E 08/3894
Register summary
- Holder
- Arrow Minerals Ltd
- Application received
- 16 Sept 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A130219 | 2022 | Bci Minerals Limited | <1% | E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022 | |
| A130219 | 2022 | Bci Minerals Limited | <1% | E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022 | |
| A130219 | 2022 | Bci Minerals Limited | <1% | E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022 | |
| A130219 | 2022 | Bci Minerals Limited | <1% | E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022 | |
| A122354 | 2020 | Bci Minerals Limited | <1% | Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013 |
245 more reports
| A122354 | 2020 | Bci Minerals Limited | <1% | Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013 | |
| A122354 | 2020 | Bci Minerals Limited | <1% | Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013 | |
| A122354 | 2020 | Bci Minerals Limited | <1% | Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013 | |
| A124087 | 2020 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020 | |
| A124087 | 2020 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020 | |
| A124087 | 2020 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020 | |
| A124087 | 2020 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola E08/1686 Partial Surrender Report for the period ending 23/06/2020 | |
| A124277 | 2020 | Zanthus Resources Pty Ltd | 6.2% | Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686, | |
| A124277 | 2020 | Zanthus Resources Pty Ltd | 6.2% | Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686, | |
| A124277 | 2020 | Zanthus Resources Pty Ltd | 6.2% | Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686, | |
| A124277 | 2020 | Zanthus Resources Pty Ltd | 6.2% | Yarraloola Project C132/2009 Combined Annual Report for the period ending 05/07/2020, E 08/01060, E 08/01686, | |
| A118759 | 2019 | Bci Minerals Limited | <1% | Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018, | |
| A118759 | 2019 | Bci Minerals Limited | <1% | Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018, | |
| A118759 | 2019 | Bci Minerals Limited | <1% | Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018, | |
| A118759 | 2019 | Bci Minerals Limited | <1% | Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018, | |
| A120882 | 2019 | Zanthus Resources Pty Ltd | 2.4% | C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060, | |
| A120882 | 2019 | Zanthus Resources Pty Ltd | 2.4% | C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060, | |
| A120882 | 2019 | Zanthus Resources Pty Ltd | 2.4% | C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060, | |
| A120882 | 2019 | Zanthus Resources Pty Ltd | 2.4% | C132_2009_2019 Yarraloola Project Combined Annual Report for the period 6 July 2018 to 5 July 2019, E08/01060, | |
| A115578 | 2018 | Fortescue Metals Group Ltd | <1% | E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017 | |
| A115578 | 2018 | Fortescue Metals Group Ltd | <1% | E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017 | |
| A115578 | 2018 | Fortescue Metals Group Ltd | <1% | E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017 | |
| A115578 | 2018 | Fortescue Metals Group Ltd | <1% | E08/1962 (Woorawa 6) Final Surrender Report, 15/0/2012-14/06/2017 | |
| A117003 | 2018 | Robe River Mining Co Pty Ltd | 100% | Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1 | |
| A117003 | 2018 | Robe River Mining Co Pty Ltd | 100% | Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1 | |
| A117003 | 2018 | Robe River Mining Co Pty Ltd | 100% | Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1 | |
| A117003 | 2018 | Robe River Mining Co Pty Ltd | 100% | Warramboo Voluntary Surrender Report Exploration Licence 08/2763 (GDSR 6795) for the period 11 April 2016 to 1 | |
| A117179 | 2018 | Coziron Resources Ltd | 2.4% | C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0 | |
| A117179 | 2018 | Coziron Resources Ltd | 2.4% | C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0 | |
| A117179 | 2018 | Coziron Resources Ltd | 2.4% | C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0 | |
| A117179 | 2018 | Coziron Resources Ltd | 2.4% | C132_2009 Yarraloola Project Annual Report for the period 6 July 2017 to 5 July 2018, E08/01060, E08/01684, E0 | |
| A114319 | 2017 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0 | |
| A114319 | 2017 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0 | |
| A114319 | 2017 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0 | |
| A114319 | 2017 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2016 to 5 July 2017, E08/01060, E08/01684, E0 | |
| A114411 | 2017 | Robe River Mining Co P/L | 100% | King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016 | |
| A114411 | 2017 | Robe River Mining Co P/L | 100% | King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016 | |
| A114411 | 2017 | Robe River Mining Co P/L | 100% | King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016 | |
| A114411 | 2017 | Robe River Mining Co P/L | 100% | King Well Voluntary Surrender Report Exploration Licence 08/2796 (GDSR 6613) For the Period 21 September 2016 | |
| A114648 | 2017 | Robe River Mining Co Pty Ltd | <1% | C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2 | |
| A114648 | 2017 | Robe River Mining Co Pty Ltd | <1% | C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2 | |
| A114648 | 2017 | Robe River Mining Co Pty Ltd | <1% | C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2 | |
| A114648 | 2017 | Robe River Mining Co Pty Ltd | <1% | C110/2016 Peedan Hill Combined Annual Report Exploration Licences 08/2762 and 08/2763 for the period 11 July 2 | |
| A108177 | 2016 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period | |
| A108177 | 2016 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period | |
| A108177 | 2016 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period | |
| A108177 | 2016 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report Exploration Licences 08/788 & 08/1196 C144/1999 for the period | |
| A108200 | 2016 | Fortescue Metals Group Ltd | 5.9% | C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942, | |
| A108200 | 2016 | Fortescue Metals Group Ltd | 5.9% | C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942, | |
| A108200 | 2016 | Fortescue Metals Group Ltd | 5.9% | C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942, | |
| A108200 | 2016 | Fortescue Metals Group Ltd | 5.9% | C167/2006 West Pilbara Annual Report For the Period 1 January 2015 to 31 December 2015, E08/01548, E08/01942, | |
| A108751 | 2016 | Taylor A | 33% | E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015 | |
| A108751 | 2016 | Taylor A | 33% | E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015 | |
| A108751 | 2016 | Taylor A | 33% | E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015 | |
| A108751 | 2016 | Taylor A | 33% | E08/2551-I Final Surrender Report Reporting Period 05/08/2014 to 27/11/2015 | |
| A108878 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0 | |
| A108878 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0 | |
| A108878 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0 | |
| A108878 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Final Surrender Report For the Period 29 September 2011 to 5 April 2016, E08/01585, E08/0 | |
| A109295 | 2016 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0 | |
| A109295 | 2016 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0 | |
| A109295 | 2016 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0 | |
| A109295 | 2016 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project C132/2009 Annual Report for the period 6 July 2015 to 5 July 2016, E08/01060, E08/01684, E0 | |
| A110065 | 2016 | Fortescue Metals Group Ltd | 5.1% | C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E | |
| A110065 | 2016 | Fortescue Metals Group Ltd | 5.1% | C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E | |
| A110065 | 2016 | Fortescue Metals Group Ltd | 5.1% | C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E | |
| A110065 | 2016 | Fortescue Metals Group Ltd | 5.1% | C167/2006 West Pilbara Final Surrender Report for the period 01/07/2011 to 03/05/2016, E08/01959, E08/01942, E | |
| A110563 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072 | |
| A110563 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072 | |
| A110563 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072 | |
| A110563 | 2016 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report for the period 1 November 2015 to 31 October 2016, E08/01962, E08/02072 | |
| A104907 | 2015 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999] | |
| A104907 | 2015 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999] | |
| A104907 | 2015 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999] | |
| A104907 | 2015 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2014 to 31/12/2014, E38/788 & 1196. [C144/1999] | |
| A105330 | 2015 | Fortescue Metals Group Ltd | 2.6% | Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E | |
| A105330 | 2015 | Fortescue Metals Group Ltd | 2.6% | Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E | |
| A105330 | 2015 | Fortescue Metals Group Ltd | 2.6% | Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E | |
| A105330 | 2015 | Fortescue Metals Group Ltd | 2.6% | Annual Mineral Exploration Report: C167/2006 West Pilbara for the period 1 January 2014 to 31 December 2014, E | |
| A105967 | 2015 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E | |
| A105967 | 2015 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E | |
| A105967 | 2015 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E | |
| A105967 | 2015 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Annual Report for the period 6 July 2014 to 5 July 2015, E08/01060, E08/01684, E08/01685, E | |
| A105977 | 2015 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015 | |
| A105977 | 2015 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015 | |
| A105977 | 2015 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015 | |
| A105977 | 2015 | Zanthus Resources Pty Ltd | 7.2% | Yarraloola Project E08/1686 Partial Surrender Report for the period 6 July 2009 to 5 July 2015 | |
| A107554 | 2015 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015 | |
| A107554 | 2015 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015 | |
| A107554 | 2015 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015 | |
| A107554 | 2015 | Fortescue Metals Group Ltd | <1% | C327/2011 Yarraloola Annual Report For the Period 1 November 2014 to 31 October 2015 | |
| A107644 | 2015 | Zanthus Resources Pty Ltd | 6.2% | Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e | |
| A107644 | 2015 | Zanthus Resources Pty Ltd | 6.2% | Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e | |
| A107644 | 2015 | Zanthus Resources Pty Ltd | 6.2% | Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e | |
| A107644 | 2015 | Zanthus Resources Pty Ltd | 6.2% | Co-funded Drilling Program 2015 Final Report Characterisation of the geology of a new, possibly Algoma-style e | |
| A101252 | 2014 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio | |
| A101252 | 2014 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio | |
| A101252 | 2014 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio | |
| A101252 | 2014 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report, Exploration Licences 08/788 & 08/1196 (C144/1999) for the perio | |
| A101523 | 2014 | Fortescue Metals Group Ltd | 3% | Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara | |
| A101523 | 2014 | Fortescue Metals Group Ltd | 3% | Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara | |
| A101523 | 2014 | Fortescue Metals Group Ltd | 3% | Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara | |
| A101523 | 2014 | Fortescue Metals Group Ltd | 3% | Annual Report for the Period 1 January 2013 to 31 December 2013, C167/2006 West Pilbara | |
| A103067 | 2014 | Zanthus Resources Pty Ltd | 2.4% | YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/ | |
| A103067 | 2014 | Zanthus Resources Pty Ltd | 2.4% | YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/ | |
| A103067 | 2014 | Zanthus Resources Pty Ltd | 2.4% | YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/ | |
| A103067 | 2014 | Zanthus Resources Pty Ltd | 2.4% | YARRALOOLA PROJECT COMBINED ANNUAL REPORT for EXPLORATION LEASES E08/1060, E08/1684, E08/1685, E08/1686, E08/ | |
| A104369 | 2014 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2 | |
| A104369 | 2014 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2 | |
| A104369 | 2014 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2 | |
| A104369 | 2014 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2013 to 31/10/2014, E08/1585, 1623, 1943, 1962, 2004, 2 | |
| A96945 | 2013 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196. | |
| A96945 | 2013 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196. | |
| A96945 | 2013 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196. | |
| A96945 | 2013 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for the period 01/01/2012 to 31/12/2012, E08/788 & 1196. | |
| A98890 | 2013 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16 | |
| A98890 | 2013 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16 | |
| A98890 | 2013 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16 | |
| A98890 | 2013 | Zanthus Resources Pty Ltd | 2.4% | Yarraloola Project Combined Annual Report for the period 6 July 2012 - 5 July 2013, E08/1060, E08/1684, E08/16 | |
| A100449 | 2013 | Fortescue Metals Group Ltd | <1% | Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08 | |
| A100449 | 2013 | Fortescue Metals Group Ltd | <1% | Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08 | |
| A100449 | 2013 | Fortescue Metals Group Ltd | <1% | Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08 | |
| A100449 | 2013 | Fortescue Metals Group Ltd | <1% | Annual Mineral Exploration Report: C327/2011 Yarraloola for the period 1 November 2012 to 31 October 2013, E08 | |
| A92882 | 2012 | Rio Tinto Iron Ore | <1% | Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. ( | |
| A92882 | 2012 | Rio Tinto Iron Ore | <1% | Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. ( | |
| A92882 | 2012 | Rio Tinto Iron Ore | <1% | Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. ( | |
| A92882 | 2012 | Rio Tinto Iron Ore | <1% | Warramboo Project, Annual Report for the period 1st January 2011 to 31st December 2011, E08/788-789 & 1196. ( | |
| A93158 | 2012 | Fortescue Metals Group Ltd | <1% | Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15 | |
| A93158 | 2012 | Fortescue Metals Group Ltd | <1% | Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15 | |
| A93158 | 2012 | Fortescue Metals Group Ltd | <1% | Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15 | |
| A93158 | 2012 | Fortescue Metals Group Ltd | <1% | Annual report for the period 1 January 2011 to 31 December 2011 for the West Pilbara Project C167/2006, E08/15 | |
| A94680 | 2012 | Zanthus Resources Pty Ltd | 2.4% | C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08 | |
| A94680 | 2012 | Zanthus Resources Pty Ltd | 2.4% | C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08 | |
| A94680 | 2012 | Zanthus Resources Pty Ltd | 2.4% | C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08 | |
| A94680 | 2012 | Zanthus Resources Pty Ltd | 2.4% | C132/2009 Yarraloola Project Combined Annual Report for the period 6 July 2011 - 5 July 2012 for E08/1060, E08 | |
| A94984 | 2012 | Zanthus Resources Pty Ltd | 15% | Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012 | |
| A94984 | 2012 | Zanthus Resources Pty Ltd | 15% | Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012 | |
| A94984 | 2012 | Zanthus Resources Pty Ltd | 15% | Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012 | |
| A94984 | 2012 | Zanthus Resources Pty Ltd | 15% | Yarraloola Project Partial Surrender Report for E08/1060 for the period 6th July 2009 – 5th July 2012 | |
| A95914 | 2012 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [ | |
| A95914 | 2012 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [ | |
| A95914 | 2012 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [ | |
| A95914 | 2012 | Fortescue Metals Group Ltd | <1% | Yarraloola Project, Annual Report for the period 01/11/2011 to 31/10/2012, E08/1585, 1623-1624, 1943 & 1962. [ | |
| A97214 | 2012 | Fortescue Metals Group Ltd | 3.3% | West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183 | |
| A97214 | 2012 | Fortescue Metals Group Ltd | 3.3% | West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183 | |
| A97214 | 2012 | Fortescue Metals Group Ltd | 3.3% | West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183 | |
| A97214 | 2012 | Fortescue Metals Group Ltd | 3.3% | West Pilbara Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1547, 1762, 183 | |
| A89412 | 2011 | Rio Tinto Iron Ore | <1% | Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196 | |
| A89412 | 2011 | Rio Tinto Iron Ore | <1% | Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196 | |
| A89412 | 2011 | Rio Tinto Iron Ore | <1% | Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196 | |
| A89412 | 2011 | Rio Tinto Iron Ore | <1% | Warramboo Combined Group Annual Report for the Period 1/1/2010 to 31/12/2010, E08/788, E08/789, E08/1196 | |
| A91378 | 2011 | Zanthus Resources Pty Ltd | 2.4% | Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western | |
| A91378 | 2011 | Zanthus Resources Pty Ltd | 2.4% | Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western | |
| A91378 | 2011 | Zanthus Resources Pty Ltd | 2.4% | Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western | |
| A91378 | 2011 | Zanthus Resources Pty Ltd | 2.4% | Report on Exploration Undertaken at the Yarraloola Project(C132/2009) Pannawonica area, West Pilbara, Western | |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me | |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me | |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me | |
| A102150 | 2011 | Rio Tinto Exploration Pty Ltd | <1% | Peth Core Library Drilling Data from Drillholes into Channel Iron Deposits (CID) in the Pilbara Hole J6088- Me | |
| A85757 | 2010 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009 | |
| A85757 | 2010 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009 | |
| A85757 | 2010 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009 | |
| A85757 | 2010 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Final Surrender Report for Period 3rd October 2005 to 29th September 2009 | |
| A85970 | 2010 | Rio Tinto Iron Ore | <1% | Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196. | |
| A85970 | 2010 | Rio Tinto Iron Ore | <1% | Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196. | |
| A85970 | 2010 | Rio Tinto Iron Ore | <1% | Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196. | |
| A85970 | 2010 | Rio Tinto Iron Ore | <1% | Warramboo Project Area, (Combined) Annual Technical Report, Exploration Licences E08/788, E08/789, E08/1196. | |
| A86833 | 2010 | Watson S | 14% | Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola | |
| A86833 | 2010 | Watson S | 14% | Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola | |
| A86833 | 2010 | Watson S | 14% | Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola | |
| A86833 | 2010 | Watson S | 14% | Partial Surrender Report for the Period Ending 15 December 2009, E08/1296 Yarraloola | |
| A88220 | 2010 | Creasy M G | 2.4% | REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA | |
| A88220 | 2010 | Creasy M G | 2.4% | REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA | |
| A88220 | 2010 | Creasy M G | 2.4% | REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA | |
| A88220 | 2010 | Creasy M G | 2.4% | REPORT ON EXPLORATION UNDERTAKEN AT THE YARRALOOLA PROJECT PANNAWONICA AREA WEST PILBARA WESTERN AUSTRALIA | |
| A81206 | 2009 | Rio Tinto Iron Ore | <1% | Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1 | |
| A81206 | 2009 | Rio Tinto Iron Ore | <1% | Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1 | |
| A81206 | 2009 | Rio Tinto Iron Ore | <1% | Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1 | |
| A81206 | 2009 | Rio Tinto Iron Ore | <1% | Warramboo Project, (Combined) Annual Technical Report, Exploration Licences E08/788m E08/789, E08/1196 (C144/1 | |
| A81248 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C | |
| A81248 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C | |
| A81248 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C | |
| A81248 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period 16 December 2007 to 15 December 2008, Yarraloola E08/1296, Coastal CID Project, C | |
| A81249 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste | |
| A81249 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste | |
| A81249 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste | |
| A81249 | 2009 | Rio Tinto Exploration Pty Ltd | 14% | Partial Surrender Report For the Period Ending 11 December 2008, E08/1296 Yarraloola, Yarraloola SF5006, Weste | |
| A81415 | 2009 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008 | |
| A81415 | 2009 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008 | |
| A81415 | 2009 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008 | |
| A81415 | 2009 | Skryne Hill Pty Ltd | <1% | E08/1406 : Yarraloola Project Surrender Report for Period 3rd October 2005 to 2nd October 2008 | |
| A81894 | 2009 | Rio Tinto Iron Ore | <1% | Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/ | |
| A81894 | 2009 | Rio Tinto Iron Ore | <1% | Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/ | |
| A81894 | 2009 | Rio Tinto Iron Ore | <1% | Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/ | |
| A81894 | 2009 | Rio Tinto Iron Ore | <1% | Congo Bore Project E08/1771, P08/536, P08/537, P08/538 and P08/547, Annual Technical Report for the Period 20/ | |
| A77206 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya | |
| A77206 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya | |
| A77206 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya | |
| A77206 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report 16 December 2006 to 15 December 2007 E08/1296, Coastal CID Project Pilbara Iron Ore Programme Ya | |
| A77447 | 2008 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan | |
| A77447 | 2008 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan | |
| A77447 | 2008 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan | |
| A77447 | 2008 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project Area Combined Annual Report for E08/788, E08/789, E08/1196 and E08/1416 For the period 1 Jan | |
| A77448 | 2008 | Newexco Services Pty Ltd | <1% | E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336 | |
| A77448 | 2008 | Newexco Services Pty Ltd | <1% | E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336 | |
| A77448 | 2008 | Newexco Services Pty Ltd | <1% | E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336 | |
| A77448 | 2008 | Newexco Services Pty Ltd | <1% | E08/1406 : Yarraloola Project Annual Report for Year Ending 2nd October 2007 REPORT NO: 336 | |
| A77618 | 2008 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul | |
| A77618 | 2008 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul | |
| A77618 | 2008 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul | |
| A77618 | 2008 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report (C15/2005) Coastal CID Period from 19 January 2007 to 18 January 2008 E08/1454 Peedamul | |
| A80195 | 2008 | Skryne Hill Pty Ltd | <1% | Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd | |
| A80195 | 2008 | Skryne Hill Pty Ltd | <1% | Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd | |
| A80195 | 2008 | Skryne Hill Pty Ltd | <1% | Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd | |
| A80195 | 2008 | Skryne Hill Pty Ltd | <1% | Annual Report for Year Ending 2nd October 2008 For Skryne Hill Pty Ltd | |
| A80225 | 2008 | Rio Tinto Exploration Pty Ltd | 71% | Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006 | |
| A80225 | 2008 | Rio Tinto Exploration Pty Ltd | 71% | Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006 | |
| A80225 | 2008 | Rio Tinto Exploration Pty Ltd | 71% | Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006 | |
| A80225 | 2008 | Rio Tinto Exploration Pty Ltd | 71% | Partial Surrender Report For the Period Ending 1 September 2008 E08/1487 Jenny’s Bore Yarraloola SF5006 | |
| A85680 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project | |
| A85680 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project | |
| A85680 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project | |
| A85680 | 2008 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report,16 December 2008 to 15 December 2009, E08/1296, Pilbara Iron Ore Detrital Fe Project | |
| A74197 | 2007 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo | |
| A74197 | 2007 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo | |
| A74197 | 2007 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo | |
| A74197 | 2007 | Rio Tinto Exploration Pty Ltd | 14% | Annual Report for the Period Ending 15 December 2006, E08/1296 Coastal CID Project Yarraloola, (Rio Tinto Repo | |
| A74436 | 2007 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P | |
| A74436 | 2007 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P | |
| A74436 | 2007 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P | |
| A74436 | 2007 | Rio Tinto Exploration Pty Ltd | 3.7% | Annual Combined Report C15/2005 Coastal CID for the Period from 19 January 2006 to 18 January 2007, E08/1454 P | |
| A74452 | 2007 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola). | |
| A74452 | 2007 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola). | |
| A74452 | 2007 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola). | |
| A74452 | 2007 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788-789,1196,1416, 01 January 2006 to 31 December 2006. (Yarraloola). | |
| A71869 | 2006 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined | |
| A71869 | 2006 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined | |
| A71869 | 2006 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined | |
| A71869 | 2006 | Robe River Mining Co Pty Ltd | <1% | Warramboo Project, Annual Report for E08/788,789,1196 & 1416 , 01 January 2005 to 31 December 2005, (Combined | |
| A74328 | 2006 | Skryne Hill Pty Ltd | <1% | E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006. | |
| A74328 | 2006 | Skryne Hill Pty Ltd | <1% | E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006. | |
| A74328 | 2006 | Skryne Hill Pty Ltd | <1% | E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006. | |
| A74328 | 2006 | Skryne Hill Pty Ltd | <1% | E08/1406 Yarraloola Project, Annual Report for Year Ending 2 October 2006. | |
| A70191 | 2005 | Robe River Mining Co Pty Ltd | <1% | Annual report for the period 01/01/04 - 31/12/04 Warramboo Project, C144/1999, E08/788, E08/789, E08/1196. | |
| A70191 | 2005 | Robe River Mining Co Pty Ltd | <1% | Annual report for the period 01/01/04 - 31/12/04 Warramboo Project, C144/1999, E08/788, E08/789, E08/1196. |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 08/3894 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 08/3894 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 08/3894? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-09-27. Compiled by NextMaps. Verify against primary sources before reliance.