3894? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.